CURRICULUM VITAE QA/QC Manager
1
ADNAN REHMAT
PERSONAL
Al-sahafa street Azizia Jeddah Saudi Arabia.
Cell # 00966-535803093 & 00966-542323199
Email: adnan_rehmat@hotmail.com, adnanji2000@yahoo.com
Profession & specialization : Quality Control /Assurance
Date of birth :1977
Saudi Aramco SAP # 70015443
Member of Pakistan Engineering council.
Member of Saudi Engineering council.
OBJECTIVE
Improving Quality standards of the company as seasoned Quality Control Manager.
EDUCATION AND TRAININGS
- BE Civil Engineering UET Peshawar 2001
- MBA Exec college of E-commerce USA, Islamabad 2003
- Quality Management System Principles and Practices
- Occupational health and safety
- Quality Management System Lead Auditor ISO 9001:2008
- Environmental Management System Lead Auditor ISO 14001:2004
- Occupational Health and Safety Auditor ISO 18001:2007
PROFESSIONAL EXPERIENCE SUMMARY:
Adnan has more than 15 years of professional experience in quality control and quality
assurance on construction projects. Throughout his career he has been involved in roles
that are related to ensuring adherence to quality standards through application of project
specifications and best engineering practices. He has proven track record of hiring and
developing individual to become high performance team members. He has remained
involved in various QA/ Qc roles in some iconic projects in Pakistan and Saudi Arabia
including Layyari expressway, Jeddah storm water drainage Program and sea water
system for Jizan integrated gasification combined cycle. Right now he would like to
join a company that has a friendly and vibrant atmosphere where his career can really take
off.
PROFESSIONAL SKILLS
 Remained involved in QA/QC roles related to ensuring adherence to Aramco
quality standards, international standards, ISO requirements, Inspection test
plan and inspection checklists and best engineering practices.
 Supervised and managed a multi-discipline team of QC engineers and
inspectors on site.
 Ensured continual improvement within the quality control systems and
culture.
CURRICULUM VITAE QA/QC Manager
2
 Ensured that all construction activities offered for inspection meets the
customer requirements.
 Ensured that all inspections as identified in approved inspection and test
plan (ITP) are attended by the relevant QA/QC inspector.
 Coordinated and scheduled the field inspections with the client
representative to ensure inspections are carried expediently.
 Ensured that inspections are carried out for the closure of EI (exception
item) as documented in EIL during the walkthrough with customer and
signed off as closed when activity is closed.
 Prepared the quality personnel mobilization plan to ensure quality
personnel coverage at project during all activities at all times and coordinate
with the client approval of QA/QC personnel as required..
 Ensured that all quality records are maintained, up-to date , traceable and
retrievable.
 Ensured that any survey and test equipment being utilized on project is
calibrated. Continuous review of calibration log.
 Well experienced in QMIS.
 Ensured use of latest revisions of IFC, MS, procedures, ITP,PQP, Project
specifications, engineering references and standards are maintained at sites.
 Developing and implementing quality control and quality assurance plans
on construction projects.
 Ensured smooth handing over of Project Documents.
 Maintained good relationship with customer and company personnel and
developed a professional team to establish a quality management system of
the company in compliance with the relevant standards.
 Ensured and communicated the implementation of storage procedure for
correct identification of materials.
 Established and maintained a system for the storage of quality assurance
records and the associated updating of register.
 Ensured that the quality objective of the project are coordinated and
established.
 Ensured that all deviations from the PQP and contract documents are
documented and recorded.
 Ensured that pro active continuous surveillance inspections are carried out
to avoid non-conformance.
 Participated in weekly progress meeting with the client and internal weekly
meetings to communicate the quality levels at project site.
 Effectively communicated quality issues to subcontractors, engineering staff,
construction team, consultants and client representative.
 Ensured that materials used on site meets the clients requirements.
 Reviewed ITP, work procedures, method statements as required on the
project prior to submittal to client for approval. Follow up approval of ITP,
procedures and method statements from the client.
 Evaluated the skills and qualifications of quality personnel prior to submittal
to the client for approval.
 Initiate corrective actions for any raised non-conformance, and implement
a preventive action plan to prevent the re-occurrence of non-
CURRICULUM VITAE QA/QC Manager
3
conformance, all in coordination with the project QA/QC Engineers.
 Well experienced in preparing QMR and quality TWLA schedule.
Recommends any necessary changes to the system.
 Developed training program for all work supervisors responsible for
implementing the QA/QC procedures at site. Training records were
maintained.
 Coordinated with the third parties for inspections as required at the project .
Ensured inspections are carried out in their presence and recorded properly.
 Coordinated and supported in the preparation of management review
meeting and highlighted all site issues to QA manager in order to minimize
the recurrence of non-conformance.
 Ensured that all internal Audits and external Audits are carried out in
accordance with project Audit Schedule and follow up closure of audit
findings after verification of quality records.
 A wide experience of handling and closing of shut down projects in oil & gas
and petrochemical industry.
 Sales of Construction Materials including Water Supply Pipes (PPRC,
HDPE, UPVC), Sewerage Pipes (PVC, Asbestos Cement), Gas Distribution
Pipes (HDPE), Electrical Conduits (PVC), Architectural Cladding Walls
(Asbestos Cement), Landscape Irrigation System (HDPE) and Corrugated
Sheets (Asbestos Cement).
 Site Construction including Surveying, Leveling, Layout, Earth Works,
Reinforced Cement Concrete (RCC) Works, Installation of Prefabricated
Shelters, Steel Structures and Managing Labor and Staff.avw HnnnH
 Vendor and Sub Contractors’ Management, Direct Interface with the
Customer, Resource Management, Team Building and Team Work.
 Solution Oriented, Dedicated, Team Player, Good Communication and Inter
Personal Skills.
 Can communicate in English (proficient), Urdu/Hindi (Proficient) and Arabic
(Basic).
 Computer Literacy including MS Office; Civil Engineering software like
Sap90 and AutoCAD
PROFESSIONAL WORK HISTORY
January 2015 to December 2015
EMPLOYER:CHEC (China Harbor Engineering Company )
Project : (Jizan Integrated combined cycle- Package 06 –Seawater system Jizan )
Position :QC Manager- Aramco Approved
CHEC scope was to design, engineer, procure, verify, finalize, construct, test, pre-
commission and assist in the successfully commissioning of project. It was EPC mega
Project that involved multi disciplines.
Project Scope includes construction of inlet canal, inlet screening section, pump station,
intake channel, Inplant lagoon, discharge channel, storm water channel, collection basin,
outfall tank, submarine outfall and mixing basin.
JIGCC seawater system is designed to provide 501,000 cum/hr/of seawater to JIGCC and
refinery for use as primary cooling medium via inplant lagoon and return it to the sea .
CURRICULUM VITAE QA/QC Manager
4
Sep 2013 to January 2015
Employer : CCCC ( China Communication Construction Company )
Project : ( Aramco-Jeddah stormwater drainage program-Package 13- Wadi Qura &
Muraygh channels and dam)
Position :QC Manager-Aramco Approved
Project Scope includes Construction of channels, main Dam and saddle dam together with
its associated works, pedestrian bridges over the channels, installation of closed circuit
television (CCTV) system at Dam and channels. Flood alarm system was to be provided at
the Dam.
June 2012 to Sep 2013
Employer: AIC ltd ( Asyad International Company ltd )
Project :(Aramco-Replace utilities control systems at Jeddah Refinery)
Position :QA/QC Supervisor-Aramco approved
AIC scope includes construction/ installation of facilities in accordance with scope of
work. Project scope includes providing and installing new equipment, associated
piping, tie-ins to all electrical and non-electrical utilities, process control and
monitoring equipment, civil foundations and structural works, and to replace utility
boilers and desalination plant existing control system with digital control system, to
transfer the process control and monitoring of utility boilers and desalination plant to
central control room, to replace existing control system of air compressors with
digital control and communication system.
Supervised and monitor activities of multi discipline QA/ QC department for ongoing
construction activities. Reviewed hydro-test package, Tie-In package, loop
package, Procedures method statement and working instructions of Vendors/sub-
contractors for adequacy in relation to ISO 9001:2008 and Saudi Aramco quality
requirements. Coordinated with third party (testing agencies/batching plants) for in
time delivery of concrete/ Asphalt. Ensuring the availability of QC inspector during
any operation. Maintain quality records and ensures control of documents by
advising document controller, QC Engineers. Supported internal and external
Audits as per schedule.
Jul 2009 To June 2012
Employer: Nokia Siemens Networks
Project: Zain Telecom
Position: Quality Control Engineer
Project scope includes design, procure, construction and commissioning of GSM sites in
the region.
Monitor Inspection activities at the Construction Sites to verify compliance with NSN
Standards and Company Specifications. Monitor Contractors’ Inspectors and
Quality System to ensure adequate performance and compliance with the company
standards. Prepare Surveillance and Inspection Report with Proactive Approach.
Promote and Built Awareness of Project Quality Requirements. Performed focused
assessment of specific work elements to ensure that the project quality activities
and processes are effective. Track and maintain quality records related to project.
Review internal and external audits and coordinate with concerned department.
CURRICULUM VITAE QA/QC Manager
5
Feb 2008 to Feb 2009
ZAIN (MTC), Saudi Arabia Senior Civil Engineer
To Supervise Preliminary Civil Design (PCD) and allowing Vendor to start Civil
Works at GSM Sites.To Supervise Site Construction Works with Quality Control
including Site Layout, Excavation, RCC Foundations, RCC Columns, Backfilling,
Finished Floor Level, Installation of Steel Structure (Towers), Installation of
Telecom Equipment, Electrical, Earthing and Grounding Works
To Monitor Materials and Material Reports for Quality Assurance including Soil
Reports, Concrete Testing, Reinforced Steel Bars Testing, Tower paint, Tower
Galvanization and Earthing Resistance
Acceptance of the Sites from Vendor, Approving Vendors’ Invoices and
Maintaining Site Acceptance Record
May 2007 to Feb 2008
Employer: REINFORCED EARTH (Pvt) Ltd. ISLAMABAD
Project: Layyari Expressway Karachi
Position: Construction Engineer
Scope of work was construction supervision and quality control of mechanically stabilized
earth walls.
To coordinate with the design department and monitor the required necessary
changes in the drawings as per field requirements. Conduct Inspections to ensure
the work has been done in compliance with contract, drawings and method
statement. To witness the sampling ,daily field tests and issue non conformance if
work done is not according to the standards. To ensure quality of precast panels at
Casting Yard According to Standard Drawings and to Maintain Quality Control and
Quality Assurance for Reinforced Steel and Concrete and getting Approval from the
Client for Site Works and Invoices
March 2005 May 2007
Employer: GLOBECOM (Pvt) Ltd. ISLAMABAD
Project: Construction of GSM towers for Mobilink
Position: Regional Manager-Centre 3 and Sindh
To Plan, Administrate, Supervise and Maintain Quality Control For Construction
of GSM sites, from scratch to finish, including Site Acquisition, Drawing
Evaluation, Site Layout, Excavation, RCC Foundations, RCC Columns,
Backfilling, Compaction, Installation of Steel Towers as high as 90 M,
Construction of Equipment & Generators Rooms, Electrical and Earthing Works.
To Deal and coordinate with clients and consultants for the progress,
construction and erection of different GSM Towers on technical grounds i.e.
according to the design and specifications. Coordination and correspondence
with the head office about the activities going on in the region.(Daily reports of
staff, bills ,car maintenance etc)
April 2004 to March 2005
CURRICULUM VITAE QA/QC Manager
6
DADEX ETERNIT (Pvt) Ltd. ISLAMABAD Assistant Sales Manager (Technical)
 To manage, discuss and coordinate with the clients/consultants for technical
usage, design requirements/aspects etc. relating to the product installation.
 To visit different architects, consultants, builders, public organizations,
NGO's and Industries and coordinate about our products.
 Maintaining the Quality Control, checking the usage of products and advise
the site staff about the use of products.
 To design, estimate, guide and survey of sites relating to installations of
different Dadex Products including PVC/UPVC sanitary, sewerage & water
supply pipes and fittings.
January 2004 to March 2004
ARMY HOUSING DTE. GHQ Quality and Site Engineer
Scope of work includes construction of houses, roads construction , laying of services and
construction of overhead water tank.
To participate in the communication meetings with contractors to identify problems
and discuss possible solutions, analyzing the options and proposing the best
option. To Study and monitor different designed aspects of construction and
development works within the site. Quality Assurance within the specifications
defined. To deliver presentations for Senior level staff and also to control
supervisory staff and manage their respective duty and sites. To estimate quantities
at sites and to approve Contractors’ invoices.
January 2001 to December 2003
Employer :KARCON (Pvt) LTD. ISLAMABAD
Projects : National Police foundation ( E-11 and Lohi Bhair ) and GT-Road
Rawalpindi
Position : Quality Control/site Supervisor
Scope of work includes laying of services, construction of roads, concrete works,
construction of culverts and construction of bridges.
Supervised and managed quality control & project scheduling of different road
projects in Rawalpindi & Peshawar (Pakistan).Quality Control of Materials at
Concrete Batching Plant. Testing and quality control of concrete and Reinforced
Bars. Issuance of safety instructions to all operators. Updating daily QC reports to
undertake QC standards.
ACHEIVEMENTS
 Letter of appraisal was awarded by the ex-employer , NSN, for timely
achievements.
 Letter of appraisal awarded by Ex employer CCCC for maintaining quality
objectives and quality control at site.
 Letter of appraisal was awarded by the Ex-Employer, Globcomm (pvt) Ltd ,
for carrying out the highest rollout for the company in Pakistan for the year
2006.
CURRICULUM VITAE QA/QC Manager
7
References:Can be furnished upon request.

Mais conteúdo relacionado

Mais procurados

CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerMujeebuddin Mohammad
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarGowrijayashankar S V
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil EngineerRavi chandran
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanicalShaik Ghouse
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC EngineerEdwin Aguinaldo
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalMohammad Akram Mian
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -RevThanki M.L
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )AdnanAltaf13
 

Mais procurados (20)

CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil Engineer
 
Cv for qc inspector mechanical
Cv for qc inspector mechanicalCv for qc inspector mechanical
Cv for qc inspector mechanical
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
AKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor Mechanical
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Ravi kumar-CV 2015
Ravi kumar-CV 2015Ravi kumar-CV 2015
Ravi kumar-CV 2015
 
CV-SITE SUPERVISOR
CV-SITE SUPERVISORCV-SITE SUPERVISOR
CV-SITE SUPERVISOR
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )
 

Semelhante a Adnan Resume revised

Semelhante a Adnan Resume revised (20)

Mech_Eng. CV updated
Mech_Eng. CV updatedMech_Eng. CV updated
Mech_Eng. CV updated
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
RESUME QA QC ENGG
RESUME  QA  QC ENGGRESUME  QA  QC ENGG
RESUME QA QC ENGG
 
Hamza qadeer cv
Hamza qadeer cvHamza qadeer cv
Hamza qadeer cv
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Mohammed Naveed uddin CV
Mohammed Naveed uddin CVMohammed Naveed uddin CV
Mohammed Naveed uddin CV
 
Qc
QcQc
Qc
 
Pradeep ramakrishnan cv 2018
Pradeep ramakrishnan   cv 2018Pradeep ramakrishnan   cv 2018
Pradeep ramakrishnan cv 2018
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Veera raghavan current cv 10 august 2016
Veera  raghavan current  cv 10 august 2016Veera  raghavan current  cv 10 august 2016
Veera raghavan current cv 10 august 2016
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
Engineer Mahboob's CV
Engineer Mahboob's CVEngineer Mahboob's CV
Engineer Mahboob's CV
 
Jiju new cv
Jiju new cvJiju new cv
Jiju new cv
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 

Adnan Resume revised

  • 1. CURRICULUM VITAE QA/QC Manager 1 ADNAN REHMAT PERSONAL Al-sahafa street Azizia Jeddah Saudi Arabia. Cell # 00966-535803093 & 00966-542323199 Email: adnan_rehmat@hotmail.com, adnanji2000@yahoo.com Profession & specialization : Quality Control /Assurance Date of birth :1977 Saudi Aramco SAP # 70015443 Member of Pakistan Engineering council. Member of Saudi Engineering council. OBJECTIVE Improving Quality standards of the company as seasoned Quality Control Manager. EDUCATION AND TRAININGS - BE Civil Engineering UET Peshawar 2001 - MBA Exec college of E-commerce USA, Islamabad 2003 - Quality Management System Principles and Practices - Occupational health and safety - Quality Management System Lead Auditor ISO 9001:2008 - Environmental Management System Lead Auditor ISO 14001:2004 - Occupational Health and Safety Auditor ISO 18001:2007 PROFESSIONAL EXPERIENCE SUMMARY: Adnan has more than 15 years of professional experience in quality control and quality assurance on construction projects. Throughout his career he has been involved in roles that are related to ensuring adherence to quality standards through application of project specifications and best engineering practices. He has proven track record of hiring and developing individual to become high performance team members. He has remained involved in various QA/ Qc roles in some iconic projects in Pakistan and Saudi Arabia including Layyari expressway, Jeddah storm water drainage Program and sea water system for Jizan integrated gasification combined cycle. Right now he would like to join a company that has a friendly and vibrant atmosphere where his career can really take off. PROFESSIONAL SKILLS  Remained involved in QA/QC roles related to ensuring adherence to Aramco quality standards, international standards, ISO requirements, Inspection test plan and inspection checklists and best engineering practices.  Supervised and managed a multi-discipline team of QC engineers and inspectors on site.  Ensured continual improvement within the quality control systems and culture.
  • 2. CURRICULUM VITAE QA/QC Manager 2  Ensured that all construction activities offered for inspection meets the customer requirements.  Ensured that all inspections as identified in approved inspection and test plan (ITP) are attended by the relevant QA/QC inspector.  Coordinated and scheduled the field inspections with the client representative to ensure inspections are carried expediently.  Ensured that inspections are carried out for the closure of EI (exception item) as documented in EIL during the walkthrough with customer and signed off as closed when activity is closed.  Prepared the quality personnel mobilization plan to ensure quality personnel coverage at project during all activities at all times and coordinate with the client approval of QA/QC personnel as required..  Ensured that all quality records are maintained, up-to date , traceable and retrievable.  Ensured that any survey and test equipment being utilized on project is calibrated. Continuous review of calibration log.  Well experienced in QMIS.  Ensured use of latest revisions of IFC, MS, procedures, ITP,PQP, Project specifications, engineering references and standards are maintained at sites.  Developing and implementing quality control and quality assurance plans on construction projects.  Ensured smooth handing over of Project Documents.  Maintained good relationship with customer and company personnel and developed a professional team to establish a quality management system of the company in compliance with the relevant standards.  Ensured and communicated the implementation of storage procedure for correct identification of materials.  Established and maintained a system for the storage of quality assurance records and the associated updating of register.  Ensured that the quality objective of the project are coordinated and established.  Ensured that all deviations from the PQP and contract documents are documented and recorded.  Ensured that pro active continuous surveillance inspections are carried out to avoid non-conformance.  Participated in weekly progress meeting with the client and internal weekly meetings to communicate the quality levels at project site.  Effectively communicated quality issues to subcontractors, engineering staff, construction team, consultants and client representative.  Ensured that materials used on site meets the clients requirements.  Reviewed ITP, work procedures, method statements as required on the project prior to submittal to client for approval. Follow up approval of ITP, procedures and method statements from the client.  Evaluated the skills and qualifications of quality personnel prior to submittal to the client for approval.  Initiate corrective actions for any raised non-conformance, and implement a preventive action plan to prevent the re-occurrence of non-
  • 3. CURRICULUM VITAE QA/QC Manager 3 conformance, all in coordination with the project QA/QC Engineers.  Well experienced in preparing QMR and quality TWLA schedule. Recommends any necessary changes to the system.  Developed training program for all work supervisors responsible for implementing the QA/QC procedures at site. Training records were maintained.  Coordinated with the third parties for inspections as required at the project . Ensured inspections are carried out in their presence and recorded properly.  Coordinated and supported in the preparation of management review meeting and highlighted all site issues to QA manager in order to minimize the recurrence of non-conformance.  Ensured that all internal Audits and external Audits are carried out in accordance with project Audit Schedule and follow up closure of audit findings after verification of quality records.  A wide experience of handling and closing of shut down projects in oil & gas and petrochemical industry.  Sales of Construction Materials including Water Supply Pipes (PPRC, HDPE, UPVC), Sewerage Pipes (PVC, Asbestos Cement), Gas Distribution Pipes (HDPE), Electrical Conduits (PVC), Architectural Cladding Walls (Asbestos Cement), Landscape Irrigation System (HDPE) and Corrugated Sheets (Asbestos Cement).  Site Construction including Surveying, Leveling, Layout, Earth Works, Reinforced Cement Concrete (RCC) Works, Installation of Prefabricated Shelters, Steel Structures and Managing Labor and Staff.avw HnnnH  Vendor and Sub Contractors’ Management, Direct Interface with the Customer, Resource Management, Team Building and Team Work.  Solution Oriented, Dedicated, Team Player, Good Communication and Inter Personal Skills.  Can communicate in English (proficient), Urdu/Hindi (Proficient) and Arabic (Basic).  Computer Literacy including MS Office; Civil Engineering software like Sap90 and AutoCAD PROFESSIONAL WORK HISTORY January 2015 to December 2015 EMPLOYER:CHEC (China Harbor Engineering Company ) Project : (Jizan Integrated combined cycle- Package 06 –Seawater system Jizan ) Position :QC Manager- Aramco Approved CHEC scope was to design, engineer, procure, verify, finalize, construct, test, pre- commission and assist in the successfully commissioning of project. It was EPC mega Project that involved multi disciplines. Project Scope includes construction of inlet canal, inlet screening section, pump station, intake channel, Inplant lagoon, discharge channel, storm water channel, collection basin, outfall tank, submarine outfall and mixing basin. JIGCC seawater system is designed to provide 501,000 cum/hr/of seawater to JIGCC and refinery for use as primary cooling medium via inplant lagoon and return it to the sea .
  • 4. CURRICULUM VITAE QA/QC Manager 4 Sep 2013 to January 2015 Employer : CCCC ( China Communication Construction Company ) Project : ( Aramco-Jeddah stormwater drainage program-Package 13- Wadi Qura & Muraygh channels and dam) Position :QC Manager-Aramco Approved Project Scope includes Construction of channels, main Dam and saddle dam together with its associated works, pedestrian bridges over the channels, installation of closed circuit television (CCTV) system at Dam and channels. Flood alarm system was to be provided at the Dam. June 2012 to Sep 2013 Employer: AIC ltd ( Asyad International Company ltd ) Project :(Aramco-Replace utilities control systems at Jeddah Refinery) Position :QA/QC Supervisor-Aramco approved AIC scope includes construction/ installation of facilities in accordance with scope of work. Project scope includes providing and installing new equipment, associated piping, tie-ins to all electrical and non-electrical utilities, process control and monitoring equipment, civil foundations and structural works, and to replace utility boilers and desalination plant existing control system with digital control system, to transfer the process control and monitoring of utility boilers and desalination plant to central control room, to replace existing control system of air compressors with digital control and communication system. Supervised and monitor activities of multi discipline QA/ QC department for ongoing construction activities. Reviewed hydro-test package, Tie-In package, loop package, Procedures method statement and working instructions of Vendors/sub- contractors for adequacy in relation to ISO 9001:2008 and Saudi Aramco quality requirements. Coordinated with third party (testing agencies/batching plants) for in time delivery of concrete/ Asphalt. Ensuring the availability of QC inspector during any operation. Maintain quality records and ensures control of documents by advising document controller, QC Engineers. Supported internal and external Audits as per schedule. Jul 2009 To June 2012 Employer: Nokia Siemens Networks Project: Zain Telecom Position: Quality Control Engineer Project scope includes design, procure, construction and commissioning of GSM sites in the region. Monitor Inspection activities at the Construction Sites to verify compliance with NSN Standards and Company Specifications. Monitor Contractors’ Inspectors and Quality System to ensure adequate performance and compliance with the company standards. Prepare Surveillance and Inspection Report with Proactive Approach. Promote and Built Awareness of Project Quality Requirements. Performed focused assessment of specific work elements to ensure that the project quality activities and processes are effective. Track and maintain quality records related to project. Review internal and external audits and coordinate with concerned department.
  • 5. CURRICULUM VITAE QA/QC Manager 5 Feb 2008 to Feb 2009 ZAIN (MTC), Saudi Arabia Senior Civil Engineer To Supervise Preliminary Civil Design (PCD) and allowing Vendor to start Civil Works at GSM Sites.To Supervise Site Construction Works with Quality Control including Site Layout, Excavation, RCC Foundations, RCC Columns, Backfilling, Finished Floor Level, Installation of Steel Structure (Towers), Installation of Telecom Equipment, Electrical, Earthing and Grounding Works To Monitor Materials and Material Reports for Quality Assurance including Soil Reports, Concrete Testing, Reinforced Steel Bars Testing, Tower paint, Tower Galvanization and Earthing Resistance Acceptance of the Sites from Vendor, Approving Vendors’ Invoices and Maintaining Site Acceptance Record May 2007 to Feb 2008 Employer: REINFORCED EARTH (Pvt) Ltd. ISLAMABAD Project: Layyari Expressway Karachi Position: Construction Engineer Scope of work was construction supervision and quality control of mechanically stabilized earth walls. To coordinate with the design department and monitor the required necessary changes in the drawings as per field requirements. Conduct Inspections to ensure the work has been done in compliance with contract, drawings and method statement. To witness the sampling ,daily field tests and issue non conformance if work done is not according to the standards. To ensure quality of precast panels at Casting Yard According to Standard Drawings and to Maintain Quality Control and Quality Assurance for Reinforced Steel and Concrete and getting Approval from the Client for Site Works and Invoices March 2005 May 2007 Employer: GLOBECOM (Pvt) Ltd. ISLAMABAD Project: Construction of GSM towers for Mobilink Position: Regional Manager-Centre 3 and Sindh To Plan, Administrate, Supervise and Maintain Quality Control For Construction of GSM sites, from scratch to finish, including Site Acquisition, Drawing Evaluation, Site Layout, Excavation, RCC Foundations, RCC Columns, Backfilling, Compaction, Installation of Steel Towers as high as 90 M, Construction of Equipment & Generators Rooms, Electrical and Earthing Works. To Deal and coordinate with clients and consultants for the progress, construction and erection of different GSM Towers on technical grounds i.e. according to the design and specifications. Coordination and correspondence with the head office about the activities going on in the region.(Daily reports of staff, bills ,car maintenance etc) April 2004 to March 2005
  • 6. CURRICULUM VITAE QA/QC Manager 6 DADEX ETERNIT (Pvt) Ltd. ISLAMABAD Assistant Sales Manager (Technical)  To manage, discuss and coordinate with the clients/consultants for technical usage, design requirements/aspects etc. relating to the product installation.  To visit different architects, consultants, builders, public organizations, NGO's and Industries and coordinate about our products.  Maintaining the Quality Control, checking the usage of products and advise the site staff about the use of products.  To design, estimate, guide and survey of sites relating to installations of different Dadex Products including PVC/UPVC sanitary, sewerage & water supply pipes and fittings. January 2004 to March 2004 ARMY HOUSING DTE. GHQ Quality and Site Engineer Scope of work includes construction of houses, roads construction , laying of services and construction of overhead water tank. To participate in the communication meetings with contractors to identify problems and discuss possible solutions, analyzing the options and proposing the best option. To Study and monitor different designed aspects of construction and development works within the site. Quality Assurance within the specifications defined. To deliver presentations for Senior level staff and also to control supervisory staff and manage their respective duty and sites. To estimate quantities at sites and to approve Contractors’ invoices. January 2001 to December 2003 Employer :KARCON (Pvt) LTD. ISLAMABAD Projects : National Police foundation ( E-11 and Lohi Bhair ) and GT-Road Rawalpindi Position : Quality Control/site Supervisor Scope of work includes laying of services, construction of roads, concrete works, construction of culverts and construction of bridges. Supervised and managed quality control & project scheduling of different road projects in Rawalpindi & Peshawar (Pakistan).Quality Control of Materials at Concrete Batching Plant. Testing and quality control of concrete and Reinforced Bars. Issuance of safety instructions to all operators. Updating daily QC reports to undertake QC standards. ACHEIVEMENTS  Letter of appraisal was awarded by the ex-employer , NSN, for timely achievements.  Letter of appraisal awarded by Ex employer CCCC for maintaining quality objectives and quality control at site.  Letter of appraisal was awarded by the Ex-Employer, Globcomm (pvt) Ltd , for carrying out the highest rollout for the company in Pakistan for the year 2006.
  • 7. CURRICULUM VITAE QA/QC Manager 7 References:Can be furnished upon request.