V2010-1
Rail Transport
Overview modules / course material 2015
V2010-1
Rail Transport
Module 1.0
From transport to traffic
V2010-1
Modal split /
Modal shift
Rail transport
Demand for rail transport
Spatial
planning
Economy
Mobility
Following market requirements
or politically driven
V2010-1
Classification of Railway systems
Rail transport course based on Joern Pachl
Public Transport
and goods
Industrial
railways
Streetcars,
trams
Local electric
railways
Metro,
Subways
Mountain
railways
Other special
railways
Connected to
the public network
Not connected to
the public network
Standard
railway
Light rail
systems
Railway
systems
Monorail
systems
Special railway
systems
V2010-1
Site preparation.
Substructure
It comprises the subgrade itself, including in particular embankments, cuttings, drainage channels,
planting for protection side slopes etc.
Superstructure
This consists of the rails (including turnouts and crossings), sleepers, fastenings, ballast and sub ballast or slab track.
Engineering structures
Viaducts, (moveable) bridges, tunnels, covered cuttings, culverts and other underpasses, retaining walls etc.
Level crossings
Including appliances to ensure the safety of road traffic.
Traction power supply
Which includes catenaries or supports of third rail, substations, power supply cables and control equipment.
Safety, signalling and telecommunications installations
Signal masts and / or cab signalling systems, train detection system, train control equipment, cables and control systems.
Additional facilities
For example baffle boards, fences etc.
Ground area
Stations and stops
Terminals, platforms, pedestrian route, elevators, escalators, stairs etc.
The railway system and its components
V2010-1
Transport Traffic Infrastructure
Three pillars of the rail system
Passenger-
and ton-kilometres
Demand for transport
Origin and destination
Definition of the transport
needs to be satisfied
(product- market)
Ticket price
Quality of service
Travel time
Frequency of service
Punctuality
Change needed
Reliability
Track length
Speed (maximum)
Routes
Synchronism
External constraints
Environmental
Relation with other modalities
Safety
Legislation
Interaction scenery
Technical aspects
Required space
Maintenance
Costs
Trains
Number and length
Cruise speed
Acceleration and
deceleration
Weight
Diesel or electric traction
1500 Volt / 25kV
Functions
Preconditions
V2010-1
Door to door journey
Connecting mode
Main leg
Connecting mode
V2010-1
Logistic chain
V2010-1
Organisation goods transport
• Full train load
• Unit cargo
• Intermodal transport
V2010-1
Full train load
• One customer, one train. No shunting. Fast.
• Goods from origin to destination by train. No other transport
mode needed. No throughput.
• “Chartered” trains. No freight, no train.
Ores
Cereals
Cars
V2010-1
Rail Transport
Module 2.1
Rolling stock
V2010-1
Traffic
Three pillars of the rail system
Trains
Number and length
Cruise speed
Acceleration and
deceleration
Weight
Diesel or electric traction
1500 Volt / 25kV
V2010-1
Our clients
People
Goods
V2010-1
=€
Transport capacity
Revenues
=€
V2010-1
Width and height
Rail head
NL L
D DK
A PL EU GB
1500 mm Standard or normal track width
Track gauge
1435 mm
3150 mm
2790 mm
1380 mm
3500mm
3805mm
4650mm
4320mm
3220mm
Overhead contact wire, viaducts and tunnels
Vehicle gauge
V2010-1
Length
Freight European UIC standard = 750 m.
While in the United States … .
V2010-1
Weight
Rail head
Axle load
2 axles
4 axles
Ton / meter
Class Axle load
103 kg
Ton / meter
103 kg / m.
A 16 5,0
B / B1 18 5,0
B2 18 6,4
C / C2 20 6,4
C3 20 7,2
C4 20 8,0
D / D2 22,5 6,4
D3 22,5 7,2
D4 22,5 8,0
V2010-1
Rolling stock
Basic forms vehicles
Locomotive
Wagon
Coach
Multiple unit
V2010-1
Rail Transport
Module 2.2
Rolling stock
V2010-1
Train characteristics
One direction
Two directions
V2010-1
• Long: Trains up to 400 m. passengers and up to 750 m.
freight (Europe).
• Heavy: Freight trains up to (gross) 5400 ton (Europe).
• High top speed: HST 200 - 350 km/h.
• Slow: Acceleration and deceleration.
• Limited gradient: 2,5 - 4 % maximum.
• Power: Diesel, electric (external supply) or hybrid
Train characteristics
V2010-1
Product – market combinations freight
Multimodal
Ores (bulk)
Chemistry
Steel
Unit cargo /
automotive
V2010-1
Regional
10 – 30 km. 2-4x t/u.
Multicity
10 – 30 km. 4-8x t/u.
30 - 100 km. 2-6x t/u.
International
300 – 1000 km. 6x t/d.
International
1000+ km. 1x t/d.
National
100 - 300 km. 1x t/u.
Product – market combinations passengers
Urban
3 – 10 km. 8-16x t/u.
Urban
1 – 3 km. 8-16x t/u.
V2010-1
Rail Transport
Module 3.0
Guided transport systems
V2010-1
Traffic Infrastructure
Three pillars of the rail system
Track length
Speed (maximum)
Routes
Synchronism
Trains
Number and length
Cruise speed
Acceleration and
deceleration
Weight
Diesel or electric traction
1500 Volt / 25kV
Functions
V2010-1
Guided transport
• Only a single degree of movement. Infrastructure
determents direction and position.
There is no steering wheel inside the vehicle!
What is the most essential
characteristic element
of rail transport?
V2010-1
Guided transport
Guided transport systems in components
Passenger compartment
Drivers cab
Engine / propulsion
Bus
(way)
Tram / train
Support
Guide
V2010-1
Train(type) versus infrastructure
V2010-1
Network elements
Only three elements:
• Transfer node
• Link
• Junction node
V2010-1
Junction node
• A network consists of many transfer nodes. Linked
together with junction nodes.
Characteristics:
Speed (maximum), relations, and synchronism
V2010-1
Rail transport
Module 4.0
Track alignment
V2010-1
Infrastructure
Three pillars of the rail system
Track length
Speed (maximum)
Routes
Synchronism
External constraints
Environmental
Relation with other modalities
Safety
Legislation
Interaction scenery
Technical aspects
Required space
Maintenance
Costs
Functions
Preconditions
V2010-1
V2
R
= a Cant allows higher speeds
g = gravity (m/s2)
h = cant (m)
s = gauge (m)
(g x h)
s
+
Maximum speed according to elementary physics (centrifugal
acceleration) is limited (safety / comfort / wear).
• V = speed (m/s)
• R = curve (m)
• a = (centrifugal) acceleration (m/s2)
Maximum centrifugal acceleration for passenger comfort = 0,8 m/s2
Curved track
V2010-1
Rail Transport
Module 5.0
Turnouts and crossings
V2010-1
Infrastructure
Three pillars of the rail system
Speed (maximum)
Routes
Synchronism
External constraints
Environmental
Relation with other modalities
Safety
Legislation
Interaction scenery
Technical aspects
Required space
Maintenance
Costs
Functions
Preconditions
V2010-1
Routes (the amount of)
D
EC
A
B
Routes or connections is the amount of possible exits
across an interlocking from a specific track (in one
movement!).
For instance: There is only one possible route from
track A; track D.
V2010-1
Synchronism
D
EC
A
B
Routes A- D and B – E
V2010-1
Standard turnout
Switch rails or points
Frog
Front Rear
Check or
guard rail
Scheme
standard turnout
Operating rod to switch stand
‘Hand throw’ or switch / point machine
remote controlled
V2010-1
Standard turnout
Front
Rear
Check or
guard rail
standard turnout
Prevents wheel flange
(opposite wheel) taking
‘the wrong direction’
Rail Transport
Module 6.0
Terminals and stops
V2010-1
Transport Infrastructure
Three pillars of the rail system
Functions
Preconditions
Quality of service
Change needed
Required space
Intermediate terminal and stop
Stop
Terminal
The four main functions
Platform
Hall
Forecourt
Pedestrianroute
“Creepy types”
I work night shifts.
Is it safe to travel
in the evening or
at night?
Social security
V2010-1
Rail Transport
Module 7.1 Signalling and safety
V2010-1
Infrastructure
Three pillars of the rail system
Functions
Preconditions
Track length
Speed (maximum)
Routes
Synchronism
External constraints
Environmental
Relation with other modalities
Safety
Legislation
Interaction scenery
Technical aspects
Required space
Maintenance
Costs
V2010-1
Safety directly related to the train system
• Infrastructure limitations
• Train separation
• Interaction with other transport modes
(level crossings)
• Rail defects
V2010-1
Infrastructure limitations
Movable
Bridges
Curves
Points
Buffer
stop
V2010-1
Train separation
Tools
Communication
Information
Control
Movement authorisation
Point machines
Remote controlled and part of an interlocking
Train detection
GSM-R
Signalling
V2010-1
Movement authority
Different forms:
• Spoken
• Written
• Procedures
• Tokens
• Signs
• Light signals
• Electronic
The message is always the same:
“From – to” and maximum speed allowed.
V2010-1
Rail Transport
Module 7.2 Signalling and safety
V2010-1
Infrastructure based traffic control system
4
2
Higher speeds ≈ longer blocks
V2010-1
Infrastructure based traffic control system
Track circuits
Power
source
Relay
+
+ -
-
Gravity
Block occupied
Insulating
joints
Insulating
joints
Track circuit
V2010-1
Infrastructure based traffic control system
Axle counters
Axle counters
60 402
V2010-1
Vehicle based traffic control system
Authority and
track description
GSM-R
Train position and
train integrity
ERTMS level 3
V2010-1
ERTMS GSM-R
2
EVC
TIM
DMI
Antenna
RBC
IXL
Eurobalise
Train report
Identification, position,
actual speed, train integrity,
Level and mode
GSM-R
876–880 MHz
Traffic management
Signalling system
Interlocking
Odo
V2010-1
ERTMS GSM-R
2
EVC
TIM
DMI
Antenna
RBC
IXL
Eurobalise
Movement Authority (MA)
Distance of the movement authority,
static speed profile, gradient profile
and linking information
GSM-R
921–925 MHz
Traffic management
Signalling system
Interlocking
Odo
V2010-1
‘Safety net’
Limit effects of passing a stop signal
1. Crosslocks in combination with a trap point.
Preventing a train entering an occupied track.
2010-1
Rail Transport
Module 8
Rail system design / capacity
2010-1
Brake margin
= 5 m.
Couple / split
= 5 m. extra
Train length part 1 Train length part 2
Sum platform length = longest train + 5 m. brake margin +
potential 5 m. couple / split
From train length to track length
End face platform
Dwarf signal = 15 m. End face platform
Standard signal= 10 m.
Fouling point –
Insulating joints =
4x tangent + 5 m.
Insulating
Joint - Signal
General 10 m.
Fouling point –
Insulating joints =
4x tangent + 5 m.
Insulating
Joint - Signal
General 10 m.
Gross track length between fouling point indicators is 405 meter for 340 meter long train!
2010-1
Headway
1181 m.1181 m.
9 seconds
reaction
time
325
2687 m. / 130 km/h = 1 minute 14 seconds.
130 – 0 = 1181 meter.
9 sec. / 130 km/h = 325 meter.
1506 meter / 130 km/h = 42 seconds
Cab signalling
Blok system
Curve brake ≤ 0,66 m/s2
2010-1
Line capacity
Time / Distance time timetable
2010-1
0
10
20
30
40
50
60
Distance →
Time→
A B C D E
00
12
02
22
15
27
Line capacity
2010-1
0
10
20
30
40
50
60
Distance →
Time→
A B C D E
Line capacity
Environmental capacity
• Geographic topics
• Traffic related topics
• Social topics
•Visual hindrance
•Spatial planning
“Healing” city structure
Noise reduction
Vibrations
Hazardous goods
Rail Transport
Module 9.0 Track concepts
The balance between safety, space and speed
V2010-1
Infrastructure
Three pillars of the rail system
Functions
Preconditions
Track length
Speed (maximum)
Routes
Synchronism
External constraints
Environmental
Relation with other modalities
Safety
Legislation
Interaction public space
Technical aspects
Required space
Maintenance
Costs
V2010-1
Drivers appreciation
(optional)
Line side signal masts
Signalling
Cab signalling
(required)
Traffic regulation with signalling
(required)
0 18 200140 300+50
V2010-1
Braking power
5,2 m/s2 = 36 meter
2,5 m/s2 = 76 meter
4,5 m/s2 = 42 meter
1,0 m/s2 = 189 meter
1,2 m/s2 = 157 meter
0,66 m/s2 = 286 meter
Braking distance at 70 km/h
Legislation
Passenger comfort
V2010-1
Interaction with other transport modes
0 18 200140 300+50
Mixed
traffic
Crossings
Traffic lights
Level crossing
(secured)
Completely segregated
infrastructure
Additional
shielding
Track concepts
• Fully integrated track
• Free (tramway) track
• Exclusive (tramway) track
• Fully segregated track
Speed Safety measures
Required space
Fully integrated track
Fully segregated track
Fully segregated track
(automated, driverless operation)
Renewed line 1 Paris
Sliding doors match vehicle
like an elevator
Rail transport
Module 10.0
The railroad and it’s environment
Integration
• Geographic topics
• Traffic related topics
• Social topics
•Visual hindrance
•Spatial planning
“Healing” city structure
Noise reduction
77 © 2009 ARCADIS
Geographic
topics
Waterways
Automatic crossings
Start alarm bells and red lights:
25 seconds based on maximum track speed allowed.
V= 130 km/h = 903 m.
Gradients different modalities
7%
5%
2,5%
Different level crossing rail - road
Optimalisation
1,7% = 120 m. 2,50m.
4,60m.
7% = 50 m.50 m. = 3%
2,00 m.
… hybrid.
Solution …
Visual hindrance
Overhead contact wire
V2010-1
Rail Transport
Module 11 Line planning and rescheduling
V2010-1
Line planning
Line planning
OV SAAL 2016
ASD
WP
ASB
RAIASDZHFD SHL
ASDL
ASSH
ASS
ASDM ASSP DMN
DVD DMNZ
HVS
HVSN
NDB
BSMZ
ALMPT ALM
ALMM
ALMP ALMO
ALMB LLS
KPNZ
DNT ZL
AMFS
AVAT
BRN
AMF
es dv
hnk
paris/bxl
rtd
bd
hfdo
gvc
gvc
gvc
hfdo
hfdo
hfdo
hfdo
hfdo
ut ut
ut
ut
HST
Intercity
All station service
Goods
awhv
on
bh
gn/lw
kfh
hfdo
Product – market
translation
V2010-1
ASD
WP
ASDM ASSP DMN
HVS
HVSN
NDB
BSMZ
AMFS
AVAT
BRN
AMF
es dv
ut
ut
awhv
bh
shl
alm
alm
Hilversum
Amsterdam Centraal
Form line planning to time table
Line planning
OV SAAL 2016
HST
Intercity
All station service
Goods
ut
V2010-1
Amsterdam Centraal
Schiphol Hilversum
AlmereTransfer
Transfer
Weesp
Cross platform
Gpda
Mdsa
Form line planning to infrastructure
V2010-1
Rescheduling
V2010-1
Amsterdam Centraal
Schiphol Hilversum
Almere
Amsterdam X !
Weesp
Schiphol ☺
Gpda
Mdsa
Rescheduling
‘Yellow infra’
Infrastructure required
for a complete / corridor
blockade
V1.1, 21-9-09
Rail Transport
Module 12
Introduction traction power supply
V2010-1
Traffic
Three pillars of the rail system
Trains
electric traction
1500 Volt / 25kV
Metro / tram
600 / 750 V
V1.1, 21-9-09
Contact wire support structures
Frame
2.85 meter
Height 5.50 meter
Height
8.50 meter
V1.1, 21-9-09
Energy
10.000 V ≈
1.800 V =
4 kA + -
Ω
± 1.500 V
4 kA
M
U = I * R
Power (max) = U * I = 6mW
Power plant Substation
V1.1, 21-9-09
Sections
To allow maintenance to the traction power supply system,
without having to turn off the entire system, the line is split
up into electrically separated portions known as
"sections".
D
EC
A
B
Insulator
Thank you
Any questions?
andre.vanes@arcadis.nl / a.vanes@utwente.nl
+31 6 2706 2413

Mais conteúdo relacionado

Mais procurados (7)

Metro Signalling Revolution in India
Metro Signalling Revolution in IndiaMetro Signalling Revolution in India
Metro Signalling Revolution in India
 
Report on Dmrc rolling stock
Report on Dmrc rolling stockReport on Dmrc rolling stock
Report on Dmrc rolling stock
 
CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...
 
Communications-Based Signalling Strategies
Communications-Based Signalling StrategiesCommunications-Based Signalling Strategies
Communications-Based Signalling Strategies
 
High precision load weight
High precision load weight High precision load weight
High precision load weight
 
Railway training ppt
Railway training pptRailway training ppt
Railway training ppt
 
Dubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazineDubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazine
 

Destaque

Presentation UIC railAlert v3
Presentation UIC railAlert v3Presentation UIC railAlert v3
Presentation UIC railAlert v3Andr van Es
 
Pengangkutan dengan kereta api (presentasi)
Pengangkutan dengan kereta api (presentasi)Pengangkutan dengan kereta api (presentasi)
Pengangkutan dengan kereta api (presentasi)Nabiil Reshuffle
 
Presentation UIC Minor Railway Technology
Presentation UIC Minor Railway TechnologyPresentation UIC Minor Railway Technology
Presentation UIC Minor Railway TechnologyAndr van Es
 
Juan Pablo - the future of high speed
Juan Pablo - the future of high speedJuan Pablo - the future of high speed
Juan Pablo - the future of high speedimadhammoud
 
1 sejarah-jalan-kereta-api
1 sejarah-jalan-kereta-api1 sejarah-jalan-kereta-api
1 sejarah-jalan-kereta-apiAmir Wardana
 
Manajemen Transportasi Materi 1
Manajemen Transportasi Materi 1Manajemen Transportasi Materi 1
Manajemen Transportasi Materi 1Arjuna Ahmadi
 
Kertas Ujian Pendidikan Moral Tahun 1 SJKT
Kertas Ujian Pendidikan Moral Tahun 1 SJKT Kertas Ujian Pendidikan Moral Tahun 1 SJKT
Kertas Ujian Pendidikan Moral Tahun 1 SJKT Kriyash Yash
 
Seminar
SeminarSeminar
SeminarJNTU
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)sharda university
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with DataSeth Familian
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheLeslie Samuel
 

Destaque (18)

Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Presentation UIC railAlert v3
Presentation UIC railAlert v3Presentation UIC railAlert v3
Presentation UIC railAlert v3
 
Pengangkutan dengan kereta api (presentasi)
Pengangkutan dengan kereta api (presentasi)Pengangkutan dengan kereta api (presentasi)
Pengangkutan dengan kereta api (presentasi)
 
Kelompok 7
Kelompok 7Kelompok 7
Kelompok 7
 
Presentation UIC Minor Railway Technology
Presentation UIC Minor Railway TechnologyPresentation UIC Minor Railway Technology
Presentation UIC Minor Railway Technology
 
Juan Pablo - the future of high speed
Juan Pablo - the future of high speedJuan Pablo - the future of high speed
Juan Pablo - the future of high speed
 
1 sejarah-jalan-kereta-api
1 sejarah-jalan-kereta-api1 sejarah-jalan-kereta-api
1 sejarah-jalan-kereta-api
 
Transportasi
TransportasiTransportasi
Transportasi
 
Maglev train
Maglev trainMaglev train
Maglev train
 
Manajemen Transportasi Materi 1
Manajemen Transportasi Materi 1Manajemen Transportasi Materi 1
Manajemen Transportasi Materi 1
 
Sistem transportasi ppt
Sistem transportasi pptSistem transportasi ppt
Sistem transportasi ppt
 
Kertas Ujian Pendidikan Moral Tahun 1 SJKT
Kertas Ujian Pendidikan Moral Tahun 1 SJKT Kertas Ujian Pendidikan Moral Tahun 1 SJKT
Kertas Ujian Pendidikan Moral Tahun 1 SJKT
 
Seminar
SeminarSeminar
Seminar
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
Revised_Freight_Rail_Handbook_8 24 2012
Revised_Freight_Rail_Handbook_8 24 2012Revised_Freight_Rail_Handbook_8 24 2012
Revised_Freight_Rail_Handbook_8 24 2012
 
Visual Design with Data
Visual Design with DataVisual Design with Data
Visual Design with Data
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Semelhante a 2015 Overview Rail Transport Course

IoT in Rail: Trains, Metro Rail and Light/Urban Rail
IoT in Rail: Trains, Metro Rail and Light/Urban RailIoT in Rail: Trains, Metro Rail and Light/Urban Rail
IoT in Rail: Trains, Metro Rail and Light/Urban RailAlcatel-Lucent Enterprise
 
Aldot railroad diagnostics key terms and concepts
Aldot railroad diagnostics key terms and conceptsAldot railroad diagnostics key terms and concepts
Aldot railroad diagnostics key terms and conceptsSainAssociates
 
Presentation Tivoli 2013
Presentation Tivoli 2013Presentation Tivoli 2013
Presentation Tivoli 2013Poul Froesig
 
ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...
ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...
ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...Ibrahim Al-Hudhaif
 
MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hattonguylundy
 
Nabil slide fyp1 new
Nabil slide fyp1 newNabil slide fyp1 new
Nabil slide fyp1 newnabelnajib
 
Cve 317- transportation engineering.pptx
Cve 317- transportation engineering.pptxCve 317- transportation engineering.pptx
Cve 317- transportation engineering.pptxopeolowooo
 
Rail_Electrification_powerpoint_presentation_2013.pdf
Rail_Electrification_powerpoint_presentation_2013.pdfRail_Electrification_powerpoint_presentation_2013.pdf
Rail_Electrification_powerpoint_presentation_2013.pdfVikashKumar547263
 
Omar Benjumea - Next Station: Cybersecurity [rooted2019]
Omar Benjumea - Next Station: Cybersecurity [rooted2019]Omar Benjumea - Next Station: Cybersecurity [rooted2019]
Omar Benjumea - Next Station: Cybersecurity [rooted2019]RootedCON
 
Guia optica Veolia
Guia optica VeoliaGuia optica Veolia
Guia optica Veoliametro bogota
 
Vectron InnoTrans 2010 english
Vectron InnoTrans 2010 englishVectron InnoTrans 2010 english
Vectron InnoTrans 2010 englishRollingOnRails
 
Moore et al. - JRC2015-5774_final
Moore et al. - JRC2015-5774_finalMoore et al. - JRC2015-5774_final
Moore et al. - JRC2015-5774_finalJon Meusch, PE
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...Hossam Shafiq I
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...Hossam Shafiq I
 

Semelhante a 2015 Overview Rail Transport Course (20)

IoT in Rail: Trains, Metro Rail and Light/Urban Rail
IoT in Rail: Trains, Metro Rail and Light/Urban RailIoT in Rail: Trains, Metro Rail and Light/Urban Rail
IoT in Rail: Trains, Metro Rail and Light/Urban Rail
 
Heavy rails
Heavy rails Heavy rails
Heavy rails
 
Aldot railroad diagnostics key terms and concepts
Aldot railroad diagnostics key terms and conceptsAldot railroad diagnostics key terms and concepts
Aldot railroad diagnostics key terms and concepts
 
Presentation Tivoli 2013
Presentation Tivoli 2013Presentation Tivoli 2013
Presentation Tivoli 2013
 
ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...
ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...
ADIF’s role as Spanish Infrastructure Manager and it’s Scope in the Haramain ...
 
MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hatton
 
Railway Signals
Railway SignalsRailway Signals
Railway Signals
 
Nabil slide fyp1 new
Nabil slide fyp1 newNabil slide fyp1 new
Nabil slide fyp1 new
 
.Chennai metro rail-2
.Chennai metro rail-2.Chennai metro rail-2
.Chennai metro rail-2
 
Cve 317- transportation engineering.pptx
Cve 317- transportation engineering.pptxCve 317- transportation engineering.pptx
Cve 317- transportation engineering.pptx
 
ETCS
ETCSETCS
ETCS
 
MATC Fall Lecture Series: Robert Kollmar
MATC Fall Lecture Series: Robert KollmarMATC Fall Lecture Series: Robert Kollmar
MATC Fall Lecture Series: Robert Kollmar
 
Rail_Electrification_powerpoint_presentation_2013.pdf
Rail_Electrification_powerpoint_presentation_2013.pdfRail_Electrification_powerpoint_presentation_2013.pdf
Rail_Electrification_powerpoint_presentation_2013.pdf
 
Omar Benjumea - Next Station: Cybersecurity [rooted2019]
Omar Benjumea - Next Station: Cybersecurity [rooted2019]Omar Benjumea - Next Station: Cybersecurity [rooted2019]
Omar Benjumea - Next Station: Cybersecurity [rooted2019]
 
Guia optica Veolia
Guia optica VeoliaGuia optica Veolia
Guia optica Veolia
 
Rtpi 2013 john palmer
Rtpi 2013 john palmerRtpi 2013 john palmer
Rtpi 2013 john palmer
 
Vectron InnoTrans 2010 english
Vectron InnoTrans 2010 englishVectron InnoTrans 2010 english
Vectron InnoTrans 2010 english
 
Moore et al. - JRC2015-5774_final
Moore et al. - JRC2015-5774_finalMoore et al. - JRC2015-5774_final
Moore et al. - JRC2015-5774_final
 
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
 
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
 

2015 Overview Rail Transport Course