SITE SPECIFIC ENVIRONMENT
MANAGEMENT PLAN
(SSEMP)
WHAT IS SSEMP?
The site-specific EMP shall refer to the policies, plans and
procedures for communicating Project specific environmental
protection matters within the Contractor's organization and to Sub-
Contractors entering the worksite.
OBJECTIVES OF SSEMP
• Identify the potential negative environmental impacts that can result from
the planned construction activities, and identify measures to control or
avoid these impacts within the Contractual constraints.
• Outline specific roles and responsibilities of Contractor staff related to
environmental management as defined in the Contract.
• List reporting, training, auditing, and other procedures required to ensure
appropriate site environmental management as defined in the Contract.
PROJECT PHASES
There are two phases of the project
1. PRE-CONSTRUCTION PHASE / DESIGNING PHASE
 Plaining
 Survey
 Identification of Hazards
 Mitigation Measures
2. CONSTRUCTION PHASE
 Implementation
 Monitoring
 Maintenance
WHAR IS HAZARD?
A hazard is something that can cause harm.
 TYPES OF HAZARDS
1. Physical Hazards
2. Chemical Hazards
3. Biological Hazards
4. Psychological Hazards
5. Ergonomic Hazards
PHYSICAL HAZARD
 Vibration
 Electricity
 Slip Trip
 Work at height
MITIGATION MEASURES
• Reduce the vibration at source
• Limit the duration of exposure
• Protecting the receiver
• Create a safe place
• Eliminate the hazard
• Use Safety harness
CHEMICAL HAZARD
Mitigation Measures
 Isolate the process
 Use proper PPES (Masks ,
Gloves, Goggles )
Biological Hazard
 Coronavirus
Harmful plants
Harmful Animals
Dust Particles
MITIGATION MEASURES
 Use Proper PPES (Masks , Gloves, Safety shoes).
 Worker Must be vaccinated
Psychological Hazards
 Work related stress
 Harassment
 Alcohol and Drug use
Mitigation Measures
 Preventing and managing stress in the workplace before it becomes a risk to health
and safety.
 Having senior management commitment to reducing workplace stress
 Workers should not drugs addicted.
Ergonomic Hazards
 Vibration
 Temperature
 Work Environment
 Welfare
Mitigation Measures
 Provide easy access of drinking water.
 Provide good work place ventilation.
 Provide frequent break and job rotation.
EMERGENCY RESPONSE
PLAN
Emergency Situations
Following emergencies may occur at workplaces:
• Fire
• Fuel spillage
• Gas leaks
• Injury from machinery and equipment.
• Fall, climbing accident.
• Emergency as a result of environmental conditions (e.g., heat, cold, wet, snow,
wind, lightning, bushfires, floods) emergencies.
• Hazardous substances and chemical spills
EMERGENCY RESPONSE
PLAN
• Keep heavy equipment away from trench edges.
• Keep surcharge loads at least 2 feet from trench edges.
• Know where underground utilities are located.
• Test for low oxygen, hazardous fumes and toxic gases.
• Inspect trenches at the start of each shift.
• Inspect trenches following a rainstorm.
• Equipment will be removed from the affected area.
• The nearest hospital should be informed for possible causalities
EMERGENCY RESPONSE
PLAN
 Plan for management of excavated soil/asphalt/concrete.
 Plan for traffic control.
 Excavation permits.
 First Aid kit should be present at site .
TRAFIC MANAGEMENT
PLAN
The purpose of the traffic management plan is to provide a framework describing M/s TMT
JV MAC will manage the traffic aspects of the Water Distribution Network and construction
of allied works. This traffic management plan will provide the processes to ensure that the
project maintains the appropriate control to manage the traffic in and around the project
during the construction phase of the project.
TRAFIC MANAGEMENT
PLAN
• Safety of roads while movement of construction vehicle.
• Ensure there is safe interface between construction traffic and local traffic.
• Eliminate the risk of injury to local traffic users and construction personnel.
• Minimize traffic delays and traffic issues.
• The traffic shall observe the speed limit, defensive driving shall be encouraged
and implemented
Presentation on SSEMP

Mais conteúdo relacionado

Mais procurados

on site storage techniques
on site storage techniqueson site storage techniques
on site storage techniques
srija juluru
 
Waste Managment EOH) Dr. Ebadullah ppt
Waste Managment  EOH) Dr. Ebadullah pptWaste Managment  EOH) Dr. Ebadullah ppt
Waste Managment EOH) Dr. Ebadullah ppt
Ebadullah Hedayat
 

Mais procurados (20)

Solid waste part-i
Solid waste part-iSolid waste part-i
Solid waste part-i
 
Solid Waste Generation and Handling
Solid Waste Generation and HandlingSolid Waste Generation and Handling
Solid Waste Generation and Handling
 
Design of effluent treatment plant
Design of effluent treatment plantDesign of effluent treatment plant
Design of effluent treatment plant
 
Introduction to municipal solid waste
Introduction to municipal solid wasteIntroduction to municipal solid waste
Introduction to municipal solid waste
 
L 30 fertilizer industry
L 30 fertilizer industryL 30 fertilizer industry
L 30 fertilizer industry
 
Treatment and disposal of Hazardous wastes
Treatment and disposal of Hazardous wastesTreatment and disposal of Hazardous wastes
Treatment and disposal of Hazardous wastes
 
Environmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of GovernanceEnvironmental clearance procedure in India: Principal of Governance
Environmental clearance procedure in India: Principal of Governance
 
Modules of Environmental Management System
Modules of Environmental Management SystemModules of Environmental Management System
Modules of Environmental Management System
 
Material Recovery Facility- MSW
Material Recovery Facility- MSWMaterial Recovery Facility- MSW
Material Recovery Facility- MSW
 
Remediation of solide waste landfill
Remediation of solide waste landfillRemediation of solide waste landfill
Remediation of solide waste landfill
 
Wastes prevention; classification, handling and control measures
Wastes prevention; classification, handling and control measuresWastes prevention; classification, handling and control measures
Wastes prevention; classification, handling and control measures
 
Integrated solid waste management
Integrated solid waste managementIntegrated solid waste management
Integrated solid waste management
 
ISO 140001
ISO 140001ISO 140001
ISO 140001
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
 
Solid Waste Management
Solid Waste ManagementSolid Waste Management
Solid Waste Management
 
on site storage techniques
on site storage techniqueson site storage techniques
on site storage techniques
 
Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)Solid Waste Management (Unit-V)
Solid Waste Management (Unit-V)
 
Source reduction of wastes - Municipal Solid Wastes
Source reduction of wastes - Municipal Solid WastesSource reduction of wastes - Municipal Solid Wastes
Source reduction of wastes - Municipal Solid Wastes
 
Waste Managment EOH) Dr. Ebadullah ppt
Waste Managment  EOH) Dr. Ebadullah pptWaste Managment  EOH) Dr. Ebadullah ppt
Waste Managment EOH) Dr. Ebadullah ppt
 
GREY WATER RECYCLING SYSTEM
GREY WATER RECYCLING SYSTEMGREY WATER RECYCLING SYSTEM
GREY WATER RECYCLING SYSTEM
 

Semelhante a Presentation on SSEMP

CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
FARSANA26
 
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptxFFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
IlyasKhan84634
 
ANNEX0~1.DOC
ANNEX0~1.DOCANNEX0~1.DOC
ANNEX0~1.DOC
AhmedIsmailmaghbashi
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 

Semelhante a Presentation on SSEMP (20)

CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
 
AIR BASED HAZARDS Ehtesham.docx
AIR BASED HAZARDS Ehtesham.docxAIR BASED HAZARDS Ehtesham.docx
AIR BASED HAZARDS Ehtesham.docx
 
Iee
IeeIee
Iee
 
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptxFFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
 
Environmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxEnvironmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptx
 
sci.pptx
sci.pptxsci.pptx
sci.pptx
 
Assessment and operational control of on site environmental impacts- moemen a...
Assessment and operational control of on site environmental impacts- moemen a...Assessment and operational control of on site environmental impacts- moemen a...
Assessment and operational control of on site environmental impacts- moemen a...
 
ANNEX0~1.DOC
ANNEX0~1.DOCANNEX0~1.DOC
ANNEX0~1.DOC
 
Opito bosiet safety induction
Opito bosiet safety inductionOpito bosiet safety induction
Opito bosiet safety induction
 
Topic 8
Topic 8Topic 8
Topic 8
 
Introduction to ERA by arup das
Introduction to ERA by arup dasIntroduction to ERA by arup das
Introduction to ERA by arup das
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Confined space – hazards –risk –control measures
Confined space – hazards –risk –control measuresConfined space – hazards –risk –control measures
Confined space – hazards –risk –control measures
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
AIR BASED HAZARDS
AIR BASED HAZARDSAIR BASED HAZARDS
AIR BASED HAZARDS
 
HAZARD_IDENTIFICATION_ibadan[1].pptx
HAZARD_IDENTIFICATION_ibadan[1].pptxHAZARD_IDENTIFICATION_ibadan[1].pptx
HAZARD_IDENTIFICATION_ibadan[1].pptx
 
17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials
 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredging
 
Aniket seminar ppt.pdf
Aniket seminar ppt.pdfAniket seminar ppt.pdf
Aniket seminar ppt.pdf
 

Último

Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Open Access Research Paper
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
BrixsonLajara
 

Último (20)

Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
Call Girls in Veraval - 8250092165 Our call girls are sure to provide you wit...
 
Deforestation
DeforestationDeforestation
Deforestation
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfdddddddddddddddddddddddddddddddddddd
 
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework  (SURRF)(1).pdfSustainable Recovery and Reconstruction Framework  (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptx2,6-Dichlorophenol - Material Safety Data Sheet.pptx
2,6-Dichlorophenol - Material Safety Data Sheet.pptx
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 

Presentation on SSEMP

  • 2. WHAT IS SSEMP? The site-specific EMP shall refer to the policies, plans and procedures for communicating Project specific environmental protection matters within the Contractor's organization and to Sub- Contractors entering the worksite.
  • 3. OBJECTIVES OF SSEMP • Identify the potential negative environmental impacts that can result from the planned construction activities, and identify measures to control or avoid these impacts within the Contractual constraints. • Outline specific roles and responsibilities of Contractor staff related to environmental management as defined in the Contract. • List reporting, training, auditing, and other procedures required to ensure appropriate site environmental management as defined in the Contract.
  • 4. PROJECT PHASES There are two phases of the project 1. PRE-CONSTRUCTION PHASE / DESIGNING PHASE  Plaining  Survey  Identification of Hazards  Mitigation Measures
  • 5. 2. CONSTRUCTION PHASE  Implementation  Monitoring  Maintenance
  • 6. WHAR IS HAZARD? A hazard is something that can cause harm.  TYPES OF HAZARDS 1. Physical Hazards 2. Chemical Hazards 3. Biological Hazards 4. Psychological Hazards 5. Ergonomic Hazards
  • 7. PHYSICAL HAZARD  Vibration  Electricity  Slip Trip  Work at height MITIGATION MEASURES • Reduce the vibration at source • Limit the duration of exposure • Protecting the receiver • Create a safe place • Eliminate the hazard • Use Safety harness
  • 8. CHEMICAL HAZARD Mitigation Measures  Isolate the process  Use proper PPES (Masks , Gloves, Goggles )
  • 9. Biological Hazard  Coronavirus Harmful plants Harmful Animals Dust Particles MITIGATION MEASURES  Use Proper PPES (Masks , Gloves, Safety shoes).  Worker Must be vaccinated
  • 10. Psychological Hazards  Work related stress  Harassment  Alcohol and Drug use Mitigation Measures  Preventing and managing stress in the workplace before it becomes a risk to health and safety.  Having senior management commitment to reducing workplace stress  Workers should not drugs addicted.
  • 11. Ergonomic Hazards  Vibration  Temperature  Work Environment  Welfare Mitigation Measures  Provide easy access of drinking water.  Provide good work place ventilation.  Provide frequent break and job rotation.
  • 12. EMERGENCY RESPONSE PLAN Emergency Situations Following emergencies may occur at workplaces: • Fire • Fuel spillage • Gas leaks • Injury from machinery and equipment. • Fall, climbing accident. • Emergency as a result of environmental conditions (e.g., heat, cold, wet, snow, wind, lightning, bushfires, floods) emergencies. • Hazardous substances and chemical spills
  • 13. EMERGENCY RESPONSE PLAN • Keep heavy equipment away from trench edges. • Keep surcharge loads at least 2 feet from trench edges. • Know where underground utilities are located. • Test for low oxygen, hazardous fumes and toxic gases. • Inspect trenches at the start of each shift. • Inspect trenches following a rainstorm. • Equipment will be removed from the affected area. • The nearest hospital should be informed for possible causalities
  • 14. EMERGENCY RESPONSE PLAN  Plan for management of excavated soil/asphalt/concrete.  Plan for traffic control.  Excavation permits.  First Aid kit should be present at site .
  • 15. TRAFIC MANAGEMENT PLAN The purpose of the traffic management plan is to provide a framework describing M/s TMT JV MAC will manage the traffic aspects of the Water Distribution Network and construction of allied works. This traffic management plan will provide the processes to ensure that the project maintains the appropriate control to manage the traffic in and around the project during the construction phase of the project.
  • 16. TRAFIC MANAGEMENT PLAN • Safety of roads while movement of construction vehicle. • Ensure there is safe interface between construction traffic and local traffic. • Eliminate the risk of injury to local traffic users and construction personnel. • Minimize traffic delays and traffic issues. • The traffic shall observe the speed limit, defensive driving shall be encouraged and implemented