Presentation Contents
- Maryland Water Resource Regulation
- Maryland Stormwater Management Principles
- Project Site
- Agency Review Process
- Proposed Best Management Practices and Mitigation
- Additional Water Quality Conditions from Public
Interest – and Outcome
Summary of Maryland
Water Resource
Regulation
Surface Water Regulation
Past and Present
Disturbance to surface water resources
• 1948 Federal Water Pollution Control Act with 1972 amendments - Clean
Water Act (CWA)
• Most influential environmental law affecting surface waters in history -
and catalyzed other ancillary state and local programs
• Established the basic structure for regulating pollutant discharges into
the Waters of the U. S. (WUS) giving the U. S. Environmental Protection
Agency (EPA) authority to implement pollution control programs directly or
by delegation or general permit to other agencies or states
• Emphasizes “…restore and maintain the chemical, physical, and biological
integrity of the Nation’s waters…” – “…make all U.S. waters fishable and
swimmable…”
• Gradually transitioned from point source strategies to nonpoint source
Surface Water Regulation
Past and Present
Disturbance to surface water resources
• The Sections of the CWA most affecting WUS, including wetlands, at the site
level at the time of this project (1990 into early 2000s) were:
– Section 404 requiring a federal permit from the U. S. Army Corps of
Engineers (COE) to discharge material
– Section 401 state Water Quality Certification (WQC) from the Maryland
Department of the Environment (MDE) requiring the applicable state certify
that a 404 permit will not violate that state’s water quality standards in order for
the permit to be issued
• Surface water resource regulation including wetlands and stormwater
management (SWM) criteria of the nature required today were in their infancy
and the above were the only true processes in place at that time
• The EPA Antidegradation policy (ADP) via the 401 WQC process was the
primary water quality management instrument and de facto on-site SWM
requirement at that time – stating: “…to accomplish the objective of maintaining
existing water quality…nonpoint sources shall achieve all cost effective and
reasonable best management practices for nonpoint source control…” –
administered in three Tiers of standards at state level
Surface Water Regulation
Past and Present
Disturbance to surface water resources
• Other CWA Sections commonly in place today (but not back then) include:
–- Section 402 National Pollutant Discharge Elimination System
(NPDES) through Phase I and II implementation regulating pre-existing
point and nonpoint source pollution, and from new construction, by EPA
“delegation” to states through General Permits
– New construction is authorized under a Notice of Intent (NOI) process
concurrent with MDE SWM plan approval
– Existing pre-regulation and older municipal discharges are authorized
by issued Municipal Separate Storm Sewer System (MS4)
programmatic permits with retrofit, restoration, and remediation conditions
– and is the only permitting to remediate legacy water quality
impairments, and in the framework of Chesapeake Bay TMDL goals in
Maryland
Surface Water Regulation
Past and Present
Disturbance to surface water resources
• Other CWA Sections that commonly apply today include:
– Section 303 requires states to list impaired waters and develop
Total Maximum Daily Loads (TMDLs) for these waterbodies to
establish the maximum amount of a pollutant allowed as a
starting point and planning tool for restoring water quality.
– The largest TMDL is for the entire Chesapeake Bay, setting
the framework today for many of current regulatory programs and
processes through local MDE-approved Watershed
Implementation Plans (WIP) along with any permitting
processes
Project Process Timeline
• 1990 – The project permittee applies for a CWA COE Nationwide General
Permit (NWP) along with a CWA Section 404 Section 401 WQC from MDE
for proposed impacts to jurisdictional WUS, including wetlands, via a joint
permit application (JPA) – these were the only authorities in place at the time
grandfathering the project from later processes
• Mid-1990s – MDE implements state Nontidal Wetlands and Waterways
(NTWW) permitting process regulating nontidal waters for areas
jurisdictional per WUS via a JPA combining it with the COE 404/MDE 401
WQC process – with MDE additionally regulating as state-only waters the
100-year floodplain, the 25.0 foot (7.6 meter) nontidal wetland buffer, wetland
vegetation clearing, and isolated wetlands not COE-jurisdictional per
SWAANC Supreme Court Ruling
• Mid-1990s - COE issues to Maryland first Maryland State Programmatic
General Permit (MDSPGP) in lieu of most NWPs programmatically
authorizing impacts to the state when meeting certain criteria which, in effect,
allows MDE to authorize many projects on the COE's behalf with certain
federal conditions
Regulatory Process Timeline
• Mid-1990s - Maryland Department of Natural Resources (DNR) implements
forest conservation act regulating forest cover including mitigation and first
programmatic stream buffer setback and reforestation requirements by delegation
to local governments through planning overlay criteria
• Mid-1990s - MDE implements CWA Section 402, NPDES Phase I and II
programmatically via EPA General Permits
• Mid-1990s to 2007 - MDE refines their SWM program delegated to localities by
policy, a manual, and 2007 SWM Act to gradually integrate ecological and
resource criteria with engineering in coordination with the limits of waters, including
wetlands – incorporating Best Management Practices (BMP) by reference, and
formalizing Environmental Site Design (ESD) to the Maximum Extent Practicable
(MEP) – compliance is achieved by channel stability and post-development
conditions replicating to the receiving stream “woods in good condition” – where
using structural stormwater practices is least preferred
• 1992 to early 2000s – the initial project is completed along with first watershed
BMP monitoring effort followed by subsequent ancillary build-out of other
contiguous properties up-drainage in separate phases regulated by the additionally
implemented criteria
Other Resource Regulatory
Processes
Disturbance to tidal surface water and land
resources regulated then but did not apply
• Tidal Waters Including Wetlands:
MDE regulates tidally-influenced open and navigable water and their
wetlands through their tidal water regulations and COE CWA Sections
404/401 along with COE Section 10 of the Rivers and Harbors Act via
the JPA process
• Critical Area Commission for The Chesapeake & Atlantic Coastal
Bays:
The DNR regulates land and water impacts including mitigation and
stream buffer setbacks within 1,000 feet landward from tidal Mean
High Water through a delegated local planning overlay process
Summary of Maryland
Stormwater Management
Principles
Habitat Avoidance Alone
Insufficient
What Could Happen
How is SWM Applied at the Project
Level?
BMPs are policies, practices, procedures, or structures that
mitigate the potential effects of stormwater runoff associated with
land clearing and impervious surfaces prior to release into a
water. BMPs can be structural or non-structural.
- Early planning
- Local stream buffers and setbacks
- Minimize or disconnect impervious surfaces
- Maximize sheet flow and open section pavement
- Utilize BMP devices (most significant factor affecting performance
is construction and maintenance!)
BMPs and Permitting
Smaller Volumes - try
first
“First Flush” is preferred and most
compatible with ESD at-source
and/or pretreatment quality
control
• Infiltration
– trench/basin
• Filtering
– sand filter/bioretention
• Hydrodynamic Devices above
or underground
– Curb & gutter vortex/filter
basin
• “Newer” Technology
– pervious surfaces/green
roofs
Larger Volumes – if
needed
When preferred is Insufficient
for both quantity and quality
• Stormwater Ponds
– wet pond
– wet ED pond
– dry ED pond (w/pre-
treatment)
– multiple pond system
• Stormwater Wetlands
– shallow marsh
– ED shallow wetland
– pond/wetland systems
Classification of Maryland Waters
• Use I & I-P: contact recreation and protection of
aquatic life waters
• Use II: shellfish harvesting waters
• Use III & III-P: natural reproducing trout waters
• Use IV & IV-P: recreational (put and take) trout
waters
Can require additional waters, including wetlands,
compliance criteria
Water Quality Standards
• Can be numeric and narrative, and may be basis for sensitive
waters requirements
• Needs to maintain the designated uses (e.g. recreation, aquatic
habitat, drinking water)
• Can impose a construction time-of-year restriction in a permit
• Numeric – Dissolved Oxygen, Temperature, pH, turbidity, bacteria,
toxics
• Narrative - Protection of aquatic life...fishable…swimmable
• Antidegradation (ADP) policy from EPA:
“…To accomplish the objective of maintaining existing water
quality…nonpoint sources shall achieve all cost effective and
reasonable best management practices for nonpoint source
control…” (this was de facto onsite stormwater quality management
at that time!)
Summary of Project Site
Location of Project Area
Location of Project Area
Initial Development at Low Point
Summary of Agency
Review Process
Initial MDE/COE Permit Steps
• Determined to be higher quality Use I-P water
• Purpose and need
• Avoidance and minimization of WUS from roads,
utilities, and other disturbances
• On-site stormwater quality management
• Quantity SWM (County review completed prior to JPA)
• Coordination with local authorities, NGOs, and
stakeholders
• Need to address ADP and SWM
Apply SWM Preferences
• Vegetative buffers, disconnects, open section
pavement
• Infiltration practices if soils allow
• Bioretention, swales, wetland filtering
• Retention or extended detention pond with
wetlands (to include quantity management)
Accepted Site-specific Mitigation
and BMP’s
• Stream/wetland impacts limited to necessary roads/utilities
• In-waters SWM in marginal/poor areas only
• Minimum stream buffer of 100‘ (30.5 meters)
• Wetland mitigation and replanting in cropped riparian buffer areas
• “First flush” stormwater quality management in uplands
• Infiltration/filtration where feasible (permeable soils and depth)
• Primary quantity stormwater management in “horseshoe” pond
• Water pooling areas planted with wetland vegetation
Public & NGO Involvement
• Public Notice
• Waters may have Use III or IV (higher quality trout
water) potential
• Temperature and ponds potential concern
• EPA ADP may apply
• Implemented trout stocking and sampling
• Findings - no Use III or IV standards but high quality
Use I
Summary of Proposed
BMPs and Mitigation
Work with Forest and Wetlands
Utilize Site Character
Pond and Wetland Management
Impact Avoidance and SWM
Temperature Sensitive Resources
Transition Pond Habitat
SWM & Landscaping
SWM and Landscaping
Urban Areas
Small Spaces
More Small Spaces
Stream Stabilization and
Restoration
• One of first then
• Can be effective
watershed
sediment control
practice
• Can be local
approval
requirement
• Can be a traded
credit
• Can be out-of-
kind wetland
mitigation
Additional Water Quality
Conditions from Public
Interest – and Outcome
Additional Mitigation and SWM
• Water quality monitoring plan
• Stream reach temperature model
• Maximum 20% diversion base flow to ponded areas
• Shade planting of open stormwater conveyance
areas
•Toe drain pipes under embankment fill for increased
cooler groundwater contribution
Stream and Water Quality
Monitoring
One of first then – basis for
County Special Protection Area
Can be used for state Watershed
Compliance
Can be used for DNR stream data
Preconstruction, construction and
post-construction essential
Included Macroinvertebrate
studies
(more common then for point
source – WWTP, mining, etc.)
Chemistry, Geomorphology
Primary Monitoring Component
Historic Rapid Bioassessment Data
Rapid Bioassessment Metric Comparisons to Pre-Construction
Year ST2 ST6 ST10
1993 Non Impaired ** Non Impaired **
1994 Non to Mod. Impaired Non Impaired Non Im
1995 Non to Mod. Impaired Non to Mod. Impaired Non Im
1996 Non to Mod. Impaired Moderately Impaired Non to M
1997 Non to Mod. Impaired Non to Mod. Impaired Modera
1998 Moderately Impaired Non to M
1999 Moderately Impaired Moderately Impaired Modera
2000 Moderately Impaired Non to Mod. Impaired
2001 Non to Severely Impaired Moderately Impaired Non Im
2002 Non to Mod. Impaired Mod. to Severely Impaired
** Non Impaired value is given to the first (reference) date for comparison purposes;
Historic Dissolved Oxygen Data
Piney Branch Mean Dissolved Oxygen Levels for Stations 2, 6 and 10
0
2
4
6
8
10
12
14
1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002
Year
mg/l
ST. 2 Mean D.O. ST. 6 Mean D.O. ST. 10 Mean D.O. Use I Min. D.O.
Historic Temperature Data
Piney Branch Instream Peak Temperatures
Stations 2, 6 and 10
0
5
10
15
20
25
30
35
1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002
Year
Temperature(oC)
ST. 2 ST. 6 ST. 10
Lessons Learned
• Contributed to “how we do it now”
• Contributed to onsite “first flush” Environmental Site Design (ESD) to
the Maximum Extent Practicable (MEP) principles
• Contributed to “cold water” SWM and BMP strategies when waters,
including wetlands, permits are required
• Contributed to innovative county Special Protection
Area legislation
• Basis for local, state, federal coordinating committees and public
processes
• Contributed to initial County reporting requirements to MDE to comply
with CWA Section 402 Phase I MS4 NPDES MS4 Permit

Mais conteúdo relacionado

Mais procurados

1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]guest7dbf4
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelAndrew T. Der & Associates, LLC
 
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...Michael F. Bloom PE, ENV SP, CFM, BCEE
 
Balancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case StudyBalancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case StudyAndrew T. Der & Associates, LLC
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 HydroCEQAplanner
 
Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...
Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...
Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...TWCA
 
WOTUS Update, Paulina Williams - Baker Botts
WOTUS Update, Paulina Williams - Baker BottsWOTUS Update, Paulina Williams - Baker Botts
WOTUS Update, Paulina Williams - Baker BottsTWCA
 
Watershed management along the Colorado River - Michael Gabaldon
Watershed management along the Colorado River - Michael GabaldonWatershed management along the Colorado River - Michael Gabaldon
Watershed management along the Colorado River - Michael GabaldonYourAlberta
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsLoren Larson, CHMM, CPEA
 
French, DFC Update
French, DFC UpdateFrench, DFC Update
French, DFC UpdateTWCA
 
Mitigation Symposium - Kim Sturgess
Mitigation Symposium - Kim SturgessMitigation Symposium - Kim Sturgess
Mitigation Symposium - Kim SturgessYourAlberta
 

Mais procurados (20)

Current Issues in Stormwater Management
Current Issues in Stormwater ManagementCurrent Issues in Stormwater Management
Current Issues in Stormwater Management
 
An Overview of Stormwater Management
An Overview of Stormwater ManagementAn Overview of Stormwater Management
An Overview of Stormwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Stormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in MarylandStormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in Maryland
 
Maryland Water Laws and Regulations
Maryland Water Laws and RegulationsMaryland Water Laws and Regulations
Maryland Water Laws and Regulations
 
Stormwater Regulation
Stormwater RegulationStormwater Regulation
Stormwater Regulation
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
 
Stormwater Magazine
Stormwater MagazineStormwater Magazine
Stormwater Magazine
 
Barfield
BarfieldBarfield
Barfield
 
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
 
Balancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case StudyBalancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case Study
 
January 22 ESP 179 Hydro
January 22  ESP 179 HydroJanuary 22  ESP 179 Hydro
January 22 ESP 179 Hydro
 
Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...
Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...
Endangered Species Act Panel, Nathan Pence - Guadalupe-Blanco River Authority...
 
WOTUS Update, Paulina Williams - Baker Botts
WOTUS Update, Paulina Williams - Baker BottsWOTUS Update, Paulina Williams - Baker Botts
WOTUS Update, Paulina Williams - Baker Botts
 
NDOR Research Conference: Dr. Zhang
NDOR Research Conference: Dr. ZhangNDOR Research Conference: Dr. Zhang
NDOR Research Conference: Dr. Zhang
 
Watershed management along the Colorado River - Michael Gabaldon
Watershed management along the Colorado River - Michael GabaldonWatershed management along the Colorado River - Michael Gabaldon
Watershed management along the Colorado River - Michael Gabaldon
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit Requirements
 
French, DFC Update
French, DFC UpdateFrench, DFC Update
French, DFC Update
 
Mitigation Symposium - Kim Sturgess
Mitigation Symposium - Kim SturgessMitigation Symposium - Kim Sturgess
Mitigation Symposium - Kim Sturgess
 

Semelhante a Water Quality and Wetlands: Historic Lessons Learned

Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingFairfax County
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Finalaearles
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...Deltares
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Fairfax County
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
Presentation (3-9-04)
Presentation (3-9-04)Presentation (3-9-04)
Presentation (3-9-04)David Lewis
 
Overview of California Water Law and Regulation
Overview of California Water Law and RegulationOverview of California Water Law and Regulation
Overview of California Water Law and RegulationKevin Haroff
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Fairfax County
 
Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...
Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...
Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...Kim Beidler
 
Presentation to AAAEA Technical conference
Presentation to AAAEA Technical conferencePresentation to AAAEA Technical conference
Presentation to AAAEA Technical conferencehbaroudi
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingFairfax County
 

Semelhante a Water Quality and Wetlands: Historic Lessons Learned (20)

Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Final
 
3 WUL appendices
3 WUL appendices 3 WUL appendices
3 WUL appendices
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
Underground Injection Well Overview, Lorrie Council
Underground Injection Well Overview, Lorrie CouncilUnderground Injection Well Overview, Lorrie Council
Underground Injection Well Overview, Lorrie Council
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
Presentation (3-9-04)
Presentation (3-9-04)Presentation (3-9-04)
Presentation (3-9-04)
 
NTU is Not a University
NTU is Not a UniversityNTU is Not a University
NTU is Not a University
 
Overview of California Water Law and Regulation
Overview of California Water Law and RegulationOverview of California Water Law and Regulation
Overview of California Water Law and Regulation
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
 
Wp mp-update-camp pendleton.-april_25_2013
Wp   mp-update-camp pendleton.-april_25_2013Wp   mp-update-camp pendleton.-april_25_2013
Wp mp-update-camp pendleton.-april_25_2013
 
Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...
Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...
Coalition for the Delaware River Watershed Presents: 2nd Annual Delaware Rive...
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Presentation to AAAEA Technical conference
Presentation to AAAEA Technical conferencePresentation to AAAEA Technical conference
Presentation to AAAEA Technical conference
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 

Mais de Andrew T. Der & Associates, LLC (15)

Waters, waters everywhere
Waters, waters everywhereWaters, waters everywhere
Waters, waters everywhere
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Bat Blog
Bat BlogBat Blog
Bat Blog
 
Wetland Law and Compliance
Wetland Law and ComplianceWetland Law and Compliance
Wetland Law and Compliance
 
Stream Buffers
Stream BuffersStream Buffers
Stream Buffers
 
Turbidity
TurbidityTurbidity
Turbidity
 
Stream Buffers
Stream BuffersStream Buffers
Stream Buffers
 
SER News
SER NewsSER News
SER News
 
Waters, Waters Everywhere
Waters, Waters EverywhereWaters, Waters Everywhere
Waters, Waters Everywhere
 
WRA DelDOT WL Presentation
WRA DelDOT WL PresentationWRA DelDOT WL Presentation
WRA DelDOT WL Presentation
 
What are Waters of the United States?
What are Waters of the United States?What are Waters of the United States?
What are Waters of the United States?
 
Invited Panel University of Delaware Symposium
Invited Panel University of Delaware SymposiumInvited Panel University of Delaware Symposium
Invited Panel University of Delaware Symposium
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 

Último

DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...rajputriyana310
 
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...PsychicRuben LoveSpells
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Bookingtanu pandey
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 

Último (20)

DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
$ Love Spells 💎 (310) 882-6330 in Pennsylvania, PA | Psychic Reading Best Bla...
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberHot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Hot Call Girls 🫤 Malviya Nagar ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 

Water Quality and Wetlands: Historic Lessons Learned

  • 1. 1186 - Balancing Nonpoint Source Water Quality Management with Wetland and Stream Preservation: Historic Lessons Learned by Andrew T. Der, C.E.P. Presentation for Society of Wetland Scientists Annual Conference Baltimore, Maryland Monday May 31, 2019 Andrew T. Der & Associates, LLC Environmental Consulting 1000 Fell Street | Baltimore, MD 21231 1.410.491.2808 | AndrewTDer@comcast.net
  • 2. Presentation Contents - Maryland Water Resource Regulation - Maryland Stormwater Management Principles - Project Site - Agency Review Process - Proposed Best Management Practices and Mitigation - Additional Water Quality Conditions from Public Interest – and Outcome
  • 3. Summary of Maryland Water Resource Regulation
  • 4. Surface Water Regulation Past and Present Disturbance to surface water resources • 1948 Federal Water Pollution Control Act with 1972 amendments - Clean Water Act (CWA) • Most influential environmental law affecting surface waters in history - and catalyzed other ancillary state and local programs • Established the basic structure for regulating pollutant discharges into the Waters of the U. S. (WUS) giving the U. S. Environmental Protection Agency (EPA) authority to implement pollution control programs directly or by delegation or general permit to other agencies or states • Emphasizes “…restore and maintain the chemical, physical, and biological integrity of the Nation’s waters…” – “…make all U.S. waters fishable and swimmable…” • Gradually transitioned from point source strategies to nonpoint source
  • 5. Surface Water Regulation Past and Present Disturbance to surface water resources • The Sections of the CWA most affecting WUS, including wetlands, at the site level at the time of this project (1990 into early 2000s) were: – Section 404 requiring a federal permit from the U. S. Army Corps of Engineers (COE) to discharge material – Section 401 state Water Quality Certification (WQC) from the Maryland Department of the Environment (MDE) requiring the applicable state certify that a 404 permit will not violate that state’s water quality standards in order for the permit to be issued • Surface water resource regulation including wetlands and stormwater management (SWM) criteria of the nature required today were in their infancy and the above were the only true processes in place at that time • The EPA Antidegradation policy (ADP) via the 401 WQC process was the primary water quality management instrument and de facto on-site SWM requirement at that time – stating: “…to accomplish the objective of maintaining existing water quality…nonpoint sources shall achieve all cost effective and reasonable best management practices for nonpoint source control…” – administered in three Tiers of standards at state level
  • 6. Surface Water Regulation Past and Present Disturbance to surface water resources • Other CWA Sections commonly in place today (but not back then) include: –- Section 402 National Pollutant Discharge Elimination System (NPDES) through Phase I and II implementation regulating pre-existing point and nonpoint source pollution, and from new construction, by EPA “delegation” to states through General Permits – New construction is authorized under a Notice of Intent (NOI) process concurrent with MDE SWM plan approval – Existing pre-regulation and older municipal discharges are authorized by issued Municipal Separate Storm Sewer System (MS4) programmatic permits with retrofit, restoration, and remediation conditions – and is the only permitting to remediate legacy water quality impairments, and in the framework of Chesapeake Bay TMDL goals in Maryland
  • 7. Surface Water Regulation Past and Present Disturbance to surface water resources • Other CWA Sections that commonly apply today include: – Section 303 requires states to list impaired waters and develop Total Maximum Daily Loads (TMDLs) for these waterbodies to establish the maximum amount of a pollutant allowed as a starting point and planning tool for restoring water quality. – The largest TMDL is for the entire Chesapeake Bay, setting the framework today for many of current regulatory programs and processes through local MDE-approved Watershed Implementation Plans (WIP) along with any permitting processes
  • 8. Project Process Timeline • 1990 – The project permittee applies for a CWA COE Nationwide General Permit (NWP) along with a CWA Section 404 Section 401 WQC from MDE for proposed impacts to jurisdictional WUS, including wetlands, via a joint permit application (JPA) – these were the only authorities in place at the time grandfathering the project from later processes • Mid-1990s – MDE implements state Nontidal Wetlands and Waterways (NTWW) permitting process regulating nontidal waters for areas jurisdictional per WUS via a JPA combining it with the COE 404/MDE 401 WQC process – with MDE additionally regulating as state-only waters the 100-year floodplain, the 25.0 foot (7.6 meter) nontidal wetland buffer, wetland vegetation clearing, and isolated wetlands not COE-jurisdictional per SWAANC Supreme Court Ruling • Mid-1990s - COE issues to Maryland first Maryland State Programmatic General Permit (MDSPGP) in lieu of most NWPs programmatically authorizing impacts to the state when meeting certain criteria which, in effect, allows MDE to authorize many projects on the COE's behalf with certain federal conditions
  • 9. Regulatory Process Timeline • Mid-1990s - Maryland Department of Natural Resources (DNR) implements forest conservation act regulating forest cover including mitigation and first programmatic stream buffer setback and reforestation requirements by delegation to local governments through planning overlay criteria • Mid-1990s - MDE implements CWA Section 402, NPDES Phase I and II programmatically via EPA General Permits • Mid-1990s to 2007 - MDE refines their SWM program delegated to localities by policy, a manual, and 2007 SWM Act to gradually integrate ecological and resource criteria with engineering in coordination with the limits of waters, including wetlands – incorporating Best Management Practices (BMP) by reference, and formalizing Environmental Site Design (ESD) to the Maximum Extent Practicable (MEP) – compliance is achieved by channel stability and post-development conditions replicating to the receiving stream “woods in good condition” – where using structural stormwater practices is least preferred • 1992 to early 2000s – the initial project is completed along with first watershed BMP monitoring effort followed by subsequent ancillary build-out of other contiguous properties up-drainage in separate phases regulated by the additionally implemented criteria
  • 10. Other Resource Regulatory Processes Disturbance to tidal surface water and land resources regulated then but did not apply • Tidal Waters Including Wetlands: MDE regulates tidally-influenced open and navigable water and their wetlands through their tidal water regulations and COE CWA Sections 404/401 along with COE Section 10 of the Rivers and Harbors Act via the JPA process • Critical Area Commission for The Chesapeake & Atlantic Coastal Bays: The DNR regulates land and water impacts including mitigation and stream buffer setbacks within 1,000 feet landward from tidal Mean High Water through a delegated local planning overlay process
  • 11. Summary of Maryland Stormwater Management Principles
  • 14. How is SWM Applied at the Project Level? BMPs are policies, practices, procedures, or structures that mitigate the potential effects of stormwater runoff associated with land clearing and impervious surfaces prior to release into a water. BMPs can be structural or non-structural. - Early planning - Local stream buffers and setbacks - Minimize or disconnect impervious surfaces - Maximize sheet flow and open section pavement - Utilize BMP devices (most significant factor affecting performance is construction and maintenance!)
  • 15. BMPs and Permitting Smaller Volumes - try first “First Flush” is preferred and most compatible with ESD at-source and/or pretreatment quality control • Infiltration – trench/basin • Filtering – sand filter/bioretention • Hydrodynamic Devices above or underground – Curb & gutter vortex/filter basin • “Newer” Technology – pervious surfaces/green roofs Larger Volumes – if needed When preferred is Insufficient for both quantity and quality • Stormwater Ponds – wet pond – wet ED pond – dry ED pond (w/pre- treatment) – multiple pond system • Stormwater Wetlands – shallow marsh – ED shallow wetland – pond/wetland systems
  • 16. Classification of Maryland Waters • Use I & I-P: contact recreation and protection of aquatic life waters • Use II: shellfish harvesting waters • Use III & III-P: natural reproducing trout waters • Use IV & IV-P: recreational (put and take) trout waters Can require additional waters, including wetlands, compliance criteria
  • 17. Water Quality Standards • Can be numeric and narrative, and may be basis for sensitive waters requirements • Needs to maintain the designated uses (e.g. recreation, aquatic habitat, drinking water) • Can impose a construction time-of-year restriction in a permit • Numeric – Dissolved Oxygen, Temperature, pH, turbidity, bacteria, toxics • Narrative - Protection of aquatic life...fishable…swimmable • Antidegradation (ADP) policy from EPA: “…To accomplish the objective of maintaining existing water quality…nonpoint sources shall achieve all cost effective and reasonable best management practices for nonpoint source control…” (this was de facto onsite stormwater quality management at that time!)
  • 23. Initial MDE/COE Permit Steps • Determined to be higher quality Use I-P water • Purpose and need • Avoidance and minimization of WUS from roads, utilities, and other disturbances • On-site stormwater quality management • Quantity SWM (County review completed prior to JPA) • Coordination with local authorities, NGOs, and stakeholders • Need to address ADP and SWM
  • 24. Apply SWM Preferences • Vegetative buffers, disconnects, open section pavement • Infiltration practices if soils allow • Bioretention, swales, wetland filtering • Retention or extended detention pond with wetlands (to include quantity management)
  • 25. Accepted Site-specific Mitigation and BMP’s • Stream/wetland impacts limited to necessary roads/utilities • In-waters SWM in marginal/poor areas only • Minimum stream buffer of 100‘ (30.5 meters) • Wetland mitigation and replanting in cropped riparian buffer areas • “First flush” stormwater quality management in uplands • Infiltration/filtration where feasible (permeable soils and depth) • Primary quantity stormwater management in “horseshoe” pond • Water pooling areas planted with wetland vegetation
  • 26. Public & NGO Involvement • Public Notice • Waters may have Use III or IV (higher quality trout water) potential • Temperature and ponds potential concern • EPA ADP may apply • Implemented trout stocking and sampling • Findings - no Use III or IV standards but high quality Use I
  • 27. Summary of Proposed BMPs and Mitigation
  • 28. Work with Forest and Wetlands
  • 30. Pond and Wetland Management
  • 39. Stream Stabilization and Restoration • One of first then • Can be effective watershed sediment control practice • Can be local approval requirement • Can be a traded credit • Can be out-of- kind wetland mitigation
  • 40. Additional Water Quality Conditions from Public Interest – and Outcome
  • 41. Additional Mitigation and SWM • Water quality monitoring plan • Stream reach temperature model • Maximum 20% diversion base flow to ponded areas • Shade planting of open stormwater conveyance areas •Toe drain pipes under embankment fill for increased cooler groundwater contribution
  • 42. Stream and Water Quality Monitoring One of first then – basis for County Special Protection Area Can be used for state Watershed Compliance Can be used for DNR stream data Preconstruction, construction and post-construction essential Included Macroinvertebrate studies (more common then for point source – WWTP, mining, etc.) Chemistry, Geomorphology
  • 44. Historic Rapid Bioassessment Data Rapid Bioassessment Metric Comparisons to Pre-Construction Year ST2 ST6 ST10 1993 Non Impaired ** Non Impaired ** 1994 Non to Mod. Impaired Non Impaired Non Im 1995 Non to Mod. Impaired Non to Mod. Impaired Non Im 1996 Non to Mod. Impaired Moderately Impaired Non to M 1997 Non to Mod. Impaired Non to Mod. Impaired Modera 1998 Moderately Impaired Non to M 1999 Moderately Impaired Moderately Impaired Modera 2000 Moderately Impaired Non to Mod. Impaired 2001 Non to Severely Impaired Moderately Impaired Non Im 2002 Non to Mod. Impaired Mod. to Severely Impaired ** Non Impaired value is given to the first (reference) date for comparison purposes;
  • 45. Historic Dissolved Oxygen Data Piney Branch Mean Dissolved Oxygen Levels for Stations 2, 6 and 10 0 2 4 6 8 10 12 14 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 Year mg/l ST. 2 Mean D.O. ST. 6 Mean D.O. ST. 10 Mean D.O. Use I Min. D.O.
  • 46. Historic Temperature Data Piney Branch Instream Peak Temperatures Stations 2, 6 and 10 0 5 10 15 20 25 30 35 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 Year Temperature(oC) ST. 2 ST. 6 ST. 10
  • 47. Lessons Learned • Contributed to “how we do it now” • Contributed to onsite “first flush” Environmental Site Design (ESD) to the Maximum Extent Practicable (MEP) principles • Contributed to “cold water” SWM and BMP strategies when waters, including wetlands, permits are required • Contributed to innovative county Special Protection Area legislation • Basis for local, state, federal coordinating committees and public processes • Contributed to initial County reporting requirements to MDE to comply with CWA Section 402 Phase I MS4 NPDES MS4 Permit