CANAL REGULATION
WORK
MODULE- 4
PREPARED BY – ABDUL SAHID
DEPARTMENT OF CIVIL
ENGINEERING
B.N. COLLEGE OF ENGG. &
TECHNOLOGY , LUCKNOW
Content…
Canal fall- necessity andlocation- types of
falls- Cross regulator anddistributory head
regulator- their functions, Silt controldevices,
Canal escapes-types of escapes.
Introduction
canal obtains its share of water from the
pool behind a barrage through a structure
called the canal head regulator
also a regulation structure for controlling
the amount of water passing into the canal
In this lesson, attention focussed on
structures that regulate the discharge and
maintain the water levels within a canal
network
These structures may be described as follows:
1. Drops and falls, to lower the water level of the
canal
2. Cross regulators, to head up water in the parent
channel to divert some of it through an off take
channel, like a distributary.
3. Distributary head regulator, to control the
amount of water flowing in to off take channel.
4. Escapes, to allow release of excess water from
the canal system.
Canal drops and falls
canal has a designed longitudinal slope
but has to pass through an undulating
terrain.
When a canal crosses an area that has a
larger natural surface slope, a canal drop,
also called fall in India, has to be provided
suitably at certain intervals.
location of fall judiciously worked out
such that there should be a balance
between the quantities of excavation and
filling.
height of the fall has to be decided, since it
is possible to provide larger falls at longer
intervals or smaller falls at shorter
intervals.
Necessity of canal falls
When slope of ground suddenly changes to
steeper slope, permissible bed slope cannot
be maintained.
Slope of ground is more or less uniform and
slope is greater than permissible bed slope of
canal.
In cross drainage work, when difference
between level of canal and that of drainage is
small or when F.S.L of canal is above bed
level.
Types of canal fall
1. Ogee fall
 an ogee curve (combination of convex
and concave curve) provided for carrying
canal water from higher level to lower
level.
 Fall is recommended when natural
ground surface suddenly changes to a
steeper slope along the alignment of the
canal.
Fall consists of a concrete vertical wall and
concrete bed.
Over the concrete bed the rubble masonry
is provided in the shape of ogee curve.
Upstream and downstream of the fall is
protected by stone pitching.
2. Rapid fall
When slope of the natural ground surface
is even and long.
Consists of long glacis with longitudinal
slope.
Curtain walls are provided on the
upstream and downstream side of the
sloping glacis.
3. Trapezoidal notch fall
Body wall is constructed across the canal.
Body wall consists of several trapezoidal
notches between side piers and
intermediate piers.
Notches are kept at the upstream bed level
of canal.
Body wall is constructed with masonry or
concrete.
4. Vertical drop fall
Consists of vertical drop wallconstructed
with masonry work.
Water flows over the crest of wall.
Concrete floor provided on downstream
side to control scouring effect.
Curtain wall provided on upstream and
downstream side.
This type falls provided at Sardar canal,
UP. Hence known as sardar fall.
Canal regulators
include the cross regulator and the
distributary headregulator structures for
controlling the flow through a parent
canal and its off-taking distributary .
help to maintain the water level in the
canal on the upstream of the regulator.
 angle at which a distributary canal off-takes
from the parent canal has to be decided
carefully.
 The best angle is when the distributary takes off
smoothly.
 Another alternative is to provide both channels
(off-taking and parent) at an angle to the original
direction of the parent canal.
 When it becomes necessary for the parent canal
to follow a straight alignment, the edge of the
canal rather than the centre line should be
considered in deciding the angle of off-take.
To prevent excessive entry of silt
deposition at the mouth of the off-take, the
entry angle should be kept to between 600
and 800.
For the hydraulic designs of cross
regulators, one may refer to the Bureau of
Indian Standard code IS: 7114-1973
“Criteria for hydraulic design of cross
regulators for canals”.
The distributary should preferably be
designed to draw sediment proportional
to its flow, for maintaining non-siltation of
either the parent canal or itself.
three types of structures have been
suggested as discussed below along with
the relevant Bureau of Indian standard
codes.
Silt vanes
are thin, vertical, curved parallel walled
structures constructed of plain or
reinforced concrete on the floor of the
parent canal, just upstream of the off-
taking canal.
height of the vanes may be about one-
fourth to one-third of the depth of flow in
the parent canal.
thickness of the vanes should be as small
as possible and the spacing of the vanes
may be kept about 1.5 times the vane
height.
To minimize silting tendency, the pitched
floor on which the vanes are built should
be about 0.15 m above the normal bed of
the parent channel.
Groyne walls or curved wings
project out in to the parent canal from the
downstream abutment of the off-taking
canal.
it divides the discharge of the parent canal
in proportion of the discharge
requirement of the off-taking canal with
respect to the flow in the downstream
parent canal.
The groyne wall extends upstream in to
the parent canal to cover ¾ to full width of
the off-take.
proportional distribution of flow in to the
off-taking canal is expected to divert
proportional amount ofsediment.
The height of the groyne wall should be at
least 0.3m above the full supply level of
the parent canal.
Skimming platforms
A skimming platform is an RCC slab
resting on low height piers on the bed of
the parent canal, and in front of the off-
taking canal.
creates a kind of low tunnel at the bed of
the parent canal, which allows the
sediment moving along its bed to pass
through downstream.
floor of the off-taking canal being above
the level of the platform thus only takes
suspended sediment load coming along
with the main flow in the parent canal.
suitable where the parent channel is deep
(about 2m or more) and the off-take is
comparatively small.
The tunnels should be at-least 0.6m deep.
The upstream and downstream edges of
the platform should be inclined at about
300 to the parent canal cross section.
Canal escapes
structures meant to release excess water
from a canal, which could be main canal,
branch canal, distributary, minorsetc.
usually an irrigation system suffers from
deficit supply in later years of its life
situations that might suddenly lead to
accumulation of excess water in a certain
reach of a canal network may occur due to
the following reasons:
1.Wrong operation of head works in trying
to regulate flow in a long channel
resulting in release of excess water than
the total demand in the canal system
downstream.
2. Excessive rainfall in the command area
leading to reduced demand and
consequent closure of downstream gates.
3. Sudden closure of control gates due to a
canal bank breach.
The excess water in a canal results in the
water level rising above the full supply
level which, if allowed to overtop the
canal banks, may cause erosion and
subsequent breaches.
Hence, canal escapes help in releasing the
excess water from a canal at times of
emergency.
Escapes as also built at the tail end of
minors at the far ends of a canal network.
These are required to maintain the
required full supply level at the tail end of
the canal branch.
Weir or surface escapes
are constructed in the form of weirs,
without any gate or shutter and spills over
when the water level of the canal goes
above its crest level.
Sluice or surplus escapes
gated escapes with a very low crest height.
these sluices can empty the canal much
below its full supply level and at a very
fast rate.
In some cases, these escapes act as
scouring sluices to facilitate removalof
sediment.
The locations for providing escapes are
often determined on the availability of
suitable drains, depressions or rivers with
their bed level at or below the canal bed
level.
Escapes may be necessary upstream of
points where canals takeoff from a main
canal branch.
Escape upstream of major aqueducts is
usually provided.
Canal escapes may be provided at
intervals of 15 to 20km for main canal and
at 10 to 15km intervals for other canals.
Canal Regulation Works

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

types of canals
types of canals types of canals
types of canals
 
Spillways
SpillwaysSpillways
Spillways
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage work
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Irrigation canals
Irrigation canalsIrrigation canals
Irrigation canals
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flow
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Canal Regulation Work
Canal Regulation WorkCanal Regulation Work
Canal Regulation Work
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
Dam design
Dam designDam design
Dam design
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
CANAL REGULATIONS
CANAL REGULATIONSCANAL REGULATIONS
CANAL REGULATIONS
 
Canal structures
Canal structuresCanal structures
Canal structures
 
types of canal
types of canaltypes of canal
types of canal
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
 
LINING OF CHANNELS
LINING OF CHANNELSLINING OF CHANNELS
LINING OF CHANNELS
 

Semelhante a Canal Regulation Works

Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report vikas rahangdale
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKSMood Naik
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Saqib Imran
 
Diversion head work
Diversion head workDiversion head work
Diversion head workdhruvalsu
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal TypesAbbasZafar3
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Latif Hyder Wadho
 
UNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxUNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxDivs97
 
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Venkataraju Badanapuri
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineeringBittuRajkumar
 
Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 
Elements of Water Conductor System
Elements of Water Conductor SystemElements of Water Conductor System
Elements of Water Conductor SystemSatish Taji
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its typesBilal Mirani
 
Presenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxPresenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxqureshixahoor
 

Semelhante a Canal Regulation Works (20)

Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report
 
Cross drainage work.pptx
Cross drainage work.pptxCross drainage work.pptx
Cross drainage work.pptx
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKS
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Canal structures
Canal structuresCanal structures
Canal structures
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
unit-3.pdf
unit-3.pdfunit-3.pdf
unit-3.pdf
 
SPILLWAYS.pdf
SPILLWAYS.pdfSPILLWAYS.pdf
SPILLWAYS.pdf
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal Types
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
UNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxUNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptx
 
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineering
 
Canal of design
Canal of designCanal of design
Canal of design
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Elements of Water Conductor System
Elements of Water Conductor SystemElements of Water Conductor System
Elements of Water Conductor System
 
Hydroelectric power plants (chapter 5)
Hydroelectric power plants   (chapter 5)Hydroelectric power plants   (chapter 5)
Hydroelectric power plants (chapter 5)
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Presenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxPresenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptx
 

Último

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Último (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

Canal Regulation Works

  • 1. CANAL REGULATION WORK MODULE- 4 PREPARED BY – ABDUL SAHID DEPARTMENT OF CIVIL ENGINEERING B.N. COLLEGE OF ENGG. & TECHNOLOGY , LUCKNOW
  • 2. Content… Canal fall- necessity andlocation- types of falls- Cross regulator anddistributory head regulator- their functions, Silt controldevices, Canal escapes-types of escapes.
  • 3. Introduction canal obtains its share of water from the pool behind a barrage through a structure called the canal head regulator also a regulation structure for controlling the amount of water passing into the canal In this lesson, attention focussed on structures that regulate the discharge and maintain the water levels within a canal network
  • 4.
  • 5. These structures may be described as follows: 1. Drops and falls, to lower the water level of the canal 2. Cross regulators, to head up water in the parent channel to divert some of it through an off take channel, like a distributary. 3. Distributary head regulator, to control the amount of water flowing in to off take channel. 4. Escapes, to allow release of excess water from the canal system.
  • 6. Canal drops and falls canal has a designed longitudinal slope but has to pass through an undulating terrain. When a canal crosses an area that has a larger natural surface slope, a canal drop, also called fall in India, has to be provided suitably at certain intervals.
  • 7.
  • 8. location of fall judiciously worked out such that there should be a balance between the quantities of excavation and filling. height of the fall has to be decided, since it is possible to provide larger falls at longer intervals or smaller falls at shorter intervals.
  • 9. Necessity of canal falls When slope of ground suddenly changes to steeper slope, permissible bed slope cannot be maintained. Slope of ground is more or less uniform and slope is greater than permissible bed slope of canal. In cross drainage work, when difference between level of canal and that of drainage is small or when F.S.L of canal is above bed level.
  • 10. Types of canal fall 1. Ogee fall  an ogee curve (combination of convex and concave curve) provided for carrying canal water from higher level to lower level.  Fall is recommended when natural ground surface suddenly changes to a steeper slope along the alignment of the canal.
  • 11. Fall consists of a concrete vertical wall and concrete bed. Over the concrete bed the rubble masonry is provided in the shape of ogee curve. Upstream and downstream of the fall is protected by stone pitching.
  • 12.
  • 13. 2. Rapid fall When slope of the natural ground surface is even and long. Consists of long glacis with longitudinal slope. Curtain walls are provided on the upstream and downstream side of the sloping glacis.
  • 14.
  • 15. 3. Trapezoidal notch fall Body wall is constructed across the canal. Body wall consists of several trapezoidal notches between side piers and intermediate piers. Notches are kept at the upstream bed level of canal. Body wall is constructed with masonry or concrete.
  • 16.
  • 17. 4. Vertical drop fall Consists of vertical drop wallconstructed with masonry work. Water flows over the crest of wall. Concrete floor provided on downstream side to control scouring effect. Curtain wall provided on upstream and downstream side. This type falls provided at Sardar canal, UP. Hence known as sardar fall.
  • 18.
  • 19. Canal regulators include the cross regulator and the distributary headregulator structures for controlling the flow through a parent canal and its off-taking distributary . help to maintain the water level in the canal on the upstream of the regulator.
  • 20.
  • 21.  angle at which a distributary canal off-takes from the parent canal has to be decided carefully.  The best angle is when the distributary takes off smoothly.  Another alternative is to provide both channels (off-taking and parent) at an angle to the original direction of the parent canal.  When it becomes necessary for the parent canal to follow a straight alignment, the edge of the canal rather than the centre line should be considered in deciding the angle of off-take.
  • 22.
  • 23. To prevent excessive entry of silt deposition at the mouth of the off-take, the entry angle should be kept to between 600 and 800. For the hydraulic designs of cross regulators, one may refer to the Bureau of Indian Standard code IS: 7114-1973 “Criteria for hydraulic design of cross regulators for canals”.
  • 24. The distributary should preferably be designed to draw sediment proportional to its flow, for maintaining non-siltation of either the parent canal or itself. three types of structures have been suggested as discussed below along with the relevant Bureau of Indian standard codes.
  • 25. Silt vanes are thin, vertical, curved parallel walled structures constructed of plain or reinforced concrete on the floor of the parent canal, just upstream of the off- taking canal. height of the vanes may be about one- fourth to one-third of the depth of flow in the parent canal.
  • 26. thickness of the vanes should be as small as possible and the spacing of the vanes may be kept about 1.5 times the vane height. To minimize silting tendency, the pitched floor on which the vanes are built should be about 0.15 m above the normal bed of the parent channel.
  • 27.
  • 28. Groyne walls or curved wings project out in to the parent canal from the downstream abutment of the off-taking canal. it divides the discharge of the parent canal in proportion of the discharge requirement of the off-taking canal with respect to the flow in the downstream parent canal.
  • 29. The groyne wall extends upstream in to the parent canal to cover ¾ to full width of the off-take. proportional distribution of flow in to the off-taking canal is expected to divert proportional amount ofsediment. The height of the groyne wall should be at least 0.3m above the full supply level of the parent canal.
  • 30.
  • 31. Skimming platforms A skimming platform is an RCC slab resting on low height piers on the bed of the parent canal, and in front of the off- taking canal. creates a kind of low tunnel at the bed of the parent canal, which allows the sediment moving along its bed to pass through downstream.
  • 32. floor of the off-taking canal being above the level of the platform thus only takes suspended sediment load coming along with the main flow in the parent canal. suitable where the parent channel is deep (about 2m or more) and the off-take is comparatively small.
  • 33. The tunnels should be at-least 0.6m deep. The upstream and downstream edges of the platform should be inclined at about 300 to the parent canal cross section.
  • 34.
  • 35. Canal escapes structures meant to release excess water from a canal, which could be main canal, branch canal, distributary, minorsetc. usually an irrigation system suffers from deficit supply in later years of its life situations that might suddenly lead to accumulation of excess water in a certain reach of a canal network may occur due to the following reasons:
  • 36. 1.Wrong operation of head works in trying to regulate flow in a long channel resulting in release of excess water than the total demand in the canal system downstream. 2. Excessive rainfall in the command area leading to reduced demand and consequent closure of downstream gates. 3. Sudden closure of control gates due to a canal bank breach.
  • 37. The excess water in a canal results in the water level rising above the full supply level which, if allowed to overtop the canal banks, may cause erosion and subsequent breaches. Hence, canal escapes help in releasing the excess water from a canal at times of emergency.
  • 38. Escapes as also built at the tail end of minors at the far ends of a canal network. These are required to maintain the required full supply level at the tail end of the canal branch.
  • 39. Weir or surface escapes are constructed in the form of weirs, without any gate or shutter and spills over when the water level of the canal goes above its crest level.
  • 40.
  • 41. Sluice or surplus escapes gated escapes with a very low crest height. these sluices can empty the canal much below its full supply level and at a very fast rate. In some cases, these escapes act as scouring sluices to facilitate removalof sediment.
  • 42.
  • 43. The locations for providing escapes are often determined on the availability of suitable drains, depressions or rivers with their bed level at or below the canal bed level. Escapes may be necessary upstream of points where canals takeoff from a main canal branch.
  • 44. Escape upstream of major aqueducts is usually provided. Canal escapes may be provided at intervals of 15 to 20km for main canal and at 10 to 15km intervals for other canals.