SlideShare uma empresa Scribd logo
1 de 10
PROFILE- ENGINEERING CONSULTANT (SELF-EMPLOYED)
Ashish Shrivastava
ashish123_sati@yahoo.co.in
Mob: -09825123586
Address: -11A, Vikram Apartment
on SBI Bank, near Naranpura Crossing,
Naranpura, Ahmedabad, Gujarat, India
380013
Date: 06/12/2021
JOB PROFILE:-
 Overwhelming experience ofmore than 16 years in renowned MNCs (Reliance, Abengoa Group &
WorleyParsons) and Startups (Nipunn Engineering and AGTS-LLP) across India.
 Extremely rich experience of leading Projects in fields like LNG/LPG/Petrochemical, Refineries,
Oil and Gas and Solar and Power Plant.
 Expertise in Preparation of Proposals for Techno-Commercial Offers & Company Presentation,
Client Coordination, KOMs etc. for LNG Projects
 Expertise in Conceptual Studies, Pre-FEED/ DFR and FEED stages of
LNG/LPG/PETROCHEMICAL Onshore, Offshore and Marine Projects.
 Expertise in Preparation of Technical Specifications for Marine equipment (Fenders, Loading
Arms, Gangway, QRMH, Winches), Equipment and Vendor List
 Cost Estimation For Jetty And Onshore Terminal
 Sound Knowledge ofrelevant Codes and Standards like DNV, BV, ABS, OCIMF, SIGGTO, NFPA
58/59A, EN 1374, OISD 118/141/150/194/214 for LNG/LPG/Petrochemical, terminals etc.
 Basic understanding of all deliverables and support required of and for all disciplines like; Naval
Arch, Civil, Process, Electrical and Instrumentation for execution of proje cts.
 Expertise in Leading Projects for PIPING STRESS ANALYSIS & Static Equipment design.
 Expertise on CAESAR II and hands on practice on PDMS, PDS, AUTOPIPE VESSEL, PVELITE,
AUTOCAD PLANT 3D, NAVISWORKS and SPR software.
I. INDIVIDUAL LNG PROJECT EXPERIENCE AND CAPABILITIES:-
1. LNG ONSHORE STORAGE AND RE-GASIFICATION TERMINAL
Conceptual design of LNG Onshore Storage and Re-gasification Terminal starting with Jetty
design for mooring and berthing of LNGC, trestle pipelines, storage and re-gasification on
onshore and finally delivery of gas to end customer as R-LNG. Following activities will be
captured during Conceptual design report, but not limited to:
 Jetty and onshore facilities design & layout sizing (mooring and berthing) based on ship and
package sizes
 Jetty topside and marine equipment design and selection
 Safety distances for jetty and onshore facilities based on applicable codes and standards
 Safety and Control Systems for and onshore facilities
 Cryogenic Pipeline sizing and supporting on trestles
 Onshore Storage tanks, pumps, BOG compressor, re-condenser etc. preliminary sizing
 Utilities, Power required etc.
 Preparation of TS for Marine equipment (Concrete, piles, Marine Loading arms (MLA), KO
drum, Fender, Gangway and QRMH)
 Firefighting & emergency requirement
 Key equipment list
 Vendor quotations
 Next engineering stage deliverables list
 Cost Estimation (+-30%)
2. FLOATING STORAGE UNIT (FSU) BASED ONSHORE RE-GASIFICATION TERMINAL
Conceptual design of Floating Storage Unit (FSU) based Onshore Re-gasification LNG terminal
starting with Jetty design for mooring and berthing of LNGC and FSU, trestle pipelines, onshore
re-gasification and finally delivery of gas to end customer as R-LNG. All the activities remain
same as above in option 1 with some additional activities in this option are mentioned below.
These will also be captured in Conceptual design report, but not limited to:
 Additional loads on Jetty due berthing of both FSU and LNGC ships either double berthing
or STS transfer.
 Marine hoses may be required for STS transfer.
 No onshore Storage tanks
3. FLOATING STORAGE AND RE-GASIFICATIONUNIT (FSRU)BASED LNG TERMINAL
Conceptual design of Floating Storage and Re-gasification Unit (FSRU) based LNG Terminal
starting with Jetty design for mooring and berthing of LNGC and FSRU, trestle/subsea pipelines
directly to end customer as R-LNG. All the activities remain same as above in option 2 with
some additional activities in this option are mentioned below. These will also be captured in
Conceptual design report, but not limited to:
 No cryogenic pipelines/Loading arms
 Utilities are on FSRU
 Subsea pipeline may come into the scheme
4. CONVERSION OF LNGC TO FSU OR FSRU PROJECT
Conceptual design of Conversion of LNGC to FSU or FSRU requires understanding of existing
LNGC parameters like size, weight, type of tanks, pump capacity etc. Following activities will
be captured during Conceptual design report, but not limited to:
 Pump Sizing
 Cryogenic piping
 Utilities
 Manifolds
 Re-gasification unit (FSRU)
 Firefighting systems
5. CONVERSION OF BARGE TO SMALL SCALE FSU OR FSRU PROJECT
Conceptual design of Conversion of Barge to small scale FSU or FSRU Project requires Barge
parameters like size, weight, type of tanks, pump capacity etc. Following activities will be
captured during Conceptual design report, but not limited to:
 Pump Sizing
 Cryogenic piping
 Utilities
 Manifolds
 Re-gasification unit (FSRU)
 Firefighting systems
6. CONVERSION OF DIESEL ENGINES SHIPS/BUSES/TRUCKS TO NATURAL GAS.
Conceptual design of Diesel Engines Ships/buses/trucks to natural gas requires parameters like
size, weight, mileage, running distance and duration, engine type for Ships/buses/Trucks and also
availability of LNG .Following activities will be captured during Conceptual design report but
not limited to:
 P&ID
 Key Equipment list
 Cost estimation/payback period
 Safety and Controls
 Firefighting systems
 Utilities system and power requirement
 Vendor quotations
 Layout
7. SETTING UP OF LNG/LCNG FILLING STATIONS.
Conceptual design setting up of LNG/LCNG stations requires parameters like required capacity,
number of vehicles anticipated, availability of LNG .Following activities will be captured during
Conceptual design report, but not limited to:
 P&ID
 Key Equipment list
 Cost estimation/payback period
 Safety and Controls
 Firefighting systems
 Utilities system and power requirement
 Vendor quotations
 Layout
8. EXECUTED PROJECTS & ESTEEMED CLIENTS LIST.
Following is the list of executed projects, case studies with esteemed clients and owners:
S. No
Project
Name
Project Details Location Scope Client Owner Period
1.
Reliance
Kutubdia
Project
FSU Based Onshore
Re-gasification
Terminal
Bangladesh
FEED-Marine
& Jetty
TechnipFMC
Reliance
Power Ltd
2017-
18
2.
SSLNG
Project
Barge Based FSRU Indonesia
In-Principle
Approval
SSLNG Confidential
2017-
18
3.
LNG Break
bulk Facility
Project
ISO containers
transported by MSV
China FEED GALWAY Confidential
2018-
19
4.
LNG -Sri
lanka Project
FSRU Based Project Srilanka
FEED-Marine
& Jetty
TechnipFMC Confidential
2017-
18
5.
LNG –
Caribbean
Project
LNG Onshore Storage
and Re-gasification
Project
Caribbean
Pre-FFED and
FEED
Excel LNG Confidential
2019-
20
6.
LNG-Vedam
Project
LNGC to FSU
conversion Project
China
Process &
Piping
layout/stress
analysis
Vedam India Confidential
2019-
20
7.
LNG
Kakinada
Project
FSRU/FSU based
Project
India
TEFR-Marine
topside and
Onshore
LNTIEL Confidential
2018-
19
8.
Diesel to
LNG truck
Conversion
Diesel to LNG truck
Conversion
India
Technical &
Commercial
Feasibility
Study
Confidential Confidential
In
Process
9.
Dredger
Conversion
to LNG
Diesel to LNG truck
Conversion
India
Technical &
Commercial
Feasibility
Confidential Confidential
In
Process
S. No
Project
Name
Project Details Location Scope Client Owner Period
Study
10.
Bus
Conversion
to LNG
Bus Conversion to
LNG
India
Technical &
Commercial
Feasibility
Study
Confidential Confidential
In
Process
11.
LNG/LCNG
Filling
station
LNG/LCNG Filling
station
India
Technical &
Commercial
Feasibility
Study
Confidential Confidential
In
Process
II. INDIVIDUAL EXPERIENCEOF LPG/OIL& GAS/PETROCHEMICAL
TERMINALS
S. No
Project
Name
Project Details Location Scope Client Owner Period
1.
Confidential
LPG Onshore Storage India
Pre-FEED
Study
Confidential Confidential
2017-
18
2.
Confidential
Petrochemical India
DFR jetty &
topside
facilities
NAYARA Confidential
2020-
21
III. INDIVIDUAL CAPABILTIES AS LEAD PIPE STRESS ENGINEER-
 Expertise in executing projects of Piping Stress Analysis
 Expertise in Piping Stress Analysis of cryogenic pipeline for LNG projects both for onshore
terminals and offshore FSU/FSRU
 Expertise in using Caesar II for static and dynamic analysis of critical piping systems.
 Expertise in stress analysis of high temperature piping systems connected to static
equipment, as per the applicable standards like Heat Exchangers, Vessels, Columns, Drums,
Reactors, Air Fin Fan coolers, Tanks, PSV lines.
 Expertise in stress analysis of high temperature piping systems connected to rotary
equipment, as per the applicable standards for Pumps (hot and cold), Compressors, Turbines
 Expertise in applying the relevant and applicable design standards like API 560 (heaters),
API 610(pumps), API 661 (air fin fan coolers), API 617 (compressors), NEMA SM23
(turbines).
 Expertise in manual thickness calculations, pipe sizing, equipment sizing
 Competent in analysis of FRP piping (BS 7159). Their Difference from Metallic piping,
parameters differences like physical properties, allowable etc.
 Expertise in spring design SPR and CPR, taking care of angulations, variability, top up and
bottom out conditions for variable spring hangers
 Expertise in dynamic analysis using Caesar II like Modal analysis (vibration), Time history
analysis (surge, water hammer), Response Spectrum analysis (earthquake) and Harmonic
analysis.
1. INDIVIDUAL CAPABILITIES TO AUDIT PIPING SYSTEM DURING PRE-COMMISSIONING
AND SITE TROUBLESHOOTING:
 Preparation on Audit reports with suggestions and recommendations for both design and
construction departments.
 Trouble shooting of piping vibration problems.
 Modal analysis and harmonic analysis with FFT plots.
 Knowledge of vibration measuring equipment like accelerometers etc.
2. INDIVIDUAL CAPABILITIES TO WORK AS OWNER’S ENGINEERFOR STRESS
ANALYSIS WORK
 Review of the third-party Pipe Stress Analysis for Owner
 Ensuring the design quality, safety and integrity is maintained
 Ease of operation and maintenance
 Timely completion of project
3. SOME CRICTICAL STRESS ANAYSIS WORK
 MRPL 24-inch Catalyst line from TSS to FSS at 760C: This site problem was extremely
critical as temperature of line was 760C, line totally supported on CPRs and special
supports. There was bowing in the line. Root cause of the problem was identified, and
suitable solution was provided in 2 days.
 FCCU 24-inch PRT turbine outlet: Designed initially for 260C, its temperature was required
to increase to 326C without any major modification in layout. It required precise spring
locations and load selection for balancing of the system keeping proper alignment both with
spring locked and unlocked conditions and nozzle loads within allowable.
 DHT reactor 24-inch outlet: As piping was supported for separate structure and connected to
reciprocating compressor line required special effort to meet the nozzle load criteria and
pulsation.
4. STRESS ANALYSIS PROJECTS & ESTEEMED CLIENTS LIST.
Following is the list of executed projects, case studies with esteemed clients and owners:
S. No Project Name Project Details Location Scope Company Client Period
1. JERP New Refinery India Stress Analysis
Reliance
Industries Ltd
Reliance
Industries
Ltd
2007-
13
S. No Project Name Project Details Location Scope Company Client Period
2. DTA Old Refinery India Stress Analysis
Reliance
Industries Ltd
Reliance
Industries
Ltd
2007-
13
3.
MEG, QUAT,
GOLIAT
Offshore FPSO
Project
Norway
Stress Analysis
Package
Piping
Confidential Confidential
2013-
13
4.
ASHALIM Solar Power Plant
Project
South
Africa
Stress Analysis Abenisa Confidential
2014-
15
5.
SALEM
HARBOR,
ALSA BAB,
RUMITHA
Power
Plant/onshore
Project
USA/UAE Stress Analysis
Worley
Parsons
Confidential
2019-
20
6.
MUNDRA-
SURGE AND
STRESS
ANALYSIS
Tank farm piping India
Surge and
Stress analysis
AGTS-LLP
HOWE
engineering
2016-
2017
7.
HAZIRA-
SURGE AND
STRESS
ANALYSIS
Tank farm piping India
Surge and
Stress analysis
AGTS-LLP
MotMac
Donald
2019-
2019
8.
LNG-VEDAM
PROJECT
LNGC to FSU
conversion Project
China
Process &
Piping
layout/stress
analysis
Vedam India Confidential
2019-
20
IV. CAPABILITIES TO DELIVER INDIVIDUAL CORPORATETRAINING
 Strong technical background and In-depth knowledge of subject topics combined with
excellent communication skills & friendly environment has helped me provide trainings and
presentations both within India and abroad. Below are the details of the topics that are
presented:
LNG
 LNG Onshore Terminal Design
 FSRU/FSU based Terminals
 Conversion of diesel to LNG Vehicles
PIPE STRESS ANALYSIS
 Basic Pipe stress analysis concepts
 Caesar modeling and analysis
 Trouble shooting
 Case studies
 Pipe Stress Analysis for cryogenic lines
V. TURNKEY PIPING DESIGN PROJECTS CAPABILITIES
 3D Model
 Isometrics, BOQ, Plant Layout, Equipment Layout
 Surge Analysis
 Hydraulic Analysis
 LPG Reticulated System
 Isometrics/drawings
 Alignment sheets
VI. OTHER DESIGN CAPABILITIES
 Static Equipment Design (Pressure Vessels)
 HVAC
 Firefighting Systems
 Marine Loading Arm, Gangway, QRMH, Fenders (TS, datasheet, envelope, MR, PS)
 E & I support
 Civil Structural Support.
 Marine/Naval Support
VII. OTHER CAPABILITIES
 Working as owners engineer for review of documents
 Vendor coordination
 Site coordination
 Procurement engineering support
VIII. SOFTWARE
 Caesar II
 Bentley Hammer
 Bentley WaterGEM
 PDMS
 AutoCAD Plant 3D
 AutoCAD 2D
 PV Elite
IX. EDUCATIONAL QUALIFICATION:
PERSONAL PROFILE:
Name : Ashish Shrivastava
Sex : Male
Marital Status : Married
Nationality : Indian
Date of Birth : 06/05/1983
DECLARATION:
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the
responsibility for the correctness of the above-mentioned particulars.
PLACE: DECLARED BY: -
Ahmedabad (Ashish Shrivastava)
Examination Discipline/
Specialization
School/college
Board/
University
Year of
Passing
%
B.E.
Mechanical
Engineering
SATI College, Vidisha
(M.P.)
RGTU 2007 74.4%
12th PCM
Christ School, Guna
(M.P.)
C.B.S.E. 2001 67%
10th S.S.C
Christ School, Guna
(M.P.)
C.B.S.E. 1999 67%
CLIENTS
VISTATECH ENGG SERVICES AZZROVA CUBIC
H.E. JACKSON ENGINEERING LTD MECHANICA ENGINEERING

Mais conteúdo relacionado

Mais procurados

Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)Dr Orhan Degermenci
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton
 
MCS Presentation
MCS PresentationMCS Presentation
MCS PresentationArranEwan
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)Sher Zaman
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)RAMA SAMY
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000daniel cobar
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERRAMA SAMY
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneAssignment Help
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul Jennings
 
Zupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
Zupt Inertial Metrology - SUT / THS Subsea Metrology SeminarZupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
Zupt Inertial Metrology - SUT / THS Subsea Metrology SeminarZupt, LLC
 

Mais procurados (20)

Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
Latest CV of Gangadhar
Latest CV of GangadharLatest CV of Gangadhar
Latest CV of Gangadhar
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
SomkiatC
SomkiatCSomkiatC
SomkiatC
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16Ismael_Lopez-Lara_Aug16
Ismael_Lopez-Lara_Aug16
 
Zupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
Zupt Inertial Metrology - SUT / THS Subsea Metrology SeminarZupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
Zupt Inertial Metrology - SUT / THS Subsea Metrology Seminar
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 

Semelhante a Ashish shrivastava engineering consultant

Semelhante a Ashish shrivastava engineering consultant (20)

Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
 
63089_SEKAR_01_12_14
63089_SEKAR_01_12_1463089_SEKAR_01_12_14
63089_SEKAR_01_12_14
 
Summary of Experience
Summary of ExperienceSummary of Experience
Summary of Experience
 
resume mechanical
resume mechanicalresume mechanical
resume mechanical
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Hafeeda. v
Hafeeda. vHafeeda. v
Hafeeda. v
 
RESUME-Radheya Karmarkar
RESUME-Radheya KarmarkarRESUME-Radheya Karmarkar
RESUME-Radheya Karmarkar
 
CV_Madhukar Kashyap
CV_Madhukar KashyapCV_Madhukar Kashyap
CV_Madhukar Kashyap
 
Cv ihsan ul haq
Cv ihsan ul haqCv ihsan ul haq
Cv ihsan ul haq
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
Moses -resume
Moses -resumeMoses -resume
Moses -resume
 
Process Engineer
Process EngineerProcess Engineer
Process Engineer
 
Oam mechanical eng
Oam mechanical engOam mechanical eng
Oam mechanical eng
 
Mechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain AliMechanical Engineer-Syed Zain Ali
Mechanical Engineer-Syed Zain Ali
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 

Último

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 

Último (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 

Ashish shrivastava engineering consultant

  • 1. PROFILE- ENGINEERING CONSULTANT (SELF-EMPLOYED) Ashish Shrivastava ashish123_sati@yahoo.co.in Mob: -09825123586 Address: -11A, Vikram Apartment on SBI Bank, near Naranpura Crossing, Naranpura, Ahmedabad, Gujarat, India 380013 Date: 06/12/2021 JOB PROFILE:-  Overwhelming experience ofmore than 16 years in renowned MNCs (Reliance, Abengoa Group & WorleyParsons) and Startups (Nipunn Engineering and AGTS-LLP) across India.  Extremely rich experience of leading Projects in fields like LNG/LPG/Petrochemical, Refineries, Oil and Gas and Solar and Power Plant.  Expertise in Preparation of Proposals for Techno-Commercial Offers & Company Presentation, Client Coordination, KOMs etc. for LNG Projects  Expertise in Conceptual Studies, Pre-FEED/ DFR and FEED stages of LNG/LPG/PETROCHEMICAL Onshore, Offshore and Marine Projects.  Expertise in Preparation of Technical Specifications for Marine equipment (Fenders, Loading Arms, Gangway, QRMH, Winches), Equipment and Vendor List  Cost Estimation For Jetty And Onshore Terminal  Sound Knowledge ofrelevant Codes and Standards like DNV, BV, ABS, OCIMF, SIGGTO, NFPA 58/59A, EN 1374, OISD 118/141/150/194/214 for LNG/LPG/Petrochemical, terminals etc.  Basic understanding of all deliverables and support required of and for all disciplines like; Naval Arch, Civil, Process, Electrical and Instrumentation for execution of proje cts.  Expertise in Leading Projects for PIPING STRESS ANALYSIS & Static Equipment design.  Expertise on CAESAR II and hands on practice on PDMS, PDS, AUTOPIPE VESSEL, PVELITE, AUTOCAD PLANT 3D, NAVISWORKS and SPR software.
  • 2. I. INDIVIDUAL LNG PROJECT EXPERIENCE AND CAPABILITIES:- 1. LNG ONSHORE STORAGE AND RE-GASIFICATION TERMINAL Conceptual design of LNG Onshore Storage and Re-gasification Terminal starting with Jetty design for mooring and berthing of LNGC, trestle pipelines, storage and re-gasification on onshore and finally delivery of gas to end customer as R-LNG. Following activities will be captured during Conceptual design report, but not limited to:  Jetty and onshore facilities design & layout sizing (mooring and berthing) based on ship and package sizes  Jetty topside and marine equipment design and selection  Safety distances for jetty and onshore facilities based on applicable codes and standards  Safety and Control Systems for and onshore facilities  Cryogenic Pipeline sizing and supporting on trestles  Onshore Storage tanks, pumps, BOG compressor, re-condenser etc. preliminary sizing  Utilities, Power required etc.  Preparation of TS for Marine equipment (Concrete, piles, Marine Loading arms (MLA), KO drum, Fender, Gangway and QRMH)  Firefighting & emergency requirement  Key equipment list  Vendor quotations  Next engineering stage deliverables list  Cost Estimation (+-30%) 2. FLOATING STORAGE UNIT (FSU) BASED ONSHORE RE-GASIFICATION TERMINAL Conceptual design of Floating Storage Unit (FSU) based Onshore Re-gasification LNG terminal starting with Jetty design for mooring and berthing of LNGC and FSU, trestle pipelines, onshore re-gasification and finally delivery of gas to end customer as R-LNG. All the activities remain same as above in option 1 with some additional activities in this option are mentioned below. These will also be captured in Conceptual design report, but not limited to:  Additional loads on Jetty due berthing of both FSU and LNGC ships either double berthing or STS transfer.  Marine hoses may be required for STS transfer.  No onshore Storage tanks 3. FLOATING STORAGE AND RE-GASIFICATIONUNIT (FSRU)BASED LNG TERMINAL Conceptual design of Floating Storage and Re-gasification Unit (FSRU) based LNG Terminal starting with Jetty design for mooring and berthing of LNGC and FSRU, trestle/subsea pipelines directly to end customer as R-LNG. All the activities remain same as above in option 2 with some additional activities in this option are mentioned below. These will also be captured in Conceptual design report, but not limited to:
  • 3.  No cryogenic pipelines/Loading arms  Utilities are on FSRU  Subsea pipeline may come into the scheme 4. CONVERSION OF LNGC TO FSU OR FSRU PROJECT Conceptual design of Conversion of LNGC to FSU or FSRU requires understanding of existing LNGC parameters like size, weight, type of tanks, pump capacity etc. Following activities will be captured during Conceptual design report, but not limited to:  Pump Sizing  Cryogenic piping  Utilities  Manifolds  Re-gasification unit (FSRU)  Firefighting systems 5. CONVERSION OF BARGE TO SMALL SCALE FSU OR FSRU PROJECT Conceptual design of Conversion of Barge to small scale FSU or FSRU Project requires Barge parameters like size, weight, type of tanks, pump capacity etc. Following activities will be captured during Conceptual design report, but not limited to:  Pump Sizing  Cryogenic piping  Utilities  Manifolds  Re-gasification unit (FSRU)  Firefighting systems 6. CONVERSION OF DIESEL ENGINES SHIPS/BUSES/TRUCKS TO NATURAL GAS. Conceptual design of Diesel Engines Ships/buses/trucks to natural gas requires parameters like size, weight, mileage, running distance and duration, engine type for Ships/buses/Trucks and also availability of LNG .Following activities will be captured during Conceptual design report but not limited to:  P&ID  Key Equipment list  Cost estimation/payback period  Safety and Controls  Firefighting systems  Utilities system and power requirement  Vendor quotations  Layout
  • 4. 7. SETTING UP OF LNG/LCNG FILLING STATIONS. Conceptual design setting up of LNG/LCNG stations requires parameters like required capacity, number of vehicles anticipated, availability of LNG .Following activities will be captured during Conceptual design report, but not limited to:  P&ID  Key Equipment list  Cost estimation/payback period  Safety and Controls  Firefighting systems  Utilities system and power requirement  Vendor quotations  Layout 8. EXECUTED PROJECTS & ESTEEMED CLIENTS LIST. Following is the list of executed projects, case studies with esteemed clients and owners: S. No Project Name Project Details Location Scope Client Owner Period 1. Reliance Kutubdia Project FSU Based Onshore Re-gasification Terminal Bangladesh FEED-Marine & Jetty TechnipFMC Reliance Power Ltd 2017- 18 2. SSLNG Project Barge Based FSRU Indonesia In-Principle Approval SSLNG Confidential 2017- 18 3. LNG Break bulk Facility Project ISO containers transported by MSV China FEED GALWAY Confidential 2018- 19 4. LNG -Sri lanka Project FSRU Based Project Srilanka FEED-Marine & Jetty TechnipFMC Confidential 2017- 18 5. LNG – Caribbean Project LNG Onshore Storage and Re-gasification Project Caribbean Pre-FFED and FEED Excel LNG Confidential 2019- 20 6. LNG-Vedam Project LNGC to FSU conversion Project China Process & Piping layout/stress analysis Vedam India Confidential 2019- 20 7. LNG Kakinada Project FSRU/FSU based Project India TEFR-Marine topside and Onshore LNTIEL Confidential 2018- 19 8. Diesel to LNG truck Conversion Diesel to LNG truck Conversion India Technical & Commercial Feasibility Study Confidential Confidential In Process 9. Dredger Conversion to LNG Diesel to LNG truck Conversion India Technical & Commercial Feasibility Confidential Confidential In Process
  • 5. S. No Project Name Project Details Location Scope Client Owner Period Study 10. Bus Conversion to LNG Bus Conversion to LNG India Technical & Commercial Feasibility Study Confidential Confidential In Process 11. LNG/LCNG Filling station LNG/LCNG Filling station India Technical & Commercial Feasibility Study Confidential Confidential In Process II. INDIVIDUAL EXPERIENCEOF LPG/OIL& GAS/PETROCHEMICAL TERMINALS S. No Project Name Project Details Location Scope Client Owner Period 1. Confidential LPG Onshore Storage India Pre-FEED Study Confidential Confidential 2017- 18 2. Confidential Petrochemical India DFR jetty & topside facilities NAYARA Confidential 2020- 21 III. INDIVIDUAL CAPABILTIES AS LEAD PIPE STRESS ENGINEER-  Expertise in executing projects of Piping Stress Analysis  Expertise in Piping Stress Analysis of cryogenic pipeline for LNG projects both for onshore terminals and offshore FSU/FSRU  Expertise in using Caesar II for static and dynamic analysis of critical piping systems.  Expertise in stress analysis of high temperature piping systems connected to static equipment, as per the applicable standards like Heat Exchangers, Vessels, Columns, Drums, Reactors, Air Fin Fan coolers, Tanks, PSV lines.  Expertise in stress analysis of high temperature piping systems connected to rotary equipment, as per the applicable standards for Pumps (hot and cold), Compressors, Turbines  Expertise in applying the relevant and applicable design standards like API 560 (heaters), API 610(pumps), API 661 (air fin fan coolers), API 617 (compressors), NEMA SM23 (turbines).  Expertise in manual thickness calculations, pipe sizing, equipment sizing  Competent in analysis of FRP piping (BS 7159). Their Difference from Metallic piping, parameters differences like physical properties, allowable etc.  Expertise in spring design SPR and CPR, taking care of angulations, variability, top up and bottom out conditions for variable spring hangers
  • 6.  Expertise in dynamic analysis using Caesar II like Modal analysis (vibration), Time history analysis (surge, water hammer), Response Spectrum analysis (earthquake) and Harmonic analysis. 1. INDIVIDUAL CAPABILITIES TO AUDIT PIPING SYSTEM DURING PRE-COMMISSIONING AND SITE TROUBLESHOOTING:  Preparation on Audit reports with suggestions and recommendations for both design and construction departments.  Trouble shooting of piping vibration problems.  Modal analysis and harmonic analysis with FFT plots.  Knowledge of vibration measuring equipment like accelerometers etc. 2. INDIVIDUAL CAPABILITIES TO WORK AS OWNER’S ENGINEERFOR STRESS ANALYSIS WORK  Review of the third-party Pipe Stress Analysis for Owner  Ensuring the design quality, safety and integrity is maintained  Ease of operation and maintenance  Timely completion of project 3. SOME CRICTICAL STRESS ANAYSIS WORK  MRPL 24-inch Catalyst line from TSS to FSS at 760C: This site problem was extremely critical as temperature of line was 760C, line totally supported on CPRs and special supports. There was bowing in the line. Root cause of the problem was identified, and suitable solution was provided in 2 days.  FCCU 24-inch PRT turbine outlet: Designed initially for 260C, its temperature was required to increase to 326C without any major modification in layout. It required precise spring locations and load selection for balancing of the system keeping proper alignment both with spring locked and unlocked conditions and nozzle loads within allowable.  DHT reactor 24-inch outlet: As piping was supported for separate structure and connected to reciprocating compressor line required special effort to meet the nozzle load criteria and pulsation. 4. STRESS ANALYSIS PROJECTS & ESTEEMED CLIENTS LIST. Following is the list of executed projects, case studies with esteemed clients and owners: S. No Project Name Project Details Location Scope Company Client Period 1. JERP New Refinery India Stress Analysis Reliance Industries Ltd Reliance Industries Ltd 2007- 13
  • 7. S. No Project Name Project Details Location Scope Company Client Period 2. DTA Old Refinery India Stress Analysis Reliance Industries Ltd Reliance Industries Ltd 2007- 13 3. MEG, QUAT, GOLIAT Offshore FPSO Project Norway Stress Analysis Package Piping Confidential Confidential 2013- 13 4. ASHALIM Solar Power Plant Project South Africa Stress Analysis Abenisa Confidential 2014- 15 5. SALEM HARBOR, ALSA BAB, RUMITHA Power Plant/onshore Project USA/UAE Stress Analysis Worley Parsons Confidential 2019- 20 6. MUNDRA- SURGE AND STRESS ANALYSIS Tank farm piping India Surge and Stress analysis AGTS-LLP HOWE engineering 2016- 2017 7. HAZIRA- SURGE AND STRESS ANALYSIS Tank farm piping India Surge and Stress analysis AGTS-LLP MotMac Donald 2019- 2019 8. LNG-VEDAM PROJECT LNGC to FSU conversion Project China Process & Piping layout/stress analysis Vedam India Confidential 2019- 20 IV. CAPABILITIES TO DELIVER INDIVIDUAL CORPORATETRAINING  Strong technical background and In-depth knowledge of subject topics combined with excellent communication skills & friendly environment has helped me provide trainings and presentations both within India and abroad. Below are the details of the topics that are presented: LNG  LNG Onshore Terminal Design  FSRU/FSU based Terminals  Conversion of diesel to LNG Vehicles PIPE STRESS ANALYSIS  Basic Pipe stress analysis concepts  Caesar modeling and analysis  Trouble shooting  Case studies  Pipe Stress Analysis for cryogenic lines
  • 8. V. TURNKEY PIPING DESIGN PROJECTS CAPABILITIES  3D Model  Isometrics, BOQ, Plant Layout, Equipment Layout  Surge Analysis  Hydraulic Analysis  LPG Reticulated System  Isometrics/drawings  Alignment sheets VI. OTHER DESIGN CAPABILITIES  Static Equipment Design (Pressure Vessels)  HVAC  Firefighting Systems  Marine Loading Arm, Gangway, QRMH, Fenders (TS, datasheet, envelope, MR, PS)  E & I support  Civil Structural Support.  Marine/Naval Support VII. OTHER CAPABILITIES  Working as owners engineer for review of documents  Vendor coordination  Site coordination  Procurement engineering support VIII. SOFTWARE  Caesar II  Bentley Hammer  Bentley WaterGEM  PDMS  AutoCAD Plant 3D  AutoCAD 2D  PV Elite
  • 9. IX. EDUCATIONAL QUALIFICATION: PERSONAL PROFILE: Name : Ashish Shrivastava Sex : Male Marital Status : Married Nationality : Indian Date of Birth : 06/05/1983 DECLARATION: I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. PLACE: DECLARED BY: - Ahmedabad (Ashish Shrivastava) Examination Discipline/ Specialization School/college Board/ University Year of Passing % B.E. Mechanical Engineering SATI College, Vidisha (M.P.) RGTU 2007 74.4% 12th PCM Christ School, Guna (M.P.) C.B.S.E. 2001 67% 10th S.S.C Christ School, Guna (M.P.) C.B.S.E. 1999 67%
  • 10. CLIENTS VISTATECH ENGG SERVICES AZZROVA CUBIC H.E. JACKSON ENGINEERING LTD MECHANICA ENGINEERING