Schneider Electric HQ Le Hive
The green building in Paris
Improve efficiency and promote occupant comfort
Located 10 km west of Paris in
Rueil Malmaison




Schneider Electric               2
Building overview
● Owned by private investor
● Built by BNP Paribas real estate & Bouygues
● Designed by famous architect JM Wilmotte
● Project start: January 2006
● Building open: November 2008
● Total floor space: 35,000 m²; 7 floors
● 1,800 employees
● The 1st building in France with at the same time
      ● HQE operation & maintenance
      ● ISO 14001 (Environment)
      ● NF EN 16001 (Energy Management)




Schneider Electric                                   3
EcoStruxure integrated architecture
Active energy management architecture from Plant to Plug

   Services
                         Supervision

                                                                                Energy Mgt. Services


                                                     Enterprise portal




          Power
          management



          Process
          & Machines
          management                                                                          Services

           IT / Server
           Room
           management
                                       Supervision

          Building
          management


          Security
          management
                                                                         Supervision
                                         Services


 Schneider Electric                                                                                 4
The EcoStruxure Marketing message
“You Deserve an Efficient Enterprise”
                                                                      You are concerned by your
                                                                      business continuity, user comfort,
                     Metering                                         equipment & people security,
      Power          Power quality mitigation
                     Local LV/MV protection & control
                                                                      while maintaining optimized
      management
                     Intelligent power & motor control                energy performance at your site
                     Renewables energy conversion
                                                                      or at your enterprise level.

                     Production Management                                               Up to 30% savings
                     Information Management
      Process &      Process Automation                                                  on OpEx and CapEx
      Machines       Advanced Process Control
                     Machine Control
      management     Remote Site Management
                     High-Availability & Safety


                     Network Connectivity
                     Rack systems
      IT room        Uninterruptible power supply                                                 Enterprise
      management     Cooling control                                                                portal
                     Surveillance                                   ONE
                                                                 Supervision

                     HVAC control
                     Lighting control
      Building       Outdoor lighting control
      management     Sun blinds control
                     Guest room control



                                                                           ONE                         ONE
                     Video security
                                                                        Supervision                 Supervision
                     Emergency lighting
      Security       Intrusion detection
      management     Access control
                     Fire and life safety
                                                                          One certified point of contact
                                                         ONE expert
                                                                          > Project simplicity & success
Schneider Electric                                                                                             5
Active Energy Management:
The fastest way to save on energy, curb CO2 emissions
and reduce operation cost
                                                      Energy audit
       1     Find out what the challenge is…           & metering




            Passive Energy Efficiency               Active Energy Management

        2                               3   Optimise through                 4     Monitor,
            Fix the basics                   automation &                          maintain,
                                               regulation                          improve

    Low consumption devices,                    Solutions in :               Metering, monitoring and
    insulation material, power             building management,           consulting services, EM analysis
        factor correction                   power management,                         software
                                        motor control, lighting control
Schneider Electric                                                                                           6
Both designed and built
for Energy Efficiency
Design & build processes
      ● Global design of all technical systems                     active EE
      ● Teamwork from initial design to implementation and setup

Technology
      ● Efficient building envelope ***                            passive EE
      ● Efficient equipment
            ●T5 dimmable lighting, Active chilled beams,
             Efficient chillers (COP =3),Low losses transformers

      ● Optimized architecture and control features for:
          ●HVAC, lighting, sun blinds
          ●Energy consumption monitoring
                                                                    active EE
Operation process
      ● Energy dashboards
      ● Continuous improvement process
      ● Continuous commissioning


Schneider Electric                                                              7
The HIVE with EcoStruxure

                                                                       Green: Make the connection of renewable
                              Renewable energies (in progress)         energy sources easy, reliable and cost-
                                                                       effective

                                Building Management System
                                                                        Efficient & productive:
                       Lighting, HVAC & sun blinds control
                                                                        • Measure and control energy, automate,
                            Energy monitoring & control                 provide relevant diagnosis
                                                                        • Manage processes
                     Motor control for pumps and fans                   • Make all the utilities of the
                                                                        infrastructure more efficient
                                            IT Cabling


                         Electrical distribution
                                                         Safe:
                                 Security                • Protect people and assets
                                                         •Transform and distribute power safely
                            Access control




Schneider Electric                                                                                                8
Renewable energies: Photovoltaic




50 kW - 90 m²
Solar panels and
EV chargers
integrated in the
EcoStruxure
architecture


Schneider Electric                 9
Improve energy performance in operation
1.Building operation indicators
       ● Building usages only: HVAC & auxiliaries (pumps …), lighting, sanitary water
       ● without activity usages: power sockets,restaurant
       ● Indoor heated area
       ● ~60% of total energy consumption
       ● all energies (electricity , gas)
       ● ratio in kWh/m².year final energy

2.Total energy consumption indicators
       ● all usages
       ● all areas ( incl parking)
       ● 100% of total energy consumption
       ● all energies (electricity , gas)
       ● value in kWh final energy

3.Environmental indicators
       ● water consumption
       ● CO2 emission
       ● Waste treatment : hazardous and standard in tons ( ISO 14001)

Schneider Electric                                                                      10
Action plans to improve energy
performance in operation
● Change AHU regulation: adaptable threshold of external temperature, non
  linear control

● Set dynamic controls of air pressure set points and adapt air flow through VSDs
  frequency control

● Fine tune temperature set points (change the value, adapt by zone)

● Fine tune time scheduling for AHU

● Adapt lighting control modes (for instance allowing occupants to manually shut
  off during occupation mode)

● Favour ECO friendly behaviour : switch off , ECO mode for PC , stop water
  taps, reduce temperature setpoint in occupation mode , stop task lighting

Schneider Electric                                                                 11
Office zone control for optimum balance
between energy consumption & comfort
● Design principles
       ● zoning with a 2 x 1,35m grid (13m²) ; enables enhanced flexibility& scalabilty for future room reconfiguration
       ● shared sensors and control panels between applications ; reduced CAPEX
       ● mixed centralized (BMS) & occupant control : continuous optimum balance between EE and comfort

                                                                                Shared control panel
                     Zoning :                      Shared sensors               Mixed centralized (BEMS) and
                     2x1,35m facade grid
                                                                                occupant control
                     4,70m depth




Schneider Electric                                                                                                        12
Office zone plan
                                  Zone
                     1.35                              1.35                      1.35




            luminaire (group 1)                                                luminaire

  Wall control panel
                                      multi-sensor
                                      multi-                                                                   multi-sensor
                                                                                                               multi-

           Chilled beam                        luminaire (group 2)         Chilled beam



            luminaire (group 1)                Chilled beam                    luminaire




           sunblind / shutter                  sunblind / shutter          sunblind / shutter




                                   Luminaire
                                                                                                                     multi-sensor
                                                                                                                     multi-
 sunblind / shutter                                                                             Wall control panel
                                                                        Remote control
                                                         Chilled beam
Schneider Electric                                                                                                       13
Continued…
● Lighting features
       ● a presence+light sensor in each zone
       ● manual switch on and automatic switch off ( 20mn in individual office, after hours in open space)
       ● automatic constant lux level with adaptable setting ( eg 330lux)

● HVAC features
       ●   a presence+light sensor in each zone
       ●   automatic ventilation & temperature control by zone
       ●   manual switch on and automatic swich off ( 20mn in individual office, after hours in open space)
       ●   occupant can change temperature setting in a +/- 1,5°C range on central( BMS) setting
       ●   manual on/of for the 2 scenarios : comfort/presence – reduced/absence
       ●   automatic(BMS) switch on for the reduced/absence scenario after hours

● Sunblinds features
       ● occupants control up/down in individual offices and open space

● Occupants control
       ● In open space , meeting rooms and individual offices : wall mounted multifunctional panel for
         lighting control, temperature settings &sunlbinds control; + comfort/presence and
         reduced/absence scenarios
       ● remote control in individual office for light, sunblinds and temperature settings

● Air quality control
       ● combined hygrometry-external-interal temperature sensors linked to automatic air flow control
Schneider Electric                                                                                            14
Energy consumption is under control by
a comprehensive energy monitoring
● Energy metering
       ● by zone
       ● by usage in each zone
       ● by energy

● 12 heat and cold meters on hair
  handling units , heat water
  production, heated floor

● 140 electrical energy meters

● Automatic data collection and
  storage

● Reporting for Facility manager

● Energy awareness for Visitors
  and employees on display in
  the showroom


Schneider Electric                       15
… to monitor and improve energy
consumption




Schneider Electric                16
Increase employee awareness
with the Hive booklet
● Objective: to ensure
  employees best possible
  comfort and working
  conditions.

● Required by French
  Labor code

● Covering Safety, Security,
  Energy Efficiency &
  Environment

● Regular newsletters to
  increase employees
  awareness

Schneider Electric             17
The Hive booklet
● Increase employee Energy efficiency
  awareness to contribute to the savings




Schneider Electric                         18
Newsletters to increase employees
awareness

● Feedback to
  employees to keep
  them updated on
  the HIVE Energy
  efficiency program

● Contests to make
  employees
  proactive




Schneider Electric                  19
The Hive - Green Building
                                    Dashboard


    Energy consumptions*
    kWh/m²/year

                     320


                            150
                                   110
                                           80
                     2008   2009   2010    2011


Divide our consumptions by 4 in 3 years, by :

 Using Solutions sold by Schneider Electric
 Applying the 3 certifications: EN16001, HQE and ISO14001 (1st building in Europe)
 Reviewing the measures of the air quality (Hygrometry, Temperatures, Microbiology,..) with the CHSCT
 Increase employee Energy Efficiency awareness


Schneider Electric
                                                                     * Final energy – 2005 RT Perimeter
                                                                                                          20
Q&A

                     Make the most of your energy
                     Email: jacques.bollecker@schneider-electric.com

Schneider Electric                                                     21
Thank you
                     for your participation !




Schneider Electric                              22

Mais conteúdo relacionado

Mais procurados

Strategic analysis of apple
Strategic analysis of appleStrategic analysis of apple
Strategic analysis of apple
Meghna Verma
 
Phuong phap giai nhanh bt nhom va hop chat cua nhom
Phuong phap giai nhanh bt nhom va hop chat cua nhomPhuong phap giai nhanh bt nhom va hop chat cua nhom
Phuong phap giai nhanh bt nhom va hop chat cua nhom
Nguyễn Tân
 
đIện hóa học day dh duoc
đIện hóa học   day dh duocđIện hóa học   day dh duoc
đIện hóa học day dh duoc
Dinngnh
 
Bo de thi lop 10 mon toan co dap an
Bo de thi lop 10 mon toan co dap anBo de thi lop 10 mon toan co dap an
Bo de thi lop 10 mon toan co dap an
Tommy Bảo
 

Mais procurados (14)

cơ sở hóa lập thể
cơ sở hóa lập thểcơ sở hóa lập thể
cơ sở hóa lập thể
 
Strategic analysis of apple
Strategic analysis of appleStrategic analysis of apple
Strategic analysis of apple
 
Phuong phap giai nhanh bt nhom va hop chat cua nhom
Phuong phap giai nhanh bt nhom va hop chat cua nhomPhuong phap giai nhanh bt nhom va hop chat cua nhom
Phuong phap giai nhanh bt nhom va hop chat cua nhom
 
đIện hóa học day dh duoc
đIện hóa học   day dh duocđIện hóa học   day dh duoc
đIện hóa học day dh duoc
 
Mẫu thiết kế Profile Tập đoàn BĐS Bảo An
Mẫu thiết kế Profile Tập đoàn BĐS Bảo AnMẫu thiết kế Profile Tập đoàn BĐS Bảo An
Mẫu thiết kế Profile Tập đoàn BĐS Bảo An
 
Bài tập về tốc độ phản ứng cân bằng hóa học
Bài tập về tốc độ phản ứng cân bằng hóa họcBài tập về tốc độ phản ứng cân bằng hóa học
Bài tập về tốc độ phản ứng cân bằng hóa học
 
Hóa lí .
Hóa lí .Hóa lí .
Hóa lí .
 
Bộ câu hỏi đúng sai phần vô cơ
Bộ câu hỏi đúng sai phần vô cơBộ câu hỏi đúng sai phần vô cơ
Bộ câu hỏi đúng sai phần vô cơ
 
Dap an-de-thi-hoc-sinh-gioi-hoa-lop-12-quang-nam
Dap an-de-thi-hoc-sinh-gioi-hoa-lop-12-quang-namDap an-de-thi-hoc-sinh-gioi-hoa-lop-12-quang-nam
Dap an-de-thi-hoc-sinh-gioi-hoa-lop-12-quang-nam
 
Tóm tắt lý thuyết + bài tập điện xoay chiều
Tóm tắt lý thuyết + bài tập điện xoay chiềuTóm tắt lý thuyết + bài tập điện xoay chiều
Tóm tắt lý thuyết + bài tập điện xoay chiều
 
Bai giang day hoc chu de phan ung oxy hoa khu
Bai giang day hoc chu de phan ung oxy hoa khuBai giang day hoc chu de phan ung oxy hoa khu
Bai giang day hoc chu de phan ung oxy hoa khu
 
Dapan b 2004
Dapan b 2004Dapan b 2004
Dapan b 2004
 
Andehit formic
Andehit formicAndehit formic
Andehit formic
 
Bo de thi lop 10 mon toan co dap an
Bo de thi lop 10 mon toan co dap anBo de thi lop 10 mon toan co dap an
Bo de thi lop 10 mon toan co dap an
 

Semelhante a Le Hive

Four practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costsFour practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costs
Schneider Electric India
 
Ge Energy swema june2008-smartgrid
Ge Energy swema june2008-smartgridGe Energy swema june2008-smartgrid
Ge Energy swema june2008-smartgrid
~Eric Principe
 

Semelhante a Le Hive (20)

Four practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costsFour practical steps for reducing overall energy costs
Four practical steps for reducing overall energy costs
 
Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01
 
Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01
 
Ge Energy swema june2008-smartgrid
Ge Energy swema june2008-smartgridGe Energy swema june2008-smartgrid
Ge Energy swema june2008-smartgrid
 
Aurora Australis UK
Aurora Australis UKAurora Australis UK
Aurora Australis UK
 
Naed Industrial Green Electrical Upgrades Brochure Final Files
Naed Industrial Green Electrical Upgrades Brochure Final FilesNaed Industrial Green Electrical Upgrades Brochure Final Files
Naed Industrial Green Electrical Upgrades Brochure Final Files
 
PCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire PennyPCTY 2012, IBM Smarter Buildings v. Claire Penny
PCTY 2012, IBM Smarter Buildings v. Claire Penny
 
Smart Solutions for Green Buildings: Enerit ISO 50001 software
Smart Solutions for Green Buildings: Enerit ISO 50001 software Smart Solutions for Green Buildings: Enerit ISO 50001 software
Smart Solutions for Green Buildings: Enerit ISO 50001 software
 
PowerLogic® energy & power
PowerLogic® energy & powerPowerLogic® energy & power
PowerLogic® energy & power
 
EcoStruxure Power – kā uzlabot datu kvalitāti, lai palielinātu uzņēmuma efekt...
EcoStruxure Power – kā uzlabot datu kvalitāti, lai palielinātu uzņēmuma efekt...EcoStruxure Power – kā uzlabot datu kvalitāti, lai palielinātu uzņēmuma efekt...
EcoStruxure Power – kā uzlabot datu kvalitāti, lai palielinātu uzņēmuma efekt...
 
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing UtilityEnhancing Facility Performance | Maximizing Investments | Reducing Utility
Enhancing Facility Performance | Maximizing Investments | Reducing Utility
 
Design Concepts And Energy Management In Green Building
Design Concepts And Energy Management In Green BuildingDesign Concepts And Energy Management In Green Building
Design Concepts And Energy Management In Green Building
 
Making Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a RealityMaking Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a Reality
 
Lesto smart grid presentation
Lesto smart grid presentationLesto smart grid presentation
Lesto smart grid presentation
 
New Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersNew Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control Centers
 
Eaton Enterprise Data Centers Sep 2010
Eaton Enterprise Data Centers Sep 2010Eaton Enterprise Data Centers Sep 2010
Eaton Enterprise Data Centers Sep 2010
 
Smart grid aep_ge
Smart grid aep_geSmart grid aep_ge
Smart grid aep_ge
 
Why RTC?
Why RTC?Why RTC?
Why RTC?
 
Idc Ei Smart Buildings Maturity Model Webcast 4 3 12 Slides
Idc Ei Smart Buildings Maturity Model Webcast 4 3 12 SlidesIdc Ei Smart Buildings Maturity Model Webcast 4 3 12 Slides
Idc Ei Smart Buildings Maturity Model Webcast 4 3 12 Slides
 
Grid optimization through intelligent control
Grid optimization through intelligent controlGrid optimization through intelligent control
Grid optimization through intelligent control
 

Le Hive

  • 1. Schneider Electric HQ Le Hive The green building in Paris Improve efficiency and promote occupant comfort
  • 2. Located 10 km west of Paris in Rueil Malmaison Schneider Electric 2
  • 3. Building overview ● Owned by private investor ● Built by BNP Paribas real estate & Bouygues ● Designed by famous architect JM Wilmotte ● Project start: January 2006 ● Building open: November 2008 ● Total floor space: 35,000 m²; 7 floors ● 1,800 employees ● The 1st building in France with at the same time ● HQE operation & maintenance ● ISO 14001 (Environment) ● NF EN 16001 (Energy Management) Schneider Electric 3
  • 4. EcoStruxure integrated architecture Active energy management architecture from Plant to Plug Services Supervision Energy Mgt. Services Enterprise portal Power management Process & Machines management Services IT / Server Room management Supervision Building management Security management Supervision Services Schneider Electric 4
  • 5. The EcoStruxure Marketing message “You Deserve an Efficient Enterprise” You are concerned by your business continuity, user comfort, Metering equipment & people security, Power Power quality mitigation Local LV/MV protection & control while maintaining optimized management Intelligent power & motor control energy performance at your site Renewables energy conversion or at your enterprise level. Production Management Up to 30% savings Information Management Process & Process Automation on OpEx and CapEx Machines Advanced Process Control Machine Control management Remote Site Management High-Availability & Safety Network Connectivity Rack systems IT room Uninterruptible power supply Enterprise management Cooling control portal Surveillance ONE Supervision HVAC control Lighting control Building Outdoor lighting control management Sun blinds control Guest room control ONE ONE Video security Supervision Supervision Emergency lighting Security Intrusion detection management Access control Fire and life safety One certified point of contact ONE expert > Project simplicity & success Schneider Electric 5
  • 6. Active Energy Management: The fastest way to save on energy, curb CO2 emissions and reduce operation cost Energy audit 1 Find out what the challenge is… & metering Passive Energy Efficiency Active Energy Management 2 3 Optimise through 4 Monitor, Fix the basics automation & maintain, regulation improve Low consumption devices, Solutions in : Metering, monitoring and insulation material, power building management, consulting services, EM analysis factor correction power management, software motor control, lighting control Schneider Electric 6
  • 7. Both designed and built for Energy Efficiency Design & build processes ● Global design of all technical systems active EE ● Teamwork from initial design to implementation and setup Technology ● Efficient building envelope *** passive EE ● Efficient equipment ●T5 dimmable lighting, Active chilled beams, Efficient chillers (COP =3),Low losses transformers ● Optimized architecture and control features for: ●HVAC, lighting, sun blinds ●Energy consumption monitoring active EE Operation process ● Energy dashboards ● Continuous improvement process ● Continuous commissioning Schneider Electric 7
  • 8. The HIVE with EcoStruxure Green: Make the connection of renewable Renewable energies (in progress) energy sources easy, reliable and cost- effective Building Management System Efficient & productive: Lighting, HVAC & sun blinds control • Measure and control energy, automate, Energy monitoring & control provide relevant diagnosis • Manage processes Motor control for pumps and fans • Make all the utilities of the infrastructure more efficient IT Cabling Electrical distribution Safe: Security • Protect people and assets •Transform and distribute power safely Access control Schneider Electric 8
  • 9. Renewable energies: Photovoltaic 50 kW - 90 m² Solar panels and EV chargers integrated in the EcoStruxure architecture Schneider Electric 9
  • 10. Improve energy performance in operation 1.Building operation indicators ● Building usages only: HVAC & auxiliaries (pumps …), lighting, sanitary water ● without activity usages: power sockets,restaurant ● Indoor heated area ● ~60% of total energy consumption ● all energies (electricity , gas) ● ratio in kWh/m².year final energy 2.Total energy consumption indicators ● all usages ● all areas ( incl parking) ● 100% of total energy consumption ● all energies (electricity , gas) ● value in kWh final energy 3.Environmental indicators ● water consumption ● CO2 emission ● Waste treatment : hazardous and standard in tons ( ISO 14001) Schneider Electric 10
  • 11. Action plans to improve energy performance in operation ● Change AHU regulation: adaptable threshold of external temperature, non linear control ● Set dynamic controls of air pressure set points and adapt air flow through VSDs frequency control ● Fine tune temperature set points (change the value, adapt by zone) ● Fine tune time scheduling for AHU ● Adapt lighting control modes (for instance allowing occupants to manually shut off during occupation mode) ● Favour ECO friendly behaviour : switch off , ECO mode for PC , stop water taps, reduce temperature setpoint in occupation mode , stop task lighting Schneider Electric 11
  • 12. Office zone control for optimum balance between energy consumption & comfort ● Design principles ● zoning with a 2 x 1,35m grid (13m²) ; enables enhanced flexibility& scalabilty for future room reconfiguration ● shared sensors and control panels between applications ; reduced CAPEX ● mixed centralized (BMS) & occupant control : continuous optimum balance between EE and comfort Shared control panel Zoning : Shared sensors Mixed centralized (BEMS) and 2x1,35m facade grid occupant control 4,70m depth Schneider Electric 12
  • 13. Office zone plan Zone 1.35 1.35 1.35 luminaire (group 1) luminaire Wall control panel multi-sensor multi- multi-sensor multi- Chilled beam luminaire (group 2) Chilled beam luminaire (group 1) Chilled beam luminaire sunblind / shutter sunblind / shutter sunblind / shutter Luminaire multi-sensor multi- sunblind / shutter Wall control panel Remote control Chilled beam Schneider Electric 13
  • 14. Continued… ● Lighting features ● a presence+light sensor in each zone ● manual switch on and automatic switch off ( 20mn in individual office, after hours in open space) ● automatic constant lux level with adaptable setting ( eg 330lux) ● HVAC features ● a presence+light sensor in each zone ● automatic ventilation & temperature control by zone ● manual switch on and automatic swich off ( 20mn in individual office, after hours in open space) ● occupant can change temperature setting in a +/- 1,5°C range on central( BMS) setting ● manual on/of for the 2 scenarios : comfort/presence – reduced/absence ● automatic(BMS) switch on for the reduced/absence scenario after hours ● Sunblinds features ● occupants control up/down in individual offices and open space ● Occupants control ● In open space , meeting rooms and individual offices : wall mounted multifunctional panel for lighting control, temperature settings &sunlbinds control; + comfort/presence and reduced/absence scenarios ● remote control in individual office for light, sunblinds and temperature settings ● Air quality control ● combined hygrometry-external-interal temperature sensors linked to automatic air flow control Schneider Electric 14
  • 15. Energy consumption is under control by a comprehensive energy monitoring ● Energy metering ● by zone ● by usage in each zone ● by energy ● 12 heat and cold meters on hair handling units , heat water production, heated floor ● 140 electrical energy meters ● Automatic data collection and storage ● Reporting for Facility manager ● Energy awareness for Visitors and employees on display in the showroom Schneider Electric 15
  • 16. … to monitor and improve energy consumption Schneider Electric 16
  • 17. Increase employee awareness with the Hive booklet ● Objective: to ensure employees best possible comfort and working conditions. ● Required by French Labor code ● Covering Safety, Security, Energy Efficiency & Environment ● Regular newsletters to increase employees awareness Schneider Electric 17
  • 18. The Hive booklet ● Increase employee Energy efficiency awareness to contribute to the savings Schneider Electric 18
  • 19. Newsletters to increase employees awareness ● Feedback to employees to keep them updated on the HIVE Energy efficiency program ● Contests to make employees proactive Schneider Electric 19
  • 20. The Hive - Green Building Dashboard Energy consumptions* kWh/m²/year 320 150 110 80 2008 2009 2010 2011 Divide our consumptions by 4 in 3 years, by :  Using Solutions sold by Schneider Electric  Applying the 3 certifications: EN16001, HQE and ISO14001 (1st building in Europe)  Reviewing the measures of the air quality (Hygrometry, Temperatures, Microbiology,..) with the CHSCT  Increase employee Energy Efficiency awareness Schneider Electric * Final energy – 2005 RT Perimeter 20
  • 21. Q&A Make the most of your energy Email: jacques.bollecker@schneider-electric.com Schneider Electric 21
  • 22. Thank you for your participation ! Schneider Electric 22