2. ANDHERI (E)- DAHISAR (E)CORRIDOR OF
MUMBAI METRO
A project by Mumbai Metropoliton Region
Development Authority(MMRDA).
Features:
Gauge : 1435 mm
Route length :16.475 km
No. Of Stationas : 16
3. DETAILS OF STATIONS OF ANDHERI (E) TO DAHISAR (E)
MUMBAI METRO
S.NO STATION NAME INTER DISTANCE UNDERGROUND OR ELEVATED
Dead End
1 Andheri(E) 1567.63 Elevated
2 Shankerwadi 1584.87 Elevated
3 JVLR Junction 1065.95 Elevated
4 Mahanand 1675.65 Elevated
5 Aarey 1381.72 Elevated
6 Pathanwadi 792.18 Elevated
7 Pushpa Park 1344.20 Elevated
8 Bandongri 667.80 Elevated
9 Mahindra And Mahindra 1677.30 Elevated
10 Magathane 792.30 Elevated
11 Devipada 1193.40 Elevated
12 National Park 971.00 Elevated
13 Overipada 810.80 Elevated
14 Dahisari(E) 500.8 Elevated
Depot
5. PUBLIC HEARING
A public consultation meeting focusing on the
environmental and social aspects of the Mumbai
Metro line 7: Andheri (E) to Dahisar (E) project was
organised on May 12, 2016
A notice regarding the schedule of the meeting was
advertised in prominent daily newspapers in three
languages i.e. English, Hindi and Marathi on the
27th April 2016
6. PUBLIC CONSULTATION DETAILS
S.No Metro Representatives Designation
1 Sh. P. R. K. Murthy Director (Projects) Metro
2 Sh. P. K. Sharma Director, DMRC
3 Sh. V. G. Patil Chief, SDC
4 Smt. K. Vijayalakshmi Chief, T&C
5 Sh. Dilip Kawathkar Dy. Metropolitian Commissioner(Admin)
6 Smt. Indurkar Tahsildar
DATE Time Place
12/05/2016 3:00 p.m. to 5:00 p.m. The Auditorium, New MMRDA building, G-Block,
Bandra Kurla Complex, Bandra (E), Mumbai -
400051
7.
8.
9.
10.
11. S.N
O
POINTS ASKED BY PUBLIC RESPONSE BY OFFICER
1. Shri Ulhas Chaudhari from Paryawarniya Grahak
Chalwal raised concerns regarding environmental effects
and carbon emissions during the project execution
caused by congestion, debris below the elevated
structures viz a viz reduction after the project is
implemented, . He also raised the question regarding the
feasibility and need of the metro project viz a viz
strengthening the existing western railway and public
bus transport system run by the BEST in the city. He
also raised concern on the water requirements and
planning for its provision for the project. Drawing
references of the previous infrastructure projects
commissioned by various government bodies in the city,
he pointed concerns on the quality, site management
during and after the project implementation phases.
He also submitted a detailed letter regarding his
concerns.
The need for these metro projects was
established based on comprehensive
transport study and as a part of
assessment and feasibility of these
projects. An extensive EIA study was
being carried out to assess the baseline
conditions and projected impacts
which would take into account the
impacts and suggest mitigation
measures. Such measures will be
implemented.
2. Shri Sunil Sampatrao Shinde from the Aanyay Nivaran
Samajik Santha raised concerns about awarding the
contract to J.Kumar against whom FIR was launched by
the Municipal Corporation of Greater Mumbai in case of
some other work
It was indicated that legal opinion was
sought before awarding the contract to
the said contractor.
12.
13.
14.
15. PUBLIC CONCERNS
Environmental effects and carbon emissions
Feasibility and need of the metro project viz a viz
strengthening the existing western railway and
public bus transport system run by the BEST
Water requirements and planning for it provision for
the project
Concerns on the quality, site management during
and after the project implementation phases
16. CRITICAL REVIEW
Adequate time was not given for public hearing, EIA report was not given
to common people so that they can go through the details of the project.
Base Line Noise level varied from 68 dBA to 87 dBA at different
locations. During Operation of the Metro Rail the noise level emitted by
the machines and the tracks will exceed the permissible limits of 55 dBA
(day) and 45 dBA (night).
Dust Pollution Levels PM10 (210-320 μg/m3) & PM2.5 (80-105μg/m3)
are not within limits as per the National Quality Standards of 100 & 40
respectively. During the Construction dust emission is likely to be high. It
is a health hazard to the workers and the exposed public
17. CRITICAL REVIEW
Total carbon credits can be earned by the Metro Line-7 project are
171.66 (based on the reduced amount)
Pollution reduction
CO : 5451.879 Kg
CO2 : 170973.967Kg
NOx : 695.498 Kg
VOC : 663.202 Kg
Particulates : 13.882 Kg
SO2 : 21.254 Kg