For
PULVARISED COAL FIRED BOILER
BY
ASHVANI SHUKLA
MANAGER(C&I)
RELIANCE
Common Logic
 1.MFT
 2.Furnace Purging
 3.Oil Leak Test
 4.OFT
 5.Oil System Normal
 6.Furnace Firing permissive Condition
 7.Runback
 8.Post trip purge excursion protection
 Any following condition generate, touch off
MFT or generate the pulse or PF contact.
 1. Manual MFT
 Both MFT pushbuttons are depressed at the
same time.
 Two signals are to trip MFT cabinet. Two
signals (AND) are to DCS system to trip.
 2. Both FDFs tripped
 FD Fan 1 trip
 FD Fan 2 trip
 3.Both ID Fans tripped.
 1.ID Fan 1 tripped.
 2.ID Fan 2 tripped.
 4. Both APHs tripped.
 1.APH A pass should be tripped
 2.APH b pass should be tripped.
 5. All BFP tripped.
 1.BFWP 1 tripped.(TD)
 2.BFWP 2 tripped.(TD)
 3.BFWP 3 tripped.(MD)
 6. Lost primary air : Both PAFs tripped when
any mill in service.
 1.PA Fan 1 tripped.
 2.PA Fan 2 tripped.
7.Lost Flame Scanner cooling air.
Both cooling air fans tripped
or outlet main pipe press LL 2/3, with delay
of 10s.
8. Total airflow is <25%BMCR (2 out of 3)
total airflow is <25%(PA +SA air flow)
9. 1.Drum level HH (2 out of 3, delayed
20s)
 2. Drum level LL (2 out of 3, delayed
20s)
10. 1.Furnace negative pressure HH (2 out
of 3)
 2. Furnace negative pressure LL (2 out
of 3)
 11.Fire failure
 Any oil burner ignite fail up to 3 times
 12. Loss of fuel trip
 1.When any oil burner ever set in service.
 2.all oil valve closed(HFO and LDO) or
OFT.
 3.all PULV stopped.
 13. Unit flames failure (AND)
 Any coal feeder has run 120 second
 No oil elevations is in service
 A coal elevations no flame(3 out of 4)
 B coal elevations no flame(3 out of 4)
 C coal elevations no flame(3 out of 4)
 D coal elevations no flame(3 out of 4)
 E coal elevations no flame(3 out of 4)
 F coal elevations no flame(3 out of 4)
14.Repurge requirement
 MFT is reset but no firing up to 30
minutes.
15. Turbine tripped.
16. MFT trip relay cabinet power off
 or Both power off.
17. FSSS cabinet power off
 When FSSS common logic cabinet
power off.
 When MFT generate, system will generate alarm,
display first reason for generating the MFT signal.
Please execute furnace purging after MFT.
 MFT will cause the following action
 Close HFO and LDO oil supply main pipe valve.
 Close HFO and LDO oil return main pipe valve.
 Close all corner oil valves. HFO and LDO.
 Retract all oil gun and ignition gun.
 Trip all PAFs.
 Trip all mills.
 Trip all coal feeders.
 Close all mill inlet valve.
 Close all mill outlet valves.
Close SH spray water valve.
Close RH spray water valve.
MFT to local ignite control box.
MFT to ETS.
Stop electrostatic precipitator.
Stop soot blowers.
MFT to MCS.
MFT to SCS.
Reset MFT: Furnace purging command
initiated and wait till completion of purge.
Furnace purging is required to clean all the
obstacle in the air and coal path of boiler.
Furnace purging have many
conditions/Interlocks to execute are given
below.
1. No MFT conditions exist.
2. Any one FDF is running.
3. Any one IDF is running.
4. Both APH are running.
5. Both PAFs stopped
6. The boiler total airflow > 30% and <40%.
7. Furnace press should be normal.
8. Drum level should be normal.
9. HFO and LDO oil supply main pipe valve
closed.
10. all corner oil valves closed HFO and
LDO.
11. All mills should be stopped.
12. All mill inlet(cold/hot) valve closed.
13. All mill outlet valve closed.
14. All coal feeders stopped.
 15. No flames are detected in the furnace.
 The furnace purging condition-2
 1. Furnace purge condition -1 should be
healthy.
 2. All auxiliary air dampers in purge position
(feedback >80%).
 The purging process is:
 When the purging condition-1 is met, push the
“start purge button”, purge command
executed.
 After the purging condition-2 is met, start the
purging process that will keep on for 5 minutes.
 When the purging process is completed after 5
minutes, reset MFT memory.
Furnace purging interrupt:
During this five minutes period, if any
condition happens to not exist, the furnace
purging process has to
be interrupted.
Permissive conditions:
1. No MFT conditions exist.
2.HFO Oil supply press normal.
3.All HFO oil valve closed.
4. HFO oil supply main pipe valve closed.
Test process:
 Step-1: Open HFO oil supply main
pipe valve, close oil return main pipe valve,
charge oil into the pipe for 60
second.
Monitor until HFO Oil supply press reach
the set point.
If the HFO oil supply press does not reach
the set point, charging oil fails and the
testing process has to be interrupted.
Step2:
Close HFO oil supply main pipe valve, start
to monitor oil pressure for 3 minutes.
HFO Oil supply press is not low.
If the HFO oil supply press is low, that
means the oil pipe leaks and the testing
process has to be interrupted.
Step3: Open HFO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Step3: Open HFO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Bypass test:
if necessary, operators can ignore this
testing process through pushing “bypass
button” on the console and force the oil
leak test to be success.
Permissive conditions:
1. No MFT conditions exist.
2.LDO Oil supply press normal.
3.All LDOO oil valve closed.
4. LDO oil supply main pipe valve closed.
Test process:
 Step-1: Open LDO oil supply main
pipe valve, close oil return main pipe valve,
charge oil into the pipe for 60
second.
Monitor until LDO Oil supply press reach
the set point.
If the LDO oil supply press does not reach
the set point, charging oil fails and the
testing process has to be interrupted.
Step2:
Close LDO oil supply main pipe valve, start
to monitor oil pressure for 3 minutes.
LDO Oil supply press is not low.
If the LDO oil supply press is low, that
means the oil pipe leaks and the testing
process has to be interrupted.
Step3: Open LDO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Step3: Open LDO oil return main pipe
valve, discharging the oil from oil pipe for
10 second.
Bypass test:
if necessary, operators can ignore this
testing process through pushing “bypass
button” on the console and force the oil
leak test to be success.
Next logic in next PPT of FSSS-2
Thank You.....................

Mais conteúdo relacionado

Mais procurados

Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
Shad Edwards
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
Nitin Mahalle
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
Mohammad Basid
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
SURAJ KUMAR
 

Mais procurados (20)

Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculation
 
boiler turbine emergency
boiler turbine emergencyboiler turbine emergency
boiler turbine emergency
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Performance calculation for feed water heater
Performance calculation  for feed water heaterPerformance calculation  for feed water heater
Performance calculation for feed water heater
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Lmw turbine oprn. manual
Lmw turbine oprn. manualLmw turbine oprn. manual
Lmw turbine oprn. manual
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)steam turbine turbine interlocks for (KWU turbine)
steam turbine turbine interlocks for (KWU turbine)
 
DC failiure at NTPC Tanda
DC failiure at NTPC TandaDC failiure at NTPC Tanda
DC failiure at NTPC Tanda
 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
 
INTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNINGINTRODUCTION TO GOVERNING
INTRODUCTION TO GOVERNING
 
660 mw turbo governing &amp; protection system
660 mw turbo  governing &amp; protection system660 mw turbo  governing &amp; protection system
660 mw turbo governing &amp; protection system
 
TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE
 
Governing and protection system
Governing and protection systemGoverning and protection system
Governing and protection system
 
Ball & tube mill
Ball & tube millBall & tube mill
Ball & tube mill
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Cfbc boiler drive interlock
Cfbc boiler drive interlockCfbc boiler drive interlock
Cfbc boiler drive interlock
 

Destaque

AS Macro Revision Aggregate Supply
AS Macro Revision Aggregate SupplyAS Macro Revision Aggregate Supply
AS Macro Revision Aggregate Supply
tutor2u
 
Unemployment
UnemploymentUnemployment
Unemployment
channyb
 
Agrregate Demand and Supply
Agrregate Demand and SupplyAgrregate Demand and Supply
Agrregate Demand and Supply
Aleeza Baig
 
Macro diagrams and definitions
Macro diagrams and definitionsMacro diagrams and definitions
Macro diagrams and definitions
12jostma
 
3.4 Demand And Supply Side Policies
3.4   Demand And Supply Side Policies3.4   Demand And Supply Side Policies
3.4 Demand And Supply Side Policies
Andrew McCarthy
 
3.3 Macro Economic Models
3.3   Macro Economic Models3.3   Macro Economic Models
3.3 Macro Economic Models
Andrew McCarthy
 

Destaque (20)

Fuel system,pptx
Fuel system,pptxFuel system,pptx
Fuel system,pptx
 
Ira y nefroproteccion
Ira y nefroproteccionIra y nefroproteccion
Ira y nefroproteccion
 
OPNAVINST 1420.1B (OFFICER PROGRAMS)
OPNAVINST 1420.1B (OFFICER PROGRAMS)OPNAVINST 1420.1B (OFFICER PROGRAMS)
OPNAVINST 1420.1B (OFFICER PROGRAMS)
 
Short Run Aggregate Supply (SRAS)
Short Run Aggregate Supply (SRAS)Short Run Aggregate Supply (SRAS)
Short Run Aggregate Supply (SRAS)
 
CTA vs SAP berbasis akrual
CTA vs SAP berbasis akrualCTA vs SAP berbasis akrual
CTA vs SAP berbasis akrual
 
LDO CWO applicantbrief
LDO CWO applicantbriefLDO CWO applicantbrief
LDO CWO applicantbrief
 
Inflation
InflationInflation
Inflation
 
AS Macro Revision Aggregate Supply
AS Macro Revision Aggregate SupplyAS Macro Revision Aggregate Supply
AS Macro Revision Aggregate Supply
 
A2 Economics Exam Technique - Weesteps to Evaluation
A2 Economics Exam Technique - Weesteps to EvaluationA2 Economics Exam Technique - Weesteps to Evaluation
A2 Economics Exam Technique - Weesteps to Evaluation
 
Memory management
Memory managementMemory management
Memory management
 
Unemployment
UnemploymentUnemployment
Unemployment
 
Chapter20 ppt
Chapter20 pptChapter20 ppt
Chapter20 ppt
 
Agrregate Demand and Supply
Agrregate Demand and SupplyAgrregate Demand and Supply
Agrregate Demand and Supply
 
Joseph Kony and the LRA
Joseph Kony and the LRAJoseph Kony and the LRA
Joseph Kony and the LRA
 
Macro diagrams and definitions
Macro diagrams and definitionsMacro diagrams and definitions
Macro diagrams and definitions
 
3.4 Demand And Supply Side Policies
3.4   Demand And Supply Side Policies3.4   Demand And Supply Side Policies
3.4 Demand And Supply Side Policies
 
3.3 Macro Economic Models
3.3   Macro Economic Models3.3   Macro Economic Models
3.3 Macro Economic Models
 
SSD Deployment Strategies for MySQL
SSD Deployment Strategies for MySQLSSD Deployment Strategies for MySQL
SSD Deployment Strategies for MySQL
 
Open Door Forum: Comprehensive ESRD Care Initiative
Open Door Forum: Comprehensive ESRD Care InitiativeOpen Door Forum: Comprehensive ESRD Care Initiative
Open Door Forum: Comprehensive ESRD Care Initiative
 
Apresentação ruido
Apresentação ruidoApresentação ruido
Apresentação ruido
 

Semelhante a Furnace safegaurd supervisory system logic-1

94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008
Mowaten Masry
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
Mowaten Masry
 
89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system
Mowaten Masry
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
mark robertson
 

Semelhante a Furnace safegaurd supervisory system logic-1 (20)

Fsss
FsssFsss
Fsss
 
BMS FSSS.pptx
BMS FSSS.pptxBMS FSSS.pptx
BMS FSSS.pptx
 
Burner Management System ( FSSS).pptx
Burner Management System ( FSSS).pptxBurner Management System ( FSSS).pptx
Burner Management System ( FSSS).pptx
 
94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008
 
Boiler purge
Boiler purge Boiler purge
Boiler purge
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
 
89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system
 
Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5Power Plant Simulator Day 3 Part 5
Power Plant Simulator Day 3 Part 5
 
Competency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator AnswersCompetency Training Evidence for Panel Operator Answers
Competency Training Evidence for Panel Operator Answers
 
MGB Race Engine Oil Leak Diagnosis
MGB Race Engine Oil Leak DiagnosisMGB Race Engine Oil Leak Diagnosis
MGB Race Engine Oil Leak Diagnosis
 
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
Mobile transformer oil purification plant with high vacuum globecore cmm(uvm)...
 
Thermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations TrainingThermal Power Plant Simulator Operations Training
Thermal Power Plant Simulator Operations Training
 
Boiler p&i
Boiler p&iBoiler p&i
Boiler p&i
 
Sop of turbine lubrication oil system
Sop of turbine lubrication oil systemSop of turbine lubrication oil system
Sop of turbine lubrication oil system
 
Globecore transformer oil purification plant cmm 2,2
Globecore transformer oil purification plant cmm  2,2Globecore transformer oil purification plant cmm  2,2
Globecore transformer oil purification plant cmm 2,2
 
SUB & Bed Lance.pptx
SUB & Bed Lance.pptxSUB & Bed Lance.pptx
SUB & Bed Lance.pptx
 
FSSS_Logic Presentation - Modified_v11.pptx
FSSS_Logic Presentation - Modified_v11.pptxFSSS_Logic Presentation - Modified_v11.pptx
FSSS_Logic Presentation - Modified_v11.pptx
 
Decanter centrifuge operation
Decanter centrifuge operationDecanter centrifuge operation
Decanter centrifuge operation
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
960649.pdf
960649.pdf960649.pdf
960649.pdf
 

Mais de Ashvani Shukla

Mais de Ashvani Shukla (20)

Adc.pptx ashvani 151503
Adc.pptx ashvani 151503Adc.pptx ashvani 151503
Adc.pptx ashvani 151503
 
Pin photodiode.pptx ashvani
Pin photodiode.pptx ashvaniPin photodiode.pptx ashvani
Pin photodiode.pptx ashvani
 
Temperature measurement
Temperature measurementTemperature measurement
Temperature measurement
 
Modern coupling
Modern couplingModern coupling
Modern coupling
 
Mechanical coupling
Mechanical couplingMechanical coupling
Mechanical coupling
 
Pressure measuring devices
Pressure measuring devicesPressure measuring devices
Pressure measuring devices
 
Urea manufacturing process
Urea manufacturing processUrea manufacturing process
Urea manufacturing process
 
Amonia manufacturing process
Amonia manufacturing process Amonia manufacturing process
Amonia manufacturing process
 
Control valve
Control valveControl valve
Control valve
 
Paper production process
Paper production processPaper production process
Paper production process
 
Steel manufacturing process
Steel manufacturing processSteel manufacturing process
Steel manufacturing process
 
Cement manufacturing process new
Cement manufacturing process newCement manufacturing process new
Cement manufacturing process new
 
Pulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedurePulverized coal fired boiler startup procedure
Pulverized coal fired boiler startup procedure
 
Nuclear reactor
Nuclear reactorNuclear reactor
Nuclear reactor
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Flow measurement
Flow measurementFlow measurement
Flow measurement
 
Orifice plate
Orifice plateOrifice plate
Orifice plate
 
Combined ff and iec applications
Combined ff and iec applications  Combined ff and iec applications
Combined ff and iec applications
 
Device exchange and calibration
Device exchange and calibration Device exchange and calibration
Device exchange and calibration
 
Devices not in abb device library
Devices not in abb device library Devices not in abb device library
Devices not in abb device library
 

Último

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Furnace safegaurd supervisory system logic-1

  • 1. For PULVARISED COAL FIRED BOILER BY ASHVANI SHUKLA MANAGER(C&I) RELIANCE
  • 2. Common Logic  1.MFT  2.Furnace Purging  3.Oil Leak Test  4.OFT  5.Oil System Normal  6.Furnace Firing permissive Condition  7.Runback  8.Post trip purge excursion protection
  • 3.  Any following condition generate, touch off MFT or generate the pulse or PF contact.  1. Manual MFT  Both MFT pushbuttons are depressed at the same time.  Two signals are to trip MFT cabinet. Two signals (AND) are to DCS system to trip.  2. Both FDFs tripped  FD Fan 1 trip  FD Fan 2 trip
  • 4.  3.Both ID Fans tripped.  1.ID Fan 1 tripped.  2.ID Fan 2 tripped.  4. Both APHs tripped.  1.APH A pass should be tripped  2.APH b pass should be tripped.  5. All BFP tripped.  1.BFWP 1 tripped.(TD)  2.BFWP 2 tripped.(TD)  3.BFWP 3 tripped.(MD)  6. Lost primary air : Both PAFs tripped when any mill in service.  1.PA Fan 1 tripped.  2.PA Fan 2 tripped.
  • 5. 7.Lost Flame Scanner cooling air. Both cooling air fans tripped or outlet main pipe press LL 2/3, with delay of 10s. 8. Total airflow is <25%BMCR (2 out of 3) total airflow is <25%(PA +SA air flow) 9. 1.Drum level HH (2 out of 3, delayed 20s)  2. Drum level LL (2 out of 3, delayed 20s) 10. 1.Furnace negative pressure HH (2 out of 3)  2. Furnace negative pressure LL (2 out of 3)
  • 6.  11.Fire failure  Any oil burner ignite fail up to 3 times  12. Loss of fuel trip  1.When any oil burner ever set in service.  2.all oil valve closed(HFO and LDO) or OFT.  3.all PULV stopped.  13. Unit flames failure (AND)  Any coal feeder has run 120 second  No oil elevations is in service  A coal elevations no flame(3 out of 4)  B coal elevations no flame(3 out of 4)  C coal elevations no flame(3 out of 4)  D coal elevations no flame(3 out of 4)  E coal elevations no flame(3 out of 4)  F coal elevations no flame(3 out of 4)
  • 7. 14.Repurge requirement  MFT is reset but no firing up to 30 minutes. 15. Turbine tripped. 16. MFT trip relay cabinet power off  or Both power off. 17. FSSS cabinet power off  When FSSS common logic cabinet power off.
  • 8.  When MFT generate, system will generate alarm, display first reason for generating the MFT signal. Please execute furnace purging after MFT.  MFT will cause the following action  Close HFO and LDO oil supply main pipe valve.  Close HFO and LDO oil return main pipe valve.  Close all corner oil valves. HFO and LDO.  Retract all oil gun and ignition gun.  Trip all PAFs.  Trip all mills.  Trip all coal feeders.  Close all mill inlet valve.  Close all mill outlet valves.
  • 9. Close SH spray water valve. Close RH spray water valve. MFT to local ignite control box. MFT to ETS. Stop electrostatic precipitator. Stop soot blowers. MFT to MCS. MFT to SCS. Reset MFT: Furnace purging command initiated and wait till completion of purge.
  • 10. Furnace purging is required to clean all the obstacle in the air and coal path of boiler. Furnace purging have many conditions/Interlocks to execute are given below. 1. No MFT conditions exist. 2. Any one FDF is running. 3. Any one IDF is running. 4. Both APH are running.
  • 11. 5. Both PAFs stopped 6. The boiler total airflow > 30% and <40%. 7. Furnace press should be normal. 8. Drum level should be normal. 9. HFO and LDO oil supply main pipe valve closed. 10. all corner oil valves closed HFO and LDO. 11. All mills should be stopped. 12. All mill inlet(cold/hot) valve closed. 13. All mill outlet valve closed. 14. All coal feeders stopped.
  • 12.  15. No flames are detected in the furnace.  The furnace purging condition-2  1. Furnace purge condition -1 should be healthy.  2. All auxiliary air dampers in purge position (feedback >80%).  The purging process is:  When the purging condition-1 is met, push the “start purge button”, purge command executed.  After the purging condition-2 is met, start the purging process that will keep on for 5 minutes.  When the purging process is completed after 5 minutes, reset MFT memory.
  • 13. Furnace purging interrupt: During this five minutes period, if any condition happens to not exist, the furnace purging process has to be interrupted.
  • 14. Permissive conditions: 1. No MFT conditions exist. 2.HFO Oil supply press normal. 3.All HFO oil valve closed. 4. HFO oil supply main pipe valve closed. Test process:  Step-1: Open HFO oil supply main pipe valve, close oil return main pipe valve, charge oil into the pipe for 60 second.
  • 15. Monitor until HFO Oil supply press reach the set point. If the HFO oil supply press does not reach the set point, charging oil fails and the testing process has to be interrupted. Step2: Close HFO oil supply main pipe valve, start to monitor oil pressure for 3 minutes. HFO Oil supply press is not low. If the HFO oil supply press is low, that means the oil pipe leaks and the testing process has to be interrupted.
  • 16. Step3: Open HFO oil return main pipe valve, discharging the oil from oil pipe for 10 second. Step3: Open HFO oil return main pipe valve, discharging the oil from oil pipe for 10 second. Bypass test: if necessary, operators can ignore this testing process through pushing “bypass button” on the console and force the oil leak test to be success.
  • 17. Permissive conditions: 1. No MFT conditions exist. 2.LDO Oil supply press normal. 3.All LDOO oil valve closed. 4. LDO oil supply main pipe valve closed. Test process:  Step-1: Open LDO oil supply main pipe valve, close oil return main pipe valve, charge oil into the pipe for 60 second.
  • 18. Monitor until LDO Oil supply press reach the set point. If the LDO oil supply press does not reach the set point, charging oil fails and the testing process has to be interrupted. Step2: Close LDO oil supply main pipe valve, start to monitor oil pressure for 3 minutes. LDO Oil supply press is not low. If the LDO oil supply press is low, that means the oil pipe leaks and the testing process has to be interrupted.
  • 19. Step3: Open LDO oil return main pipe valve, discharging the oil from oil pipe for 10 second. Step3: Open LDO oil return main pipe valve, discharging the oil from oil pipe for 10 second. Bypass test: if necessary, operators can ignore this testing process through pushing “bypass button” on the console and force the oil leak test to be success.
  • 20. Next logic in next PPT of FSSS-2 Thank You.....................