Capacitor Bank
and
Improvement
of power factor
Instructor
Rethwan Faiz
Assistant Professor
AIUB
Hello! Every One
American International University-
Bangladesh (AIUB)
Group Members-
1.Shahriar Niloy. 14-26876-2
2.Kabir,Md.Ahshan 14-26903-2
3.Nurnobe ,Md. 14-26845-2
4.Hossain,Mohammad Ismail 14-27342-2
5.Shahabuddin,khan Istiak 13-24372-2
Contents:
•Capacitor Bank
•Power factor
•Causes of low power factor
•Disadvantages of low power factor
•The Need for Power factor correction
•Methods for improving Pf
•Advantages of power factor correction
•How capacitor Bank install in the plant
•Reference
What is Capacitor Bank?
A capacitor bank is a group of several capacitors
of the same rating that are connected in series or
parallel with each other to store electrical energy .
The resulting bank is then used to counteract or
correct a power factor lag or phase shift in an
alternating current (AC) power supply.
What is the reason for using it?
Capacitor banks are generally used in
substations. Since most of the household
and industrial appliances are either
resistive(eg. incandescent light, heater,
etc.) or inductive(e.g. refrigerator, air-
conditioner, motor, etc). The capacitive
load of the capacitor bank will help to
adjust the power factor as close to 1 as
possible, in which case the voltage and
current are in phase and deliver maximum
usable power to the load.
Power Factor:
 The power factor is the ratio of the real
power that is used to do work and the apparent
power that is supplied to the circuit.
 The power factor can get values in the range
from 0 to 1.
 When all the power is reactive power with no real
power (usually inductive load) - the power factor
is 0.
 When all the power is real power with no reactive
power (resistive load) - the power factor is 1.
The power factor can be expressed in
two ways:
■Power factor (pf) = Useful power (kW)
divided by the total power (kVA),or
■Power factor (pf) = The cosine of the
angle between useful power and total
power= cos ø.
Cause of low power factor:
Low power factor results when KW is small
in relation to KVA.
What causes a large KVAR in a system?
Inductive Loads
•Transformer
•Induction motors
•Induction generators (Wind mill
generators)
•High intensity discharge (HID) lighting
Disadvantages of low power factor:
•The increase in reactive power increases
the current flowing through the network
•Large copper losses
•Large KVA rating and size of electrical
equipment
•Greater conductor size and cost
•Poor voltage regulation and large voltage
drop
•Low efficiency
•Reduced handling capacity of the system
What can I do to improve power factor?
You can improve power factor by adding power factor
correction capacitors to your plant distribution system.
95% power factor provides maximum benefit
Theoretically, capacitors could provide 100% of needed reactive
power. In practical usage, however, power factor correction to
approximately 95% provides maximum benefit.
Other methods of improving PF :
Synchronous Condenser
Phase Advancer
■To reduce losses in the distribution system
■Reduction of electricity bills
■Extra kVA available from the existing supply
■Reduction of I2R losses in transformers and
distribution equipment
■Reduction of voltage drop in long cables.
■Extended equipment life – Reduced
electrical burden on cables
■and electrical components.
How much can I save by installing
power capacitors?
Where should I install capacitors in my plant
distribution system?
At Load-
Because capacitors act as kVAR generators, the most efficient
place
to install them is directly at the motor, where kVAR is consumed.
Three options exist for installing capacitors at the motor.
Want big impact?
Use big image.
At the service feeder-
When correcting entire plant loads, capacitor banks can be
installed
at the service entrance, if load conditions and transformer size
permit. If the amount of correction is too large, some capacitors
can
be installed at individual motors or branch circuits.
When capacitors are connected to the bus, feeder, motor control
center, or switchboard, a disconnect and overcurrent protection
must be provided.
References-
i. https://en.wikipedia.org/wiki/Traffic_light
ii. http://circuitdigest.com/electronic-circuits/four-
way-traffic-light-circuit
iii. https://www.youtube.com/watch?v=_XtsEVTro
gc&feature=youtu.be
iv. http://www.powershow.com/view/1f2279-
MTA5Y/Traffic_Signs_powerpoint_ppt_presentati
on
What about maintenance?
Capacitors have no moving parts to wear out and
require very little maintenance.Check fuses on a
regular basis. If high voltages,harmonics,switching
surges, or vibration exists, fuses should be checked
more frequently.
References-
i. International Journal of Emerging Technology
and Advanced Engineering Website:
www.ijetae.com (ISSN 2250-2459, ISO
9001:2008 Certified Journal, Volume 4, Issue
8, August 2014)
ii. http://www.eaton.com/electrical.
iii. http://www.electrical4u.com/capacitor-bank-
reactive-power-compensation/
Capacitor bank and improvement of power factor

Mais conteúdo relacionado

Mais procurados

400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Power quality notes unit 1
Power quality notes unit  1 Power quality notes unit  1
Power quality notes unit 1 Dilip kumar
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical powerpriyanka1432
 
Power Quality & Power Quality Problems
Power Quality & Power Quality ProblemsPower Quality & Power Quality Problems
Power Quality & Power Quality ProblemsPower System Operation
 
Load factor and demand factor
Load factor and demand factorLoad factor and demand factor
Load factor and demand factordhirajthakkar1
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work pptDemsew Mitiku
 
Power qualty conditioners
Power qualty conditionersPower qualty conditioners
Power qualty conditionersSudhanshu Goel
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHShankar Singh
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmissionprasantakcs
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 

Mais procurados (20)

400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Power factor improvement
Power factor improvement Power factor improvement
Power factor improvement
 
Single line diagram
Single line diagramSingle line diagram
Single line diagram
 
Power factor(r)
Power factor(r)Power factor(r)
Power factor(r)
 
Power quality notes unit 1
Power quality notes unit  1 Power quality notes unit  1
Power quality notes unit 1
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical power
 
Power Quality & Power Quality Problems
Power Quality & Power Quality ProblemsPower Quality & Power Quality Problems
Power Quality & Power Quality Problems
 
Load factor and demand factor
Load factor and demand factorLoad factor and demand factor
Load factor and demand factor
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Short and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITYShort and long interruptions- UNIT-II-POWER QUALITY
Short and long interruptions- UNIT-II-POWER QUALITY
 
IEEE substation design
IEEE substation designIEEE substation design
IEEE substation design
 
Chapter 01- High Voltage Engineering Introduction
Chapter 01- High Voltage Engineering IntroductionChapter 01- High Voltage Engineering Introduction
Chapter 01- High Voltage Engineering Introduction
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 
Power qualty conditioners
Power qualty conditionersPower qualty conditioners
Power qualty conditioners
 
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGHHIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
HIGH VOL TAGE TESTING OF TRANSFORMER BY HARI SHANKAR SINGH
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmission
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
EXCITATION SYSTEMS
EXCITATION SYSTEMSEXCITATION SYSTEMS
EXCITATION SYSTEMS
 

Destaque

1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500Navyasri Jiguru
 
Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Pulse Energy
 
Power factor improvement of an induction motor
Power factor improvement of an induction motorPower factor improvement of an induction motor
Power factor improvement of an induction motorIIT Roorkee
 
Power Factor Basics
Power Factor BasicsPower Factor Basics
Power Factor Basicsno suhaila
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensationcijogeorgep
 
Project report soofi
Project report soofiProject report soofi
Project report soofialmsoofi
 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationAmeen San
 
Power Factor
Power FactorPower Factor
Power FactorTim Cohen
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Deviceskhemraj298
 
automatic power factor controller
automatic power factor controllerautomatic power factor controller
automatic power factor controllersingh1515
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportTheory to Practical
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in indiaJasgt Singh
 
Samick Linear Bushing 2012 E
Samick Linear Bushing 2012 ESamick Linear Bushing 2012 E
Samick Linear Bushing 2012 EJasonSamick
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalStaco Energy
 
Power factor solution,presentation
Power factor solution,presentationPower factor solution,presentation
Power factor solution,presentationAmol Chande
 
significance of reactive power and its need of compensation
significance of reactive power and its need of compensationsignificance of reactive power and its need of compensation
significance of reactive power and its need of compensationShubham Sadatkar
 
Power factor
Power factorPower factor
Power factorwkugubre
 
Power factor and power in AC circuit
Power factor and power in AC circuitPower factor and power in AC circuit
Power factor and power in AC circuitRavi Gelani
 

Destaque (20)

Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
 
Power Factor
Power FactorPower Factor
Power Factor
 
Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...
 
Power factor improvement of an induction motor
Power factor improvement of an induction motorPower factor improvement of an induction motor
Power factor improvement of an induction motor
 
Power Factor Basics
Power Factor BasicsPower Factor Basics
Power Factor Basics
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Project report soofi
Project report soofiProject report soofi
Project report soofi
 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage Regulation
 
Power Factor
Power FactorPower Factor
Power Factor
 
Series & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs DevicesSeries & shunt compensation and FACTs Devices
Series & shunt compensation and FACTs Devices
 
automatic power factor controller
automatic power factor controllerautomatic power factor controller
automatic power factor controller
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System Report
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
 
Samick Linear Bushing 2012 E
Samick Linear Bushing 2012 ESamick Linear Bushing 2012 E
Samick Linear Bushing 2012 E
 
Product: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: TechnicalProduct: Power Factor & Harmonics: StacoSine: Technical
Product: Power Factor & Harmonics: StacoSine: Technical
 
Power factor solution,presentation
Power factor solution,presentationPower factor solution,presentation
Power factor solution,presentation
 
significance of reactive power and its need of compensation
significance of reactive power and its need of compensationsignificance of reactive power and its need of compensation
significance of reactive power and its need of compensation
 
Power factor
Power factorPower factor
Power factor
 
Power factor and power in AC circuit
Power factor and power in AC circuitPower factor and power in AC circuit
Power factor and power in AC circuit
 

Semelhante a Capacitor bank and improvement of power factor

IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET Journal
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptxPoojaAnupGarg
 
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...ijtsrd
 
Integration of solar PV Plant to utility grod by improving its power quality
Integration of solar PV Plant to utility grod by improving its power qualityIntegration of solar PV Plant to utility grod by improving its power quality
Integration of solar PV Plant to utility grod by improving its power qualityRuchiGautam28
 
Control and Operation_GPV.pdf
Control and Operation_GPV.pdfControl and Operation_GPV.pdf
Control and Operation_GPV.pdfPKSahu6
 
Advance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsAdvance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsTexas A&M University
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxSveris COE Pandharpur
 
SOLAR PANEL POWERED BATTERY E VEHICLE....
SOLAR PANEL POWERED BATTERY E VEHICLE....SOLAR PANEL POWERED BATTERY E VEHICLE....
SOLAR PANEL POWERED BATTERY E VEHICLE....DeepakK547422
 
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESpower factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESEMERSON EDUARDO RODRIGUES
 
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...IRJET Journal
 
Solar electricity india-2011
Solar electricity india-2011Solar electricity india-2011
Solar electricity india-2011H Janardan Prabhu
 
MINOR MODULE 2.pptx
MINOR MODULE 2.pptxMINOR MODULE 2.pptx
MINOR MODULE 2.pptxvikip35
 

Semelhante a Capacitor bank and improvement of power factor (20)

IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonic
 
POWER FACTOR.pptx
POWER FACTOR.pptxPOWER FACTOR.pptx
POWER FACTOR.pptx
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
 
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
Experimental Research on Power Quality Improvement using Capacitor Bank for 5...
 
Integration of solar PV Plant to utility grod by improving its power quality
Integration of solar PV Plant to utility grod by improving its power qualityIntegration of solar PV Plant to utility grod by improving its power quality
Integration of solar PV Plant to utility grod by improving its power quality
 
Mohsin rana
Mohsin ranaMohsin rana
Mohsin rana
 
Solar ppt
Solar pptSolar ppt
Solar ppt
 
Control and Operation_GPV.pdf
Control and Operation_GPV.pdfControl and Operation_GPV.pdf
Control and Operation_GPV.pdf
 
Advance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsAdvance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy Systems
 
pdf presentation
pdf presentationpdf presentation
pdf presentation
 
Hybrid inverter project report
Hybrid inverter project reportHybrid inverter project report
Hybrid inverter project report
 
Ssfcl
SsfclSsfcl
Ssfcl
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.Pptx
 
SOLAR PANEL POWERED BATTERY E VEHICLE....
SOLAR PANEL POWERED BATTERY E VEHICLE....SOLAR PANEL POWERED BATTERY E VEHICLE....
SOLAR PANEL POWERED BATTERY E VEHICLE....
 
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESpower factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
 
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
Inverter doc
Inverter docInverter doc
Inverter doc
 
Solar electricity india-2011
Solar electricity india-2011Solar electricity india-2011
Solar electricity india-2011
 
MINOR MODULE 2.pptx
MINOR MODULE 2.pptxMINOR MODULE 2.pptx
MINOR MODULE 2.pptx
 

Último

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 

Último (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 

Capacitor bank and improvement of power factor

  • 3. Hello! Every One American International University- Bangladesh (AIUB) Group Members- 1.Shahriar Niloy. 14-26876-2 2.Kabir,Md.Ahshan 14-26903-2 3.Nurnobe ,Md. 14-26845-2 4.Hossain,Mohammad Ismail 14-27342-2 5.Shahabuddin,khan Istiak 13-24372-2
  • 4. Contents: •Capacitor Bank •Power factor •Causes of low power factor •Disadvantages of low power factor •The Need for Power factor correction •Methods for improving Pf •Advantages of power factor correction •How capacitor Bank install in the plant •Reference
  • 5. What is Capacitor Bank? A capacitor bank is a group of several capacitors of the same rating that are connected in series or parallel with each other to store electrical energy . The resulting bank is then used to counteract or correct a power factor lag or phase shift in an alternating current (AC) power supply.
  • 6. What is the reason for using it? Capacitor banks are generally used in substations. Since most of the household and industrial appliances are either resistive(eg. incandescent light, heater, etc.) or inductive(e.g. refrigerator, air- conditioner, motor, etc). The capacitive load of the capacitor bank will help to adjust the power factor as close to 1 as possible, in which case the voltage and current are in phase and deliver maximum usable power to the load.
  • 7. Power Factor:  The power factor is the ratio of the real power that is used to do work and the apparent power that is supplied to the circuit.  The power factor can get values in the range from 0 to 1.  When all the power is reactive power with no real power (usually inductive load) - the power factor is 0.  When all the power is real power with no reactive power (resistive load) - the power factor is 1.
  • 8. The power factor can be expressed in two ways: ■Power factor (pf) = Useful power (kW) divided by the total power (kVA),or ■Power factor (pf) = The cosine of the angle between useful power and total power= cos ø.
  • 9. Cause of low power factor: Low power factor results when KW is small in relation to KVA. What causes a large KVAR in a system? Inductive Loads •Transformer •Induction motors •Induction generators (Wind mill generators) •High intensity discharge (HID) lighting
  • 10. Disadvantages of low power factor: •The increase in reactive power increases the current flowing through the network •Large copper losses •Large KVA rating and size of electrical equipment •Greater conductor size and cost •Poor voltage regulation and large voltage drop •Low efficiency •Reduced handling capacity of the system
  • 11. What can I do to improve power factor? You can improve power factor by adding power factor correction capacitors to your plant distribution system.
  • 12. 95% power factor provides maximum benefit Theoretically, capacitors could provide 100% of needed reactive power. In practical usage, however, power factor correction to approximately 95% provides maximum benefit. Other methods of improving PF : Synchronous Condenser Phase Advancer
  • 13. ■To reduce losses in the distribution system ■Reduction of electricity bills ■Extra kVA available from the existing supply ■Reduction of I2R losses in transformers and distribution equipment ■Reduction of voltage drop in long cables. ■Extended equipment life – Reduced electrical burden on cables ■and electrical components. How much can I save by installing power capacitors?
  • 14. Where should I install capacitors in my plant distribution system? At Load- Because capacitors act as kVAR generators, the most efficient place to install them is directly at the motor, where kVAR is consumed. Three options exist for installing capacitors at the motor.
  • 15. Want big impact? Use big image.
  • 16. At the service feeder- When correcting entire plant loads, capacitor banks can be installed at the service entrance, if load conditions and transformer size permit. If the amount of correction is too large, some capacitors can be installed at individual motors or branch circuits. When capacitors are connected to the bus, feeder, motor control center, or switchboard, a disconnect and overcurrent protection must be provided.
  • 17. References- i. https://en.wikipedia.org/wiki/Traffic_light ii. http://circuitdigest.com/electronic-circuits/four- way-traffic-light-circuit iii. https://www.youtube.com/watch?v=_XtsEVTro gc&feature=youtu.be iv. http://www.powershow.com/view/1f2279- MTA5Y/Traffic_Signs_powerpoint_ppt_presentati on
  • 18.
  • 19. What about maintenance? Capacitors have no moving parts to wear out and require very little maintenance.Check fuses on a regular basis. If high voltages,harmonics,switching surges, or vibration exists, fuses should be checked more frequently.
  • 20. References- i. International Journal of Emerging Technology and Advanced Engineering Website: www.ijetae.com (ISSN 2250-2459, ISO 9001:2008 Certified Journal, Volume 4, Issue 8, August 2014) ii. http://www.eaton.com/electrical. iii. http://www.electrical4u.com/capacitor-bank- reactive-power-compensation/