Well Completion Program
OPEN HOLE COPLETION DESIGN
PAGE 1
Well Completion Program
Completion, in petroleum production,is the process of making a well ready for production (or
injection). This principally involves preparing the bottom of the hole to the required
specifications, running in the production tubing and it’s associated down hole tools as well as
perforating and stimulating as required. Sometimes, the process of running in and cementing
the casing is also included.
Open-hole Completion
Open-hole completions are also termed 'barefoot' completions. In this type of completion the
casing is set in place and cemented above the productive interval(s). Further drilling extends
the well bore into and/or through the reservoir(s) which is left uncased, hence the term 'Open
Hole’.
This completion method is used where it is desirable to expose the whole of the productive
interval(s) to the well bore. The rock of the producing formations must be strong or
'consolidated' to prevent breakdown and collapse when in production
We will take a simple well completion for open-hole well to explain the operation steps:
1-The production casing is set on top of production zone before drill the production formation
that contains the hydrocarbon fluids, then after casing was cemented, producing formation
drilled.
2- The production casing is set above the zone of interest before drilling the zone. The zone
is open to the well bore. In this case little expense is generated with perforations log
interpretation is not critical. The well can be deepened easily and it is easily converted to
screen and liner. However, excessive gas and water production is difficult to control, and may
require frequent clean outs. Also the interval cannot be selectively stimulated.
3-After casing and cement the well without production zone, run the hole log tool for checking
the cement.
4-According to the pressure of the well, if the reservoir pressure is adequate to give a flowrate
fit to the casing is ok, if not install of tubing is performed.
5-Screen is reliable if set in the interval zone for preventing sand particles to the well bore.
6-Preforation is not require to the open hole.
7-Gravel pack is good if set in the interval zone.
8-The production zone is open to the well bore.
9-Set ‘BOP’ to the well.
10-Setthe well-head on the top of the well bore,thatinclude X-mass tree and master valve…..&
so on.
PAGE 2
11-The well head valves must be connected to burn pipe to burn the fluid in burn pit.
12-The well opened to flow by small choke size for cleanout purpose,the hydrocarbons fluid
was burned in the burn pit that far about 300 meters from the well .
13-The burned of hydrocarbons was continued until the well cleaned from from completion
fluid or water or residual drill mud,and the well reached stabilized condition.
14-The surface facilites should be establish at surface.
15-Then the well closed and it will be ready to done evaluated test.
16-After that production can be started.
PAGE 3
PAGE 4

Mais conteúdo relacionado

Mais procurados

Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
AFATous
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
yudi05
 

Mais procurados (20)

Well test-procedures-manual
Well test-procedures-manualWell test-procedures-manual
Well test-procedures-manual
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Packers
PackersPackers
Packers
 
Tubing string
Tubing stringTubing string
Tubing string
 
05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
 
Casing design
Casing designCasing design
Casing design
 
Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)
 
Well completion d.pptx
Well completion d.pptxWell completion d.pptx
Well completion d.pptx
 
Drill stem testing
Drill stem testingDrill stem testing
Drill stem testing
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
One day gas lift system course
One day gas lift system course One day gas lift system course
One day gas lift system course
 
WELL COMPLETIONS.pptx
WELL COMPLETIONS.pptxWELL COMPLETIONS.pptx
WELL COMPLETIONS.pptx
 
Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 

Destaque

Developing Your Project From Concept to Completion
Developing Your Project From Concept to CompletionDeveloping Your Project From Concept to Completion
Developing Your Project From Concept to Completion
Yorkshire Cricket Board
 
Retail Management Final Project: Store Analysis of EA Davis
Retail Management Final Project: Store Analysis of EA DavisRetail Management Final Project: Store Analysis of EA Davis
Retail Management Final Project: Store Analysis of EA Davis
Aglazer1
 
METAL IMPURITIES IN CRUDE OIL
METAL IMPURITIES IN CRUDE OILMETAL IMPURITIES IN CRUDE OIL
METAL IMPURITIES IN CRUDE OIL
aatif shahab
 
Motivation in Job satisfaction
Motivation in Job satisfactionMotivation in Job satisfaction
Motivation in Job satisfaction
shweta mukherjee
 
Open Hole Electric logs interpretation
Open Hole Electric logs interpretationOpen Hole Electric logs interpretation
Open Hole Electric logs interpretation
Mourad Wassef
 
Motivation and Job Satisfaction
Motivation and Job SatisfactionMotivation and Job Satisfaction
Motivation and Job Satisfaction
Beverly Carey
 
Project report on retail management .
Project report on retail management .Project report on retail management .
Project report on retail management .
c143k
 
Motivation & job satisfaction
Motivation & job satisfactionMotivation & job satisfaction
Motivation & job satisfaction
Mohit Singla
 
Retail management project
Retail management projectRetail management project
Retail management project
Deepika Agrawal
 
Project report on retail marketing in india
Project report on retail marketing in indiaProject report on retail marketing in india
Project report on retail marketing in india
Gaurav Tyagi
 
Well logging and interpretation techniques asin b000bhl7ou
Well logging and interpretation techniques asin  b000bhl7ouWell logging and interpretation techniques asin  b000bhl7ou
Well logging and interpretation techniques asin b000bhl7ou
Ahmed Raafat
 

Destaque (20)

Concept to Completion
Concept to CompletionConcept to Completion
Concept to Completion
 
Developing Your Project From Concept to Completion
Developing Your Project From Concept to CompletionDeveloping Your Project From Concept to Completion
Developing Your Project From Concept to Completion
 
Retail management
Retail managementRetail management
Retail management
 
Defining Well completion
Defining Well completionDefining Well completion
Defining Well completion
 
Retail Management Final Project: Store Analysis of EA Davis
Retail Management Final Project: Store Analysis of EA DavisRetail Management Final Project: Store Analysis of EA Davis
Retail Management Final Project: Store Analysis of EA Davis
 
METAL IMPURITIES IN CRUDE OIL
METAL IMPURITIES IN CRUDE OILMETAL IMPURITIES IN CRUDE OIL
METAL IMPURITIES IN CRUDE OIL
 
Motivation in Job satisfaction
Motivation in Job satisfactionMotivation in Job satisfaction
Motivation in Job satisfaction
 
Open Hole Electric logs interpretation
Open Hole Electric logs interpretationOpen Hole Electric logs interpretation
Open Hole Electric logs interpretation
 
Motivation and Job Satisfaction
Motivation and Job SatisfactionMotivation and Job Satisfaction
Motivation and Job Satisfaction
 
Project report on retail management .
Project report on retail management .Project report on retail management .
Project report on retail management .
 
waterflooding
waterfloodingwaterflooding
waterflooding
 
Motivation & job satisfaction
Motivation & job satisfactionMotivation & job satisfaction
Motivation & job satisfaction
 
Retail management project
Retail management projectRetail management project
Retail management project
 
Well logging
Well loggingWell logging
Well logging
 
Well logging
Well loggingWell logging
Well logging
 
From Concept to Completion: Tips for Designing Great Content
From Concept to Completion: Tips for Designing Great ContentFrom Concept to Completion: Tips for Designing Great Content
From Concept to Completion: Tips for Designing Great Content
 
Geophysical well logging
Geophysical well loggingGeophysical well logging
Geophysical well logging
 
Project report on retail marketing in india
Project report on retail marketing in indiaProject report on retail marketing in india
Project report on retail marketing in india
 
Conflict of interest
Conflict of interestConflict of interest
Conflict of interest
 
Well logging and interpretation techniques asin b000bhl7ou
Well logging and interpretation techniques asin  b000bhl7ouWell logging and interpretation techniques asin  b000bhl7ou
Well logging and interpretation techniques asin b000bhl7ou
 

Semelhante a Open Hole Completion Design

Semester Assignment Drilling, Reservoir & Well Engineering Study
Semester Assignment Drilling, Reservoir & Well Engineering StudySemester Assignment Drilling, Reservoir & Well Engineering Study
Semester Assignment Drilling, Reservoir & Well Engineering Study
Nikolaos Felessakis
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
Mohamed Elnagar
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1
AFATous
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1
AFATous
 

Semelhante a Open Hole Completion Design (20)

260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples260416413-Well-Completion-ppt with examples
260416413-Well-Completion-ppt with examples
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
Chapter_6-OCW.pdf
Chapter_6-OCW.pdfChapter_6-OCW.pdf
Chapter_6-OCW.pdf
 
Chapter_6hdhdvd-OCW.pdf
Chapter_6hdhdvd-OCW.pdfChapter_6hdhdvd-OCW.pdf
Chapter_6hdhdvd-OCW.pdf
 
Well Complection - Basic-1.pptx
Well Complection - Basic-1.pptxWell Complection - Basic-1.pptx
Well Complection - Basic-1.pptx
 
Semester Assignment Drilling, Reservoir & Well Engineering Study
Semester Assignment Drilling, Reservoir & Well Engineering StudySemester Assignment Drilling, Reservoir & Well Engineering Study
Semester Assignment Drilling, Reservoir & Well Engineering Study
 
Well work over
Well work overWell work over
Well work over
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdf
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6
 
Anggely c.i 27.360.304 completacion pozos
Anggely  c.i 27.360.304  completacion pozosAnggely  c.i 27.360.304  completacion pozos
Anggely c.i 27.360.304 completacion pozos
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
well control (IWCF)
well control (IWCF)well control (IWCF)
well control (IWCF)
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
Well completion.
Well completion.Well completion.
Well completion.
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down Test
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1
 

Mais de Kamal Abdurahman

Mais de Kamal Abdurahman (20)

Styleguide
StyleguideStyleguide
Styleguide
 
Assignment guides
Assignment guides  Assignment guides
Assignment guides
 
Project guideline for 4th stage students
Project guideline for 4th stage studentsProject guideline for 4th stage students
Project guideline for 4th stage students
 
Liquid permeability
Liquid permeabilityLiquid permeability
Liquid permeability
 
Helum porosty meter
Helum porosty meterHelum porosty meter
Helum porosty meter
 
Porosity by saturation method
Porosity by saturation methodPorosity by saturation method
Porosity by saturation method
 
Core cleaning
Core cleaningCore cleaning
Core cleaning
 
Core plugging test
Core plugging testCore plugging test
Core plugging test
 
Mud density
Mud densityMud density
Mud density
 
Multi desaturator cell
Multi desaturator cellMulti desaturator cell
Multi desaturator cell
 
Surface Tension Report
Surface Tension ReportSurface Tension Report
Surface Tension Report
 
Carbon residue report
Carbon residue reportCarbon residue report
Carbon residue report
 
Specific gravity by weight
Specific gravity by weightSpecific gravity by weight
Specific gravity by weight
 
Capillary suction-timers
Capillary suction-timersCapillary suction-timers
Capillary suction-timers
 
PH meter report
PH meter reportPH meter report
PH meter report
 
Mud Filtration Test
Mud Filtration TestMud Filtration Test
Mud Filtration Test
 
Capillary suction-timers
Capillary suction-timersCapillary suction-timers
Capillary suction-timers
 
Steady state gas permeameter
Steady state gas permeameterSteady state gas permeameter
Steady state gas permeameter
 
Rheological properties using model 900 viscometer
Rheological properties using model 900 viscometerRheological properties using model 900 viscometer
Rheological properties using model 900 viscometer
 
Liquid permeability
Liquid permeabilityLiquid permeability
Liquid permeability
 

Último

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

Open Hole Completion Design

  • 1. Kamal Abdurahman | Student Activity | June 14, 2014 Well Completion Program OPEN HOLE COPLETION DESIGN
  • 2. PAGE 1 Well Completion Program Completion, in petroleum production,is the process of making a well ready for production (or injection). This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and it’s associated down hole tools as well as perforating and stimulating as required. Sometimes, the process of running in and cementing the casing is also included. Open-hole Completion Open-hole completions are also termed 'barefoot' completions. In this type of completion the casing is set in place and cemented above the productive interval(s). Further drilling extends the well bore into and/or through the reservoir(s) which is left uncased, hence the term 'Open Hole’. This completion method is used where it is desirable to expose the whole of the productive interval(s) to the well bore. The rock of the producing formations must be strong or 'consolidated' to prevent breakdown and collapse when in production We will take a simple well completion for open-hole well to explain the operation steps: 1-The production casing is set on top of production zone before drill the production formation that contains the hydrocarbon fluids, then after casing was cemented, producing formation drilled. 2- The production casing is set above the zone of interest before drilling the zone. The zone is open to the well bore. In this case little expense is generated with perforations log interpretation is not critical. The well can be deepened easily and it is easily converted to screen and liner. However, excessive gas and water production is difficult to control, and may require frequent clean outs. Also the interval cannot be selectively stimulated. 3-After casing and cement the well without production zone, run the hole log tool for checking the cement. 4-According to the pressure of the well, if the reservoir pressure is adequate to give a flowrate fit to the casing is ok, if not install of tubing is performed. 5-Screen is reliable if set in the interval zone for preventing sand particles to the well bore. 6-Preforation is not require to the open hole. 7-Gravel pack is good if set in the interval zone. 8-The production zone is open to the well bore. 9-Set ‘BOP’ to the well. 10-Setthe well-head on the top of the well bore,thatinclude X-mass tree and master valve…..& so on.
  • 3. PAGE 2 11-The well head valves must be connected to burn pipe to burn the fluid in burn pit. 12-The well opened to flow by small choke size for cleanout purpose,the hydrocarbons fluid was burned in the burn pit that far about 300 meters from the well . 13-The burned of hydrocarbons was continued until the well cleaned from from completion fluid or water or residual drill mud,and the well reached stabilized condition. 14-The surface facilites should be establish at surface. 15-Then the well closed and it will be ready to done evaluated test. 16-After that production can be started.