Factories and Machinery Act (BOWEC)

  1. 1. #gengkasutbesi
  2. 2. Building Operations:  Construction, structural alteration, repair or maintenance of a building (including re-pointing, re- decoration and external cleaning of the structure), the demolition of a building, and the preparation for and the laying of foundation of an intended building.  Provision and measures that are required to be taken while conducting handling and maintenance works, as well as works of engineering construction.
  3. 3. Arrangement Of Regulations PART REGULATION Part I- Preliminary Regulation 1-4 Part II- General provision Regulation 5-27 Part III- Concrete work Regulation 28-32 Part IV- Structural steel and precast concrete assembly Regulation 33-38 Part V- Cleaning, repairing, and maintenance of roof gutters, windows, louvers and ventilators Regulation 39-42 Part VII- Chutes, safety belts and nets Regulation 43-45 Part VIII- Runways and ramps Regulation 46-57) Part X- Scaffolds Regulation 62-71 Part XI- Demolition Regulation- 72-98 Part XII- Excavation work Regulation 99-118 Part XIII- Material handling and storage, use and disposal Regulation 119 -133 Part XIV- Piling Regulation 134-134 Part XV- Blasting and use of explosive Regulation 135-146 Part XVI- Hand and power tools Regulation 147-153 Part XVII- Miscellaneous Regulation 154
  4. 4. Importance of BOWEC a) Provide and maintain safe construction site and systems of work at the site b) Make arrangement for ensuring safety and health in connection with the use or operation, handling, building, storage and transport of site and substances c) Provide necessary information, instruction, training and supervision for purpose of ensuring the safety and health of employees in the site d) Maintain the site in a safe and healthy condition, as well as to provide and maintain safe means of access to and egress from the site. e) Provide and maintain safe and healthy working environment, as well as to provide and maintain adequate facilities for the welfare of the employees
  5. 5. Effectiveness of Implementation Part Effectiveness I Preliminary  People know about the specific meaning and application of law toward certain people. II General Provisions  To prevent people from general hazard at workplace.  Function of certain people in construction site. III Concrete Work  Give stability to support structural building.  To ensure the formwork is safe and secure.  Secure access to do the inspection at construction site. IV Structure Steel and Precast Concrete Assembly  Prevent uncontrolled movement of people and workload. V Cleaning, Repairing, and Maintenance Of Roof, Gutters, Windows, Louvers and Ventilators  Maintain the safe workplace.  Protection against sliding.
  6. 6. Part Effectiveness VI Catch Platforms  To prevent people from fall height place.  Prevent injury to the public and man working at construction site. VII Chutes, Safety Belts and Nets  Provided to removal the material and easy to people to discharging of materials.  To ensure the safety belt is safe from any of the hazard and save it to long life.  To prevent sagging to any surface or object beneath when cushioning the fall of a person.  To cover the area if possible fall. VIII Runways and Ramps  Easily to people to carry any workload when have proper way.  Prevent people from any hazard by using suitable way at construction site. IX Ladders and Step-Ladders  Give access to people to move to all floors or to scaffolds or platform where work is performed.  Wooden ladder is prohibited to prevent people fall from unstable ladder.  Stable ladder prevent slipping, swaying and sagging.
  7. 7. Part Effectiveness X Scaffolds - Prevent and protect the person from fall from height. - Provides a flat, well balanced working platform to navigate across with ease. - It use as fall arrest systems. XI Demolition - It is the fastest way of combination site clearing. - Easiest way to remove hazardous materials. - Involve a team effort between many people. - No ground vibrations XII Excavation Work - Involving the removal of soil or rock from a site to form an open face, hole or cavity using tools, machinery or explosives. XIII Material Handling And Storage, Use And Disposal - Provide a continuous flow of parts and assemblies through the workplace. - Ensure that materials are available when needed. - Prevent improper handling and storing of materials often result in costly injuries.
  8. 8. Part Effectiveness XIV Piling - Offer a strong, sturdy foundation for a structure regardless of soil quality or harsh environment. - Control the settlements and to transfer the load of the building onto the foundation regardless if the load is inclined or vertical. XV Blasting And Use Of Explosives - Easy to break rock for excavation. - Approval from relevant authorities shall be obtained before blasting activity is carrying out. XVI Hand And Power Tools - Make the job easy and efficient. - Safe time. XVII Miscellaneous - People will obey to the rule. - Scare need to pay fine.
  9. 9. Suggestions to Improvise Enforcement  As an employer / business owner ◦ Plan and arrange safety and health steps ◦ Keep close call with legal enforcers on law and provision commencement ◦ Enhance effectiveness of safety and health committee ◦ Proper step to identify hazards and define risk in accordance to each regulation ◦ Hire competent and knowledgeable Safety Site Supervisor and Safety Officer ◦ Re-enforce safety rules at workplace / site
  10. 10.  Supervise high risk activity based on risk assessment commenced  Hire competent, experienced & certified workers to manage machineries  Strict practice on safety procedures and penalties for breach of rules  Frequent investigation and maintenance check on site, material, equipment and tools.  Legal enforcers (DOSH) frequent site visit  Aliases management system with BOWEC enforcement on site.
  11. 11. Conclusion  Variety activities on construction site are highly potential to cause hazard and accident  BOWEC 1986 regulations must be on place, implemented and practiced effectively at construction sites  Special provisions must be enforced to ensure safety and health of workers on site  Safety and Health practitioners must be aware of risks on site and make sure applicable control measures been implemented and monitor for effectiveness.

×