Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Pci group audit
1. PCI Group Audit
Audit Criteria:-
Cluster:- Atanu
Distance Considered less than 7 KM(Having same PCI Group)
Only Post Launch Sites Considered(Except Indoor Sites)
Reason for Audit is to avoid PCI Confusion and PCI Collision