Project – PML3_US_EHVL_02
Heightening and conversion of existing
220 kV & 132 kV Overhead line
infringing Metro Rail alignment of Pune
Metro Line III
Project Synopsis
Contract No.: PML3_US_EHLV_02
Authority: Pune Metropolitan Region Development Authority
Employer PITCMRL, PUNE
Completion Period: 240 days from LOA ( Package B,C & D - 180 days)
(Package E & F – 240 Days)
LOA Date 15 th March 2022
Contract Value INR 1,10,80,08,369 ( Rs.110.80 Crs) excluding GST
Contractor Rahul Cables Pvt. Ltd.
Bank Guarantee INR 11,08,00,837.00 valid up to 30.06.2025
Contractual Completion
Date
10 th November 2022
Anticipated Completion
Date
30.06.2023
Sailent features of the Project
 The project is for heightening & conversion of existing 220 kV & 132 kV overhead lines which are infringing the Metro
Rail alignment of Pune Metro Line 3 Project to Underground Cable.
 The project work consist of total five packages
 Package 1 – 220 kV S/c Chinchwad – Hinjewadi line between Location No.159 to 163
 Package 2 – 220 kV D/c Chinchwad – Parvati (PRM) line between Location No.16 to 20 Heightening with Monopole
 Package 3 – 132 kV D/C Rahatani – Varasagan line between location No.11 to 16
 Package 4 – 132 kV S/C NCL – Rahatani line between Location No.33 to 38
 Package 5 – 132 kV D/c Chinchwad – Ganeshkhind Line between Loacation 1 to 7 Conversion of OH to UG Cable
 The line is passing through highly traffic zone and the lot of utilities are passing through the proposed cable route.
 In all the heightening works ( Package 1 to 3) monopoles are proposed in the same power corridor and for execution,
outage is must for Monopole erection and stringing work and also utmost safety measures to adhered.
 ROW will play a vital role in this project. As the Monopole designs are unique, change in the position of tower may lead
to change in the type of Monopole and it is time taking process for the new type pole from its design to manufacturing.
Scope of work – Line wise
S No Line name Monopole
(Nos)
UG Cable
(Kms)
Remarks
01 220 kV S/c Chinchwad -
Hinjewadi
4 Nil Tower Nos.160, 161,161A &
162
02 220 kV D/c Chinchwad –
Parvati Flagship
3 Nil Tower Nos.17, 17A & 18
03 132 kV D/c Rahatani –
Varasgan
3 Nil Tower Nos. 13, 14 & 15
04 132 kV S/c NCL - Rahatni 1 1.288 CTT proposed at Tower
No.34A ( Near Vidyanchal
School)
05 132 kV D/c Chinchwad -
Ganeshkhind
1 1.582 CTT proposed at Tower
No.6 (YASHDA premises)
Supply Status (Monopole)
Sl
No
Description Unit Req. Qty Supplied Balance Remarks
1
220 kV S/c
Chinchwad -
Hinjewadi
Nos 4 3 1 Tower No.160 on hold due to
ROW
2
220 kV D/c
Chinchwad – Parvati
Flagship
Nos 3 3 Nil
3
132 kV D/c Rahatani
–Varasgan
Nos 3 - 3 Manufacturing clearance
awaited from client
4 132 kV S/c NCL -
Rahatni
Nos 1 - 1 Design verification u/p at
MSETCL, Mumbai
5 132 kV D/c
Chinchwad -
Ganeshkhind
Nos 1 - 1 Design verification u/p at
MSETCL, Mumbai
Supply Status (Cable)
Sl
No
Description Unit Req. Qty Supplied Balance Remarks
1 132 kV S/c NCL -
Rahatni
Kms 7.8 -
First lot of cable drums in
transit
2
132 kV D/c
Chinchwad -
Ganeshkhind
Kms 9.5 -
First lot cable drums in transit
Physical Completion Plan – Monopole works
Activity Anticipated Qty Progress till date Bal Plan
Jan Feb Mar April May
Foundation (Nos)
P-1 4 P-1 - P-1 4 P-1 - P-1 2 P-1 2 P-1 - P-1 -
P-2 3 P-2 1 P-2 2 P-2 - P-2 1 P-2 1 P-2 - P-2 -
P-3 3 P-3 - P-3 3 P-3 - P-3 - P-3 1 P-3 2 P-3 -
P-4 1 P-4 - P-4 1 P-4 - P-4 - P-4 1 P-4 - P-4 -
P-5 1 P-5 - P-5 1 P-5 - P-5 - P-5 - P-5 1 P-5 -
Erection ( Nos)
P-1 4 P-1 - P-1 4 P-1 - P-1 - P-1 2 P-1 1 P-1 1
P-2 3 P-2 - P-2 3 P-2 - P-2 1 P-2 1 P-2 1 P-2 -
P-3 3 P-3 - P-3 3 P-3 - P-3 - P-3 - P-3 1 P-3 2
P-4 1 P-4 - P-4 1 P-4 - P-4 - P-4 - P-4 1 P-4 -
P-5 1 P-5 - P-5 1 P-5 - P-5 - P-5 - P-5 - P-5 1
Stringing ( Kms)
P-1 2.46
P-1 - P-1 2.46
P-1 - P-1 - P-1 - P-1 - P-1 2.46
P-2 1.28
P-2 - P-2 1.28
P-2 - P-2 - P-2 - P-2 1.28 P-2 -
P-3 1.35
P-3 - P-3 1.35
P-3 - P-3 - P-3 - P-3 - P-3 1.35
Physical Completion Plan ( UG Cable works)
Description Anticipated
Qty
Progress till
date
Bal as on
date
Plan
Jan Feb Mar April May Jun
Cable laying ( Sections)
P4 3 P4 - P4 3 P4 - P4 1 P4 1 P4 1 P4 - P4 -
P5 3 P5 - P5 3 P5 - P5 - P5 1 P5 1 P5 1 P5 -
Joint Bay construction
P4 4 P4 - P4 6 P4 - P4 - P4 2 P4 2 P4 - P4 -
P5 4 P5 - P5 6 P5 - P5 - P5 1 P5 3 P5 - P5 -
OET Foundation
P4 6 P4 - P4 6 P4 - P4 - P4 - P4 6 P4 - P4 -
P5 6 P5 - P5 6 P5 - P5 - P5 - P5 - P5 6 P5 -
Jointing (JB wise)
P4 4 P4 - P4 6 P4 - P4 - P4 - P4 2 P4 2 P4 -
P5 4 P5 - P5 6 P5 - P5 - P5 - P5 - P5 2 P5 2
Termination
P4 24 P4 - P4 24 P4 - P4 - P4 - P4 - P4 12 P4 -
P5 24 P5 - P5 24 P5 - P5 - P5 - P5 - P5 - P5 12
Challenges and Action Plan
Challenges
 ROW clearance of Monopole locations - Package –B
(160, 162)
 ROW clearance of Monopole locations - Package –C
(17A)
 ROW clearance of Monopole locations -Package –D
(13,14 & 15 )
 Monopole design Approval – Package E & F
 NHAI approval Package – D
 EI permission
 Finalization of cable route & CTT –Package F
Action Plan
 Coordination with MSETCL/PMRDA/PITCMRL to
resolve ROW by this week of Location Nos 17A, 160
& 162.
 Package D – Coordination with collector office to
resolve ROW . PMRDA Scope
 Monpole Design approval – Under process at
MSETCL Corporate office
 RCPL will submit the proposal after ROW clearance
 EI permission – In coordination with MSETCL, RCPL
will file the on line application this week
Challenges and Action Plan
Challenges
 Finalization of Gantry (NCL)
 SLD preparation and its approval
Action Plan
 NCL gantry yet to finalize MSETCL. Coordination
with MSETCL to finalize by month end
 SLD – RCPL has to submit the SLD for both lines
after cable route approval.
Site Photos - Execution
Site Photos - Execution
Site Photos – Execution
Site Photos – Execution
Site Photos - Safety
Site Photos - Safety
Site Photos - Safety
Site Photos - Safety
Site Photos – client visit
Thank you

Mais conteúdo relacionado

Semelhante a Project Review Meeting - 14.02.23.ppt

Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
Thomas Ingrey
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
vasanth morais
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
Subhash Dhiman
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
Rolando Garcia
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
Shaukat Mahmood Khan
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
Paolo Aguzzi
 

Semelhante a Project Review Meeting - 14.02.23.ppt (20)

Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)
 
MIG CV (Mar 2016)
MIG CV (Mar 2016)MIG CV (Mar 2016)
MIG CV (Mar 2016)
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
Review of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxReview of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptx
 
CV Solar
CV SolarCV Solar
CV Solar
 
CV-Priono_Update
CV-Priono_UpdateCV-Priono_Update
CV-Priono_Update
 
Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)
 
Ashish Resume
Ashish ResumeAshish Resume
Ashish Resume
 
RS Resume
RS ResumeRS Resume
RS Resume
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
Cv Piping Engineer
Cv Piping EngineerCv Piping Engineer
Cv Piping Engineer
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
CV-SC-Shaukat Mahmood Khan(5306) January 08,2017
 
RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
Cv paoloaguzzinov16
Cv paoloaguzzinov16Cv paoloaguzzinov16
Cv paoloaguzzinov16
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 

Último

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Project Review Meeting - 14.02.23.ppt

  • 1. Project – PML3_US_EHVL_02 Heightening and conversion of existing 220 kV & 132 kV Overhead line infringing Metro Rail alignment of Pune Metro Line III
  • 2. Project Synopsis Contract No.: PML3_US_EHLV_02 Authority: Pune Metropolitan Region Development Authority Employer PITCMRL, PUNE Completion Period: 240 days from LOA ( Package B,C & D - 180 days) (Package E & F – 240 Days) LOA Date 15 th March 2022 Contract Value INR 1,10,80,08,369 ( Rs.110.80 Crs) excluding GST Contractor Rahul Cables Pvt. Ltd. Bank Guarantee INR 11,08,00,837.00 valid up to 30.06.2025 Contractual Completion Date 10 th November 2022 Anticipated Completion Date 30.06.2023
  • 3. Sailent features of the Project  The project is for heightening & conversion of existing 220 kV & 132 kV overhead lines which are infringing the Metro Rail alignment of Pune Metro Line 3 Project to Underground Cable.  The project work consist of total five packages  Package 1 – 220 kV S/c Chinchwad – Hinjewadi line between Location No.159 to 163  Package 2 – 220 kV D/c Chinchwad – Parvati (PRM) line between Location No.16 to 20 Heightening with Monopole  Package 3 – 132 kV D/C Rahatani – Varasagan line between location No.11 to 16  Package 4 – 132 kV S/C NCL – Rahatani line between Location No.33 to 38  Package 5 – 132 kV D/c Chinchwad – Ganeshkhind Line between Loacation 1 to 7 Conversion of OH to UG Cable  The line is passing through highly traffic zone and the lot of utilities are passing through the proposed cable route.  In all the heightening works ( Package 1 to 3) monopoles are proposed in the same power corridor and for execution, outage is must for Monopole erection and stringing work and also utmost safety measures to adhered.  ROW will play a vital role in this project. As the Monopole designs are unique, change in the position of tower may lead to change in the type of Monopole and it is time taking process for the new type pole from its design to manufacturing.
  • 4. Scope of work – Line wise S No Line name Monopole (Nos) UG Cable (Kms) Remarks 01 220 kV S/c Chinchwad - Hinjewadi 4 Nil Tower Nos.160, 161,161A & 162 02 220 kV D/c Chinchwad – Parvati Flagship 3 Nil Tower Nos.17, 17A & 18 03 132 kV D/c Rahatani – Varasgan 3 Nil Tower Nos. 13, 14 & 15 04 132 kV S/c NCL - Rahatni 1 1.288 CTT proposed at Tower No.34A ( Near Vidyanchal School) 05 132 kV D/c Chinchwad - Ganeshkhind 1 1.582 CTT proposed at Tower No.6 (YASHDA premises)
  • 5. Supply Status (Monopole) Sl No Description Unit Req. Qty Supplied Balance Remarks 1 220 kV S/c Chinchwad - Hinjewadi Nos 4 3 1 Tower No.160 on hold due to ROW 2 220 kV D/c Chinchwad – Parvati Flagship Nos 3 3 Nil 3 132 kV D/c Rahatani –Varasgan Nos 3 - 3 Manufacturing clearance awaited from client 4 132 kV S/c NCL - Rahatni Nos 1 - 1 Design verification u/p at MSETCL, Mumbai 5 132 kV D/c Chinchwad - Ganeshkhind Nos 1 - 1 Design verification u/p at MSETCL, Mumbai
  • 6. Supply Status (Cable) Sl No Description Unit Req. Qty Supplied Balance Remarks 1 132 kV S/c NCL - Rahatni Kms 7.8 - First lot of cable drums in transit 2 132 kV D/c Chinchwad - Ganeshkhind Kms 9.5 - First lot cable drums in transit
  • 7. Physical Completion Plan – Monopole works Activity Anticipated Qty Progress till date Bal Plan Jan Feb Mar April May Foundation (Nos) P-1 4 P-1 - P-1 4 P-1 - P-1 2 P-1 2 P-1 - P-1 - P-2 3 P-2 1 P-2 2 P-2 - P-2 1 P-2 1 P-2 - P-2 - P-3 3 P-3 - P-3 3 P-3 - P-3 - P-3 1 P-3 2 P-3 - P-4 1 P-4 - P-4 1 P-4 - P-4 - P-4 1 P-4 - P-4 - P-5 1 P-5 - P-5 1 P-5 - P-5 - P-5 - P-5 1 P-5 - Erection ( Nos) P-1 4 P-1 - P-1 4 P-1 - P-1 - P-1 2 P-1 1 P-1 1 P-2 3 P-2 - P-2 3 P-2 - P-2 1 P-2 1 P-2 1 P-2 - P-3 3 P-3 - P-3 3 P-3 - P-3 - P-3 - P-3 1 P-3 2 P-4 1 P-4 - P-4 1 P-4 - P-4 - P-4 - P-4 1 P-4 - P-5 1 P-5 - P-5 1 P-5 - P-5 - P-5 - P-5 - P-5 1 Stringing ( Kms) P-1 2.46 P-1 - P-1 2.46 P-1 - P-1 - P-1 - P-1 - P-1 2.46 P-2 1.28 P-2 - P-2 1.28 P-2 - P-2 - P-2 - P-2 1.28 P-2 - P-3 1.35 P-3 - P-3 1.35 P-3 - P-3 - P-3 - P-3 - P-3 1.35
  • 8. Physical Completion Plan ( UG Cable works) Description Anticipated Qty Progress till date Bal as on date Plan Jan Feb Mar April May Jun Cable laying ( Sections) P4 3 P4 - P4 3 P4 - P4 1 P4 1 P4 1 P4 - P4 - P5 3 P5 - P5 3 P5 - P5 - P5 1 P5 1 P5 1 P5 - Joint Bay construction P4 4 P4 - P4 6 P4 - P4 - P4 2 P4 2 P4 - P4 - P5 4 P5 - P5 6 P5 - P5 - P5 1 P5 3 P5 - P5 - OET Foundation P4 6 P4 - P4 6 P4 - P4 - P4 - P4 6 P4 - P4 - P5 6 P5 - P5 6 P5 - P5 - P5 - P5 - P5 6 P5 - Jointing (JB wise) P4 4 P4 - P4 6 P4 - P4 - P4 - P4 2 P4 2 P4 - P5 4 P5 - P5 6 P5 - P5 - P5 - P5 - P5 2 P5 2 Termination P4 24 P4 - P4 24 P4 - P4 - P4 - P4 - P4 12 P4 - P5 24 P5 - P5 24 P5 - P5 - P5 - P5 - P5 - P5 12
  • 9. Challenges and Action Plan Challenges  ROW clearance of Monopole locations - Package –B (160, 162)  ROW clearance of Monopole locations - Package –C (17A)  ROW clearance of Monopole locations -Package –D (13,14 & 15 )  Monopole design Approval – Package E & F  NHAI approval Package – D  EI permission  Finalization of cable route & CTT –Package F Action Plan  Coordination with MSETCL/PMRDA/PITCMRL to resolve ROW by this week of Location Nos 17A, 160 & 162.  Package D – Coordination with collector office to resolve ROW . PMRDA Scope  Monpole Design approval – Under process at MSETCL Corporate office  RCPL will submit the proposal after ROW clearance  EI permission – In coordination with MSETCL, RCPL will file the on line application this week
  • 10. Challenges and Action Plan Challenges  Finalization of Gantry (NCL)  SLD preparation and its approval Action Plan  NCL gantry yet to finalize MSETCL. Coordination with MSETCL to finalize by month end  SLD – RCPL has to submit the SLD for both lines after cable route approval.
  • 11. Site Photos - Execution
  • 12. Site Photos - Execution
  • 13. Site Photos – Execution
  • 14. Site Photos – Execution
  • 15. Site Photos - Safety
  • 16. Site Photos - Safety Site Photos - Safety
  • 17. Site Photos - Safety
  • 18. Site Photos – client visit