Topic: Manufacturing of Fly Ash Based Geo-Polymer
Materials.
Context
4
• Focus of NGT on Ash Utilization in Distt
Korba.
• Exploring Un-utilized Avenues.
• Prospects for Team Alchemy.
• Idea Generation.
• Existing Methods of Ash Utilization at
NTPC Korba.
• Utilization of Idea.
• Ash Dyke Issues.
GoI’s Ash Notification-2015/16
Clause-2.11/ 2.12 & 5.0
2.11 – The Coal based TPP shall promote, adopt & setup Ash based manufacturing
facilities within their premises or vicinity.
2.12 – The coal based TPP in the vicinity of the cities shall promote, support and
assist in setting up of ash based product manufacturing units so as to meet the
requirements of bricks and other building construction materials and also to reduce
the transportation.
5.0 – 100% utilization of Fly Ash generated by 31.12.2017.
NTPC’s Ash Policy-2015
Clause-11.0 “Efforts for New Area of Ash Utilization -
Geopolymers”
11.1 Fly Ash based light weight sand. 11.2 Fly Ash based Geo-Polymer Concrete.
*These activities shall be financed from
Ash Fund.
Material Requirement
1) Sodium Silicate – Na2SiO3
2) Sodium Hydroxide – NaOH
3) Fly Ash
Activator
Concept of Geopolymers
Geo-polymerisation involves alkaline activation of materials rich in silica and alumina.
Reaction
conditions
Temp/
Time
Solid aluminosilicate raw
material
Alkali
activator
Geopolymer paste
It give a three- dimensional silico-aluminate structure by polycondensation.
Potential at NTPC Korba
• Sodium Hydroxide – Pellets used in DM Plant
for Resin Regeneration. Required only for
preparation of alkali activator.
• Sodium Silicate – Required as Binder in alkali
activator solution. It is an inorganic sodium
salt which has silicate as the counterion. To
be arranged/ sourced.
2x NaOH + SiO2 →
(Na2O)x·SiO2 + x H2O
• Aggregate material – Sand/ Gravel or any
other coarse material to be iterated as per
availability.
Raw Material Availability
• Solid Aluminosilicate Raw Material – Available
as Fly Ash in plenty.
Iterations
Iteration I – Silica Gel
9
NTPC’s Zero Deviation Document –
• Disposal of Silica Waste - P.No. 36 of 55.
• Material Type – Hazardous as per HWM Rules-
2016.
• Authorization from PCB – Required for Disposal.
• Disposal – Sale to Recycler or disposal at TSDF
facility.
• Documentation – Annual Return/ Storage
permission from PCB.
Present stock at NTPC Korba:
• At Stores – 5 MT
• At site – 1 MT
• Validity of Authorization for NTPC Korba:
Qty – 10 MT/ annum.
Period – 21.11.2024.
Silica Gel stored at NTPC Korba
Preparation of Sodium Silicate solution
1. Removing water and impurities from Silica gel and Sodium Hydroxide.
2. Weighment as per stoichiometric requirement.
3. Addition and Preparation of Reactants.
4. Maintaining reaction conditions (100-120 deg C with stirring).
5. Filtration of reaction product.
6. Stocking of sodium silicate solution.
1 5
4
3
2 6
Iteration II – Mill Reject as aggregate
11
• Available quantity – 75, 000 MT (approx).
• Material Type – Waste with minimal resale value.
• Authorization – Not required.
• Disposal – Sale on online platform MSTC.
• Utilization proposed – As aggregate for GP
concrete mix after crushing.
• Potential – 1, 35, 000 sqm area.
Design Parameters
12
Mix Design parameters selected for Fly Ash
Geopolymer Mortar
Ratio of alkaline liquid to fly ash by
mass
0.35
Concentration of NaOH solution (in
molar)
8
Ratio of Na2SiO3 to NaOH (by
mass)
2.5
Initial Curing Method Oven
Initial Curing Temp (deg C) 60
Curing Time (in hrs) 24
Rest Period (in hrs) 168
Preparation of Fly Ash Geopolymer concrete
Mortar blocks 9X9X9 cm.
Preparation of blocks using Sand-Fly Ash
Geopolymer concrete 15X15 X15 cm.
Preparation of blocks using Mill Reject-Fly Ash
Geopolymer concrete 15X15X15 cm.
9X9X9 cm
Mould
15X15X15 cm Mould
Detailed Mix Proportions
13
Details of mix proportions for Fly ash geopolymer concrete
Mix-type proportion GP-Mortar Block Sand-Fly Ash GP Mill Reject-Fly Ash
GP
Fly Ash Only (kg/
m3)
1201 721 960
Sand (kg/ m3) - 480 -
Mill Reject (kg/ m3) - - 241
Extra Water (kg/ m3) 10 10 10
NaOH (kg/ m3) 41 43 45
Na2SiO3 (kg/ m3) 103 108 113
Na2O/SiO2 0.1 0.12 0.15
SiO2/Al2O3 4.68 4.8 4.95
H2O/SiO2 14.70 14.40 14.10
Water to Solids by
weight
0.2 0.2 0.2
Preparation Process
Raw Material - Fly Ash GP
Mortar
Raw Material – Sand Fly Ash GP
Concrete
Raw Material – Mill Reject Fly Ash
GP Concrete
Step-1 – Preparation of Precursors & Raw
aggregates
Preparation Process
Raw Material – Sand Fly Ash GP Concrete Raw Material – Mill Reject Fly Ash GP
Concrete
Step-2 – Mixing of Raw aggregates
Preparation Process
Addition of Alkali Activator Making Dough Mix
Step-3 – Preparation of Dough Mix
Sand-Fly Ash Mill Reject-Fly Ash
Preparation Process
Mould Sand-Fly Ash Mould Mill Reject-Fly Ash
Step-4 – Filing of Mould
Mould Filing
Preparation Process
Blocks after temperature
curing
Step-5 – Temperature Curing and Resting
Temperature Curing @ 24
Hrs at
60 deg C
Mould after Temperature
Curing
Preparation Process
Sand-Fly Ash Geopolymer
Concrete
Step-6 – Final Fly Ash Geopolymer Concrete Block after 4 days
Fly Ash Mortar Geopolymers
Mill Reject - Fly Ash
Geopolymer Concrete
Testing planned of GP Fly Ash Concrete
Blocks
20
Tests Planned
• Dimensions & Tolerances
• Compressive Strength at 7, 21 & 28 days.
• Abrasion Resistance.
• Water Absorption Tests after 28 days.
• X-ray Diffraction test for crystallinity.
• SEM analysis to study morphology and
distribution of particles.
Other Iterations proposed –
• Use of Bottom Ash as aggregate
material for construction of test
blocks.
Advantages & Disadvantages
21
Advantages
• Reduces Carbon footprint.
• Utilize Fly Ash.
• High Compressive &
Tensile Strength.
• Very low Creep and
Shrinkage.
• Resistant to Heat & Cold.
• Chemical Resistant.
Disadvantages
• Slight Difficult to create.
• Require handling of
chemicals.
• Field is Nascent and still
under study.
22
Areas available for Testing Geopolymer
Concrete
DM Plant CW P/p House CT Area Construction Stores ZLD Area
Cost savings/100 sqm concreting of 0.15m
thickness
23
 Cement required 28 bags @ Rs 300/ bag (1:2:4) (tentative) = Rs 8, 400/-
 Sand & Aggregates Cost @ Rs 3/ kg (1:2:4) (tentative) = Rs 5, 120/-
 Total material savings for 100 sqm fly ash geopolymer concreting
with mill reject = Rs 13, 520/-
 Cost to be incurred for alkali activator per 15 m3 of fly ash
GP concrete = Rs 42/-
 Nominal cost of Mill reject @ Rs 650/ m3 = Rs 4, 062/-
 Gross material savings/ 100 sqm fly ash GP concreting = Rs 9, 416/-
• NaOH required for alkali activator can be further reduced by using effluent of
regeneration (2M) in DM plant.
NTPC Green Initiatives
24
 Our company has planned to replace 11000 MW Thermal Power
Plants older than 25 years with Energy Efficient Super Critical
Plants.
 Our company is running more than a dozen initiatives to get rid of
fly ash.
 Our company has planted 20 million trees till date in and around its
projects.
 Our company have committed to use treated sewage water at its
Dadri Power Station.
 Our Company has set ambitious targets for promotion of Green
Hydrogen as alternate fuel for Transport and Gas turbines.
Conclusion
25
 Our company has been at the forefront of Agro Residue and
Municipal Solid Waste Management, to give the capital and
NCR cleaner air.
 Our company has invited developers to set up 100 waste-to-
energy plants.
 Our company has gone for Paperless Office through “PRADIP”
Project.
 Going Green begins at home’ is the company’s mantra in
all aspects of its operations.
26
• The savings on account of use of Fly Ash GP may
not be huge.
• As a responsible corporate entity, NTPC can spread
environment protection message among its industry
peers.
• Inhouse utilization of fly ash will help NTPC to
achieve the GoI set target of 100% ash utilization
from TPP’s
• Moreover, this initiative will add one more feather in
already bright cap of NTPC towards environment
protection.
Conclusion
27
/ntpc1 /ntpclt
d1
/ntpclimite
d
/Company/nt
pc
/ntpclimited
Follow us
Thank You
Website: www.ntpc.co.in | Email: chandansharma@ntpc.co.in,
vikeshkumar@ntpc.co.in, shreyaroy@ntpc.co.in, dcsnaidu@ntpc.co.in
Migratory Birds at NTPC Dadri
NTPC Ramagundam
28
Click to edit Master title style
Copyright © 2016 Your Company All Rights Reserved. 28
29
Click to edit Master title style
Copyright © 2016 Your Company All Rights Reserved. 29
Laboratory Testing of GP Fly Ash Concrete
Blocks
30
Sample Block Compressive Strength at
25 oC in N/mm2
(IS 15658: 2006)
*Cement Mortar Blocks 7.5
*Concrete Blocks (M25) 18.3
**Fly Ash GP Mortar
Blocks
**Fly Ash - Sand GP
Blocks
**Mill Reject - Sand GP
Blocks
*Source – IS 2185: 2005 “Concrete Masonry Units”.
Laboratory Testing of GP Fly Ash Concrete
Blocks
31
Sample Block (after 28 days curing) Water Absorption at room temp %
(IS 15658: 2006)
*Cement Mortar Blocks 1.5
*Concrete Blocks 2.4
Fly Ash GP Mortar Blocks
Sand – Fly Ash GP Blocks
Mill Reject – Fly Ash GP Blocks
*Source – IS 2185: 2005 “Concrete Masonry Units”.

Mais conteúdo relacionado

Semelhante a Team_Alchemy_Korba_PC_2022.pptx

Rmc plant
Rmc plantRmc plant
Rmc plant
Kp Ahm
 

Semelhante a Team_Alchemy_Korba_PC_2022.pptx (20)

Geopolymer Concrete
Geopolymer Concrete Geopolymer Concrete
Geopolymer Concrete
 
Recovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn productionRecovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn production
 
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLYPRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
PRODUCTION & LOGISTICS FOR AN IN-MARKET FRAC SAND SUPPLY
 
Rehabilitation Of Reinforced Geopolymer Concrete Beam
Rehabilitation Of Reinforced Geopolymer Concrete BeamRehabilitation Of Reinforced Geopolymer Concrete Beam
Rehabilitation Of Reinforced Geopolymer Concrete Beam
 
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer ConcreteIRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
IRJET - Fly Ash Interlocking Brick by using Geopolymer Concrete
 
Total replacement of cement using flyash and silicafume
Total replacement of cement using flyash and silicafumeTotal replacement of cement using flyash and silicafume
Total replacement of cement using flyash and silicafume
 
Caltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavementsCaltrans view on recycling of in-place asphalt pavements
Caltrans view on recycling of in-place asphalt pavements
 
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
 
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
Durability Studies on Geopolymer Concrete using Ground Granulated Blast Furna...
 
presentation_for_SOLIDWASTE_IN_STEEL_INDUSTRY (1).pdf
presentation_for_SOLIDWASTE_IN_STEEL_INDUSTRY (1).pdfpresentation_for_SOLIDWASTE_IN_STEEL_INDUSTRY (1).pdf
presentation_for_SOLIDWASTE_IN_STEEL_INDUSTRY (1).pdf
 
Reshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/ClayReshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/Clay
 
The Integration of Power Generation, Cement Manufacture, Biomass Utilisation ...
The Integration of Power Generation, Cement Manufacture, Biomass Utilisation ...The Integration of Power Generation, Cement Manufacture, Biomass Utilisation ...
The Integration of Power Generation, Cement Manufacture, Biomass Utilisation ...
 
Construction of an ash pond with wrp,
Construction of an ash pond with wrp,Construction of an ash pond with wrp,
Construction of an ash pond with wrp,
 
Management of fly ash
Management of fly ashManagement of fly ash
Management of fly ash
 
Cesium formate brine
Cesium formate brine Cesium formate brine
Cesium formate brine
 
Calcinacion
CalcinacionCalcinacion
Calcinacion
 
Rmc plant
Rmc plantRmc plant
Rmc plant
 
Experimental Investigation on Geo-polymer Bricks
Experimental Investigation on Geo-polymer BricksExperimental Investigation on Geo-polymer Bricks
Experimental Investigation on Geo-polymer Bricks
 
Challenges for Concrete - Karen Scrivener
Challenges for Concrete - Karen ScrivenerChallenges for Concrete - Karen Scrivener
Challenges for Concrete - Karen Scrivener
 
Rethinking Cement
Rethinking CementRethinking Cement
Rethinking Cement
 

Último

the Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentationthe Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentation
brynpueblos04
 
February 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterFebruary 2024 Recommendations for newsletter
February 2024 Recommendations for newsletter
ssuserdfec6a
 
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
Cara Menggugurkan Kandungan 087776558899
 

Último (10)

SIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptxSIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
 
the Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentationthe Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentation
 
Dadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Dadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsDadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Dadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...
Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...
Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...
 
February 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterFebruary 2024 Recommendations for newsletter
February 2024 Recommendations for newsletter
 
2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga
 
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
 
March 2023 Recommendations for newsletter
March 2023 Recommendations for newsletterMarch 2023 Recommendations for newsletter
March 2023 Recommendations for newsletter
 
WOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxWOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptx
 
Pokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy TheoryPokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy Theory
 

Team_Alchemy_Korba_PC_2022.pptx

  • 1. Team Alchemy Welcomes Respected Dignitaries Korba STPS
  • 2. 2 Click to edit Master title style Copyright © 2016 Your Company All Rights Reserved. 2 “The value of an idea lies in the using of it” — Thomas Edison
  • 3. 3 3 Click to edit Master title style Copyright © 2016 Your Company All Rights Reserved. 3 Team Alchemy from Chemistry Topic: Manufacturing of Fly Ash Based Geo-Polymer Materials.
  • 4. Context 4 • Focus of NGT on Ash Utilization in Distt Korba. • Exploring Un-utilized Avenues. • Prospects for Team Alchemy. • Idea Generation. • Existing Methods of Ash Utilization at NTPC Korba. • Utilization of Idea. • Ash Dyke Issues.
  • 5. GoI’s Ash Notification-2015/16 Clause-2.11/ 2.12 & 5.0 2.11 – The Coal based TPP shall promote, adopt & setup Ash based manufacturing facilities within their premises or vicinity. 2.12 – The coal based TPP in the vicinity of the cities shall promote, support and assist in setting up of ash based product manufacturing units so as to meet the requirements of bricks and other building construction materials and also to reduce the transportation. 5.0 – 100% utilization of Fly Ash generated by 31.12.2017.
  • 6. NTPC’s Ash Policy-2015 Clause-11.0 “Efforts for New Area of Ash Utilization - Geopolymers” 11.1 Fly Ash based light weight sand. 11.2 Fly Ash based Geo-Polymer Concrete. *These activities shall be financed from Ash Fund. Material Requirement 1) Sodium Silicate – Na2SiO3 2) Sodium Hydroxide – NaOH 3) Fly Ash Activator
  • 7. Concept of Geopolymers Geo-polymerisation involves alkaline activation of materials rich in silica and alumina. Reaction conditions Temp/ Time Solid aluminosilicate raw material Alkali activator Geopolymer paste It give a three- dimensional silico-aluminate structure by polycondensation.
  • 8. Potential at NTPC Korba • Sodium Hydroxide – Pellets used in DM Plant for Resin Regeneration. Required only for preparation of alkali activator. • Sodium Silicate – Required as Binder in alkali activator solution. It is an inorganic sodium salt which has silicate as the counterion. To be arranged/ sourced. 2x NaOH + SiO2 → (Na2O)x·SiO2 + x H2O • Aggregate material – Sand/ Gravel or any other coarse material to be iterated as per availability. Raw Material Availability • Solid Aluminosilicate Raw Material – Available as Fly Ash in plenty. Iterations
  • 9. Iteration I – Silica Gel 9 NTPC’s Zero Deviation Document – • Disposal of Silica Waste - P.No. 36 of 55. • Material Type – Hazardous as per HWM Rules- 2016. • Authorization from PCB – Required for Disposal. • Disposal – Sale to Recycler or disposal at TSDF facility. • Documentation – Annual Return/ Storage permission from PCB. Present stock at NTPC Korba: • At Stores – 5 MT • At site – 1 MT • Validity of Authorization for NTPC Korba: Qty – 10 MT/ annum. Period – 21.11.2024. Silica Gel stored at NTPC Korba
  • 10. Preparation of Sodium Silicate solution 1. Removing water and impurities from Silica gel and Sodium Hydroxide. 2. Weighment as per stoichiometric requirement. 3. Addition and Preparation of Reactants. 4. Maintaining reaction conditions (100-120 deg C with stirring). 5. Filtration of reaction product. 6. Stocking of sodium silicate solution. 1 5 4 3 2 6
  • 11. Iteration II – Mill Reject as aggregate 11 • Available quantity – 75, 000 MT (approx). • Material Type – Waste with minimal resale value. • Authorization – Not required. • Disposal – Sale on online platform MSTC. • Utilization proposed – As aggregate for GP concrete mix after crushing. • Potential – 1, 35, 000 sqm area.
  • 12. Design Parameters 12 Mix Design parameters selected for Fly Ash Geopolymer Mortar Ratio of alkaline liquid to fly ash by mass 0.35 Concentration of NaOH solution (in molar) 8 Ratio of Na2SiO3 to NaOH (by mass) 2.5 Initial Curing Method Oven Initial Curing Temp (deg C) 60 Curing Time (in hrs) 24 Rest Period (in hrs) 168 Preparation of Fly Ash Geopolymer concrete Mortar blocks 9X9X9 cm. Preparation of blocks using Sand-Fly Ash Geopolymer concrete 15X15 X15 cm. Preparation of blocks using Mill Reject-Fly Ash Geopolymer concrete 15X15X15 cm. 9X9X9 cm Mould 15X15X15 cm Mould
  • 13. Detailed Mix Proportions 13 Details of mix proportions for Fly ash geopolymer concrete Mix-type proportion GP-Mortar Block Sand-Fly Ash GP Mill Reject-Fly Ash GP Fly Ash Only (kg/ m3) 1201 721 960 Sand (kg/ m3) - 480 - Mill Reject (kg/ m3) - - 241 Extra Water (kg/ m3) 10 10 10 NaOH (kg/ m3) 41 43 45 Na2SiO3 (kg/ m3) 103 108 113 Na2O/SiO2 0.1 0.12 0.15 SiO2/Al2O3 4.68 4.8 4.95 H2O/SiO2 14.70 14.40 14.10 Water to Solids by weight 0.2 0.2 0.2
  • 14. Preparation Process Raw Material - Fly Ash GP Mortar Raw Material – Sand Fly Ash GP Concrete Raw Material – Mill Reject Fly Ash GP Concrete Step-1 – Preparation of Precursors & Raw aggregates
  • 15. Preparation Process Raw Material – Sand Fly Ash GP Concrete Raw Material – Mill Reject Fly Ash GP Concrete Step-2 – Mixing of Raw aggregates
  • 16. Preparation Process Addition of Alkali Activator Making Dough Mix Step-3 – Preparation of Dough Mix Sand-Fly Ash Mill Reject-Fly Ash
  • 17. Preparation Process Mould Sand-Fly Ash Mould Mill Reject-Fly Ash Step-4 – Filing of Mould Mould Filing
  • 18. Preparation Process Blocks after temperature curing Step-5 – Temperature Curing and Resting Temperature Curing @ 24 Hrs at 60 deg C Mould after Temperature Curing
  • 19. Preparation Process Sand-Fly Ash Geopolymer Concrete Step-6 – Final Fly Ash Geopolymer Concrete Block after 4 days Fly Ash Mortar Geopolymers Mill Reject - Fly Ash Geopolymer Concrete
  • 20. Testing planned of GP Fly Ash Concrete Blocks 20 Tests Planned • Dimensions & Tolerances • Compressive Strength at 7, 21 & 28 days. • Abrasion Resistance. • Water Absorption Tests after 28 days. • X-ray Diffraction test for crystallinity. • SEM analysis to study morphology and distribution of particles. Other Iterations proposed – • Use of Bottom Ash as aggregate material for construction of test blocks.
  • 21. Advantages & Disadvantages 21 Advantages • Reduces Carbon footprint. • Utilize Fly Ash. • High Compressive & Tensile Strength. • Very low Creep and Shrinkage. • Resistant to Heat & Cold. • Chemical Resistant. Disadvantages • Slight Difficult to create. • Require handling of chemicals. • Field is Nascent and still under study.
  • 22. 22 Areas available for Testing Geopolymer Concrete DM Plant CW P/p House CT Area Construction Stores ZLD Area
  • 23. Cost savings/100 sqm concreting of 0.15m thickness 23  Cement required 28 bags @ Rs 300/ bag (1:2:4) (tentative) = Rs 8, 400/-  Sand & Aggregates Cost @ Rs 3/ kg (1:2:4) (tentative) = Rs 5, 120/-  Total material savings for 100 sqm fly ash geopolymer concreting with mill reject = Rs 13, 520/-  Cost to be incurred for alkali activator per 15 m3 of fly ash GP concrete = Rs 42/-  Nominal cost of Mill reject @ Rs 650/ m3 = Rs 4, 062/-  Gross material savings/ 100 sqm fly ash GP concreting = Rs 9, 416/- • NaOH required for alkali activator can be further reduced by using effluent of regeneration (2M) in DM plant.
  • 24. NTPC Green Initiatives 24  Our company has planned to replace 11000 MW Thermal Power Plants older than 25 years with Energy Efficient Super Critical Plants.  Our company is running more than a dozen initiatives to get rid of fly ash.  Our company has planted 20 million trees till date in and around its projects.  Our company have committed to use treated sewage water at its Dadri Power Station.  Our Company has set ambitious targets for promotion of Green Hydrogen as alternate fuel for Transport and Gas turbines.
  • 25. Conclusion 25  Our company has been at the forefront of Agro Residue and Municipal Solid Waste Management, to give the capital and NCR cleaner air.  Our company has invited developers to set up 100 waste-to- energy plants.  Our company has gone for Paperless Office through “PRADIP” Project.  Going Green begins at home’ is the company’s mantra in all aspects of its operations.
  • 26. 26 • The savings on account of use of Fly Ash GP may not be huge. • As a responsible corporate entity, NTPC can spread environment protection message among its industry peers. • Inhouse utilization of fly ash will help NTPC to achieve the GoI set target of 100% ash utilization from TPP’s • Moreover, this initiative will add one more feather in already bright cap of NTPC towards environment protection. Conclusion
  • 27. 27 /ntpc1 /ntpclt d1 /ntpclimite d /Company/nt pc /ntpclimited Follow us Thank You Website: www.ntpc.co.in | Email: chandansharma@ntpc.co.in, vikeshkumar@ntpc.co.in, shreyaroy@ntpc.co.in, dcsnaidu@ntpc.co.in Migratory Birds at NTPC Dadri NTPC Ramagundam
  • 28. 28 Click to edit Master title style Copyright © 2016 Your Company All Rights Reserved. 28
  • 29. 29 Click to edit Master title style Copyright © 2016 Your Company All Rights Reserved. 29
  • 30. Laboratory Testing of GP Fly Ash Concrete Blocks 30 Sample Block Compressive Strength at 25 oC in N/mm2 (IS 15658: 2006) *Cement Mortar Blocks 7.5 *Concrete Blocks (M25) 18.3 **Fly Ash GP Mortar Blocks **Fly Ash - Sand GP Blocks **Mill Reject - Sand GP Blocks *Source – IS 2185: 2005 “Concrete Masonry Units”.
  • 31. Laboratory Testing of GP Fly Ash Concrete Blocks 31 Sample Block (after 28 days curing) Water Absorption at room temp % (IS 15658: 2006) *Cement Mortar Blocks 1.5 *Concrete Blocks 2.4 Fly Ash GP Mortar Blocks Sand – Fly Ash GP Blocks Mill Reject – Fly Ash GP Blocks *Source – IS 2185: 2005 “Concrete Masonry Units”.

Notas do Editor

  1. 1 sq ft = 0.09 sqm 1 cum = 35.3 cuft Aggregate req = 1.35cuft per sqft i.e. 1350 cuft for 1000 sqft
  2. SEM- Scanning Electron microscopy
  3. 1 m3 = 2.4 MT
  4. Water absorption IS 15,658:2006. The block was completely immersed in water tank at room temperature for 24 hours. The block was removed and allowed to drain for 1 minute. The excess water on the surface of block was removed by damp cloth. The weight of block was noted immediately. Afterwards, the block was dried in a ventilated oven at 110ºC for 24 h. The dry weight of each block was recorded. The water absorption of block was calculated by taking the difference of weights of saturated block and dry block and dividing it by the weight of dry block.