Highway drainage is a process of removing
and controlling excess surface and sub-soil
water within the right of way.
It includes interception and diversion of
water from the road surface and subgrade.
Excessmoisture in soil subgrade causesconsiderable
lowering of its stability.
Increasein moisture causereduction in strength of
many pavement materials like stabilized soil and
water bound macadam.
Sustained contact of water with bituminous pavements
causesfailure due to stripping of bitumen from
aggregates like loosening or detachment of some of the
bituminous pavement layers and formations of pot
holes
Excesswater on shoulders and pavement edges causes
considerable damage.
In clayey soil variation in moisture content causes
considerable variation in volume of sub grade.
High moisture content causesincreases in weight and
thus increasein stress and simultaneous reduction in
strength of soil mass.
Erosion of soil from top of unsurfaced roads and slopes
of embankment,
cut and hill side is also due to surface water.
In cold regions presence of water in the subgrade and a
continuous supply of water from the ground water can
causeconsiderable damage to the pavement due to
frost action.
The surface water from the carriageway and shoulder
should effectively be drained off without allowing it
to percolate to sub grade.
Surface water from adjoining land should be
prevented form entering the roadway.
Side drain should have sufficient capacity and
longitudinal slope to carry away all surface water
collected.
Flow of surface water acrossthe road and shoulders
and along slopes should not causeformation of cross
ruts or erosion.
Seepageand other sources of under ground water
should be drained off by the subsurfacedrainage
system.
Highest level of ground water table should be
kept well below the level of subgrade,
preferably by atleast 1.2m.
In waterlogged areasspecial precautions should
be taken
During rains,
• part of the rain water flows on surface
• part of it percolate through the soil mass as
gravitational water until it reaches the
ground water below the water table.
Removal and diversion of surface water from the
road way and adjoining land is termedassurface
drainage.
Diversion and removal of excess of soil water from
the subgrade is termed asSurfaceDrainage.
Methods of surface drainage
1.By Longitudinal sidedrains.
2.CatchbasinsandInlets in urbanareas
3.Providing damp proofcourse
4. Providing propercamber
5.Providing sufficient slope to the sides
6. Keepingthe level of carriage way at least 60 cm above the HFL.
A)Sidedrainsfor roadin embankment
-
It is necessaryto provide side drain on one side or
both sides, when road is constructed in
embankment.
Side drains should be at least 2.0 m away from
bottom edge of an embankment.
Depth of side drains is kept 1.0 to 1.5m to
prevent the entry of drain water intothe
embankment.
B)Sidedrainsfor roadin cutting
A) Catch basins
Catchbasin is astructure like chamber
constructed on asewer line.
Water from pavement surface is collected in catch
basin and discharged to thesewer line.
The catch basin (catch pit) is provided with
grating to prevent the entry of rubbish into the
drainage system.
Inlets is aconcrete box with grating either at the top or in the
side.
For aquick drainageit isnecessaryto ensure that shoulder
surface is properly slopedand free from irregularities and
depressions.
In impervious type, it is practiced to extend the subbasecourse
with drainageacrossthe shoulderupto side drain.
Alternatively we canprovide cont layer of 75-100mm thick laid
under the shoulder at the bottom layer of sub baseabout 150
mm thick extended upto theedge.
The pavedshouldershould be at least 0.5%steeper then
camber subjectedto min of 3%
The unpaved shoulder should be further 0.5%
steeper along the horizontal curve,Shoulder on
inner side of the curve should have slope steeper
than that of pavement.
On the outer side, the shoulder should be made
to drain away from the pavement, alow rate of
super elevation are provided.
On the other hand, where higher rate of super
elevation, the outside shoulder are kept level or
rounded.
Except for amedian less than 5m wide, it is not
desirable to drain the median areatowards the
pavement surface.
 1.2 - 1.8 m wide median –Provided with kerbs
and always paved.
 1.8 - 5 m wide median – Usually turfed and
crowned so that surface water could run
towards the pavement maybe with or without
kerbs.
If carriage way slopes towards the median, central
drain maybe made to carry the runoff and slope
shouldnot be steeper than 6:1.
When the median hasonly earthen surface, it
should not be crowned because it can result in
soil particles being carried to the pavement
surface making itslippery.
Removal or Diversion of excess soil-water from
sub-grade is termed as sub-surface drainage.
The changein moisture of sub-grade are causedby
the following
 Fluctuations in GroundWaterTable
 SeepageFlow
 Percolation Of RainWater
 Movement of CapillaryWater
In sub-surface drainage it is practiced to keep the
variation of moisture in sub-grade to a minimum.
Lowering of Water
Table
Controlling Seepage
Flow
Controlling Capillary
Water
In order to that the sub-grade and pavement are
not subjected to excessivemoisture the water
table shouldkept at least 1.0to 1.2m below the
sub-grade.
In places where water table is high to take the
road formation on embankment of height not
less than 1.0-1.2mis the best approach.
ButWhen the formation level is at or below the
general ground level it is necessaryto lower the water
table.
(a) If soil is relatively permeable, it may be possible
to lowerWTby constructing longitudinal drainage
trenches with drain pipe and filter sand and top of
trenches is covered with clay seal
The depth of trench depend on:
(i) The required lowering of water table
(ii) distanceb/w the drainagetrenches
(iii)Types of soil
(b) If the soil is relatively
lesspermeable, the
lowering of ground WT
may not be adequate.
Hence in addition to the
longitudinal drains
traversedrainshaveto be
installed at suitable
intervals in effectively
drain off the water.
When the general ground aswell asimpervious
strata below are sloping, seepageflow is likely to
exist.
If seepage zone is at depth less than 0.6-0.9 m
from sub-grade level, longitudinal pipe drain
in trench filled with filter material and clay seal
may be constructed to intercept the flow.
If the water reaching the sub-grade due to capillary rise
is likely to be detrimental, it is possible to solve the
problem by arresting the capillary rise.
It canbe done by following methods:
(a)Alayer of granular materials of suitable thickness is
provided during the construction of embankment,
between the sub-grade and the highest level of sub
surface water table.
(b)Alternate method is providing the capillary cut off is
by inserting an impermeable or abituminous layer in
place of granular blanket.
Thesizeandspacingof the sub-surface drainagesystem
depend on the
quantity of water to bedrained off, the type of soil and
type of drain.
The filter material usedin sub-surfacedrains should be
designedto have sufficient permeability offering
negligible resistance to the flow.
And alsoresist the flow of the fine foundation soil
resulting in soil piping.
TheSteps areas follows:
Draw grain sizedistribution curveon log scale%passingvs.
particles size for the foundation soil.
Find the valueof D15sizeof foundation soil.
 Thesizeof filter material should be 5times more than the
sizeof
foundation soil
 D15of filter/D15 of foundation >5
Tofulfill the condition to prevent piping.
 D15of filter/D85 of foundation <5
Henceplot apoint represent the upper limit of D15sizeof
filter given by 5D85of foundation.
Find the sizeof the perforation in the drain pipe or the gap
in the open jointed pipes andlet this be =Dp
Plot apoint representing D85sizeof filter given by the size
2Dp.
TheShadedarea thus obtained represents the region within
which the grain sizedistribution curveof satisfactoryfilter
material shouldlie.
In caseof sub-grade subjected soil water to soakingcond.,
capillary rise, and in extreme cond. Even flooding for
prolonged periods is termed as water loggedareas.
In such areasconstruction and maintenanceof road is a
problem.
Methods adopted to Overcome
 Raisingthe road level by constructing embankment
 Providing acapillary cut off to arrest capillary water
 ProvidingCementConcrete Block
 Depressingthe sub surface water level by drainage
system
Thank you
Lintels
For more…. Mail to aglaiaconnect2018@gmail.com

Mais conteúdo relacionado

Mais procurados

Group index method
Group index methodGroup index method
Group index methodUsama Aslam
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPTKavin Raval
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. IGauri kadam
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavementsHARITSEHRAWAT
 
Highway drainage
 Highway drainage Highway drainage
Highway drainageRaju Bhele
 
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION Sagar Kaptan
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - ISachin Kulkarni
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavementspradip dangar
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section Rana Ibrahim
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenanceSatyapal Singh
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSramgsvhce
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADkumawat123
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICEFresher Thinking
 

Mais procurados (20)

Group index method
Group index methodGroup index method
Group index method
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. I
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Highway drainage
 Highway drainage Highway drainage
Highway drainage
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - I
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
 
Pavement
PavementPavement
Pavement
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
Pavement failures
Pavement failuresPavement failures
Pavement failures
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
BITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROADBITUMEN MIXES FOR ROAD
BITUMEN MIXES FOR ROAD
 
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
HIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICEHIGHWAY  CONSTRUCTION  MATERIAL  &  PRACTICE
HIGHWAY CONSTRUCTION MATERIAL & PRACTICE
 

Semelhante a Highway drainage

Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfrajundauliya
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadKHUSHBU SHAH
 
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...VATSAL PATEL
 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsDhananjayM6
 
Water logging.pptx
Water logging.pptxWater logging.pptx
Water logging.pptxEmaan Sharma
 
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringSpecial Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringVenkata Sai Kari
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installationtoverwater
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasIEI GSC
 
Highway drainage system
Highway drainage systemHighway drainage system
Highway drainage systemmadhvitilgam
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water loggingNIKHIL PAKWANNE
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneNIKHIL PAKWANNE
 
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Ambo University (Ethiopia)
 
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREASIMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREASYallanagouda Madagoudra
 

Semelhante a Highway drainage (20)

Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdf
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
 
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
 
Highway drainage
Highway drainageHighway drainage
Highway drainage
 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway Economics
 
Water logging.pptx
Water logging.pptxWater logging.pptx
Water logging.pptx
 
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringSpecial Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installation
 
20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt
 
Techniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areasTechniques of rain water harvesting in urban and rural areas
Techniques of rain water harvesting in urban and rural areas
 
Drainage water management
Drainage water management Drainage water management
Drainage water management
 
Highway drainage system
Highway drainage systemHighway drainage system
Highway drainage system
 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water logging
 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil Pakwanne
 
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
 
New
NewNew
New
 
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREASIMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 

Mais de Aglaia Connect

Underground construction
Underground constructionUnderground construction
Underground constructionAglaia Connect
 
Reactive powder-concrete
Reactive powder-concreteReactive powder-concrete
Reactive powder-concreteAglaia Connect
 
Self healing-material-bacterial-concrete
Self healing-material-bacterial-concreteSelf healing-material-bacterial-concrete
Self healing-material-bacterial-concreteAglaia Connect
 
Structural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteStructural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteAglaia Connect
 
Aerated autoclaved-concrete
Aerated autoclaved-concreteAerated autoclaved-concrete
Aerated autoclaved-concreteAglaia Connect
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelAglaia Connect
 
Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete Aglaia Connect
 
Plastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis processPlastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis processAglaia Connect
 
Geotextile for soil stabilization
Geotextile for soil stabilizationGeotextile for soil stabilization
Geotextile for soil stabilizationAglaia Connect
 
Corrosion control of underwater piles
Corrosion control of underwater pilesCorrosion control of underwater piles
Corrosion control of underwater pilesAglaia Connect
 
Constucted wetlands for waste water treatment
Constucted wetlands for waste water treatmentConstucted wetlands for waste water treatment
Constucted wetlands for waste water treatmentAglaia Connect
 
Coconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteCoconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteAglaia Connect
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavementAglaia Connect
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavementAglaia Connect
 

Mais de Aglaia Connect (20)

Underground construction
Underground constructionUnderground construction
Underground construction
 
Self curing-concrete-
Self curing-concrete-Self curing-concrete-
Self curing-concrete-
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Reactive powder-concrete
Reactive powder-concreteReactive powder-concrete
Reactive powder-concrete
 
Stress ribbon-bridges
Stress ribbon-bridgesStress ribbon-bridges
Stress ribbon-bridges
 
Self healing-material-bacterial-concrete
Self healing-material-bacterial-concreteSelf healing-material-bacterial-concrete
Self healing-material-bacterial-concrete
 
Structural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteStructural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concrete
 
Aerated autoclaved-concrete
Aerated autoclaved-concreteAerated autoclaved-concrete
Aerated autoclaved-concrete
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
Tube structures
Tube structuresTube structures
Tube structures
 
Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete Marble and-quarry-dust-as-additives-in-concrete
Marble and-quarry-dust-as-additives-in-concrete
 
Computer ethics
Computer ethics Computer ethics
Computer ethics
 
Plastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis processPlastic waste into fuel using pyrolysis process
Plastic waste into fuel using pyrolysis process
 
Geotextile for soil stabilization
Geotextile for soil stabilizationGeotextile for soil stabilization
Geotextile for soil stabilization
 
Corrosion control of underwater piles
Corrosion control of underwater pilesCorrosion control of underwater piles
Corrosion control of underwater piles
 
Constucted wetlands for waste water treatment
Constucted wetlands for waste water treatmentConstucted wetlands for waste water treatment
Constucted wetlands for waste water treatment
 
Coconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concreteCoconut shell as coarse aggregate in the concrete
Coconut shell as coarse aggregate in the concrete
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavement
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Usage of geogrids in flexible pavement
Usage of geogrids in flexible pavementUsage of geogrids in flexible pavement
Usage of geogrids in flexible pavement
 

Último

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Último (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Highway drainage

  • 2. Highway drainage is a process of removing and controlling excess surface and sub-soil water within the right of way. It includes interception and diversion of water from the road surface and subgrade.
  • 3. Excessmoisture in soil subgrade causesconsiderable lowering of its stability. Increasein moisture causereduction in strength of many pavement materials like stabilized soil and water bound macadam. Sustained contact of water with bituminous pavements causesfailure due to stripping of bitumen from aggregates like loosening or detachment of some of the bituminous pavement layers and formations of pot holes Excesswater on shoulders and pavement edges causes considerable damage.
  • 4.
  • 5. In clayey soil variation in moisture content causes considerable variation in volume of sub grade. High moisture content causesincreases in weight and thus increasein stress and simultaneous reduction in strength of soil mass. Erosion of soil from top of unsurfaced roads and slopes of embankment, cut and hill side is also due to surface water. In cold regions presence of water in the subgrade and a continuous supply of water from the ground water can causeconsiderable damage to the pavement due to frost action.
  • 6. The surface water from the carriageway and shoulder should effectively be drained off without allowing it to percolate to sub grade. Surface water from adjoining land should be prevented form entering the roadway. Side drain should have sufficient capacity and longitudinal slope to carry away all surface water collected. Flow of surface water acrossthe road and shoulders and along slopes should not causeformation of cross ruts or erosion.
  • 7.
  • 8. Seepageand other sources of under ground water should be drained off by the subsurfacedrainage system. Highest level of ground water table should be kept well below the level of subgrade, preferably by atleast 1.2m. In waterlogged areasspecial precautions should be taken
  • 9. During rains, • part of the rain water flows on surface • part of it percolate through the soil mass as gravitational water until it reaches the ground water below the water table. Removal and diversion of surface water from the road way and adjoining land is termedassurface drainage. Diversion and removal of excess of soil water from the subgrade is termed asSurfaceDrainage.
  • 10. Methods of surface drainage 1.By Longitudinal sidedrains. 2.CatchbasinsandInlets in urbanareas 3.Providing damp proofcourse 4. Providing propercamber 5.Providing sufficient slope to the sides 6. Keepingthe level of carriage way at least 60 cm above the HFL.
  • 12. It is necessaryto provide side drain on one side or both sides, when road is constructed in embankment. Side drains should be at least 2.0 m away from bottom edge of an embankment. Depth of side drains is kept 1.0 to 1.5m to prevent the entry of drain water intothe embankment.
  • 14.
  • 16. Catchbasin is astructure like chamber constructed on asewer line. Water from pavement surface is collected in catch basin and discharged to thesewer line. The catch basin (catch pit) is provided with grating to prevent the entry of rubbish into the drainage system.
  • 17.
  • 18. Inlets is aconcrete box with grating either at the top or in the side.
  • 19. For aquick drainageit isnecessaryto ensure that shoulder surface is properly slopedand free from irregularities and depressions. In impervious type, it is practiced to extend the subbasecourse with drainageacrossthe shoulderupto side drain. Alternatively we canprovide cont layer of 75-100mm thick laid under the shoulder at the bottom layer of sub baseabout 150 mm thick extended upto theedge. The pavedshouldershould be at least 0.5%steeper then camber subjectedto min of 3%
  • 20. The unpaved shoulder should be further 0.5% steeper along the horizontal curve,Shoulder on inner side of the curve should have slope steeper than that of pavement. On the outer side, the shoulder should be made to drain away from the pavement, alow rate of super elevation are provided. On the other hand, where higher rate of super elevation, the outside shoulder are kept level or rounded.
  • 21.
  • 22.
  • 23.
  • 24. Except for amedian less than 5m wide, it is not desirable to drain the median areatowards the pavement surface.  1.2 - 1.8 m wide median –Provided with kerbs and always paved.  1.8 - 5 m wide median – Usually turfed and crowned so that surface water could run towards the pavement maybe with or without kerbs.
  • 25. If carriage way slopes towards the median, central drain maybe made to carry the runoff and slope shouldnot be steeper than 6:1. When the median hasonly earthen surface, it should not be crowned because it can result in soil particles being carried to the pavement surface making itslippery.
  • 26.
  • 27. Removal or Diversion of excess soil-water from sub-grade is termed as sub-surface drainage. The changein moisture of sub-grade are causedby the following  Fluctuations in GroundWaterTable  SeepageFlow  Percolation Of RainWater  Movement of CapillaryWater In sub-surface drainage it is practiced to keep the variation of moisture in sub-grade to a minimum.
  • 28. Lowering of Water Table Controlling Seepage Flow Controlling Capillary Water
  • 29. In order to that the sub-grade and pavement are not subjected to excessivemoisture the water table shouldkept at least 1.0to 1.2m below the sub-grade. In places where water table is high to take the road formation on embankment of height not less than 1.0-1.2mis the best approach. ButWhen the formation level is at or below the general ground level it is necessaryto lower the water table.
  • 30. (a) If soil is relatively permeable, it may be possible to lowerWTby constructing longitudinal drainage trenches with drain pipe and filter sand and top of trenches is covered with clay seal The depth of trench depend on: (i) The required lowering of water table (ii) distanceb/w the drainagetrenches (iii)Types of soil
  • 31.
  • 32. (b) If the soil is relatively lesspermeable, the lowering of ground WT may not be adequate. Hence in addition to the longitudinal drains traversedrainshaveto be installed at suitable intervals in effectively drain off the water.
  • 33.
  • 34. When the general ground aswell asimpervious strata below are sloping, seepageflow is likely to exist. If seepage zone is at depth less than 0.6-0.9 m from sub-grade level, longitudinal pipe drain in trench filled with filter material and clay seal may be constructed to intercept the flow.
  • 35.
  • 36.
  • 37.
  • 38. If the water reaching the sub-grade due to capillary rise is likely to be detrimental, it is possible to solve the problem by arresting the capillary rise. It canbe done by following methods: (a)Alayer of granular materials of suitable thickness is provided during the construction of embankment, between the sub-grade and the highest level of sub surface water table. (b)Alternate method is providing the capillary cut off is by inserting an impermeable or abituminous layer in place of granular blanket.
  • 39.
  • 40. Thesizeandspacingof the sub-surface drainagesystem depend on the quantity of water to bedrained off, the type of soil and type of drain. The filter material usedin sub-surfacedrains should be designedto have sufficient permeability offering negligible resistance to the flow. And alsoresist the flow of the fine foundation soil resulting in soil piping. TheSteps areas follows: Draw grain sizedistribution curveon log scale%passingvs. particles size for the foundation soil. Find the valueof D15sizeof foundation soil.
  • 41.  Thesizeof filter material should be 5times more than the sizeof foundation soil  D15of filter/D15 of foundation >5 Tofulfill the condition to prevent piping.  D15of filter/D85 of foundation <5 Henceplot apoint represent the upper limit of D15sizeof filter given by 5D85of foundation. Find the sizeof the perforation in the drain pipe or the gap in the open jointed pipes andlet this be =Dp Plot apoint representing D85sizeof filter given by the size 2Dp. TheShadedarea thus obtained represents the region within which the grain sizedistribution curveof satisfactoryfilter material shouldlie.
  • 42.
  • 43. In caseof sub-grade subjected soil water to soakingcond., capillary rise, and in extreme cond. Even flooding for prolonged periods is termed as water loggedareas. In such areasconstruction and maintenanceof road is a problem. Methods adopted to Overcome  Raisingthe road level by constructing embankment  Providing acapillary cut off to arrest capillary water  ProvidingCementConcrete Block  Depressingthe sub surface water level by drainage system