You’ve been told that you will need to go though Connections 6.0 to get to Connections PINK. We’ve been through the process already and can show you the best way to do it. From planning your data migration strategy, requirements and software upgrades, to time estimates and lessons learned and the all important documentation stage that everyone loves. Let us be the pain relief to your migrations headache (other antidotes are available).
Diamond Application Development Crafting Solutions with Precision
Connections 5.x to 6.0 migration
1. Social Connections 11 Chicago, June 1-2 2017
Migration from 5.x and 5.5 to
Connections 6.0 – Been there, done
that!
Sharon James &
Tim Clark - BCC
@socialshazza @timsterc
3. Social Connections 11 Chicago, June 1-2 2017
Sharon James Tim Clark
• Senior Consultant
• Connections wizard
• IBM Champion
• Director of Services
• Domino Admin (ish)
• IBM Champion
5. Social Connections 11 Chicago, June 1-2 2017
What do you need to know?
• Plan
• Gather your requirements
• Check system reqs
• Get the right software
• Test system first
• If you don’t have one – build
one
• Side by side where
possible
• Backup your data
• Keep it simple
• Upgrade first
• Test
• Add additional PINK
components
• Test again
• Do not use all or nothing
• Can cause issues
• Difficult to debug
• Troubleshooting
6. Social Connections 11 Chicago, June 1-2 2017
What do you need to know?
• Your system must be at least V5 to go to 6
• If not you must migrate the DBs to V5 before you start
• Essentially its like installing a new Connections system
• There is no magical upgrade button
• Most components need updating or are new versions
• Sometimes the instructions for configuring have completely changed
• Know what to back up
• Read the migration guide
• Backup the shared data, customizations and DBs before you start
• DO NOT just copy the customizations over
• Often jsps or config has changed. Once new version is installed – reapply the
changes in the new file versions
• READ THE DOCUMENTATION – before you do anything
8. Social Connections 11 Chicago, June 1-2 2017
New Pink Features
• Orient Me
• Notification Center
• Additional features –
not magically installed
as part of the standard
6 install
• Linux Only
• RHEL 7 / Centos 7
• VM needs some power:
10GB Ram, 4 CPUs
• Runs on new Pink stack
of Docker, cfc,
mongoDB, redis etc
11. Social Connections 11 Chicago, June 1-2 2017
Get the right stuff
• Regularly check requirement documents
• All versions are listed here:
• http://www-01.ibm.com/support/docview.wss?uid=swg27012786
• Check all notes, Download PDF
• Be careful with installation documents
• Sometimes wrong dependencies mentioned
• Supported statement does not mean it’s licensed
12. Social Connections 11 Chicago, June 1-2 2017
Get the right stuff
• Check the system requirements
• Make a list
• Get the correct versions
• WAS is mutli os, as are the fixes
(8.5.5.10)
• Connections– os versions
• TDI – os versions (7.1.1 fp6)
• DB2 – os versions (11.1)
• Other DBs – use supported
versions – or you may hit issues
Oracle (12.1.0.2), MSSQL
(2016)
• Install a DB Client
• Install 64 bit where possible
• Install an LDAP browser
• *Real* text editor – notepad is
useless
• Fiddler for support & its useful
• If Windows use a tool like baretail
for watching logs
• PINK
• IC-OrientMe-6.0.0.0.zip – from
fixcentral
• Must set Linux as the OS or you
can’t find it
14. Social Connections 11 Chicago, June 1-2 2017
Test System is a must
• ALWAYS test a migration – did we mention ALWAYS!!
• A test or dev system is always a good idea
• Useful for migrations, fix packs, customization and config
changes
• Doesn’t have to be a mirror of live – can be a single node system
• VM or spare machine under a desk – it will do
• Same OS, DB, LDAP and HTTP server a must for sensible
testing
• Ensure your boss, project manager etc. knows how important a
test system is
• Add a test system to the requirements
16. Social Connections 11 Chicago, June 1-2 2017
NEVER do an in-place migration
• There is NO TEST – all or nothing
• Once you have started there is no real
roll back
• System is down when the migration takes
place – users are off for however long it
takes
• Much pressure if there is a problem
• Avoid where possible
• If there HAS to be an in place migration
ensure sufficient offline backups and
snapshots have been taken to allow a
restore
• Have a plan to roll back, where possible
migrate when system has down time
(weekend, maintenance window etc)
• Stop EVERYTHING – your system will be
completely offline whilst the update takes
place
• Back it up : DBs and File System
• Uninstall Connections
• Ensure WAS profiles are clean (no apps
or config), update WebSphere, recreate
and configure (as per install)
• Install connections and configure
• Drop new Connections DBS, restore and
update existing
• Configure connections, apply fixes, any
customizations
• Test
17. Social Connections 11 Chicago, June 1-2 2017
NEVER do an in-place migration
• There is NO TEST – all or nothing
• Once you have started there is no real
roll back
• System is down when the migration takes
place – users are off for however long it
takes
• Much pressure if there is a problem
• Avoid where possible
• If there HAS to be an in place migration
ensure sufficient offline backups and
snapshots have been taken to allow a
restore
• Have a plan to roll back, where possible
migrate when system has down time
(weekend, maintenance window etc)
• Stop EVERYTHING – your system will be
completely offline whilst the update takes
place
• Back it up : DBs and File System
• Uninstall Connections
• Ensure WAS profiles are clean (no apps
or config), update WebSphere, recreate
and configure (as per install)
• Install connections and configure
• Drop new Connections DBS, restore and
update existing
• Configure connections, apply fixes, any
customizations
• Test
18. Social Connections 11 Chicago, June 1-2 2017
Side by Side – best practise (sensible)
way
• Completely separate environment – live
system can stay up whilst migration
testing / system building occurs
• Allows for full testing before go-live
• Any changes can be made to the new
system with little pressure as the live is
still functioning
• An actual live migration can be run when
the system has planned downtime
(weekend, maintenance window etc) –
can take as little as 4 hours (depending
on amount of data)
• If issues with live migration – existing
system is still available to roll back to in
seconds
• Less risk, less pressure, easier to debug
• Stop the Connections system – back up
everything
• If a test migration - Restart and let your
users carry on
• Install a fresh Connections system
elsewhere and configure it up as per
normal – apply fixes, customizations etc.
• Test the clean system to ensure it works
as expected – then BACK IT UP
• Migrate the data – File system
(Connections data shared)
• Migrate the DB’s – either with the DBT or
drop, restore and update
• Test
20. Social Connections 11 Chicago, June 1-2 2017
Back everything up
• Data bases
• ALL OF THEM!!
• Even if you are using the
Database transfer tool
(DBT)
• Shared File System
• Back up the whole of the
shared content store
• We can restore a subset
shared_content_store/audit
shared_content_store/activities/content
shared_content_store/activities/statistics
shared_content_store/blogs/upload
shared_content_store/communities/statistics
shared_content_store/customization*
shared_content_store/dogear/favorite
shared_content_store/files/upload
shared_content_store/forums/content
shared_content_store/profiles/statistics
shared_content_store/wikis/upload
* We refer to this not restore the whole folder
22. Social Connections 11 Chicago, June 1-2 2017
K.I.S.S – its not rocket science
• NEVER (seriously NEVER) do an in
place migration
• Side by Side allows to test a clean
system before running the data migration
• Use the same DB type (i.e DB2 to DB2)
• Install with example.com for mail
notifications
• Run at least one test data migration
• Test all customisations with migrated
data
• Document everything – record for go
live and subsequent upgrades
• If an issue occurs fix it – don’t plough on
regardless
• If you have to do an in place DB
migration make sure DBA understands
the steps and order things need to be run
• Firewalls / DNS / Network – get these
sorted before you start.
• Dedicated *Admin* user for install
• Simpler to implement phases to minimise
risk – allows testing at each stage
• Test without proxies – add once working
– Keep it simple to install
23. Do not fall for ALL or Nothing
1. 5.X > 6
2. 6 + Pink
=
24. Social Connections 11 Chicago, June 1-2 2017
Never all or nothing
• All or Nothing
• What happens when you try
to do too much at the same
time
• Issues with Cognos, Issues
with CCM, Issues with Docs,
Issues with data migration
• Issues were fixed, something
else broke
• Hard to debug as too much
going on at any one time.No quick wins, customer loses focus, many
PMRS opened, hard to resolve issues as
multiple products with problems.
25. Social Connections 11 Chicago, June 1-2 2017
Never all or nothing
• Phased
• Connections upgrade from 4
to 5
• Deployed FIB for surveys,
add the additional
customization
• Deployed Cognos / Kudos for
metrics
• Connections Content
Manager
• Then last but not least IBM
Docs
Quick wins, customer has working system, easy
to debug any issues.
Total time 6 weeks
27. Social Connections 11 Chicago, June 1-2 2017
TEST !!!!!
• Test a clean 6 system before
migrating data
• If in doubt test again before
installing / adding a new
feature
• Migrate to 6 before adding
PINK features
• Get *REAL* users to pre and
post migration
29. Social Connections 11 Chicago, June 1-2 2017
Pink is the new Blue / Green / Yellow
• Easy (ish) install on a newly
updated Centos 7 (or RHEL)
box*
• Machine must have a
resolvable external DNS
currently**
• For test/demo/small
environments a single VM will
do
• Larger production
environments recommended 3
VMs***
• Ensure you have installed zip
• Networking is configured
correctly
• ***If installing on multiple VMS
– set NFS file sharing up
• This is the FOUNDATION for
PINK
• As new features are rolled out
they will be deployed to this
“OrientMe” environment* Take note of the system requirements (see the
knowledge center link on the next slide)
** work around for this here: http://bit.ly/PINK-DNS-FIX
30. Social Connections 11 Chicago, June 1-2 2017
Pink – install info
• Extract IC-OrientMe-6.0.0.0.zip
• Follow the instructions in
https://www.ibm.com/support/knowledgecenter/SSYGQ
H_6.0.0/admin/install/c_install_orient_me_homepage.ht
ml
• Prepare the install files
• Run the installer script –
downloads and deploys Docker,
CFC and other associated
software.
• DO NOT change the default
CFC password of admin/admin
until everything is configured
• Create the storage
• Configure Connections 6 TDI /
Profiles
• Install the Orient Me images
• Configure HTTP / Proxy
• Configure REDIS
• Run the people migrator for
homepage
• Fix for SSL
• Configure the notification center
• Test via
yourconnections.url/social
34. Social Connections 11 Chicago, June 1-2 2017
Post migration & Troubleshooting Cnx
6
• Post migration tasks - Read
the KB http://bit.ly/cnx6-
postmigrate
• Migrate / rebuild search
• Clear all scheduled tasks
• Migrate community surveys
• Steps or profile / profile policy
types
• + More …
• Troubleshooting
• Start with clear logs & clear
<profile>/temp & wstemp
• Know where the logs are
• WAS, HTTP, Plugin,
DB2, Cognos, CCM,
Docs etc.
• Start with Systemout and
work backwards
• Test against WAS (no
HTTP) if HTTP issues
35. Social Connections 11 Chicago, June 1-2 2017
Troubleshooting PINK
• Check the datastores / pvs –
kubectl get pv,pvc
• Check the pods –
kubectl get pods
(use –o wide for more details)
• Check the services –
kubectl get svc
36. Social Connections 11 Chicago, June 1-2 2017
Troubleshooting PINK
• If you see issues with the pods
you can redeploy them
• Get the pod name from
running
kubectl get pods –o wide
• Simply delete it
i.e.
kubectl delete pods orient-
webclient-2180930634-2831s
• Pods recreate themselves
• If you need to delete all pods
• kubectl get pod | cut -d " " -f 1 |
xargs -n1 -P 10 kubectl delete
pod
• Pods terminate then recreate
• If in any doubt ask in the
Connections Skype chat – the
PINK devs are listening in
38. Social Connections 11 Chicago, June 1-2 2017
Remember this is the last upgrade you will
do this way
39. Social Connections 11 Chicago, June 1-2 2017
Other Sessions that will be useful
• Thurs 1st June : 1:30 pm - 2:00 pm - An introduction to Docker: What is it and
why should I care to learn about it? – with Alan Forbes
• Thurs 1st June : 3:50 pm - 5:00 pm - Think Pink – The Future of IBM
Connections – with Jason Gary & Baan Slavens
• Fri 2nd June : 8:25 am - 8:55 am - Let’s Talk about Deployment of
Connections 6 – The Easy Button – with Jim Puckett
• Fri 2nd June : 9:00 am - 9:30 am - All you need to know about Orient Me –
with Nico Meisenzahl
• Fri 2nd June : 9:40 am - 10:50 am - Turning the IBM Collaboration
Ecosystem Pink – with Heath McCarthy & Maureen Leland
• Fri 2nd June : 3:25 pm - 4:00 pm – What’s new in IBM Connections 6 - with
Jim Puckett & Daniel Kim
40. Social Connections 11 Chicago, June 1-2 2017
Thank you
• Come and see us at our
booth
• You could win
an Amazon Echo
• E - contact@bcc.biz
• W - www.bcchub.com
Tim
Sharon
http://socialshazza.com
dilftechnical
@socialshazza
http://blog.tc-soft.com
timsterc
@timsterc