2. 5 stage model picture: inside the Forge
20/11/2011 E-tivities Knowledge Gilly Salmon 2
3. Students’
engagement
with each other
Sparks to start
the dialogue
careful clear E-moderator
instructions role
20/11/2011 E-tivities Knowledge Gilly Salmon 3
4. 5 stage model
for productive
learning forums:
the role of the
5. Development Guide
e-moderator
4. Collaboration Facilitate
3. Co-operation Lead
2. Culture Building Host
1. Access & Motivation Welcome
E-tivities Knowledge Gilly
20/11/2011 4
Salmon
6. How can we How can we
customise personalise
learning learning
(staff) (students)?
While enabling
efficiency &
effectiveness of the
processes?
20/11/2011 E-tivities Knowledge Gilly Salmon 6
7. Clear pacing &
Familiar symbols PURPOSE
sequencing
Single Task Spark Where to
Per message/forum (to start the dialogue) respond
Response to
others
E-tivities Knowledge Gilly
20/11/2011 7
Salmon
14. E-tivity 1.1: The Relative Priority of the Knowledge Areas
As you have seen from our coverage of the standards to date, the PMBOK does
not put a priority on the different project management knowledge areas (i.e.
Introduction
cost, time, scope, risk, etc.).
Despite this, understanding the relative priority within a specific organisational
context is likely to enhance project performance.
The purpose of this e-tivity is to identify the top 3 knowledge areas driving
Purpose project management within your organisation and identify what is driving this
relative priority.
To be done by September 7th.
Identify the top 3 knowledge areas driving project management within your
Task organisation and share your refections on what you think is driving this relative
priority (e.g. it might be organisational or industry imperatives).
Post your contribution to the 2nd column of the Wiki.
To be done 1-2 days after the above date. Choose a contribution posted by a
peer that you find interesting and respond to it in the 3rd column.
Respond
To go back to the module contents, please click on the MN6901 crumbs on the
Moodle toolbar.
E-tivities Knowledge Gilly
20/11/2011 14
Salmon
15. E-tivity 1.1 generated huge traffic on the wiki, of which about 1/20th is shown here
E-tivities Knowledge Gilly
20/11/2011 15
Salmon
16. http://bit.ly/nSPkkK
E-tivity 1.2: Critical Review of the BOKs
We have reviewed the two most prevalent project management
Bodies of Knowledge (BOKs) at a high level at this point in the
module.
Introduction As you will have seen from your review of the articles presented for
this e-tivity, whilst the BOKs have played a key role in developing the
discipline of project management, critics of the prescriptive approach
often advocated by the professional bodies suggest 'best practice'
and linear models have no place in today's complex environment.
The purpose of this e-tivity is to explore both the value and the
Purpose
limitations of the Bodies of Knowledge in the project domain.
To be done by September 10th.
Task Reflecting on the BOKs, post an argument either in favour of or
against their value to the discussion forum.
To be done no more than 2 days after the above date. Choose a
Respond contribution posted by a peer that considers a different value or
limitation, and respond to it.
E-tivities Knowledge Gilly
20/11/2011 16
Salmon
18. E-tivity 3.2: Matching Competences to Context
Purpose The purpose of this e-tivity is to reflect on and share what you see as an
appropriate competency profile for a given scenario in light of your recent
reading. The scenario and detailed instructions are included in
the resources section below.
Task To be done by September 23rd.
In your role as recruitment agent, you are requested to complete a 1 page
powerpoint presentation with voiceover of what is in your view, the
ideal candidate for the job. You should upload this to the discussion forum.
Respond To be done 1-2 days after the above date.
For the response, please put yourself into the role of the HR Director. Select
what you consider to be the best candidate from all of those proposed by your
peers, and respond to that peer, explaining the rationale for this decision.
Resources Scenario
Adding voiceover to powerpoint.
If you wish to upload the audio and the powerpoint slide separately, please
refer back to the Induction Programme under Section 7, Creating
PodCasts which will instruct you on what software is needed for this.
E-tivities Knowledge Gilly
20/11/2011 18
Salmon
19. E-tivity 4.2 "Capability Maturity - The Silver Bullet"
Introduction There is a central assumption underlying concepts of project and organisational maturity that a
single trajectory towards the utopia of level 5 is something all organisations should aspire to,
and that this is the silver bullet that will enhance organisational performance.
Purpose The purpose of this e-tivity is for you each to reflect on what might be an appropriate maturity
level for your organisation.
Task To be done by October 2nd.
In light of your recent reading, consider what you deem to be an appropriate level of maturity
for your organisation and post this to the Wiki. Include in your posting a brief rationale as to why
you have chosen this level.
Respond To be done 2 days after the above date. Comment on a posting that either has indicated an
appropriate level significantly lower or higher than yours and respond to it, or the same level but
based on an entirely different rationale.
E-tivities Knowledge Gilly
20/11/2011 19
Salmon
20. Another hugely successful wiki-tivity. The wiki goes on for several pages!
E-tivities Knowledge Gilly
20/11/2011 20
Salmon
21. http://bit.ly/nSPkkK
E-tivity 1.2: Critical Review of the BOKs
We have reviewed the two most prevalent project management
Bodies of Knowledge (BOKs) at a high level at this point in the
module.
Introduction As you will have seen from your review of the articles presented for
this e-tivity, whilst the BOKs have played a key role in developing the
discipline of project management, critics of the prescriptive approach
often advocated by the professional bodies suggest 'best practice'
and linear models have no place in today's complex environment.
The purpose of this e-tivity is to explore both the value and the
Purpose
limitations of the Bodies of Knowledge in the project domain.
To be done by September 10th.
Task Reflecting on the BOKs, post an argument either in favour of or
against their value to the discussion forum.
To be done no more than 2 days after the above date. Choose a
Respond contribution posted by a peer that considers a different value or
limitation, and respond to it.
E-tivities Knowledge Gilly
20/11/2011 21
Salmon
23. E-tivity 3.2: Matching Competences to Context
Purpose The purpose of this e-tivity is to reflect on and share what you see as an
appropriate competency profile for a given scenario in light of your recent
reading. The scenario and detailed instructions are included in
the resources section below.
Task To be done by September 23rd.
In your role as recruitment agent, you are requested to complete a 1 page
powerpoint presentation with voiceover of what is in your view, the
ideal candidate for the job. You should upload this to the discussion forum.
Respond To be done 1-2 days after the above date.
For the response, please put yourself into the role of the HR Director. Select
what you consider to be the best candidate from all of those proposed by your
peers, and respond to that peer, explaining the rationale for this decision.
Resources Scenario
Adding voiceover to powerpoint.
If you wish to upload the audio and the powerpoint slide separately, please
refer back to the Induction Programme under Section 7, Creating
PodCasts which will instruct you on what software is needed for this.
E-tivities Knowledge Gilly
20/11/2011 23
Salmon
24. E-tivity 4.2 "Capability Maturity - The Silver Bullet"
Introduction There is a central assumption underlying concepts of project and organisational maturity that a
single trajectory towards the utopia of level 5 is something all organisations should aspire to,
and that this is the silver bullet that will enhance organisational performance.
Purpose The purpose of this e-tivity is for you each to reflect on what might be an appropriate maturity
level for your organisation.
Task To be done by October 2nd.
In light of your recent reading, consider what you deem to be an appropriate level of maturity
for your organisation and post this to the Wiki. Include in your posting a brief rationale as to why
you have chosen this level.
Respond To be done 2 days after the above date. Comment on a posting that either has indicated an
appropriate level significantly lower or higher than yours and respond to it, or the same level but
based on an entirely different rationale.
E-tivities Knowledge Gilly
20/11/2011 24
Salmon
25. Another hugely successful wiki-tivity. The wiki goes on for several pages!
E-tivities Knowledge Gilly
20/11/2011 25
Salmon
27. OER Commons is a place to find and share open educational resources
List of free and open textbooks
Directory of Open Access Journals over 6,000 journals with more than 3,000 searchable at
the article level
www.youtube.com
www.flickr.com
20/11/2011 E-tivities Knowledge Gilly Salmon 27
29. “Be the change you want to see in the world”
Mahatma Ghandi
“Never doubt the power of a small
group of people to change the world.
Nothing else ever has.”
Margaret Mead
“Every society honors its live conformists and its dead
troublemakers." Mignon McLaughlin
No budgets or humans were harmed in the making of this presentation
20/11/2011 E-tivities Knowledge Gilly Salmon 29
30. Art work by Rod Angood
.
All images from Flickr.com,
Creative Commons Licensing.
20/11/2011 E-tivities Knowledge Gilly Salmon
30