SlideShare uma empresa Scribd logo
1 de 4
ANJAN SEN GUPTA
Address: 232, Rafi Ahmed Kidwai Road, Dum Dum, Kolkata - 700055
E-Mail: anjan.engr@gmail.com, aanjansg@yahoo.co.in / Contact No.: +91 9903739148
Senior Level Assignments
Nearly 5 years of Result driven experience in Project Management, Planning and Execution Work in Solar Power
Project
Total 23 years excellent experienced in Project Management, Planning and Execution Work in SOLAR EPC Project &
others EPC Project.
Proficiency in Planning, Scheduling & Executing Solar Power Projects in diverse Geographies of India. Has Hands on
Experience in Solar Projects at Site for Installation of Structures, Modules, Combiner boxes, D.C and A.C Cabling,
Inverters Installation, LT & HT panel , Transformers and SCADA Communication.
On-going PPA mode 143 MW & EPC mode various solar projects with clients like 5.5MW SJVNL, Commissioned OCL
5.5MW, Todays 10MW, AAI Kolkata 2MW, JVS 5MW. Total of almost 30MW Solar Power Plant installed all over in
India.
High energy leader having keen interest in solar technology and always willing to work in a fast paced environment
and utilizing my experience to create value for companies. I am always inspired when working in a team-based
environment - no matter leading or supporting.
Specialties: -Expertise in leading Installation team for seamless execution of Projects and timely commissioning.
-Proficiency in Planning & executing Solar Power Projects in diverse Geographies of India.
-Solar Cell line Automation Installation, commissioning and troubleshooting
Preferred Location – Any Where in India & Abroad
PROFILE SNAPSHOT
 A seasoned professional with nearly 21 years of rich & extensive experience in Project Planning & Management,
Erection & Commissioning, Site Management, Process Enhancement, Client Relationship Management and Team
Management.
 Expertise in managing various Infrastructure Projects – Solar SPV Power Plant Project.
 Presently associated with Rays Power Experts Pvt. Ltd. as Manager PMO.
 A strategic planner with proficiency in Project Planning & Management, Erection, Installation & Commissioning of
various Machines & Equipment, thereby reducing breakdown / downtime & enhancing operational effectiveness
of equipment.
 Insightful exposure of efficiently liaising & co-ordinating with Contractors, Clients, Consultants, Suppliers, Vendors
and various other government departments to ensure compliance with requirements.
 Adept at carrying out various tests & inspections for various processes and checking for quality compliance.
 An effective communicator with excellent relationship management skills and strong analytical, leadership,
decision making, problem solving & organizational abilities.
AREAS OF EXPERTISE
Scope Management Cost Management Time Management
Quality Management Communication management Fund Management
Procurement Management Strategic Planning Project Management
Site Management Erection & Commissioning Process Enhancements
Vendor Management Liaison & Co-ordination Risk Management
NOTABLE ACCOMPLISHMENTS
 Successfully handled all day-to-day troubleshooting issues across 30MW sites and efficiently achieved monthly
targets regularly with Vikram Solar Pvt. Ltd. & Rays Power Experts Pvt. Ltd. & Renew Solar Venture Pvt Ltd.
 Received excellent co-ordination rewards from all vendors, PMCs, Contractors, OCL Bengal Cement, CIAL, JVS.
 Contributed significantly in increasing the development rate in the sites (Doubled within a month) at TCI Telenet
Solution Pvt. Ltd., Mumbai.
 Work in project: Non-conventional Solar project with WEBREDA - Won Oscar Award (Pollution) in 2004.
 Instrumental in supervising and monitoring Telecom & Transmission Tower manufacturing projects at Skipper
Steels Ltd., Kolkatta.
 Successfully completed project for over 3500 sites for various clients within the scheduled timeframe at Skipper
Steels Ltd., Kolkatta.
EMPLOYMENT SCAN
Since June 24th
2016 Renew Solar Venture PVT. LTD. Manager Planning
Project 143 MW Dichipally (Telangana) Solar Project in PPA Mode.
Key Deliverables
 Overseeing project planning activities for all elements and understanding the linkages involved.
 Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Installation and
Commissioning work.
 Liaising and communicating with the senior management and various departments to resolve critical issues of the
entire team during different stages of the project.
 Conducting periodic review meetings with vendors and customers to monitor and report project status.
Since Dec 15 to 15th
June 2016 RAYS POWER EXPERTS PVT. LTD. Manager PMO
Project Solar Photovoltaic MW / KW Power Plant Project, Total 30MW Projects.
Client Todays 10MW, SJVNL 5.5MW, DMRC 5MW, NDMC 5MW, OCL Bengal 5.5MW.
Key Deliverables
 Overseeing project planning activities for all elements and understanding the linkages involved.
 Co-ordinating with Project Clients as well as handling all day-to-day troubleshooting issues across 900 sites.
 Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Installation and
Commissioning work.
 Liaising and communicating with the senior management and various departments to resolve critical issues of the
entire team during different stages of the project.
 Conducting periodic review meetings with vendors and customers to monitor and report project status.
Since Dec 12 to Dec 2015 VIKRAM SOLAR PVT. LTD. Manager Project
Project Solar Photovoltaic KW Power Plant Project, Total 40 MW Projects.
Client JVS 5MW, 2MW at AAI Kolkata & 750kWp AAI Calicut, Cochin DNRE Nagaland - 170 KW, BSES,
Yamuna Power-Delhi - 170 KW
Key Deliverables:
 Overseeing project planning activities for all elements and understanding the linkages involved.
 Co-ordinating with Project Clients as well as handling all day-to-day troubleshooting issues of sites.
 Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Transformer
Installation and Commissioning work.
 Liaising and communicating with the senior management and various departments to resolve critical issues of the
entire team during different stages of the project.
 Conducting periodic review meetings with vendors and customers to monitor and report project status.
Since Mar 2011 to Dec 2012 Environ Energy Corporation India Pvt. Ltd. Manager - Project
Project Solar Energy Management & 1100 KW Solar Project
Client Indus, Idea & VIOM (W.B., Bihar & Jharkhand)
Key Deliverables:
 Overseeing project planning activities for all elements and understanding the linkages involved.
 Co-ordinating with Project Clients as well as handling all day-to-day troubleshooting issues across 900 sites.
 Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Installation and
Commissioning work.
 Liaising and communicating with the senior management and various departments to resolve critical issues of the
entire team during different stages of the project.
 Conducting periodic review meetings with vendors and customers to monitor and report project status.
Dec 2008 to Mar 2011 Vihaan Infrasystems India Ltd. Deputy Project Manager
Key Deliverables:
 Reviewed daily site progress of every site in all circles as per roll out DPR & properly coordinated with the
Company Project Management.
 Generated and presented daily progress report to the immediate superior as well as to the client.
 Completed site activities including JMR signing with invoicing from the respective client thereby periodically
followed-up for payment clearance.
 Co-ordinated with Project Client & handled day-to-day troubleshoot related issues in over 600 sites for various
clients involving Idea TSP in Chhattisgarh, INDUS TSP in Gujarat, Punjab & West Bengal all clusters Midnapur,
Bankura, Murshidabad, Purulia, North & South 24 PGS, North Bengal.
Apr 2007 to Dec 2008 Skipper Steels Ltd., Kolkatta Executive Project Manager
Key Deliverables:
 Ensured that material gets ordered, delivered, installed, commissioned and AT'ed on time as per schedules.
 Managed the entire Civil, Electrical & Tower erection with AT for 4000 sites for various clients including Vodafone,
Airtel / Infratel, Excel Telecom, Maxis-NSN, Ericsson-BSNL, TVS, GIL, ESSAR, Aircel, etc.
 Handled (TSP job-EPC mode, O&M) in all circles across India.
 Involved in producing the documents needed for customer invoicing based on the project related milestones.
Preceding Assignments:
Sep 2005 to Apr 2007 TCI Telenet Solution Pvt. Ltd., Project Coordinator
Jan 2005 to Aug 2005 GIGA Network Pvt. Ltd. Quality Assurance Executive
1998 to 2004 S.K. Technirite Business Pvt. Ltd. Development Executive / Inspector
1996 to 1998 Metra Electronics, Kolkata Designer & Inspector
1994 to 1996 Abhya Precision Industries Pvt. Ltd. Engineering Apprentice
ACADEMIA
Diploma in Mechanical Engineering WBSCETE 1994
PROFESSIONAL CERTIFICATIONS & COURSES
 Certificate Course on 35 hrs PDUs - PMP Yr.-2014.
 Certificate Course on 6Sigma Green Belt – 2014.
 Certificate Course on MS Project Yr.-2014.
 Certificate Course on CAD Operator from Cad Cam Consultants Pvt. Ltd. Yr.-1994.
 Undergone Programming through C & MS office, Windows 2007, XP, Networking Skills, HTML Editor Basics,
Computer Hardware Basics, Basic SAP.
PERSONAL DOSSIER
Date of Birth 6th
February, 1973 References Available on request
Languages Known English, Bengali & Hindi CTC 12 Lac
Notice Period One month

Mais conteúdo relacionado

Mais procurados (20)

Resume 1
Resume 1Resume 1
Resume 1
 
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
 
CV
CVCV
CV
 
CV
CVCV
CV
 
CV RESUME -20.11.2016.docx AGM
CV  RESUME -20.11.2016.docx  AGM  CV  RESUME -20.11.2016.docx  AGM
CV RESUME -20.11.2016.docx AGM
 
Resume SPS
Resume SPSResume SPS
Resume SPS
 
navroon2
navroon2navroon2
navroon2
 
IGNATIOUS RESUME
IGNATIOUS RESUMEIGNATIOUS RESUME
IGNATIOUS RESUME
 
Resume_raghvendra_1updated
Resume_raghvendra_1updatedResume_raghvendra_1updated
Resume_raghvendra_1updated
 
RESUME
RESUMERESUME
RESUME
 
Profile for MEP Service Consultant
Profile for MEP Service ConsultantProfile for MEP Service Consultant
Profile for MEP Service Consultant
 
asthasinghResume-1
asthasinghResume-1asthasinghResume-1
asthasinghResume-1
 
CV-PRASHANT PATIL
CV-PRASHANT PATILCV-PRASHANT PATIL
CV-PRASHANT PATIL
 
CV S.K.Panda
CV S.K.PandaCV S.K.Panda
CV S.K.Panda
 
Suvradip Guha _Resume
Suvradip Guha _ResumeSuvradip Guha _Resume
Suvradip Guha _Resume
 
Electrical Engineer - Tarun (1) (1)
Electrical Engineer - Tarun (1) (1)Electrical Engineer - Tarun (1) (1)
Electrical Engineer - Tarun (1) (1)
 
JOJI GEORGE new
JOJI GEORGE newJOJI GEORGE new
JOJI GEORGE new
 
155809
155809155809
155809
 
nitintripathi
nitintripathinitintripathi
nitintripathi
 
Ajay's Resume
Ajay's ResumeAjay's Resume
Ajay's Resume
 

Destaque (12)

ajay_Resume_dec
ajay_Resume_decajay_Resume_dec
ajay_Resume_dec
 
Resumen Huesos de la MANO y del PIE
Resumen Huesos de la MANO y del PIEResumen Huesos de la MANO y del PIE
Resumen Huesos de la MANO y del PIE
 
A.hegazy c.v
A.hegazy c.vA.hegazy c.v
A.hegazy c.v
 
Ensaio sobre a criaçao teorica em psicanalise
Ensaio sobre a criaçao teorica em psicanaliseEnsaio sobre a criaçao teorica em psicanalise
Ensaio sobre a criaçao teorica em psicanalise
 
HISTORIA INSPIRADORA ANDIS YULIETH
HISTORIA INSPIRADORA ANDIS YULIETHHISTORIA INSPIRADORA ANDIS YULIETH
HISTORIA INSPIRADORA ANDIS YULIETH
 
Diego andres rivera
Diego andres riveraDiego andres rivera
Diego andres rivera
 
новації у поч школі
новації у поч школіновації у поч школі
новації у поч школі
 
Douglas M Pruitt Resume 10-20-2016
Douglas M Pruitt Resume 10-20-2016Douglas M Pruitt Resume 10-20-2016
Douglas M Pruitt Resume 10-20-2016
 
Usinas Termoelétricas e Eólicas
Usinas Termoelétricas e EólicasUsinas Termoelétricas e Eólicas
Usinas Termoelétricas e Eólicas
 
Articulaciones (resumen)
Articulaciones (resumen)Articulaciones (resumen)
Articulaciones (resumen)
 
Trabajo anatomía
Trabajo anatomíaTrabajo anatomía
Trabajo anatomía
 
PROYECTO DEL PROGRAMA PARTICIPACIÓN ESTUDIANTIL (PPE) RÉGIMEN COSTA UNIDAD ED...
PROYECTO DEL PROGRAMA PARTICIPACIÓN ESTUDIANTIL (PPE) RÉGIMEN COSTA UNIDAD ED...PROYECTO DEL PROGRAMA PARTICIPACIÓN ESTUDIANTIL (PPE) RÉGIMEN COSTA UNIDAD ED...
PROYECTO DEL PROGRAMA PARTICIPACIÓN ESTUDIANTIL (PPE) RÉGIMEN COSTA UNIDAD ED...
 

Semelhante a Anjan Sen Gupta 1 (20)

santanu sasmal
santanu sasmalsantanu sasmal
santanu sasmal
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
Adil Mansoor
Adil MansoorAdil Mansoor
Adil Mansoor
 
SUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATISUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATI
 
KRT Resume 29th July 2015
KRT Resume 29th July 2015KRT Resume 29th July 2015
KRT Resume 29th July 2015
 
venky CV( solar )
venky CV( solar )venky CV( solar )
venky CV( solar )
 
resume - Copy
resume - Copyresume - Copy
resume - Copy
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Resume_Amteshwar
Resume_AmteshwarResume_Amteshwar
Resume_Amteshwar
 
Resume abhishek
Resume abhishekResume abhishek
Resume abhishek
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
CV - PJ
CV - PJCV - PJ
CV - PJ
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
CV
CVCV
CV
 

Anjan Sen Gupta 1

  • 1. ANJAN SEN GUPTA Address: 232, Rafi Ahmed Kidwai Road, Dum Dum, Kolkata - 700055 E-Mail: anjan.engr@gmail.com, aanjansg@yahoo.co.in / Contact No.: +91 9903739148 Senior Level Assignments Nearly 5 years of Result driven experience in Project Management, Planning and Execution Work in Solar Power Project Total 23 years excellent experienced in Project Management, Planning and Execution Work in SOLAR EPC Project & others EPC Project. Proficiency in Planning, Scheduling & Executing Solar Power Projects in diverse Geographies of India. Has Hands on Experience in Solar Projects at Site for Installation of Structures, Modules, Combiner boxes, D.C and A.C Cabling, Inverters Installation, LT & HT panel , Transformers and SCADA Communication. On-going PPA mode 143 MW & EPC mode various solar projects with clients like 5.5MW SJVNL, Commissioned OCL 5.5MW, Todays 10MW, AAI Kolkata 2MW, JVS 5MW. Total of almost 30MW Solar Power Plant installed all over in India. High energy leader having keen interest in solar technology and always willing to work in a fast paced environment and utilizing my experience to create value for companies. I am always inspired when working in a team-based environment - no matter leading or supporting. Specialties: -Expertise in leading Installation team for seamless execution of Projects and timely commissioning. -Proficiency in Planning & executing Solar Power Projects in diverse Geographies of India. -Solar Cell line Automation Installation, commissioning and troubleshooting Preferred Location – Any Where in India & Abroad PROFILE SNAPSHOT  A seasoned professional with nearly 21 years of rich & extensive experience in Project Planning & Management, Erection & Commissioning, Site Management, Process Enhancement, Client Relationship Management and Team Management.  Expertise in managing various Infrastructure Projects – Solar SPV Power Plant Project.  Presently associated with Rays Power Experts Pvt. Ltd. as Manager PMO.  A strategic planner with proficiency in Project Planning & Management, Erection, Installation & Commissioning of various Machines & Equipment, thereby reducing breakdown / downtime & enhancing operational effectiveness of equipment.  Insightful exposure of efficiently liaising & co-ordinating with Contractors, Clients, Consultants, Suppliers, Vendors and various other government departments to ensure compliance with requirements.  Adept at carrying out various tests & inspections for various processes and checking for quality compliance.  An effective communicator with excellent relationship management skills and strong analytical, leadership, decision making, problem solving & organizational abilities. AREAS OF EXPERTISE Scope Management Cost Management Time Management Quality Management Communication management Fund Management Procurement Management Strategic Planning Project Management Site Management Erection & Commissioning Process Enhancements Vendor Management Liaison & Co-ordination Risk Management
  • 2. NOTABLE ACCOMPLISHMENTS  Successfully handled all day-to-day troubleshooting issues across 30MW sites and efficiently achieved monthly targets regularly with Vikram Solar Pvt. Ltd. & Rays Power Experts Pvt. Ltd. & Renew Solar Venture Pvt Ltd.  Received excellent co-ordination rewards from all vendors, PMCs, Contractors, OCL Bengal Cement, CIAL, JVS.  Contributed significantly in increasing the development rate in the sites (Doubled within a month) at TCI Telenet Solution Pvt. Ltd., Mumbai.  Work in project: Non-conventional Solar project with WEBREDA - Won Oscar Award (Pollution) in 2004.  Instrumental in supervising and monitoring Telecom & Transmission Tower manufacturing projects at Skipper Steels Ltd., Kolkatta.  Successfully completed project for over 3500 sites for various clients within the scheduled timeframe at Skipper Steels Ltd., Kolkatta. EMPLOYMENT SCAN Since June 24th 2016 Renew Solar Venture PVT. LTD. Manager Planning Project 143 MW Dichipally (Telangana) Solar Project in PPA Mode. Key Deliverables  Overseeing project planning activities for all elements and understanding the linkages involved.  Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Installation and Commissioning work.  Liaising and communicating with the senior management and various departments to resolve critical issues of the entire team during different stages of the project.  Conducting periodic review meetings with vendors and customers to monitor and report project status. Since Dec 15 to 15th June 2016 RAYS POWER EXPERTS PVT. LTD. Manager PMO Project Solar Photovoltaic MW / KW Power Plant Project, Total 30MW Projects. Client Todays 10MW, SJVNL 5.5MW, DMRC 5MW, NDMC 5MW, OCL Bengal 5.5MW. Key Deliverables  Overseeing project planning activities for all elements and understanding the linkages involved.  Co-ordinating with Project Clients as well as handling all day-to-day troubleshooting issues across 900 sites.  Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Installation and Commissioning work.  Liaising and communicating with the senior management and various departments to resolve critical issues of the entire team during different stages of the project.  Conducting periodic review meetings with vendors and customers to monitor and report project status. Since Dec 12 to Dec 2015 VIKRAM SOLAR PVT. LTD. Manager Project Project Solar Photovoltaic KW Power Plant Project, Total 40 MW Projects. Client JVS 5MW, 2MW at AAI Kolkata & 750kWp AAI Calicut, Cochin DNRE Nagaland - 170 KW, BSES, Yamuna Power-Delhi - 170 KW Key Deliverables:  Overseeing project planning activities for all elements and understanding the linkages involved.  Co-ordinating with Project Clients as well as handling all day-to-day troubleshooting issues of sites.  Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Transformer Installation and Commissioning work.  Liaising and communicating with the senior management and various departments to resolve critical issues of the entire team during different stages of the project.  Conducting periodic review meetings with vendors and customers to monitor and report project status.
  • 3. Since Mar 2011 to Dec 2012 Environ Energy Corporation India Pvt. Ltd. Manager - Project Project Solar Energy Management & 1100 KW Solar Project Client Indus, Idea & VIOM (W.B., Bihar & Jharkhand) Key Deliverables:  Overseeing project planning activities for all elements and understanding the linkages involved.  Co-ordinating with Project Clients as well as handling all day-to-day troubleshooting issues across 900 sites.  Implementing and interacting with various Vendors / Engineers for Civil, Electrical, Automation, Installation and Commissioning work.  Liaising and communicating with the senior management and various departments to resolve critical issues of the entire team during different stages of the project.  Conducting periodic review meetings with vendors and customers to monitor and report project status. Dec 2008 to Mar 2011 Vihaan Infrasystems India Ltd. Deputy Project Manager Key Deliverables:  Reviewed daily site progress of every site in all circles as per roll out DPR & properly coordinated with the Company Project Management.  Generated and presented daily progress report to the immediate superior as well as to the client.  Completed site activities including JMR signing with invoicing from the respective client thereby periodically followed-up for payment clearance.  Co-ordinated with Project Client & handled day-to-day troubleshoot related issues in over 600 sites for various clients involving Idea TSP in Chhattisgarh, INDUS TSP in Gujarat, Punjab & West Bengal all clusters Midnapur, Bankura, Murshidabad, Purulia, North & South 24 PGS, North Bengal. Apr 2007 to Dec 2008 Skipper Steels Ltd., Kolkatta Executive Project Manager Key Deliverables:  Ensured that material gets ordered, delivered, installed, commissioned and AT'ed on time as per schedules.  Managed the entire Civil, Electrical & Tower erection with AT for 4000 sites for various clients including Vodafone, Airtel / Infratel, Excel Telecom, Maxis-NSN, Ericsson-BSNL, TVS, GIL, ESSAR, Aircel, etc.  Handled (TSP job-EPC mode, O&M) in all circles across India.  Involved in producing the documents needed for customer invoicing based on the project related milestones. Preceding Assignments: Sep 2005 to Apr 2007 TCI Telenet Solution Pvt. Ltd., Project Coordinator Jan 2005 to Aug 2005 GIGA Network Pvt. Ltd. Quality Assurance Executive 1998 to 2004 S.K. Technirite Business Pvt. Ltd. Development Executive / Inspector 1996 to 1998 Metra Electronics, Kolkata Designer & Inspector 1994 to 1996 Abhya Precision Industries Pvt. Ltd. Engineering Apprentice ACADEMIA Diploma in Mechanical Engineering WBSCETE 1994 PROFESSIONAL CERTIFICATIONS & COURSES  Certificate Course on 35 hrs PDUs - PMP Yr.-2014.  Certificate Course on 6Sigma Green Belt – 2014.  Certificate Course on MS Project Yr.-2014.  Certificate Course on CAD Operator from Cad Cam Consultants Pvt. Ltd. Yr.-1994.  Undergone Programming through C & MS office, Windows 2007, XP, Networking Skills, HTML Editor Basics, Computer Hardware Basics, Basic SAP. PERSONAL DOSSIER Date of Birth 6th February, 1973 References Available on request
  • 4. Languages Known English, Bengali & Hindi CTC 12 Lac Notice Period One month