CONTENTS
 Introduction
 Components of staircases
 Types of staircases
 Structural behaviour of staircases
 Points of consideration
 Design steps
 Numerical problem
2
DESIGN OF STAIRCASE
3
DESIGN OF STAIRCASE
INTRODUCTION
 Stairs consist of steps arranged in a series for
the purpose of giving access to different
floors of building.
 Since stair is often the only means of
communication between the various floors of
building, the location requires good and
careful consideration.
COMPONENTS OF STAIRCASE
 TREAD : The upper horizontal portion of step over which
foot is placed during ascending and descending a stairway.
 RISER : The vertical member of step. It is used to support
and connect successive treads.
 HEADROOM : The vertical height between the tread of one
flight and ceiling of overhead construction. It should be
sufficient so as not to cause any difficulty to person using
stairs
4
DESIGN OF STAIRCASE
Contd...
 STRINGERS : These are sloping members of the stair,
used to support the end of steps.
 WINDERS : These are the steps used for changing the
direction of stairs. These are usually triangular in plan.
 FLIGHT : This consist of series of steps provided between
landings.
 RUN OR GOING : Total length of stairs in horizontal plain
including length of landings
5
DESIGN OF STAIRCASE
Contd...
 LANDING : Horizontal platform provided at the head of
series of steps. It facilitates change of direction of flight.
 HAND RAILS : Inclined rail provided at convenient
height over steps. It serves as guard rail and provide
assistance to user steps.
 BALUSTER : Its individual vertical member fixed
between string and hand rail.
6
DESIGN OF STAIRCASE
Contd...
 NOSING : Projecting part of tread beyond the face of
riser.
 LINE OF NOSING : The straight line joining the nosing
of various steps and parallel to slope of line.
 PITCH OR SLOPE : Vertical angle made by line of
nosing with horizontal
7
DESIGN OF STAIRCASE
TYPES OF STAIRCASE
 STRAIGHT STAIRS
8
DESIGN OF STAIRCASE
 DOG-LEGGED STAIRS  CIRCULAR STAIRS
Contd…
DESIGN OF STAIRCASE
99
 OPEN WELL STAIRS  CANTILEVER STAIRS  TREAD-RISER STAIRS
STRUCTURAL BEHAVIOUR OF STAIRCASE
 EFFECTIVE SPAN OF STAIRS
a) Where supported at top and bottom risers by beams
spanning parallel with the risers, the distance c/c of
beams.
b) Where spanning on to the edge of a landing slab,
which spans parallel, with the risers, a distance
equal to the going of stairs plus at each end either
half the width of the landing or one metre,
whichever is less.
DESIGN OF STAIRCASE
10
( IS 456:2000 – Cl. 33.1)
Fig a)
Contd…
DESIGN OF STAIRCASE
11
c) Where the landing slab spans in the same direction as the stairs,
they shall be considered as acting together to form a single slab and
the span determined as distance c/c of supporting beams or walls,
the going being measured horizontally.
Fig b)
Contd…
 DISTRIBUTION OF LOADING STAIRS ( IS 456:2000 – Cl. 33.2)
 In case of open well stairs where span partly cross at right angle, the load on
common area may distributed as one half in each direction.
 Where flights or landings are embedded into walls for a length not less than
110mm and are designed to span in direction of flight, a 150mm strip may be
deducted from load area and effective breadth of the section increased by
75mm for purposes of design.
DESIGN OF STAIRCASE
12
DESIGN OF STAIRCASE
13
Fig c) Fig d)
POINTS OF CONSIDERATION
 LANDING WIDTH : Should not be less than the width of stairs.
 WIDTH OF STAIRS : Residential – 0.8m to 1m
Public – 1.8m to 2m
 TREAD : Residential – 220mm to 250mm
Public – 250mm to 300mm
 RISER : Residential – 150mm to 180mm
Public – 120mm to 150mm
 PITCH : Should be not more than 38
 HEAD ROOM
CLEARENCE
 LENGTH OF FLIGHT: Number of steps should be min. 3 and max. 12
DESIGN OF STAIRCASE
14
Not less than
200mm in any case
Not less than
200mm in any case
Should not be less than 2.1m
Contd…
DESIGN OF STAIRCASE
16
 STRUCTURAL DESIGN
 Effective Span calculation :
Leff = c/c distance between supports
If not given width of support can be taken in between 200 and 300mm
 Thickness of waist slab : ( IS 456:2000 Cl: 23.2.1)
By calculating span to depth ratio and after that ratio of span is
multiplying by modification factor. (fig 4, page :38)
OR, Thickness of waist slab can be assumed as (L/20) for simply
supported slab and (L/25) for continous slab.
( minimum thickness of 80mm should be given )
As per
IS 456:2000
Contd…
 Load Calculation :
 Dead load of slab on horizontal span: where,
ws is the dead load on slab on slope = 25⨯D⨯t (take width of slab as 1m)
R – rise , T – tread
 Dead load on one step = 0.5⨯25 ⨯ R⨯T (kN/m)
 Load of steps per metre length = (dead load on one step) ⨯ t
T
 Assume suitable floor finish
 Live load if not given take 3kN/m²(residential building) and
5kN/m²(public building)
 Find total factored load (Wu )
DESIGN OF STAIRCASE
17
Contd…
 Bending Moment Calculation :
 Check For Depth Of Waist Slab :
 Main Reinforcement (Ast) :
 Distribution Reinforcement : 0.12 % of b⨯D
DESIGN OF STAIRCASE
18
M = 0.125 Wu L²
Contd…
 Design using SP 16 design charts :
 Calculate (Mu/ bd²)
 Refer SP :16 Table 2, corresponding to fck value take % of reinforcement (pt)
 Find Ast ,
Ast = pt ⨯b⨯d
100
 Detailing.
DESIGN OF STAIRCASE
19
THANK YOU
DESIGN OF STAIRCASE
20

Mais conteúdo relacionado

Mais procurados

Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircasesKHUSHBU SHAH
 
Staircase Parts of Staircase.pdf
Staircase Parts of Staircase.pdfStaircase Parts of Staircase.pdf
Staircase Parts of Staircase.pdfAQIBIMRAN3
 
Lintels and arches
Lintels and archesLintels and arches
Lintels and archesSAGAR RAUT
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonryDivya Vishnoi
 
Roof and roof covering
Roof and roof coveringRoof and roof covering
Roof and roof coveringDivya Vishnoi
 
Doors,Windows & Ventilator in Building Construction
Doors,Windows & Ventilator in Building ConstructionDoors,Windows & Ventilator in Building Construction
Doors,Windows & Ventilator in Building ConstructionEr.Karan Chauhan
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONRavindra Patnayaka
 
design of staircase
design of staircasedesign of staircase
design of staircasevasu.chawla
 
Staircase ppt kamal
Staircase ppt kamalStaircase ppt kamal
Staircase ppt kamalKamal Bajaj
 
Staircase gyan
Staircase gyan Staircase gyan
Staircase gyan Sneha Das
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRSAbhishek Mewada
 

Mais procurados (20)

Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircases
 
Staircase Parts of Staircase.pdf
Staircase Parts of Staircase.pdfStaircase Parts of Staircase.pdf
Staircase Parts of Staircase.pdf
 
Stairs
StairsStairs
Stairs
 
Lintels and arches
Lintels and archesLintels and arches
Lintels and arches
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonry
 
Roof and roof covering
Roof and roof coveringRoof and roof covering
Roof and roof covering
 
Arches
ArchesArches
Arches
 
Doors,Windows & Ventilator in Building Construction
Doors,Windows & Ventilator in Building ConstructionDoors,Windows & Ventilator in Building Construction
Doors,Windows & Ventilator in Building Construction
 
Arches
ArchesArches
Arches
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTION
 
Staircase ppt
Staircase ppt Staircase ppt
Staircase ppt
 
types of Doors
types of Doorstypes of Doors
types of Doors
 
design of staircase
design of staircasedesign of staircase
design of staircase
 
Doors and windows
Doors and windowsDoors and windows
Doors and windows
 
Staircase ppt kamal
Staircase ppt kamalStaircase ppt kamal
Staircase ppt kamal
 
7.roofs
7.roofs7.roofs
7.roofs
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
 
Staircase gyan
Staircase gyan Staircase gyan
Staircase gyan
 
Combined footing 1-1-18
Combined footing 1-1-18Combined footing 1-1-18
Combined footing 1-1-18
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 

Semelhante a Staircase

Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionEr.Karan Chauhan
 
Types & construction of stairs with photos
Types & construction of stairs with photosTypes & construction of stairs with photos
Types & construction of stairs with photosakshitachauhan1206
 
Vertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaVertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaMr. Ramesh Nayaka
 
Straight Concrete Staircase
Straight Concrete StaircaseStraight Concrete Staircase
Straight Concrete StaircaseAndi Rahman
 
MULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGMULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGManoj Navneeth
 
chapter 3 roof in building construction(1).pptx
chapter 3 roof in building  construction(1).pptxchapter 3 roof in building  construction(1).pptx
chapter 3 roof in building construction(1).pptxsagarchettry1
 
Design of Reinforced Concrete Stair Case
Design of Reinforced Concrete Stair CaseDesign of Reinforced Concrete Stair Case
Design of Reinforced Concrete Stair CaseJayBhavsar71
 
Pelat pondasi
Pelat pondasiPelat pondasi
Pelat pondasiBeta Saya
 

Semelhante a Staircase (20)

STAIRS (PART 1)
STAIRS (PART 1)STAIRS (PART 1)
STAIRS (PART 1)
 
Staircase design
Staircase designStaircase design
Staircase design
 
Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building Construction
 
staircase .pptx
staircase .pptxstaircase .pptx
staircase .pptx
 
stair-1_044053.pptx
stair-1_044053.pptxstair-1_044053.pptx
stair-1_044053.pptx
 
Stairs
StairsStairs
Stairs
 
Types & construction of stairs with photos
Types & construction of stairs with photosTypes & construction of stairs with photos
Types & construction of stairs with photos
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
R.C.C. STAIRS
R.C.C. STAIRSR.C.C. STAIRS
R.C.C. STAIRS
 
Timber staircase
Timber staircaseTimber staircase
Timber staircase
 
Vertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaVertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh Nayaka
 
Straight Concrete Staircase
Straight Concrete StaircaseStraight Concrete Staircase
Straight Concrete Staircase
 
MULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKINGMULTI-STOREY CAR PARKING
MULTI-STOREY CAR PARKING
 
Stair case
Stair caseStair case
Stair case
 
chapter 3 roof in building construction(1).pptx
chapter 3 roof in building  construction(1).pptxchapter 3 roof in building  construction(1).pptx
chapter 3 roof in building construction(1).pptx
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
 
STAIRCASES.pptx
STAIRCASES.pptxSTAIRCASES.pptx
STAIRCASES.pptx
 
ppt stairs.pptx
ppt stairs.pptxppt stairs.pptx
ppt stairs.pptx
 
Design of Reinforced Concrete Stair Case
Design of Reinforced Concrete Stair CaseDesign of Reinforced Concrete Stair Case
Design of Reinforced Concrete Stair Case
 
Pelat pondasi
Pelat pondasiPelat pondasi
Pelat pondasi
 

Último

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 

Último (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 

Staircase

  • 1.
  • 2. CONTENTS  Introduction  Components of staircases  Types of staircases  Structural behaviour of staircases  Points of consideration  Design steps  Numerical problem 2 DESIGN OF STAIRCASE
  • 3. 3 DESIGN OF STAIRCASE INTRODUCTION  Stairs consist of steps arranged in a series for the purpose of giving access to different floors of building.  Since stair is often the only means of communication between the various floors of building, the location requires good and careful consideration.
  • 4. COMPONENTS OF STAIRCASE  TREAD : The upper horizontal portion of step over which foot is placed during ascending and descending a stairway.  RISER : The vertical member of step. It is used to support and connect successive treads.  HEADROOM : The vertical height between the tread of one flight and ceiling of overhead construction. It should be sufficient so as not to cause any difficulty to person using stairs 4 DESIGN OF STAIRCASE
  • 5. Contd...  STRINGERS : These are sloping members of the stair, used to support the end of steps.  WINDERS : These are the steps used for changing the direction of stairs. These are usually triangular in plan.  FLIGHT : This consist of series of steps provided between landings.  RUN OR GOING : Total length of stairs in horizontal plain including length of landings 5 DESIGN OF STAIRCASE
  • 6. Contd...  LANDING : Horizontal platform provided at the head of series of steps. It facilitates change of direction of flight.  HAND RAILS : Inclined rail provided at convenient height over steps. It serves as guard rail and provide assistance to user steps.  BALUSTER : Its individual vertical member fixed between string and hand rail. 6 DESIGN OF STAIRCASE
  • 7. Contd...  NOSING : Projecting part of tread beyond the face of riser.  LINE OF NOSING : The straight line joining the nosing of various steps and parallel to slope of line.  PITCH OR SLOPE : Vertical angle made by line of nosing with horizontal 7 DESIGN OF STAIRCASE
  • 8. TYPES OF STAIRCASE  STRAIGHT STAIRS 8 DESIGN OF STAIRCASE  DOG-LEGGED STAIRS  CIRCULAR STAIRS
  • 9. Contd… DESIGN OF STAIRCASE 99  OPEN WELL STAIRS  CANTILEVER STAIRS  TREAD-RISER STAIRS
  • 10. STRUCTURAL BEHAVIOUR OF STAIRCASE  EFFECTIVE SPAN OF STAIRS a) Where supported at top and bottom risers by beams spanning parallel with the risers, the distance c/c of beams. b) Where spanning on to the edge of a landing slab, which spans parallel, with the risers, a distance equal to the going of stairs plus at each end either half the width of the landing or one metre, whichever is less. DESIGN OF STAIRCASE 10 ( IS 456:2000 – Cl. 33.1) Fig a)
  • 11. Contd… DESIGN OF STAIRCASE 11 c) Where the landing slab spans in the same direction as the stairs, they shall be considered as acting together to form a single slab and the span determined as distance c/c of supporting beams or walls, the going being measured horizontally. Fig b)
  • 12. Contd…  DISTRIBUTION OF LOADING STAIRS ( IS 456:2000 – Cl. 33.2)  In case of open well stairs where span partly cross at right angle, the load on common area may distributed as one half in each direction.  Where flights or landings are embedded into walls for a length not less than 110mm and are designed to span in direction of flight, a 150mm strip may be deducted from load area and effective breadth of the section increased by 75mm for purposes of design. DESIGN OF STAIRCASE 12
  • 14. POINTS OF CONSIDERATION  LANDING WIDTH : Should not be less than the width of stairs.  WIDTH OF STAIRS : Residential – 0.8m to 1m Public – 1.8m to 2m  TREAD : Residential – 220mm to 250mm Public – 250mm to 300mm  RISER : Residential – 150mm to 180mm Public – 120mm to 150mm  PITCH : Should be not more than 38  HEAD ROOM CLEARENCE  LENGTH OF FLIGHT: Number of steps should be min. 3 and max. 12 DESIGN OF STAIRCASE 14 Not less than 200mm in any case Not less than 200mm in any case Should not be less than 2.1m
  • 15. Contd… DESIGN OF STAIRCASE 16  STRUCTURAL DESIGN  Effective Span calculation : Leff = c/c distance between supports If not given width of support can be taken in between 200 and 300mm  Thickness of waist slab : ( IS 456:2000 Cl: 23.2.1) By calculating span to depth ratio and after that ratio of span is multiplying by modification factor. (fig 4, page :38) OR, Thickness of waist slab can be assumed as (L/20) for simply supported slab and (L/25) for continous slab. ( minimum thickness of 80mm should be given ) As per IS 456:2000
  • 16. Contd…  Load Calculation :  Dead load of slab on horizontal span: where, ws is the dead load on slab on slope = 25⨯D⨯t (take width of slab as 1m) R – rise , T – tread  Dead load on one step = 0.5⨯25 ⨯ R⨯T (kN/m)  Load of steps per metre length = (dead load on one step) ⨯ t T  Assume suitable floor finish  Live load if not given take 3kN/m²(residential building) and 5kN/m²(public building)  Find total factored load (Wu ) DESIGN OF STAIRCASE 17
  • 17. Contd…  Bending Moment Calculation :  Check For Depth Of Waist Slab :  Main Reinforcement (Ast) :  Distribution Reinforcement : 0.12 % of b⨯D DESIGN OF STAIRCASE 18 M = 0.125 Wu L²
  • 18. Contd…  Design using SP 16 design charts :  Calculate (Mu/ bd²)  Refer SP :16 Table 2, corresponding to fck value take % of reinforcement (pt)  Find Ast , Ast = pt ⨯b⨯d 100  Detailing. DESIGN OF STAIRCASE 19