L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
1
TOPIC : INPLANT TRAINING AT L&T
BY:
ADRIAN ROY
2155002
ME5GA
B3 BATCH
Vth SEM
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 2
Introduction
1. I COMPLETED MY ONE MONTH INPLANT TRAINING AT L&T
POWAI IN THE HEAVY ENGINEERING DEPARTMENT HEIC AT
PC-2 IN ONE OF MY FAVOURITE DEPARTMENT THAT IS
MAINTENANCE
2. I HAVE GAINED HANDS ON KNOWLEDGE OF ALL THE
INSTRUMENTS AND TOOLS IN THE WORKSHOP AND SHOP
FLOOR
3. I HAVE ALSO INCREASED MY CONFIDENCE AND CAN WORK
AT ANY COMPANY IN THE FUTURE WITH FULL CONFIDENCE
4. THIS TRAINING HAS HELPED ME IN FINDING OUT THE
APPLICATIONS OF WHAT I HAVE LEARNED IN THEORY
DURING COLLEGE LECTURES AND REDUCED THE GAP
BETWEEN THEORETICAL AND ACTUAL APPLICATIONS
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
3
My role in the department
1. I USED TO HELP THE WORKERS AND SUPERVISORS WHERE
EVER POSSIBLE TO INCREASE MY CONFIDENCE
2. I WAS LOOKING AFTER THE STR DEPARTMENT THAT IS SMALL
TOOL REPAIR WHERE THEY USED TO REPAIR SMALL ITEMS
SUCH AS GRINDERS,EXTENSION BOX,HAND LAMPS ,HYDAULIC
JACKS,TIG AND MIG TORCHES
3. I HAVE ALSO HAD THE OPPORTUNITY TO WORK ON THE
OVERHEAD CRANE WHICH WAS A VERY GOOD EXPERIENCE
FOR ME
4. I HAVE ALSO LEARNED HOW TO USE VERNIER CALLIPER,DIAL
CALLIPER,BORE GAUGE,T-METER,MICROMETER AND MANY
MORE INSTRUMENTS
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
4
MAINTENANCE OF
SMALL TOOLS STR
IN THE SPAN OF
ONE MONTH
NAME TOTAL NAME TOTAL
BOSCH GRINDER 18 LPG 0
840 GRINDER 13 GRINDER EXT BOX 3
852 GRINDER 13 24 VOLT EXT. BOX 8
869 GRINDER 4 230 VOLT EXT. BOX 4
TIG TORCH 0 HAND LAMP 23
WELDING CABLE 12 OVEN 4
EARTHING CABLE 11 JACK 11
SAW CABLE 4 POWER PACK 5
OXYGEN ACETYLENE 7 MIG TORCH 1
ARGON 1 VALVE 4
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
5
CLASSIFICATION OF
MAINTENANCE
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
6
PRODUCTIVE MAINTENANCE
Wagon is used to transport Heat
exchanger jobs from one shop to
another shop
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
7
Maintenance of WAGON
Old System :
60 T Wagon Was operated on Petrol or
LPG/BMCG
New System :
AC Motor & Belt drive Installed.
Petrol tank
Fiat engine
Gearbox
Gas supply to engine through
regulator
LPG/BMCG Cylinders using
regulator
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
8
WORKING:
1. AC electric motor
2. Belt drive
3. Gear box
4. Gear train
PROBLEMS: – Gear box housing broken
ADVANTAGES AND USES:
1. Non hazardous
2. No petrol or LPG
3. Easy to operate
4. Less maintenance
5. Skilled manpower not required
6. Low maintenance cost
7. Spare AC motor used
8. No pollution
9. Less jerks while starting the engine
PRECAUTIONS :
1. Electric cables should be kept away from
the rail
2. During movement cable should not get
stretched or entangled
3. Cable should be looped properly after use
CORRECTIVE ACTION:
1. Push pull arrangement
2. Gear box removed and dismantled
3. New gear box details and cost
CONSTRUCTION:
1. GB 1:63
2. DRIVER GEAR 20TEETH
3. DRIVEN GEAR 60 TEETH
4. IDLE GEAR 21 TEETH
5. HELICAL SPRING 16 (2 EACH WHEEL)
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
9
Gearbox
housing broken
Layout of wagon
Immediate action
taken:PULLED USING 160T
PULLER
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
10
The new gearbox
The new gearbox connected
to the AC motor using belt
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
11
CORRECTIVE MAINTENANCE
Underwater Plasma pit (NTM)
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
12
Maintenance of Messer Plasma cutting
machine(underwater & above water)
WORKING:
1. Plasma torch
2. Hydrogen gas
3. Nitrogen gas
4. Argon gas
5. Water coolant
6. The sheets which has thickness more than
50mm and less than 300mm is cut using
this method
7. Plasma is the 4th state of matter after solid
liquid and gas
8. It is formed when we heat gas up to a
temperature of about 6000 degree Celsius.
Cutting holes of dia 50mm
and thickness100mm
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
13
PROBLEMS:
1. The gas cap broke
2. The hydrogen gas pipe had leakage
problems
IMMEDIATE ACTION: We removed the
gun assembly and we purchased a new gun
from Messer and we replaced the gas pipe
Underwater plasma cutting
operation Dia 50mm
thickness 160mm
Gas cap
broken
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
14
Assembly
of old torch
New plasma torch
Nozzle
Water coolant
pipe
Argon
Hydrogen
Nitrogen
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
15
BREAKDOWN MAINTENANCE
Overhead cranes are used to
sling jobs from one place to
another in the shop floor
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
16
CRANE NO 16 (CT)
Make:ELECTROMECH
WORKING:
1. Four motors and four gear boxes
2. Cross travel, long travel, main hoist and
auxiliary hoist
3. Limit switches
4. Anti collision sensors
5. Stopper
6. Remote
CAPACITY: MAIN HOIST 60T & AUX
HOIST 10T
PROBLEM: The gear got worn out for cross
travel gearbox
ROOT CAUSES:
1. Less lubrication
2. Misalignment
3. Meshing of gears had a problem
4. Poor gear ratio
5. Something went wrong inside the gear box
IMMEDIATE ACTION:
1. We went on top of crane no. 16
2. We dismantled the housing of gear box
3. We dismantled the gear
4. We took the remote and kept it separate so
that no one uses the crane
STEPS TAKEN:
We contacted the company and took the necessary action and we brought a new gear box and
we also checked the reason why we had wear and tear.
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved
L&T Heavy Engineering
17
Cross travel
gearbox
Input gear
diagram
Helix output gear
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 18
Broken teeth of
Helical input gear
11 teeth
Output gear 77teeth
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 19
PREDICTIVE MAINTENANCE OF
CONVEYOR BELT OF TOS FHB
Multi axis horizontal boring
machine
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 20
WORKING
1. Gear box
2. Motor
3. Clutch plate
4. Sprocket wheel
5. Shaft
6. Limit switch
7. Belt
USES: Used to remove burr and scrap from the
boring machine to the bin.
PROBLEMS
The clutch overload did not get actuated due to
which the sprocket wheel got worn out and
limit switch could not detect the rotation.
IMMEDIATE ACTION: We removed the
shaft and sprocket wheel and clutch plate. We
had to make the whole shaft and sprocket
wheel in MMS.
Clutch overload
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 21
MAINTENANCE OF SKZ BORING
MACHINE
WORKING:
1. Motor and gearbox
2. Tachometer
3. Encoder
4. Panel
PROBLEMS: It was not giving high speed at
high voltage DC supply So we put an encoder
with the tachometer.
We made housing for the encoder and we
connected it to the tachometer and we could get
high speeds during high load condition.Minor
tweaks were made in the SIEMENS software.
Encoder
Tachometer
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 22
MAINTENANCE OF HYDROPRO JR7
WORKING:
1. Solenoid valve
2. Filter
3. Air
4. Pneumatic cylinder
5. Regulator
PROBLEM: The solenoid valve was damaged
due to which the filter could not filter the air so
there was moisture and due to this there was
water leakage problem.
USED: It is used to expand the tubes of heat
exchanger to get close tolerances so that there
is no direct load on the tubes.
IMMEDIATE ACTION: We opened the cover
of Hydropro and we removed the valve and
replaced it with a new valve.
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 23
Holes drilled using deep hole
drilling machine
Block diagram of hydropro
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 24
PSLV MK III
MS200 for ISRO
Under VSSC
From outside
PPT S200
20% work done for GSLV MK II
L&T
accidents
L&T Heavy Engineering
© 2011 Larsen & Toubro Limited : All rights reserved 25
THANK YOU
Straight type tube heat
exchanger L-150m
Capacity-200metric T
Double shell and tube type
heat exchanger

Mais conteúdo relacionado

Destaque

Tata Motors - B2B Case Analysis
Tata Motors - B2B Case AnalysisTata Motors - B2B Case Analysis
Tata Motors - B2B Case AnalysisPooja Gupta
 
larsen and toubro ppt
larsen and toubro pptlarsen and toubro ppt
larsen and toubro pptsachin kr
 
Larsen and toubro
Larsen and toubroLarsen and toubro
Larsen and toubroankit3991
 
WhatsApp und B2B Social Media Marketing 2016
WhatsApp und B2B Social Media Marketing 2016WhatsApp und B2B Social Media Marketing 2016
WhatsApp und B2B Social Media Marketing 2016Robert Seeger
 
marketing strategy of monginis
marketing strategy of monginismarketing strategy of monginis
marketing strategy of monginisVinay Bhs
 
L&t industrial marketing ppt
L&t industrial marketing pptL&t industrial marketing ppt
L&t industrial marketing pptMohit Malviya
 
Marketing Plan of Cafe Coffee Day!
Marketing Plan of Cafe Coffee Day!Marketing Plan of Cafe Coffee Day!
Marketing Plan of Cafe Coffee Day!SHAHBAAZ AHMED
 
Mc donalds ppt
Mc donalds pptMc donalds ppt
Mc donalds pptrakesh9334
 
Starbucks PowerPoint
Starbucks PowerPointStarbucks PowerPoint
Starbucks PowerPointjjhackn
 
Cafe coffee Day
Cafe coffee DayCafe coffee Day
Cafe coffee Daynima15288
 
Cafe Coffee day (CCD)
Cafe Coffee day (CCD)Cafe Coffee day (CCD)
Cafe Coffee day (CCD)Sanjay Gupta
 
B2B Branding from Tata steel
B2B Branding from Tata steelB2B Branding from Tata steel
B2B Branding from Tata steelKIIT University
 

Destaque (17)

Titan
TitanTitan
Titan
 
Tata Motors - B2B Case Analysis
Tata Motors - B2B Case AnalysisTata Motors - B2B Case Analysis
Tata Motors - B2B Case Analysis
 
larsen and toubro ppt
larsen and toubro pptlarsen and toubro ppt
larsen and toubro ppt
 
Parle g ppt
Parle g pptParle g ppt
Parle g ppt
 
Larsen and toubro
Larsen and toubroLarsen and toubro
Larsen and toubro
 
BtoB in CRM
BtoB in CRMBtoB in CRM
BtoB in CRM
 
WhatsApp und B2B Social Media Marketing 2016
WhatsApp und B2B Social Media Marketing 2016WhatsApp und B2B Social Media Marketing 2016
WhatsApp und B2B Social Media Marketing 2016
 
marketing strategy of monginis
marketing strategy of monginismarketing strategy of monginis
marketing strategy of monginis
 
L&t industrial marketing ppt
L&t industrial marketing pptL&t industrial marketing ppt
L&t industrial marketing ppt
 
Xiaomi Inc.
Xiaomi Inc.Xiaomi Inc.
Xiaomi Inc.
 
Marketing Plan of Cafe Coffee Day!
Marketing Plan of Cafe Coffee Day!Marketing Plan of Cafe Coffee Day!
Marketing Plan of Cafe Coffee Day!
 
LARSEN AND TOUBRO
 LARSEN AND TOUBRO LARSEN AND TOUBRO
LARSEN AND TOUBRO
 
Mc donalds ppt
Mc donalds pptMc donalds ppt
Mc donalds ppt
 
Starbucks PowerPoint
Starbucks PowerPointStarbucks PowerPoint
Starbucks PowerPoint
 
Cafe coffee Day
Cafe coffee DayCafe coffee Day
Cafe coffee Day
 
Cafe Coffee day (CCD)
Cafe Coffee day (CCD)Cafe Coffee day (CCD)
Cafe Coffee day (CCD)
 
B2B Branding from Tata steel
B2B Branding from Tata steelB2B Branding from Tata steel
B2B Branding from Tata steel
 

Semelhante a L&T Presentation Seminar by Adrian Roy

Km08 pneumatic automatic bumper (wecompress)
Km08 pneumatic automatic bumper (wecompress)Km08 pneumatic automatic bumper (wecompress)
Km08 pneumatic automatic bumper (wecompress)1000kv technologies
 
power transformer and its usage
power transformer and its usage power transformer and its usage
power transformer and its usage gourav1245
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationFawaz Baik
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMOThushan Sivalingam
 
Fabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machineFabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machineIRJET Journal
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawalDhiraj Mahajan
 
Transformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptxTransformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptxVishalSen33
 
Terry CV June 2015
Terry CV June 2015Terry CV June 2015
Terry CV June 2015Terry Harvey
 
Design and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium Gas
Design and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium GasDesign and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium Gas
Design and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium GasIRJET Journal
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010kmccarthy1981
 

Semelhante a L&T Presentation Seminar by Adrian Roy (20)

Km08 pneumatic automatic bumper (wecompress)
Km08 pneumatic automatic bumper (wecompress)Km08 pneumatic automatic bumper (wecompress)
Km08 pneumatic automatic bumper (wecompress)
 
power transformer and its usage
power transformer and its usage power transformer and its usage
power transformer and its usage
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMO
 
APOEM PLANT LAUNCH
APOEM PLANT LAUNCHAPOEM PLANT LAUNCH
APOEM PLANT LAUNCH
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
 
Bhel presentation
 Bhel presentation Bhel presentation
Bhel presentation
 
Fabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machineFabrication of automatic hydraulic bending and bend removing machine
Fabrication of automatic hydraulic bending and bend removing machine
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Dlw report
Dlw  report Dlw  report
Dlw report
 
POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
 
Gear shifter
Gear shifterGear shifter
Gear shifter
 
Transformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptxTransformer repairing & manufacturing.pptx
Transformer repairing & manufacturing.pptx
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
 
Terry CV June 2015
Terry CV June 2015Terry CV June 2015
Terry CV June 2015
 
Design and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium Gas
Design and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium GasDesign and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium Gas
Design and Analysis Of Hybrid Car Using Tubular Frame Chasis and Helium Gas
 
mostafaelzawawy
mostafaelzawawymostafaelzawawy
mostafaelzawawy
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
HOSAM CV
HOSAM CVHOSAM CV
HOSAM CV
 

Último

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Último (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

L&T Presentation Seminar by Adrian Roy

  • 1. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 1 TOPIC : INPLANT TRAINING AT L&T BY: ADRIAN ROY 2155002 ME5GA B3 BATCH Vth SEM
  • 2. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 2 Introduction 1. I COMPLETED MY ONE MONTH INPLANT TRAINING AT L&T POWAI IN THE HEAVY ENGINEERING DEPARTMENT HEIC AT PC-2 IN ONE OF MY FAVOURITE DEPARTMENT THAT IS MAINTENANCE 2. I HAVE GAINED HANDS ON KNOWLEDGE OF ALL THE INSTRUMENTS AND TOOLS IN THE WORKSHOP AND SHOP FLOOR 3. I HAVE ALSO INCREASED MY CONFIDENCE AND CAN WORK AT ANY COMPANY IN THE FUTURE WITH FULL CONFIDENCE 4. THIS TRAINING HAS HELPED ME IN FINDING OUT THE APPLICATIONS OF WHAT I HAVE LEARNED IN THEORY DURING COLLEGE LECTURES AND REDUCED THE GAP BETWEEN THEORETICAL AND ACTUAL APPLICATIONS
  • 3. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 3 My role in the department 1. I USED TO HELP THE WORKERS AND SUPERVISORS WHERE EVER POSSIBLE TO INCREASE MY CONFIDENCE 2. I WAS LOOKING AFTER THE STR DEPARTMENT THAT IS SMALL TOOL REPAIR WHERE THEY USED TO REPAIR SMALL ITEMS SUCH AS GRINDERS,EXTENSION BOX,HAND LAMPS ,HYDAULIC JACKS,TIG AND MIG TORCHES 3. I HAVE ALSO HAD THE OPPORTUNITY TO WORK ON THE OVERHEAD CRANE WHICH WAS A VERY GOOD EXPERIENCE FOR ME 4. I HAVE ALSO LEARNED HOW TO USE VERNIER CALLIPER,DIAL CALLIPER,BORE GAUGE,T-METER,MICROMETER AND MANY MORE INSTRUMENTS
  • 4. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 4 MAINTENANCE OF SMALL TOOLS STR IN THE SPAN OF ONE MONTH NAME TOTAL NAME TOTAL BOSCH GRINDER 18 LPG 0 840 GRINDER 13 GRINDER EXT BOX 3 852 GRINDER 13 24 VOLT EXT. BOX 8 869 GRINDER 4 230 VOLT EXT. BOX 4 TIG TORCH 0 HAND LAMP 23 WELDING CABLE 12 OVEN 4 EARTHING CABLE 11 JACK 11 SAW CABLE 4 POWER PACK 5 OXYGEN ACETYLENE 7 MIG TORCH 1 ARGON 1 VALVE 4
  • 5. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 5 CLASSIFICATION OF MAINTENANCE
  • 6. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 6 PRODUCTIVE MAINTENANCE Wagon is used to transport Heat exchanger jobs from one shop to another shop
  • 7. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 7 Maintenance of WAGON Old System : 60 T Wagon Was operated on Petrol or LPG/BMCG New System : AC Motor & Belt drive Installed. Petrol tank Fiat engine Gearbox Gas supply to engine through regulator LPG/BMCG Cylinders using regulator
  • 8. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 8 WORKING: 1. AC electric motor 2. Belt drive 3. Gear box 4. Gear train PROBLEMS: – Gear box housing broken ADVANTAGES AND USES: 1. Non hazardous 2. No petrol or LPG 3. Easy to operate 4. Less maintenance 5. Skilled manpower not required 6. Low maintenance cost 7. Spare AC motor used 8. No pollution 9. Less jerks while starting the engine PRECAUTIONS : 1. Electric cables should be kept away from the rail 2. During movement cable should not get stretched or entangled 3. Cable should be looped properly after use CORRECTIVE ACTION: 1. Push pull arrangement 2. Gear box removed and dismantled 3. New gear box details and cost CONSTRUCTION: 1. GB 1:63 2. DRIVER GEAR 20TEETH 3. DRIVEN GEAR 60 TEETH 4. IDLE GEAR 21 TEETH 5. HELICAL SPRING 16 (2 EACH WHEEL)
  • 9. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 9 Gearbox housing broken Layout of wagon Immediate action taken:PULLED USING 160T PULLER
  • 10. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 10 The new gearbox The new gearbox connected to the AC motor using belt
  • 11. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 11 CORRECTIVE MAINTENANCE Underwater Plasma pit (NTM)
  • 12. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 12 Maintenance of Messer Plasma cutting machine(underwater & above water) WORKING: 1. Plasma torch 2. Hydrogen gas 3. Nitrogen gas 4. Argon gas 5. Water coolant 6. The sheets which has thickness more than 50mm and less than 300mm is cut using this method 7. Plasma is the 4th state of matter after solid liquid and gas 8. It is formed when we heat gas up to a temperature of about 6000 degree Celsius. Cutting holes of dia 50mm and thickness100mm
  • 13. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 13 PROBLEMS: 1. The gas cap broke 2. The hydrogen gas pipe had leakage problems IMMEDIATE ACTION: We removed the gun assembly and we purchased a new gun from Messer and we replaced the gas pipe Underwater plasma cutting operation Dia 50mm thickness 160mm Gas cap broken
  • 14. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 14 Assembly of old torch New plasma torch Nozzle Water coolant pipe Argon Hydrogen Nitrogen
  • 15. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 15 BREAKDOWN MAINTENANCE Overhead cranes are used to sling jobs from one place to another in the shop floor
  • 16. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 16 CRANE NO 16 (CT) Make:ELECTROMECH WORKING: 1. Four motors and four gear boxes 2. Cross travel, long travel, main hoist and auxiliary hoist 3. Limit switches 4. Anti collision sensors 5. Stopper 6. Remote CAPACITY: MAIN HOIST 60T & AUX HOIST 10T PROBLEM: The gear got worn out for cross travel gearbox ROOT CAUSES: 1. Less lubrication 2. Misalignment 3. Meshing of gears had a problem 4. Poor gear ratio 5. Something went wrong inside the gear box IMMEDIATE ACTION: 1. We went on top of crane no. 16 2. We dismantled the housing of gear box 3. We dismantled the gear 4. We took the remote and kept it separate so that no one uses the crane STEPS TAKEN: We contacted the company and took the necessary action and we brought a new gear box and we also checked the reason why we had wear and tear.
  • 17. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved L&T Heavy Engineering 17 Cross travel gearbox Input gear diagram Helix output gear
  • 18. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 18 Broken teeth of Helical input gear 11 teeth Output gear 77teeth
  • 19. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 19 PREDICTIVE MAINTENANCE OF CONVEYOR BELT OF TOS FHB Multi axis horizontal boring machine
  • 20. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 20 WORKING 1. Gear box 2. Motor 3. Clutch plate 4. Sprocket wheel 5. Shaft 6. Limit switch 7. Belt USES: Used to remove burr and scrap from the boring machine to the bin. PROBLEMS The clutch overload did not get actuated due to which the sprocket wheel got worn out and limit switch could not detect the rotation. IMMEDIATE ACTION: We removed the shaft and sprocket wheel and clutch plate. We had to make the whole shaft and sprocket wheel in MMS. Clutch overload
  • 21. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 21 MAINTENANCE OF SKZ BORING MACHINE WORKING: 1. Motor and gearbox 2. Tachometer 3. Encoder 4. Panel PROBLEMS: It was not giving high speed at high voltage DC supply So we put an encoder with the tachometer. We made housing for the encoder and we connected it to the tachometer and we could get high speeds during high load condition.Minor tweaks were made in the SIEMENS software. Encoder Tachometer
  • 22. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 22 MAINTENANCE OF HYDROPRO JR7 WORKING: 1. Solenoid valve 2. Filter 3. Air 4. Pneumatic cylinder 5. Regulator PROBLEM: The solenoid valve was damaged due to which the filter could not filter the air so there was moisture and due to this there was water leakage problem. USED: It is used to expand the tubes of heat exchanger to get close tolerances so that there is no direct load on the tubes. IMMEDIATE ACTION: We opened the cover of Hydropro and we removed the valve and replaced it with a new valve.
  • 23. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 23 Holes drilled using deep hole drilling machine Block diagram of hydropro
  • 24. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 24 PSLV MK III MS200 for ISRO Under VSSC From outside PPT S200 20% work done for GSLV MK II L&T accidents
  • 25. L&T Heavy Engineering © 2011 Larsen & Toubro Limited : All rights reserved 25 THANK YOU Straight type tube heat exchanger L-150m Capacity-200metric T Double shell and tube type heat exchanger