Amtrak
CASE STUDY
Amtrak operates a nationwide rail network, serving more than 500 destinations in 46
states on 21,000 miles of routes. Amtrak’s Northeast Corridor is the busiest passenger
line in North America, with more than 1,700 trains operating over some portion of the
Boston-New York-Washington route each day, carrying more than 9 million passengers
annually.
The Challenge
In the mid 1990’s, Amtrak had installed a large display wall in
their New York Penn Station Central Control (PSCC) facility to
display their Centralized Traffic Control (CTC) system for the
Amtrak and Long Island Railroad (LIRR) route systems. The
display wall was driven by rear screen projectors which, after
10 years of use, were no longer reliable or visually clear, and
required spare parts that were both expensive and difficult to
source.
Amtrak was intent upon resolving a notable problem with
their current system which used 30 projectors to make
up an integrated wall. In order to replicate their entire
route grid on the wall, the CTC system image had to be
divided into sections which were then routed to individual
computers driving each projector. Each projector’s image had
to be matched pixel-to-pixel to the next one. This created
significant difficulties when any changes were required,
because a change in one section affected everything else.
For example, adding a new route that crossed over several
sections required a complicated and time consuming
reconfiguration of the entire wall.
As part of the upgrade, Amtrak wished to install a new display
system for Power Traction management in another area of the
operations theater.
The Solution
Activu was selected for its ability to provide dynamic and
flexible display that both eliminated current problems as well
as provided a greater range of functionality. Since Activu is a
networkbased solution, it transports and displays the route
grid image as a complete entity, enabling dynamic changes
to be instantly displayed. Activu enables greater visibility by
allowing control room operators to crop and enlarge specific
areas of information during alarm conditions, and these can
then be easily shared with other colleagues across the room
or in another location.
888-activu-1
www.activu.com
The bulky projector system was replaced by a display wall (of
the same size) using Mitsubishi MegaView™ rear projection
display cubes with DLP® technology. Due to the low profile
of the projection cubes, a considerable amount of space was
made available behind the wall for other uses. We installed
a large 30 display cube wall composed of 67” Mitsubishi
DLP cubes in the train control area, which was divided two
sections: a 2 x 10 wall for the Amtrak route grid, and a
smaller 2 x 5 adjoining wall for the LIRR. A separate display
wall, consisting of 18 Mitsubishi DLP 50” cubes, was installed
for power traction.
The Activu team coordinated the phased dismantling and
removal of the old display wall. The new system was pre-
built and staged in company’s facility where it was thoroughly
tested prior to installation. This significantly shortened the
implementation process, sustained efficient and effective
operations while it also reduced potential safety risks.
888-activu-1
www.activu.com
CASE STUDY

Mais conteúdo relacionado

Destaque

Amtrak Services Presentation
Amtrak  Services PresentationAmtrak  Services Presentation
Amtrak Services Presentationmjpiscadlo
 
The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...
The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...
The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...guest4330129
 
National rail road passenger corporation ( amtrak)
National rail road passenger corporation ( amtrak)National rail road passenger corporation ( amtrak)
National rail road passenger corporation ( amtrak)mario manurung
 
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Rajendra Inani
 
THE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITY
THE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITYTHE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITY
THE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITYSwarupa Rani Sahu
 
Titan: The Rise of Big Graph Data
Titan: The Rise of Big Graph DataTitan: The Rise of Big Graph Data
Titan: The Rise of Big Graph DataMarko Rodriguez
 

Destaque (9)

Amtrak Services Presentation
Amtrak  Services PresentationAmtrak  Services Presentation
Amtrak Services Presentation
 
The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...
The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...
The Amtrak Funding Debate:Why Amtrak Should Continue to Receive Federal Subsi...
 
National rail road passenger corporation ( amtrak)
National rail road passenger corporation ( amtrak)National rail road passenger corporation ( amtrak)
National rail road passenger corporation ( amtrak)
 
Amtrak
AmtrakAmtrak
Amtrak
 
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
Epgp (one year) 2009-10_cf_ assignment_#3_14jan10
 
THE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITY
THE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITYTHE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITY
THE COMPANY I ADMIRE THE MOST FOR ITS CORPORATE SOCIAL RESPONSIBILITY
 
Titan presentation
Titan presentation Titan presentation
Titan presentation
 
Air india
Air indiaAir india
Air india
 
Titan: The Rise of Big Graph Data
Titan: The Rise of Big Graph DataTitan: The Rise of Big Graph Data
Titan: The Rise of Big Graph Data
 

Último

Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVshikhaohhpro
 
DNT_Corporate presentation know about us
DNT_Corporate presentation know about usDNT_Corporate presentation know about us
DNT_Corporate presentation know about usDynamic Netsoft
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
 
How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsHow To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsAndolasoft Inc
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...kellynguyen01
 
Clustering techniques data mining book ....
Clustering techniques data mining book ....Clustering techniques data mining book ....
Clustering techniques data mining book ....ShaimaaMohamedGalal
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdfWave PLM
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comFatema Valibhai
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...gurkirankumar98700
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...panagenda
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providermohitmore19
 
why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfjoe51371421
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfkalichargn70th171
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...OnePlan Solutions
 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxComplianceQuest1
 
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...harshavardhanraghave
 

Último (20)

Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
 
DNT_Corporate presentation know about us
DNT_Corporate presentation know about usDNT_Corporate presentation know about us
DNT_Corporate presentation know about us
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
 
How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsHow To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.js
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
 
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdfMicrosoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
 
Clustering techniques data mining book ....
Clustering techniques data mining book ....Clustering techniques data mining book ....
Clustering techniques data mining book ....
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
 
why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdf
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
 
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docx
 
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
 

Amtrak case-study

  • 1. Amtrak CASE STUDY Amtrak operates a nationwide rail network, serving more than 500 destinations in 46 states on 21,000 miles of routes. Amtrak’s Northeast Corridor is the busiest passenger line in North America, with more than 1,700 trains operating over some portion of the Boston-New York-Washington route each day, carrying more than 9 million passengers annually. The Challenge In the mid 1990’s, Amtrak had installed a large display wall in their New York Penn Station Central Control (PSCC) facility to display their Centralized Traffic Control (CTC) system for the Amtrak and Long Island Railroad (LIRR) route systems. The display wall was driven by rear screen projectors which, after 10 years of use, were no longer reliable or visually clear, and required spare parts that were both expensive and difficult to source. Amtrak was intent upon resolving a notable problem with their current system which used 30 projectors to make up an integrated wall. In order to replicate their entire route grid on the wall, the CTC system image had to be divided into sections which were then routed to individual computers driving each projector. Each projector’s image had to be matched pixel-to-pixel to the next one. This created significant difficulties when any changes were required, because a change in one section affected everything else. For example, adding a new route that crossed over several sections required a complicated and time consuming reconfiguration of the entire wall. As part of the upgrade, Amtrak wished to install a new display system for Power Traction management in another area of the operations theater. The Solution Activu was selected for its ability to provide dynamic and flexible display that both eliminated current problems as well as provided a greater range of functionality. Since Activu is a networkbased solution, it transports and displays the route grid image as a complete entity, enabling dynamic changes to be instantly displayed. Activu enables greater visibility by allowing control room operators to crop and enlarge specific areas of information during alarm conditions, and these can then be easily shared with other colleagues across the room or in another location. 888-activu-1 www.activu.com
  • 2. The bulky projector system was replaced by a display wall (of the same size) using Mitsubishi MegaView™ rear projection display cubes with DLP® technology. Due to the low profile of the projection cubes, a considerable amount of space was made available behind the wall for other uses. We installed a large 30 display cube wall composed of 67” Mitsubishi DLP cubes in the train control area, which was divided two sections: a 2 x 10 wall for the Amtrak route grid, and a smaller 2 x 5 adjoining wall for the LIRR. A separate display wall, consisting of 18 Mitsubishi DLP 50” cubes, was installed for power traction. The Activu team coordinated the phased dismantling and removal of the old display wall. The new system was pre- built and staged in company’s facility where it was thoroughly tested prior to installation. This significantly shortened the implementation process, sustained efficient and effective operations while it also reduced potential safety risks. 888-activu-1 www.activu.com CASE STUDY