PRODUCT PLANNING AND
PROCESS PLANNING
PRODUCTION PLANNING AND
CONTROL-3
SUBMITTED BY GUIDED BY
V.ATTIMURUGAN(B.E) Dr. R.SENTHILKUMAR.M.E,
Ph.D.,
HEAD OF
DEPARTMENT
DEFINITION: The evaluation of the range, mix,
specification and pricing of existing and new
products in relation to present and future market
requirements and competition.
NEEDS FOR PRODUCT PLANNING
 Needs determined from current deficiencies.
 Needs determined from anticipated deficiencies.
1. Marketing and marketing analysis.
2. Performance of feasibility studies, and
3. Advanced product planning.
1.MARKETING AND MARKETING ANALYSIS
1. For simple products, the marketing function may not
require direct engineering involvement.
2. For more complex products, the marketing effort
involves a team approach, constituting the non-technical
sales and promotional orientation, with engineering role.
2.FEASIBILITY STUDY
The purpose of feasibility study is to extend the market
analysis with the intent of arriving at a preferred system
configuration that the firm is willing to offer the product
or product-mix in response to an identified need.
The various elements of the feasibility study includes:
 A detailed need analysis
(1) system operation requirements
(2) maintenance support requirements.
 Identification of alternative configurations.
 Screening and evaluation of the available alternatives
 Selection of preferred approach.
3.ADVANCED PRODUCT PLANNING
The advanced product planning includes:
 Product selection and justification.
 Product specifications and plans.
 Product acquisition plan.
 Product evaluation plan.
 Product use and logistic support plan.
 System proposal.
 Value analysis is one of the technique of cost
reduction and cost prevention.
 Also known as value engineering, value assurance,
and value management.
 According to SAVE, value engineering is the
systematic application of recognized technique
which identify the function of a product or service,
establish a monetary value for the function and
provide the necessary function reliably at the
lowest overall cost.
STEPS IN VALUE ANALYSIS
BLAST
•IDENTIFY THE
PRODUCT.
•COLLECT RELEVANT
INFORMATION
•DEFINE DIFFERENT
FUNCTIONS
CREATE
•CREATE DIFFERENT
ALTERNATIVES
•CRITICALLY
EVALUATE
ALTERNATIVES
REFINE
•DEVELOP THE BEST
ALTERNATIVE
•IMPLEMENT THE
ALTERNATIVE
CLASSES OF ECONOMIC VALUES
 Use value
 Esteem value
 Cost value
 Exchange value
The value of the product is increased:
 By reducing the costs,
 By improving the functions,
 By both
 By increasing function by increasing the costs disproportionately
low.
1. Orientation phase
2. Information phase
3. Functional analysis
4. Creative phase
5. Evaluation phase
6. Development phase
7. Recommendation phase
8. Implementation phase
9. Follow up phase
 Value analysis is the application of a set of
techniques to an existing product with a view to
improve its value. Thus value analysis is a remedial
process.
 Value engineering is the application of exactly the
same set of techniques to a new product at the
design stage itself. Therefore value engineering is a
preventive process.
 Process planning consists of preparing set of
instructions that describe how to manufacture the
product and its parts.
 Process planning is a detailed specification which
lists the operations, tools, and facilities.
IMPORTANCE
 It establishes the link between the engineering
design and shop floor manufacturing.
1
• Interpreting part print analysis and symbols.
2
• Gathering the fundamental details of product design
3
• Selecting the machining processes.
4
• Selecting the proper machining with allied tooling
5
• Sequencing the operations
6
• Deciding on the inspection equipment in order to meet the desired quality
7
• Determining appropriate production tolerances
8
• Determining proper cutting tools and cutting conditions
9
• Calculating the overall times using work measurement techniques
1. Volume of production.
2. The skill and expertise of manpower.
3. Delivery dates for parts or product.
4. Material specifications.
5. Accuracy and process capability of machines.
ANALYSE
Part requirements
DETERMINE
Operation sequence
SELECT
Equipment
CALCULATE
Processing times
DOCUMENT
Process plan
COMMUNICATION
Mfg. engg & shop
Manual method
• Depends on the manufacturing engineer’s
experience and knowledge of production
facilities, equipment and their capabilities,
processes and tooling.
• This method is time consuming.
• May not be consistence & optimum.
• CAPP is developed to overcome this.
• Experienced based and performed manually
• Variability in planner’s judgment and
experience
can lead to differences in the quality
• Problem facing modern industry is the current
lack of skilled labor force to produce machined
parts as was done in the past
• Hence Computer Integrated Manufacturing
and
Computer Aided Process Planning
• Reduces the demand on the skilled planner
• Reduces the process planning time
•Reduces both process planning and manufacturing
cost
• Creates consistent plans
• It produces accurate plans
• It increases productivity
APPROACHES IN CAPP
• Variant
• Generative
• Automatic
Batch production is needed
 When the demand for a product is limited
 When the rate of production is higher than the
consumption
Planning for batch production:
1. Determination of the batch size.
2. Determination of batch scheduling.
1.Stock control without buffer stock
Stock control with buffer stock
FACTORS
AFFECTING
THE
SELECTION
OF BATCH
SIZE
SETUP COST
CONSUMPTION
RATE
PRODUCTION
RATE
INTEREST
CHARGES
STORAGE COST
SALES
TOTAL COST PER PIECE IS ALSO WRITTEN AS
MACHINE LOADING
 Machine loading is the process of assigning jobs to
machines, men or work centers based on relative
priorities and capacity utilisation.
 Machine output is inversely proportional to the
cycle time
 Qth Vs T
Q= α Qth
REDUCING THE
IDLE TIME
•Changing the
sequence of
operation.
•Eliminating delays
at end of cycles.
REDUCT THE
INDEPENDENT
ACTIVITY TIME
•Increasing the
running speeds,
feeds, etc.
•Selecting a better
machine for the
job.
•Transferring a part
of the operations to
another machine.
REDUCE THE
CONCURRENT
ACTIVITY TIME
•Using a better
methods and jigs
for feeding the
work .
•Carrying out most
of the preparatory
tasks while the
machine is
running.
•Automation.
 Balancing refers to the procedures of adjusting the
times at work centers to conform as much as
possible to the required cycle time.
 A balanced process is one where the actual cycle
times at every stage are equal.
1. BALANCED PROCESS
Let the operation time for all stages is same, say
1min. This is known as paced production line.
1MINA 1MINB 1MINC 1MIND 1MINE
RAW
MATERIA
LS
FINAL
PROADU
CT
2.Unbalanced process
This is known as unpaced production line.
0.1minA 0.3minB 0.1minC 0.5minD 0.2minE
RAW
MATERIA
LS
FINAL
PROADU
CT
 PROCESS CAPACITY OF STAGE 1
 CAPACITY OF FIVE STAGES/PROCESSES FOR
THE PRODUCT
1. Maximum process capacity in a three-product system
 Maximum capacity of process 1 is described by the plane 1-3-7-1
 Maximum capacity for process 2 is described by the plane 2-6-8-2
 Maximum capacity for process 2 is described by the plane 2-4-1-3-5-2
a1x1+a2x2+………..=an xn ≤ A
b1x1+b2x2+………..=bn xn ≤ B
1. Amount of product 1 = x1
2. Amount of product 2 = x2
3. Amount of product n = xn
4. Capacity of process 1= A
5. Capacity of process 2= B
PRODUCTION PLANNING AND CONTROL

Mais conteúdo relacionado

Mais procurados

Production planning & control (ppc)
Production planning & control (ppc)Production planning & control (ppc)
Production planning & control (ppc)
VARUN MODI
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
Junaid Hassan
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
amirthakarthi
 
Production planning & control (PPC)
Production planning & control (PPC)Production planning & control (PPC)
Production planning & control (PPC)
Hakeem-Ur- Rehman
 
Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and control
Vignesh Jayakumar
 

Mais procurados (20)

Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production planning & control (ppc)
Production planning & control (ppc)Production planning & control (ppc)
Production planning & control (ppc)
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
production planning & control
production planning & controlproduction planning & control
production planning & control
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Pull Vs. Push Production
Pull Vs. Push ProductionPull Vs. Push Production
Pull Vs. Push Production
 
Production and operations management
Production and operations managementProduction and operations management
Production and operations management
 
Inventory Management And Mrp Erp
Inventory Management And Mrp   ErpInventory Management And Mrp   Erp
Inventory Management And Mrp Erp
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 
Production planning-and-control
Production planning-and-controlProduction planning-and-control
Production planning-and-control
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
PPC
PPCPPC
PPC
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Objectives and function of Production Planning and Control
Objectives and function of Production Planning and ControlObjectives and function of Production Planning and Control
Objectives and function of Production Planning and Control
 
Production planning & control (PPC)
Production planning & control (PPC)Production planning & control (PPC)
Production planning & control (PPC)
 
Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and control
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
PPC
PPCPPC
PPC
 

Semelhante a PRODUCTION PLANNING AND CONTROL

final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptx
ssusera46859
 
Production Planning and Control .pptx
Production Planning and Control .pptxProduction Planning and Control .pptx
Production Planning and Control .pptx
Anand Gaikwad
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
Eric
 

Semelhante a PRODUCTION PLANNING AND CONTROL (20)

Unit I.pdf
Unit I.pdfUnit I.pdf
Unit I.pdf
 
Product planning and product control
Product planning and product controlProduct planning and product control
Product planning and product control
 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPC
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Pm1
Pm1Pm1
Pm1
 
final no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptxfinal no-2 U too brutus persentation[1].pptx
final no-2 U too brutus persentation[1].pptx
 
10656595.ppt
10656595.ppt10656595.ppt
10656595.ppt
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
UNIT-III.ppt
UNIT-III.pptUNIT-III.ppt
UNIT-III.ppt
 
PPC-Unit III- PRODUCT PLANNING AND PRODUCT CONTROL
PPC-Unit III- PRODUCT PLANNING AND PRODUCT CONTROLPPC-Unit III- PRODUCT PLANNING AND PRODUCT CONTROL
PPC-Unit III- PRODUCT PLANNING AND PRODUCT CONTROL
 
Production management
Production managementProduction management
Production management
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation management
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
OPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptxOPERATIONS MANAGEMENT- Full Slides.pptx
OPERATIONS MANAGEMENT- Full Slides.pptx
 
Production Planning and Control .pptx
Production Planning and Control .pptxProduction Planning and Control .pptx
Production Planning and Control .pptx
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
 
Production planning and Control, Sale's forecasting
Production planning and Control, Sale's forecastingProduction planning and Control, Sale's forecasting
Production planning and Control, Sale's forecasting
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 

Último

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Último (20)

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 

PRODUCTION PLANNING AND CONTROL

  • 2. PRODUCTION PLANNING AND CONTROL-3 SUBMITTED BY GUIDED BY V.ATTIMURUGAN(B.E) Dr. R.SENTHILKUMAR.M.E, Ph.D., HEAD OF DEPARTMENT
  • 3. DEFINITION: The evaluation of the range, mix, specification and pricing of existing and new products in relation to present and future market requirements and competition. NEEDS FOR PRODUCT PLANNING  Needs determined from current deficiencies.  Needs determined from anticipated deficiencies.
  • 4. 1. Marketing and marketing analysis. 2. Performance of feasibility studies, and 3. Advanced product planning. 1.MARKETING AND MARKETING ANALYSIS 1. For simple products, the marketing function may not require direct engineering involvement. 2. For more complex products, the marketing effort involves a team approach, constituting the non-technical sales and promotional orientation, with engineering role.
  • 5.
  • 6. 2.FEASIBILITY STUDY The purpose of feasibility study is to extend the market analysis with the intent of arriving at a preferred system configuration that the firm is willing to offer the product or product-mix in response to an identified need. The various elements of the feasibility study includes:  A detailed need analysis (1) system operation requirements (2) maintenance support requirements.  Identification of alternative configurations.  Screening and evaluation of the available alternatives  Selection of preferred approach.
  • 7. 3.ADVANCED PRODUCT PLANNING The advanced product planning includes:  Product selection and justification.  Product specifications and plans.  Product acquisition plan.  Product evaluation plan.  Product use and logistic support plan.  System proposal.
  • 8.  Value analysis is one of the technique of cost reduction and cost prevention.  Also known as value engineering, value assurance, and value management.  According to SAVE, value engineering is the systematic application of recognized technique which identify the function of a product or service, establish a monetary value for the function and provide the necessary function reliably at the lowest overall cost.
  • 9. STEPS IN VALUE ANALYSIS BLAST •IDENTIFY THE PRODUCT. •COLLECT RELEVANT INFORMATION •DEFINE DIFFERENT FUNCTIONS CREATE •CREATE DIFFERENT ALTERNATIVES •CRITICALLY EVALUATE ALTERNATIVES REFINE •DEVELOP THE BEST ALTERNATIVE •IMPLEMENT THE ALTERNATIVE
  • 10. CLASSES OF ECONOMIC VALUES  Use value  Esteem value  Cost value  Exchange value The value of the product is increased:  By reducing the costs,  By improving the functions,  By both  By increasing function by increasing the costs disproportionately low.
  • 11. 1. Orientation phase 2. Information phase 3. Functional analysis 4. Creative phase 5. Evaluation phase 6. Development phase 7. Recommendation phase 8. Implementation phase 9. Follow up phase
  • 12.  Value analysis is the application of a set of techniques to an existing product with a view to improve its value. Thus value analysis is a remedial process.  Value engineering is the application of exactly the same set of techniques to a new product at the design stage itself. Therefore value engineering is a preventive process.
  • 13.
  • 14.  Process planning consists of preparing set of instructions that describe how to manufacture the product and its parts.  Process planning is a detailed specification which lists the operations, tools, and facilities. IMPORTANCE  It establishes the link between the engineering design and shop floor manufacturing.
  • 15.
  • 16. 1 • Interpreting part print analysis and symbols. 2 • Gathering the fundamental details of product design 3 • Selecting the machining processes. 4 • Selecting the proper machining with allied tooling 5 • Sequencing the operations 6 • Deciding on the inspection equipment in order to meet the desired quality 7 • Determining appropriate production tolerances 8 • Determining proper cutting tools and cutting conditions 9 • Calculating the overall times using work measurement techniques
  • 17. 1. Volume of production. 2. The skill and expertise of manpower. 3. Delivery dates for parts or product. 4. Material specifications. 5. Accuracy and process capability of machines.
  • 18. ANALYSE Part requirements DETERMINE Operation sequence SELECT Equipment CALCULATE Processing times DOCUMENT Process plan COMMUNICATION Mfg. engg & shop
  • 19. Manual method • Depends on the manufacturing engineer’s experience and knowledge of production facilities, equipment and their capabilities, processes and tooling. • This method is time consuming. • May not be consistence & optimum. • CAPP is developed to overcome this.
  • 20. • Experienced based and performed manually • Variability in planner’s judgment and experience can lead to differences in the quality • Problem facing modern industry is the current lack of skilled labor force to produce machined parts as was done in the past • Hence Computer Integrated Manufacturing and Computer Aided Process Planning
  • 21. • Reduces the demand on the skilled planner • Reduces the process planning time •Reduces both process planning and manufacturing cost • Creates consistent plans • It produces accurate plans • It increases productivity APPROACHES IN CAPP • Variant • Generative • Automatic
  • 22. Batch production is needed  When the demand for a product is limited  When the rate of production is higher than the consumption Planning for batch production: 1. Determination of the batch size. 2. Determination of batch scheduling.
  • 23. 1.Stock control without buffer stock
  • 24. Stock control with buffer stock
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. TOTAL COST PER PIECE IS ALSO WRITTEN AS
  • 31. MACHINE LOADING  Machine loading is the process of assigning jobs to machines, men or work centers based on relative priorities and capacity utilisation.
  • 32.
  • 33.
  • 34.  Machine output is inversely proportional to the cycle time  Qth Vs T
  • 36. REDUCING THE IDLE TIME •Changing the sequence of operation. •Eliminating delays at end of cycles. REDUCT THE INDEPENDENT ACTIVITY TIME •Increasing the running speeds, feeds, etc. •Selecting a better machine for the job. •Transferring a part of the operations to another machine. REDUCE THE CONCURRENT ACTIVITY TIME •Using a better methods and jigs for feeding the work . •Carrying out most of the preparatory tasks while the machine is running. •Automation.
  • 37.  Balancing refers to the procedures of adjusting the times at work centers to conform as much as possible to the required cycle time.  A balanced process is one where the actual cycle times at every stage are equal.
  • 38.
  • 39. 1. BALANCED PROCESS Let the operation time for all stages is same, say 1min. This is known as paced production line. 1MINA 1MINB 1MINC 1MIND 1MINE RAW MATERIA LS FINAL PROADU CT
  • 40. 2.Unbalanced process This is known as unpaced production line. 0.1minA 0.3minB 0.1minC 0.5minD 0.2minE RAW MATERIA LS FINAL PROADU CT
  • 41.
  • 42.  PROCESS CAPACITY OF STAGE 1
  • 43.  CAPACITY OF FIVE STAGES/PROCESSES FOR THE PRODUCT
  • 44.
  • 45. 1. Maximum process capacity in a three-product system  Maximum capacity of process 1 is described by the plane 1-3-7-1  Maximum capacity for process 2 is described by the plane 2-6-8-2  Maximum capacity for process 2 is described by the plane 2-4-1-3-5-2
  • 46. a1x1+a2x2+………..=an xn ≤ A b1x1+b2x2+………..=bn xn ≤ B 1. Amount of product 1 = x1 2. Amount of product 2 = x2 3. Amount of product n = xn 4. Capacity of process 1= A 5. Capacity of process 2= B