SlideShare uma empresa Scribd logo
1 de 25
Baixar para ler offline
Antonio MONACO
237 Brick Cottage LN # 102 - 38105 Memphis – TN (USA)
Mob: 1 – 901 – 848 - 0148
e-mail: antonio_monaco@ymail.com

MANAGED PROJECTS
2012 to present (U.S.A.)
 ASSISTANT BRANCH MANAGER
 Engineering, Budgeting, Logistic, Transportation and Heavy Lift Cranes, involved in civil
constructions, wind turbine parks, chemical, refineries, power and nuclear implants across the USA.
 CONSTRUCTION SPECIALIST – Engineering, Construction, bridges, roads and infrastructures..
 Engineering Coordinator, Budget management, analysis projects, planning and scheduling, code
compliance, supervising, government funds managements.

2008 to 2011 (U.S.A. & Africa)
 DEPUTY PROJECT MANAGER
 New University Center. – (University of Memphis – TN work amount $ 45,500,000.00).
 FIELD ENGINEER / CONSTRUCTION MANAGER
 New Clinic Center (ENI Congo - Italian National Oil Company – Africa branch - work amount
$ 15,000,000.00).

From 2007 to 2008 (Italy)
 PROJECT MANAGER
 New n. 9 buildings (n° 90 apartments) – (Rimini City Hall – work amount $ 35,000,000.00).

From 2001 to 2007 (Italy & Africa)
 DEPUTY PROJECT MANAGER
 Industrial shed in the Port of Livorno (Shipyards AZIMUT BENETTI SpA work amount $ 6,000,000.00);
 Urban requalification in Salerno (private business – work amount $ 100,000,000.00);
 Civil works in the Center Oil (ENI Italian National Oil Company – work amount $ 5,000,000.00);
 New Highways, for Winter Olympics Game in Piemonte (work amount $ 9,000,000.00);
 Bridge on the river DORA, Interstate A1 Turin-Milan widening (work amount $ 125,000,000.00);
 Renovation of country houses in Tuscany (private business, work amount $ 9,000,000.0);
 New terminal oil port located in Africa (Djibouti). For the storage of oil at the service of United States,
Arab Emirates, France and UK. (ENOC – Emirates National Oil Company – work amount
$ 56,000,000.00)
 New Industrial Shed in Africa (Djibouti). (Coca-Cola Company, work amount $ 16,000,000.00);
 New prison in Sardinia (Italy). (Italian Ministry of Public Works, amount $ 90,000,000.00)

Pages 1 of 2
Antonio MONACO

237 Brick Cottage LN # 102 - 38105 Memphis – TN (USA)
Mob: 1 – 901 – 848 - 0148
e-mail: antonio_monaco@ymail.com

From 1994 to 2001
 PROJECT MANAGEMENT CONSULTANT
 Houses in Bologna (Private business – work amount $ 12,000,000.00);
 Houses in Basilicata (average work amount $ 6,000,000.00);
 Stadium in Potenza (Italian Ministry of Sport work amount $ 24,000,000.00);
 Extension of the Municipal Cemeteries (average work amount $ 15,000,000.00);
 Recovery of buildings damaged by earthquakes (works amount $ 60,000,000.00);
 Industrial sheds (Private business – works amount $ 7,500,000.00);
 Highways, bridgs, aqueducts and drainage systems (works amount $ 18,000,000.00);
 Maintenance of the railway network (Italian Ministry of Infrastructure and Transport – work amount $
7,600,000.00);
 Maintenance and installation of the gas network (ENI Italian National Oil Company – work amount
$ 5,500,000.00);
 Consolidation of bridges (Italian Ministry of Infrastructure and Transport – work amount
$ 15,600,000.00);
 Aqueducts, sewer and gas line (work amount $ 5,000,000.0);
 New parking area in Trieste (work amount $ 3,000,000.00);
 New City Hall in Trieste (work amount $ 20,000,000.00);
 New Mall in Trieste (works amount $ 55,000,000.00);
 Project design for buildings used for housing and industrial settlements, built in Italy;
 Project design for fuel distribution systems (Client: API, Q8 and TAMOIL);
 Highways and road planning, implemented in province of Potenza;
 Project design for the realization of the Cathedral in Potenza ($ 6,000,000.00);
 Project design for the expansion of the Municipal Cemetery in Italy ($ 5,000,000.00);
 Project design for the construction of wind farms in Italy ($ 12,000,000.00);
 Land survey for splits, road works, buildings and stacking.
 Search sites for Radio Base Stations, and subsequent project development;
 Safety Manager;
 Freelance collaboration with Technical State Land Department in Potenza;
 Freelance Collaboration with Technical Office CITY HALL of Potenza.

Pages 2 of 2
MANAGED PROJECTS
¾ ASSISTANT PROJECT MANAGER
From 2005 to 2007
‰ The Doraleh Port in Djibouti – Africa (work amount $ 56,000,000.00)
The Emirates National Oil Company (ENOC) has committed to developing a New Oil Port
Terminal in Djibouti (Africa) located in Doraleh area, so other oil companies (Shell, Mobil,
Total, Ethiopian Petroleum-EPE) have been offered land at Doraleh to develop similar
facilities. DPI (Dubai Ports International) has committed to developing the oil jetty to serve
the new terminal(s) and, also, constructed the road link from Doraleh to the Djibouti –
Ethiopia highway.
The Company that I worked with, had the job to build some civil constructions (roads,
bridges, jetty, concrete pipeline supports, fens, excavations, slabs concrete).
Dimensions (Jetty Bridge – shipping and pipeline used)
Length
360.00 mt
(1,18 feet / 393.70
Deck Width
18.00 mt
(59.06 feet / 19.96
Deep Water
55.00 mt
(180.40 feet / 60.15
Spans
each 30.00 mt
(98.43 feet / 32.81

yards)
yards)
yards)
yards)

All structure was in steel.
Dimensions (Jetty Bridge – cars and pipeline used)
Length
210.00 mt
(689.00 feet / 229.70
Deck Width
25.00 mt
(82.02 feet / 10.94
Deep Water
10.0-55.0 mt
(32.81-180.40 feet / 10.94-60.15
Spans
each 30.00 mt
(98.43 feet / 32.81

yards)
yards)
yards)
yards)

All structure was in steel, part of deck used by cars was in concrete.
Part of jetty (cars and pipeline used) was rock filled for a length of 1,100.0 mt (3,609.0 feet /
1203.0 yards), width of 70.00 mt (229.70 feet / 76.55 yards) and deep water of 2.0–10.0 mt
(6.562–32.81 feet / 2.187-10.94 yards).
Dimensions (Bridges crossing roads – cars used)
Length
10.0–40.0 mt
(32.81-131.20 feet / 10.94-43.74
Deck Width
4.0–10.0 mt
(13.12-32.81 feet / 4.37-10.94
Height
3.0–15.0 mt
(9.84-49.21 feet / 3.28-16.40
Spans
each 10.0-20.0 mt
(32.81-65.62 feet / 10.94-21.87

yards)
yards)
yards)
yards)

All structures were in concrete and steel beams.
I was employed with an Italian construction company that they moved me from a Italian site
to Afirca to be assistant project manager, with responsibilities in Analysis executive project,
design, quality control, project development, planning and scheduling, cost control and
supervisor work.

From 2004 to 2005
‰ Bridge on the river DORA, highway A4 Turin-Milan widening (work amount $ 125,000,000.00)
The highway Turin-Milan was subject to an extensive renovation, contextual to the
implementation of high-speed rail line, to extend the three lanes and add the emergency one.
The project that I managed, concerned the upgrading of a 6.00 km (Km. 20+800 a 26+800)
long section of the A4 toll motorway between Torino – starting at Rondissone Gate – and
Milano.
Page 1/3
It comprised: (1) widening and upgrading safety standards over the whole length of the
highway; (2) constructing a new Bridge crossing river DORA; and (3) constructing the safety
lane between.
Dimensions (Steel Bridge crossing river DORA)
Length
200.00 mt
(656.20 feet / 218.70
Deck Width
6.00 mt
(19.69 feet / 6.56
Height
9.00 mt
(29.53 feet / 9.84
Spans
n. 3 each 65.00 mt
(213.30 feet / 71.08

yards)
yards)
yards)
yards)

The piers footing, deep in the water, were built in concrete, the beams were built in steel.
Dimensions (Concrete Bridge crossing river DORA)
Length
500.00 mt
(1,640.00 feet / 546.80
Deck Width
6.00 mt
(19.69 feet / 6.56
Height
9.00–3.00 mt
(29.53–9.84 feet / 9.84–3.28
Spans
each 20.00 mt
(65.62 feet / 21.87

yards)
yards)
yards)
yards)

All structure was in concrete with prestressed concrete beam.
I was employed with a construction company as assistant project manager, with
responsibilities in Analysis executive project, project development, design, quality control,
planning and scheduling, building code compliance, material purchasing, negotiation, cost
control.

From 2003 to 2004
‰ New roads, for Winter Olympics Game in Piemonte (work amount $ 9,000,000.00)
The Piemonte’s government needed to improve several roads for the Winter Olympics Game.
There were some old roads to replace the asphalt or concrete works, but the design for the
new roads planned for the construction of bridges.
They comprises: (1) upgrading safety standards over the whole length of the highway; (2)
constructing a new bridges crossing the Interstates; and (3) constructing the safety lane
between.
Dimensions
Length
Deck Width
Height
Spans

20.0– 60.0
8.00
10.0–15.0
each 20.00

mt
mt
mt
mt

(65.62–196.60 feet / 21.87–65.62
(26.25 feet / 8.75
(32.81–49.21 feet / 10.94–16.40
(65.62 feet / 21.87

yards)
yards)
yards)
yards)

All structure was in concrete with prestressed concrete beam.
I was employed with a construction company as assistant project manager, with
responsibilities in Analysis executive project, project development, design, quality control,
planning and scheduling, building code compliance, material purchasing, negotiation, cost
control.
¾ PROJECT MANAGEMENT CONSULTANT
From 2000 to 2001
‰ Consolidation of a railway bridges by injection of EMACO (two-component resin - epoxy).
Railways Line required structural improvement along the whole line Campobasso-Benevento
(south of Italy) and particularly on a couple of XIX century masonry arch bridges near
Campobasso (Molise region).
Some bridges crossing the Biferno River, with the piers footing deep in the water.
Dimensions
Length
Deck Width

150.0–300.0 mt
10.00 mt

(492.10–984.3 feet / 164.0-328.10 yards)
(32.88 feet / 10.96 yards)
Page 2/3
Height
Spans

10.00 – 40.00 mt
each 18.00 mt

(32.81-131.20 feet / 10.94–43.74 yards)
(59.06 feet / 19.69 yards)

In this project I was Consultant Project Manager (freelance) for the construction company, to
scheduling, direction, coordination and budget control.
Client: Italian Ministry of Infrastructure and Transport – work amount $ 15,600,000.00.

From 1998 to 1999
‰ Bridge across interstate N. 95 (Tito-Brienza) in Basilicata.
The existing Interstate, crossing a Tito Village, needed a new exit to emerge onto it.
Dimensions
Length
Deck Width
Height
Spans

230.00
11.00
18.00
23.00

mt
mt
mt
mt

(767.70 feet / 255.90 yards)
(36.09 feet / 12.03 yards)
(59.06 feet / 19.69 yards)
(75.46 feet / 25.15 yards)

All structure was in concrete and prestressed concrete beam.
In this project I was freelance with my own Professional Licence, I worked in team with one
engineer and one surveyor, to do planning, scheduling, direction, coordination, cost control
and land surveying.
Client: Italian Ministry of Infrastructure and Transport – work amount $ 3,000,000.00.
From 1997 to 2001
‰ Roads, aqueducts and drainage systems (works amount $ 18,000,000.00)
In some of project where I was Supervisor or Consultant Project Manager included the
construction of shorts bridges with maximum length 20.00 mt (65.62 feet / 21.87 yards),
with all structures in concrete and prestressed concrete beam.

Page 3/3
From 2005 to 2007
The Doraleh Port in Djibouti – Africa (work amount $ 56,000,000.00)

Project Area

Jetty Bridge – used for the
shipping and the pipelines

Phase for construction of the Jetty Bridge
Used by cars and for the pipelines
Phase for construction of the Jetty Bridge
Used by cars and for the pipelines

Phase for construction of the Jetty Bridge
Used by cars and for the pipelines

Bridges crossing roads
Used by cars
From 2004 to 2005
Bridge on the river DORA, highway A4 Turin-Milan widening (work amount $ 125,000,000.00)

Project Area

Project Completed

From 2000 to 2001
Consolidation of a railway bridges by injection of EMACO (two-component resin - epoxy).
Railways XIX century masonry arch bridges near Campobasso (Molise region).
From 1998 to 1999
Road planning - Bridge across interstate N. 95 (Tito-Brienza) in Basilicata.

Project Area

Project Example

From 1997 to 2001
Roads included the construction of shorts bridges with all structures in concrete and prestressed
concrete beam.
ITALY
RIMINI

CONSTRUCTION OF A NEW COMPLEX OF
N. 9 BUILDINGS FOR CIVIL RESIDENCE
CONSTRUCTION

PROJECT

PHASE WORK BUILDINGS C-D

PHASE WORK BUILDINGS A-B

PHASE WORK BUILDINGS C-D

PHASE WORK BUILDINGS B-A

PHASE WORK BUILDINGS C
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list
Projects list

Mais conteúdo relacionado

Mais procurados

Primavera Project Manager And Construction Projects
Primavera Project Manager And Construction ProjectsPrimavera Project Manager And Construction Projects
Primavera Project Manager And Construction Projectsbeverly0bennett8
 
State Farm Center: Renovation and Addition Project
State Farm Center: Renovation and Addition ProjectState Farm Center: Renovation and Addition Project
State Farm Center: Renovation and Addition ProjectAusrine Rakauskaite
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINALCandice Spiroski
 

Mais procurados (9)

Kd6
Kd6Kd6
Kd6
 
Primavera Project Manager And Construction Projects
Primavera Project Manager And Construction ProjectsPrimavera Project Manager And Construction Projects
Primavera Project Manager And Construction Projects
 
BE Cost Plan
BE Cost Plan BE Cost Plan
BE Cost Plan
 
State Farm Center: Renovation and Addition Project
State Farm Center: Renovation and Addition ProjectState Farm Center: Renovation and Addition Project
State Farm Center: Renovation and Addition Project
 
Resume_Wizard
Resume_WizardResume_Wizard
Resume_Wizard
 
Airport Construction
Airport ConstructionAirport Construction
Airport Construction
 
Rail case study birmingham layout 1
Rail case study birmingham layout 1Rail case study birmingham layout 1
Rail case study birmingham layout 1
 
Profile e mail (3)
Profile e mail (3)Profile e mail (3)
Profile e mail (3)
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
 

Destaque

Previsioni lotto gratis 21112013
Previsioni lotto gratis 21112013Previsioni lotto gratis 21112013
Previsioni lotto gratis 21112013gigicalo
 
ConductRF Overview-2016
ConductRF Overview-2016ConductRF Overview-2016
ConductRF Overview-2016Dean Gammell
 
Sinonimos y Antonimos
Sinonimos y AntonimosSinonimos y Antonimos
Sinonimos y AntonimosLuz Deu
 
Introduction who am i (1)
Introduction  who am i (1)Introduction  who am i (1)
Introduction who am i (1)Noemi2222
 
Presentation1(1)
Presentation1(1)Presentation1(1)
Presentation1(1)Noemi2222
 
Volunteering
VolunteeringVolunteering
VolunteeringNoemi2222
 
L'Escola en dansa 2016
L'Escola en dansa 2016L'Escola en dansa 2016
L'Escola en dansa 2016Noemi2222
 

Destaque (13)

Previsioni lotto gratis 21112013
Previsioni lotto gratis 21112013Previsioni lotto gratis 21112013
Previsioni lotto gratis 21112013
 
Barcelona
BarcelonaBarcelona
Barcelona
 
ConductRF Overview-2016
ConductRF Overview-2016ConductRF Overview-2016
ConductRF Overview-2016
 
Sinonimos y Antonimos
Sinonimos y AntonimosSinonimos y Antonimos
Sinonimos y Antonimos
 
Leanna
LeannaLeanna
Leanna
 
Introduction who am i (1)
Introduction  who am i (1)Introduction  who am i (1)
Introduction who am i (1)
 
Baylee
BayleeBaylee
Baylee
 
Stephanie
StephanieStephanie
Stephanie
 
Presentation1(1)
Presentation1(1)Presentation1(1)
Presentation1(1)
 
Volunteering
VolunteeringVolunteering
Volunteering
 
Descripcion y-analisis-del-puesto
Descripcion y-analisis-del-puestoDescripcion y-analisis-del-puesto
Descripcion y-analisis-del-puesto
 
The third man
The third manThe third man
The third man
 
L'Escola en dansa 2016
L'Escola en dansa 2016L'Escola en dansa 2016
L'Escola en dansa 2016
 

Semelhante a Projects list

Bouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationBouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationPierre HUBERT
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaductJayanta Sen
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelShivam Sood
 
Politecnico of Turin Presentation - 29 May 2014
Politecnico of Turin Presentation - 29 May 2014Politecnico of Turin Presentation - 29 May 2014
Politecnico of Turin Presentation - 29 May 2014Ignazio Dogliani
 
Víctor Oyarce Resume Ingles
Víctor Oyarce Resume InglesVíctor Oyarce Resume Ingles
Víctor Oyarce Resume InglesVictor Oyarce
 
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions
RV 2014: Mobile Workshop #15- Integrating Transit into Large InstitutionsRV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions
RV 2014: Mobile Workshop #15- Integrating Transit into Large InstitutionsRail~Volution
 
Ur-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical ConsultationsUr-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical ConsultationsMazin Alhamrany
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experiencegifanta
 
Curriculum 2016_Eng
Curriculum 2016_EngCurriculum 2016_Eng
Curriculum 2016_EngCarlo Ceresa
 

Semelhante a Projects list (20)

2018 Planning
2018 Planning2018 Planning
2018 Planning
 
PROJECTS index updated
PROJECTS index updatedPROJECTS index updated
PROJECTS index updated
 
Bouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate PresentationBouygues Travaux Publics_Corporate Presentation
Bouygues Travaux Publics_Corporate Presentation
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
Breviary Photographic Projects
Breviary Photographic ProjectsBreviary Photographic Projects
Breviary Photographic Projects
 
Presentation on Millau viaduct
Presentation on Millau viaductPresentation on Millau viaduct
Presentation on Millau viaduct
 
The Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering MarvelThe Millau Viaduct Project - An Engineering Marvel
The Millau Viaduct Project - An Engineering Marvel
 
Politecnico of Turin Presentation - 29 May 2014
Politecnico of Turin Presentation - 29 May 2014Politecnico of Turin Presentation - 29 May 2014
Politecnico of Turin Presentation - 29 May 2014
 
2022_03_PRESENTAZIONE L.L.F..pdf
2022_03_PRESENTAZIONE L.L.F..pdf2022_03_PRESENTAZIONE L.L.F..pdf
2022_03_PRESENTAZIONE L.L.F..pdf
 
KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016
 
Víctor Oyarce Resume Ingles
Víctor Oyarce Resume InglesVíctor Oyarce Resume Ingles
Víctor Oyarce Resume Ingles
 
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions
RV 2014: Mobile Workshop #15- Integrating Transit into Large InstitutionsRV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions
 
C.V.
C.V.C.V.
C.V.
 
Project
ProjectProject
Project
 
Eng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photoEng - GFM- 04.15 +photo
Eng - GFM- 04.15 +photo
 
Ur-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical ConsultationsUr-GeoTech / Geotechnical Consultations
Ur-GeoTech / Geotechnical Consultations
 
Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experience
 
Curriculum 2016_Eng
Curriculum 2016_EngCurriculum 2016_Eng
Curriculum 2016_Eng
 

Último

Factors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptx
Factors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptxFactors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptx
Factors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptxvemusae
 
Top Call Girls In Charbagh ( Lucknow ) 🔝 8923113531 🔝 Cash Payment
Top Call Girls In Charbagh ( Lucknow  ) 🔝 8923113531 🔝  Cash PaymentTop Call Girls In Charbagh ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment
Top Call Girls In Charbagh ( Lucknow ) 🔝 8923113531 🔝 Cash Paymentanilsa9823
 
Night 7k Call Girls Atta Market Escorts Call Me: 8448380779
Night 7k Call Girls Atta Market Escorts Call Me: 8448380779Night 7k Call Girls Atta Market Escorts Call Me: 8448380779
Night 7k Call Girls Atta Market Escorts Call Me: 8448380779Delhi Call girls
 
Film show investigation powerpoint for the site
Film show investigation powerpoint for the siteFilm show investigation powerpoint for the site
Film show investigation powerpoint for the siteAshtonCains
 
Spotify AI DJ Deck - The Agency at University of Florida
Spotify AI DJ Deck - The Agency at University of FloridaSpotify AI DJ Deck - The Agency at University of Florida
Spotify AI DJ Deck - The Agency at University of Floridajorirz24
 
Film show pre-production powerpoint for site
Film show pre-production powerpoint for siteFilm show pre-production powerpoint for site
Film show pre-production powerpoint for siteAshtonCains
 
Top Call Girls In Telibagh ( Lucknow ) 🔝 8923113531 🔝 Cash Payment
Top Call Girls In Telibagh ( Lucknow  ) 🔝 8923113531 🔝  Cash PaymentTop Call Girls In Telibagh ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment
Top Call Girls In Telibagh ( Lucknow ) 🔝 8923113531 🔝 Cash Paymentanilsa9823
 
Improve Your Brand in Waco with a Professional Social Media Marketing Company
Improve Your Brand in Waco with a Professional Social Media Marketing CompanyImprove Your Brand in Waco with a Professional Social Media Marketing Company
Improve Your Brand in Waco with a Professional Social Media Marketing CompanyWSI INTERNET PARTNER
 
Elite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCR
Elite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCRElite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCR
Elite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCRDelhi Call girls
 
Social media marketing/Seo expert and digital marketing
Social media marketing/Seo expert and digital marketingSocial media marketing/Seo expert and digital marketing
Social media marketing/Seo expert and digital marketingSheikhSaifAli1
 
Production diary Film the city powerpoint
Production diary Film the city powerpointProduction diary Film the city powerpoint
Production diary Film the city powerpointAshtonCains
 
Call^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call Me
Call^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call MeCall^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call Me
Call^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call MeMs Riya
 
Call Girls In Noida Mall Of Noida O9654467111 Escorts Serviec
Call Girls In Noida Mall Of Noida O9654467111 Escorts ServiecCall Girls In Noida Mall Of Noida O9654467111 Escorts Serviec
Call Girls In Noida Mall Of Noida O9654467111 Escorts ServiecSapana Sha
 
9990611130 Find & Book Russian Call Girls In Crossings Republik
9990611130 Find & Book Russian Call Girls In Crossings Republik9990611130 Find & Book Russian Call Girls In Crossings Republik
9990611130 Find & Book Russian Call Girls In Crossings RepublikGenuineGirls
 
Your LinkedIn Makeover: Sociocosmos Presence Package
Your LinkedIn Makeover: Sociocosmos Presence PackageYour LinkedIn Makeover: Sociocosmos Presence Package
Your LinkedIn Makeover: Sociocosmos Presence PackageSocioCosmos
 
Film show production powerpoint for site
Film show production powerpoint for siteFilm show production powerpoint for site
Film show production powerpoint for siteAshtonCains
 
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779Delhi Call girls
 

Último (20)

Factors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptx
Factors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptxFactors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptx
Factors-on-Authenticity-and-Validity-of-Evidences-and-Information.pptx
 
Top Call Girls In Charbagh ( Lucknow ) 🔝 8923113531 🔝 Cash Payment
Top Call Girls In Charbagh ( Lucknow  ) 🔝 8923113531 🔝  Cash PaymentTop Call Girls In Charbagh ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment
Top Call Girls In Charbagh ( Lucknow ) 🔝 8923113531 🔝 Cash Payment
 
Night 7k Call Girls Atta Market Escorts Call Me: 8448380779
Night 7k Call Girls Atta Market Escorts Call Me: 8448380779Night 7k Call Girls Atta Market Escorts Call Me: 8448380779
Night 7k Call Girls Atta Market Escorts Call Me: 8448380779
 
Film show investigation powerpoint for the site
Film show investigation powerpoint for the siteFilm show investigation powerpoint for the site
Film show investigation powerpoint for the site
 
Spotify AI DJ Deck - The Agency at University of Florida
Spotify AI DJ Deck - The Agency at University of FloridaSpotify AI DJ Deck - The Agency at University of Florida
Spotify AI DJ Deck - The Agency at University of Florida
 
Film show pre-production powerpoint for site
Film show pre-production powerpoint for siteFilm show pre-production powerpoint for site
Film show pre-production powerpoint for site
 
Bicycle Safety in Focus: Preventing Fatalities and Seeking Justice
Bicycle Safety in Focus: Preventing Fatalities and Seeking JusticeBicycle Safety in Focus: Preventing Fatalities and Seeking Justice
Bicycle Safety in Focus: Preventing Fatalities and Seeking Justice
 
Top Call Girls In Telibagh ( Lucknow ) 🔝 8923113531 🔝 Cash Payment
Top Call Girls In Telibagh ( Lucknow  ) 🔝 8923113531 🔝  Cash PaymentTop Call Girls In Telibagh ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment
Top Call Girls In Telibagh ( Lucknow ) 🔝 8923113531 🔝 Cash Payment
 
Improve Your Brand in Waco with a Professional Social Media Marketing Company
Improve Your Brand in Waco with a Professional Social Media Marketing CompanyImprove Your Brand in Waco with a Professional Social Media Marketing Company
Improve Your Brand in Waco with a Professional Social Media Marketing Company
 
Elite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCR
Elite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCRElite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCR
Elite Class ➥8448380779▻ Call Girls In New Friends Colony Delhi NCR
 
Social media marketing/Seo expert and digital marketing
Social media marketing/Seo expert and digital marketingSocial media marketing/Seo expert and digital marketing
Social media marketing/Seo expert and digital marketing
 
Production diary Film the city powerpoint
Production diary Film the city powerpointProduction diary Film the city powerpoint
Production diary Film the city powerpoint
 
Russian Call Girls Rohini Sector 37 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 37 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 37 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 37 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Call^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call Me
Call^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call MeCall^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call Me
Call^ Girls Delhi Independent girls Chanakyapuri 9711199012 Call Me
 
Call Girls In Noida Mall Of Noida O9654467111 Escorts Serviec
Call Girls In Noida Mall Of Noida O9654467111 Escorts ServiecCall Girls In Noida Mall Of Noida O9654467111 Escorts Serviec
Call Girls In Noida Mall Of Noida O9654467111 Escorts Serviec
 
9990611130 Find & Book Russian Call Girls In Crossings Republik
9990611130 Find & Book Russian Call Girls In Crossings Republik9990611130 Find & Book Russian Call Girls In Crossings Republik
9990611130 Find & Book Russian Call Girls In Crossings Republik
 
Your LinkedIn Makeover: Sociocosmos Presence Package
Your LinkedIn Makeover: Sociocosmos Presence PackageYour LinkedIn Makeover: Sociocosmos Presence Package
Your LinkedIn Makeover: Sociocosmos Presence Package
 
Film show production powerpoint for site
Film show production powerpoint for siteFilm show production powerpoint for site
Film show production powerpoint for site
 
Russian Call Girls Rohini Sector 35 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 35 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 35 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 35 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
Night 7k Call Girls Noida Sector 121 Call Me: 8448380779
 

Projects list

  • 1. Antonio MONACO 237 Brick Cottage LN # 102 - 38105 Memphis – TN (USA) Mob: 1 – 901 – 848 - 0148 e-mail: antonio_monaco@ymail.com MANAGED PROJECTS 2012 to present (U.S.A.)  ASSISTANT BRANCH MANAGER  Engineering, Budgeting, Logistic, Transportation and Heavy Lift Cranes, involved in civil constructions, wind turbine parks, chemical, refineries, power and nuclear implants across the USA.  CONSTRUCTION SPECIALIST – Engineering, Construction, bridges, roads and infrastructures..  Engineering Coordinator, Budget management, analysis projects, planning and scheduling, code compliance, supervising, government funds managements. 2008 to 2011 (U.S.A. & Africa)  DEPUTY PROJECT MANAGER  New University Center. – (University of Memphis – TN work amount $ 45,500,000.00).  FIELD ENGINEER / CONSTRUCTION MANAGER  New Clinic Center (ENI Congo - Italian National Oil Company – Africa branch - work amount $ 15,000,000.00). From 2007 to 2008 (Italy)  PROJECT MANAGER  New n. 9 buildings (n° 90 apartments) – (Rimini City Hall – work amount $ 35,000,000.00). From 2001 to 2007 (Italy & Africa)  DEPUTY PROJECT MANAGER  Industrial shed in the Port of Livorno (Shipyards AZIMUT BENETTI SpA work amount $ 6,000,000.00);  Urban requalification in Salerno (private business – work amount $ 100,000,000.00);  Civil works in the Center Oil (ENI Italian National Oil Company – work amount $ 5,000,000.00);  New Highways, for Winter Olympics Game in Piemonte (work amount $ 9,000,000.00);  Bridge on the river DORA, Interstate A1 Turin-Milan widening (work amount $ 125,000,000.00);  Renovation of country houses in Tuscany (private business, work amount $ 9,000,000.0);  New terminal oil port located in Africa (Djibouti). For the storage of oil at the service of United States, Arab Emirates, France and UK. (ENOC – Emirates National Oil Company – work amount $ 56,000,000.00)  New Industrial Shed in Africa (Djibouti). (Coca-Cola Company, work amount $ 16,000,000.00);  New prison in Sardinia (Italy). (Italian Ministry of Public Works, amount $ 90,000,000.00) Pages 1 of 2
  • 2. Antonio MONACO 237 Brick Cottage LN # 102 - 38105 Memphis – TN (USA) Mob: 1 – 901 – 848 - 0148 e-mail: antonio_monaco@ymail.com From 1994 to 2001  PROJECT MANAGEMENT CONSULTANT  Houses in Bologna (Private business – work amount $ 12,000,000.00);  Houses in Basilicata (average work amount $ 6,000,000.00);  Stadium in Potenza (Italian Ministry of Sport work amount $ 24,000,000.00);  Extension of the Municipal Cemeteries (average work amount $ 15,000,000.00);  Recovery of buildings damaged by earthquakes (works amount $ 60,000,000.00);  Industrial sheds (Private business – works amount $ 7,500,000.00);  Highways, bridgs, aqueducts and drainage systems (works amount $ 18,000,000.00);  Maintenance of the railway network (Italian Ministry of Infrastructure and Transport – work amount $ 7,600,000.00);  Maintenance and installation of the gas network (ENI Italian National Oil Company – work amount $ 5,500,000.00);  Consolidation of bridges (Italian Ministry of Infrastructure and Transport – work amount $ 15,600,000.00);  Aqueducts, sewer and gas line (work amount $ 5,000,000.0);  New parking area in Trieste (work amount $ 3,000,000.00);  New City Hall in Trieste (work amount $ 20,000,000.00);  New Mall in Trieste (works amount $ 55,000,000.00);  Project design for buildings used for housing and industrial settlements, built in Italy;  Project design for fuel distribution systems (Client: API, Q8 and TAMOIL);  Highways and road planning, implemented in province of Potenza;  Project design for the realization of the Cathedral in Potenza ($ 6,000,000.00);  Project design for the expansion of the Municipal Cemetery in Italy ($ 5,000,000.00);  Project design for the construction of wind farms in Italy ($ 12,000,000.00);  Land survey for splits, road works, buildings and stacking.  Search sites for Radio Base Stations, and subsequent project development;  Safety Manager;  Freelance collaboration with Technical State Land Department in Potenza;  Freelance Collaboration with Technical Office CITY HALL of Potenza. Pages 2 of 2
  • 3. MANAGED PROJECTS ¾ ASSISTANT PROJECT MANAGER From 2005 to 2007 ‰ The Doraleh Port in Djibouti – Africa (work amount $ 56,000,000.00) The Emirates National Oil Company (ENOC) has committed to developing a New Oil Port Terminal in Djibouti (Africa) located in Doraleh area, so other oil companies (Shell, Mobil, Total, Ethiopian Petroleum-EPE) have been offered land at Doraleh to develop similar facilities. DPI (Dubai Ports International) has committed to developing the oil jetty to serve the new terminal(s) and, also, constructed the road link from Doraleh to the Djibouti – Ethiopia highway. The Company that I worked with, had the job to build some civil constructions (roads, bridges, jetty, concrete pipeline supports, fens, excavations, slabs concrete). Dimensions (Jetty Bridge – shipping and pipeline used) Length 360.00 mt (1,18 feet / 393.70 Deck Width 18.00 mt (59.06 feet / 19.96 Deep Water 55.00 mt (180.40 feet / 60.15 Spans each 30.00 mt (98.43 feet / 32.81 yards) yards) yards) yards) All structure was in steel. Dimensions (Jetty Bridge – cars and pipeline used) Length 210.00 mt (689.00 feet / 229.70 Deck Width 25.00 mt (82.02 feet / 10.94 Deep Water 10.0-55.0 mt (32.81-180.40 feet / 10.94-60.15 Spans each 30.00 mt (98.43 feet / 32.81 yards) yards) yards) yards) All structure was in steel, part of deck used by cars was in concrete. Part of jetty (cars and pipeline used) was rock filled for a length of 1,100.0 mt (3,609.0 feet / 1203.0 yards), width of 70.00 mt (229.70 feet / 76.55 yards) and deep water of 2.0–10.0 mt (6.562–32.81 feet / 2.187-10.94 yards). Dimensions (Bridges crossing roads – cars used) Length 10.0–40.0 mt (32.81-131.20 feet / 10.94-43.74 Deck Width 4.0–10.0 mt (13.12-32.81 feet / 4.37-10.94 Height 3.0–15.0 mt (9.84-49.21 feet / 3.28-16.40 Spans each 10.0-20.0 mt (32.81-65.62 feet / 10.94-21.87 yards) yards) yards) yards) All structures were in concrete and steel beams. I was employed with an Italian construction company that they moved me from a Italian site to Afirca to be assistant project manager, with responsibilities in Analysis executive project, design, quality control, project development, planning and scheduling, cost control and supervisor work. From 2004 to 2005 ‰ Bridge on the river DORA, highway A4 Turin-Milan widening (work amount $ 125,000,000.00) The highway Turin-Milan was subject to an extensive renovation, contextual to the implementation of high-speed rail line, to extend the three lanes and add the emergency one. The project that I managed, concerned the upgrading of a 6.00 km (Km. 20+800 a 26+800) long section of the A4 toll motorway between Torino – starting at Rondissone Gate – and Milano. Page 1/3
  • 4. It comprised: (1) widening and upgrading safety standards over the whole length of the highway; (2) constructing a new Bridge crossing river DORA; and (3) constructing the safety lane between. Dimensions (Steel Bridge crossing river DORA) Length 200.00 mt (656.20 feet / 218.70 Deck Width 6.00 mt (19.69 feet / 6.56 Height 9.00 mt (29.53 feet / 9.84 Spans n. 3 each 65.00 mt (213.30 feet / 71.08 yards) yards) yards) yards) The piers footing, deep in the water, were built in concrete, the beams were built in steel. Dimensions (Concrete Bridge crossing river DORA) Length 500.00 mt (1,640.00 feet / 546.80 Deck Width 6.00 mt (19.69 feet / 6.56 Height 9.00–3.00 mt (29.53–9.84 feet / 9.84–3.28 Spans each 20.00 mt (65.62 feet / 21.87 yards) yards) yards) yards) All structure was in concrete with prestressed concrete beam. I was employed with a construction company as assistant project manager, with responsibilities in Analysis executive project, project development, design, quality control, planning and scheduling, building code compliance, material purchasing, negotiation, cost control. From 2003 to 2004 ‰ New roads, for Winter Olympics Game in Piemonte (work amount $ 9,000,000.00) The Piemonte’s government needed to improve several roads for the Winter Olympics Game. There were some old roads to replace the asphalt or concrete works, but the design for the new roads planned for the construction of bridges. They comprises: (1) upgrading safety standards over the whole length of the highway; (2) constructing a new bridges crossing the Interstates; and (3) constructing the safety lane between. Dimensions Length Deck Width Height Spans 20.0– 60.0 8.00 10.0–15.0 each 20.00 mt mt mt mt (65.62–196.60 feet / 21.87–65.62 (26.25 feet / 8.75 (32.81–49.21 feet / 10.94–16.40 (65.62 feet / 21.87 yards) yards) yards) yards) All structure was in concrete with prestressed concrete beam. I was employed with a construction company as assistant project manager, with responsibilities in Analysis executive project, project development, design, quality control, planning and scheduling, building code compliance, material purchasing, negotiation, cost control. ¾ PROJECT MANAGEMENT CONSULTANT From 2000 to 2001 ‰ Consolidation of a railway bridges by injection of EMACO (two-component resin - epoxy). Railways Line required structural improvement along the whole line Campobasso-Benevento (south of Italy) and particularly on a couple of XIX century masonry arch bridges near Campobasso (Molise region). Some bridges crossing the Biferno River, with the piers footing deep in the water. Dimensions Length Deck Width 150.0–300.0 mt 10.00 mt (492.10–984.3 feet / 164.0-328.10 yards) (32.88 feet / 10.96 yards) Page 2/3
  • 5. Height Spans 10.00 – 40.00 mt each 18.00 mt (32.81-131.20 feet / 10.94–43.74 yards) (59.06 feet / 19.69 yards) In this project I was Consultant Project Manager (freelance) for the construction company, to scheduling, direction, coordination and budget control. Client: Italian Ministry of Infrastructure and Transport – work amount $ 15,600,000.00. From 1998 to 1999 ‰ Bridge across interstate N. 95 (Tito-Brienza) in Basilicata. The existing Interstate, crossing a Tito Village, needed a new exit to emerge onto it. Dimensions Length Deck Width Height Spans 230.00 11.00 18.00 23.00 mt mt mt mt (767.70 feet / 255.90 yards) (36.09 feet / 12.03 yards) (59.06 feet / 19.69 yards) (75.46 feet / 25.15 yards) All structure was in concrete and prestressed concrete beam. In this project I was freelance with my own Professional Licence, I worked in team with one engineer and one surveyor, to do planning, scheduling, direction, coordination, cost control and land surveying. Client: Italian Ministry of Infrastructure and Transport – work amount $ 3,000,000.00. From 1997 to 2001 ‰ Roads, aqueducts and drainage systems (works amount $ 18,000,000.00) In some of project where I was Supervisor or Consultant Project Manager included the construction of shorts bridges with maximum length 20.00 mt (65.62 feet / 21.87 yards), with all structures in concrete and prestressed concrete beam. Page 3/3
  • 6. From 2005 to 2007 The Doraleh Port in Djibouti – Africa (work amount $ 56,000,000.00) Project Area Jetty Bridge – used for the shipping and the pipelines Phase for construction of the Jetty Bridge Used by cars and for the pipelines
  • 7. Phase for construction of the Jetty Bridge Used by cars and for the pipelines Phase for construction of the Jetty Bridge Used by cars and for the pipelines Bridges crossing roads Used by cars
  • 8. From 2004 to 2005 Bridge on the river DORA, highway A4 Turin-Milan widening (work amount $ 125,000,000.00) Project Area Project Completed From 2000 to 2001 Consolidation of a railway bridges by injection of EMACO (two-component resin - epoxy). Railways XIX century masonry arch bridges near Campobasso (Molise region).
  • 9. From 1998 to 1999 Road planning - Bridge across interstate N. 95 (Tito-Brienza) in Basilicata. Project Area Project Example From 1997 to 2001 Roads included the construction of shorts bridges with all structures in concrete and prestressed concrete beam.
  • 10. ITALY RIMINI CONSTRUCTION OF A NEW COMPLEX OF N. 9 BUILDINGS FOR CIVIL RESIDENCE CONSTRUCTION PROJECT PHASE WORK BUILDINGS C-D PHASE WORK BUILDINGS A-B PHASE WORK BUILDINGS C-D PHASE WORK BUILDINGS B-A PHASE WORK BUILDINGS C