CHAPTER 6
SITE SELECTION AND PLANT LAYOUT
In this chapter factors for plant location selection and site selection also ideal location is
suggested. [15]
6.1 Factors affecting the selection of the plant location:
Proper layout includes arrangement of processing areas, and handling areas in efficient co-
ordination and with regard to such factors as:
Ø New site development or addition to previously developed
Ø site Type and quantity of the product to be produced
Ø Type of process and product control
Ø Operational convenience and accessibility
Ø Economic distribution of utilities and services like water, process steam, and power
Ø Type of building and building code requirements
Ø Health and safety considerations including possible hazards of fire, explosion and
fumes
Ø Waste disposal problems
Ø Auxiliary equipment
Ø Space available and space require
Ø Roads and rail roads
Ø Possible future expansion
Ø Sensible use of floor and elevation space
Cost of construction can be minimized by adopting a layout that gives shortest run of
connecting pipes between equipments and least amount of structural steel work, but this is not
necessarily the best option for operation and maintenance. Following care is taken:
Ø The base of column must be elevated and provided with necessary net positive suction
head to a pump.
Ø Two escape routes for operators are provided from each level in process buildings.
Ø Equipments should be located so that it can be conveniently tied with any future
expansion of process. Space must be left on pipe alloys for future needs and services.
Considering all factors, ideal plant layout for our plant is as under:
47
Ø Process units and ancillary buildings are laid out to give most economical and personnel
around the site.
Ø Hazardous processes are at a safe distance from other building.
Ø Consideration for future expansion is economically justified.
Ø Minimum time is spent by personnel in travelling between buildings.
Ø Administrative offices and laboratories are at a considerable distance from places where
hazardous processes take place.
Ø Auxiliary buildings are placed on different site.
Ø Each equipment is at a distance of 2x2 m from each other.
Ø Control room is located adjacent to processing units, but potentially hazardous processes
are sited at a safer distance.
Ø Access roads are provided to each part of plant for construction operation and
maintenance.
Ø Storage tanks with hazardous materials are at least 10 m from site boundary.
Ø Utility buildings are sited with respect to most economical run of pipe to and from process
unit.
6.2 Selection of plant site:
Selection of plant site plays a very important role in the success of a chemical plant. If plant
is not located in the most economically favorable position, the competitive advantage of
process, so carefully engineered during research and development phases can be wiped out.
The following are the reasons of this plant site:
Ø Raw material sources:
The major raw material for the plant is ethanol. The location of an industry contributes
more towards the choice of a plant site than any other factor. Not only should this but
the supply of basic raw materials be controlled directly by the user.
The physical distance is not the only controlling factor in the source of raw materials,
for purchase price and buying expenses base point pricing, stock and reliability are
also determinates.
Ø Market location:
The location should be chosen if possible which has several competing rails, roads and
water ways as in order that the competition will help to maintain low rates and give
48
better services. The relation of railway to market is as close that no pains should be
spared in making a careful investigation of freight rates before deciding upon a plant
location.
Ø Labor resources:
Before locating an industry in any particular locality, a careful study of the supply of
the available labors must be made. Factors to be considered in labor studies are supply,
kind, diversity, intelligence, wage scale, regulations, efficiency and cost.
Labors sometimes stay at a great distance from the site and hence what may have
appeared cheap location develops into a very expensive one because of the inefficiency
of labor and high turnover. Industrial housing, safety-first movement, welfare
institution, better sanitation, launch room etc. have all contributed to the solution of
labor problems. Skilled as well as unskilled persons are easily available.
Ø Land costs:
The price of land also plays quite important in the location. By selecting the plant in
the backward or subsidized area the price is reduced considerably. Moreover selecting
the area in backward area also helps in getting subsidies like sales tax etc. This helps
a lot in the price of finished goods and saves the money that can be used for work
capitals.
Ø Utilities (power, water, etc.):
Power for chemical industry is primarily obtained from the coal, water and oil. These
fuels supply the most flexible and economical source in as much as they provide for
the generation of the steam both processing and electricity production.
Water for industrial purpose can be obtained from one or two general sources: plant’s
own source or municipal supply. Here a large demand of water is needed, so
company’s own water source is required which is satisfied by GIDC wells.
Ø Effluent disposal:
Disposal of waste water and waste product is frequently a problem for the chemical
plant and therefore must be given serious consideration in choosing the site. Accurate
information on the quality and quantity of industrial waste is necessary to design waste
collection system.
49
Ø Climate:
Excessive hot or cold climate necessitates construction of protective shelters and effect
the economic operation of the plant. Hence this factor should be examined when
picking a plant site.
Ø Taxation &legal restriction:
State and local tax rates on property, income, unemployment, insurance and similar
items vary from one location to another. Similarly, local regulation on zoning, building
codes, nuisance aspects and transportation facilities can have a major influence on the
final choice of a plant site. In fact, zoning difficulties can often be much more
important in terms of cost and time delays than many of the factors discussed in the
proceeding section.
Ø Site characteristics:
The characteristics of the land at proposed plant site should be examined carefully.
The topography of the trace of land and the soil structure must be considered, since
they may have a pronounced effect on construction costs. The cost of the land is
important. The new plant should be considered for construction at a location where
additional space for expansion is available.
Ø Community factors:
Cultural and recreational facilities like mosques, temples, libraries, schools, civic
theatres, concert associations etc. can have an effect on the location.
6.3 Plant layout:
The economic construction and efficient operation of a process depend on how well the plant
and equipment specified on the process flow sheet is laid out. The principal factors to be
considered are:
1. Economic consideration: construction and operating costs.
2. The process requirement.
3. Convenience of operation.
4. Convenience of maintenance
5. Safety.
6. Future expansion
7. Modular construction
50
Fig.6.1: plant layout [15]
51
Costs:
The cost of construction can be minimized by adopting a layout that gives the shortest run of
connecting pipe between equipment, and the least amount of structural steel works.
Operation:
Equipment that needs to have frequent operator attention should be located convenient to the
control room. Valves, sample points and instruments should be located at convenient positions
and heights. Sufficient working space and headroom must be provided to allow easy access
to equipments.
Safety:
Blast walls may be needed to isolate potentially hazardous equipment, and confine the effects
of an explosion. At least two escape routes for operators must be provided from each level in
process buildings.
Plant expansion:
Equipment should be located so that it can be conveniently tied in with future expansion of
the process.
Modular construction:
In recent years there has been a move to assemble sections of plant at the plant manufacturer’s
site. These modules will include the equipment, structural steel, piping and instrumentation.
The modules are then transported to the plant site, by road or sea.
General consideration:
Open, structural steelwork, building is normally used for process equipment; closed buildings
are only used for process operations that require protection from the weather.
6.4 Ideal Location: Nearby DAHEJ, Bharuch
Based on the above mention conditions, the Diethyl ether (DEE) manufacturing plant can be
located nearby Dahej, Bharuch.
52
Ø There is an easy transportation of raw material because of easy availability of Railway
and Road.
Ø This location is very near to sea so cheap availability of water and shipment in
international market is also major advantage.
Ø It is industrially developed area so we can also get land by comfortable price.
Ø At this location, unskilled labors are easily available.

Mais conteúdo relacionado

Mais procurados

Pinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchangerPinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchangerK Vivek Varkey
 
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...Student
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economicsSunita Jobli
 
Introduction to Chemical Engineering
Introduction to Chemical EngineeringIntroduction to Chemical Engineering
Introduction to Chemical EngineeringSAFFI Ud Din Ahmad
 
ChE184b Final Design
ChE184b Final DesignChE184b Final Design
ChE184b Final DesignRussell Wong
 
Diethyl Ether (DEE) Process Description
Diethyl Ether (DEE) Process Description Diethyl Ether (DEE) Process Description
Diethyl Ether (DEE) Process Description Pratik Patel
 
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Chemical Engineering Guy
 
Lecture-III Basics of Pinch Analysis.pdf
Lecture-III Basics of Pinch Analysis.pdfLecture-III Basics of Pinch Analysis.pdf
Lecture-III Basics of Pinch Analysis.pdfHaileGetachew2
 
Module 3 - Basic Equipment
Module 3 - Basic EquipmentModule 3 - Basic Equipment
Module 3 - Basic Equipmentriezqaandika
 
final thesis
final thesisfinal thesis
final thesisAli Raza
 
Naphtha Cracking Unit : Ethylene Production
Naphtha Cracking Unit : Ethylene ProductionNaphtha Cracking Unit : Ethylene Production
Naphtha Cracking Unit : Ethylene ProductionMayank Mehta
 
13 l1-l2-reactor design
13 l1-l2-reactor design13 l1-l2-reactor design
13 l1-l2-reactor designDinesh Shah
 
pressure drop calculation in sieve plate distillation column
pressure drop calculation in sieve plate distillation columnpressure drop calculation in sieve plate distillation column
pressure drop calculation in sieve plate distillation columnAli Shaan Ghumman
 
Chemical Process Industry - Overview
Chemical Process Industry - OverviewChemical Process Industry - Overview
Chemical Process Industry - OverviewPankaj Khandelwal
 
Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...
Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...
Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...Engr Muhammad Zeeshan
 

Mais procurados (20)

Pinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchangerPinch analysis technique to optimize heat exchanger
Pinch analysis technique to optimize heat exchanger
 
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
Standard Test for Smoke Point for Kerosene and Aviation Turbine fuel, ASTM 13...
 
01 kern's method.
01 kern's method.01 kern's method.
01 kern's method.
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economics
 
Introduction to Chemical Engineering
Introduction to Chemical EngineeringIntroduction to Chemical Engineering
Introduction to Chemical Engineering
 
ChE184b Final Design
ChE184b Final DesignChE184b Final Design
ChE184b Final Design
 
Diethyl Ether (DEE) Process Description
Diethyl Ether (DEE) Process Description Diethyl Ether (DEE) Process Description
Diethyl Ether (DEE) Process Description
 
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
Aspen HYSYS - Petroleum Assays and Oil Characterization (Slideshare)
 
Flixborough disaster
Flixborough disasterFlixborough disaster
Flixborough disaster
 
Production of styrene
Production of styreneProduction of styrene
Production of styrene
 
Lecture-III Basics of Pinch Analysis.pdf
Lecture-III Basics of Pinch Analysis.pdfLecture-III Basics of Pinch Analysis.pdf
Lecture-III Basics of Pinch Analysis.pdf
 
Module 3 - Basic Equipment
Module 3 - Basic EquipmentModule 3 - Basic Equipment
Module 3 - Basic Equipment
 
final thesis
final thesisfinal thesis
final thesis
 
Naphtha Cracking Unit : Ethylene Production
Naphtha Cracking Unit : Ethylene ProductionNaphtha Cracking Unit : Ethylene Production
Naphtha Cracking Unit : Ethylene Production
 
Koch Modular Extraction Technology Group
Koch Modular Extraction Technology GroupKoch Modular Extraction Technology Group
Koch Modular Extraction Technology Group
 
13 l1-l2-reactor design
13 l1-l2-reactor design13 l1-l2-reactor design
13 l1-l2-reactor design
 
Material balance
Material balanceMaterial balance
Material balance
 
pressure drop calculation in sieve plate distillation column
pressure drop calculation in sieve plate distillation columnpressure drop calculation in sieve plate distillation column
pressure drop calculation in sieve plate distillation column
 
Chemical Process Industry - Overview
Chemical Process Industry - OverviewChemical Process Industry - Overview
Chemical Process Industry - Overview
 
Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...
Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...
Production of 66000 ton/year of Formaldehyde from Methanol using Silver catal...
 

Destaque

Diethyl Ether (DEE): Equipments Design
Diethyl Ether (DEE): Equipments DesignDiethyl Ether (DEE): Equipments Design
Diethyl Ether (DEE): Equipments DesignPratik Patel
 
Diethyl Ether (DEE): Energy Balance
Diethyl Ether (DEE): Energy BalanceDiethyl Ether (DEE): Energy Balance
Diethyl Ether (DEE): Energy BalancePratik Patel
 
Diethyl Ether (DEE): Introduction
Diethyl Ether (DEE): IntroductionDiethyl Ether (DEE): Introduction
Diethyl Ether (DEE): IntroductionPratik Patel
 
Diethyl Ether (DEE): Literature Review
Diethyl Ether (DEE): Literature ReviewDiethyl Ether (DEE): Literature Review
Diethyl Ether (DEE): Literature ReviewPratik Patel
 
Diethyl Ether (DEE): Material balance
Diethyl Ether (DEE): Material balanceDiethyl Ether (DEE): Material balance
Diethyl Ether (DEE): Material balancePratik Patel
 
Diethyl Ether (DEE): The Conclusion
Diethyl Ether (DEE): The ConclusionDiethyl Ether (DEE): The Conclusion
Diethyl Ether (DEE): The ConclusionPratik Patel
 
Industrial production of diethyl ether
Industrial production of diethyl etherIndustrial production of diethyl ether
Industrial production of diethyl etherrita martin
 
Diethyl Ether (DEE): Cost estimation of Plant
Diethyl Ether (DEE): Cost estimation of PlantDiethyl Ether (DEE): Cost estimation of Plant
Diethyl Ether (DEE): Cost estimation of PlantPratik Patel
 
Diethyl Ether (DEE): Safety and Health Consideration
Diethyl Ether (DEE): Safety and Health ConsiderationDiethyl Ether (DEE): Safety and Health Consideration
Diethyl Ether (DEE): Safety and Health ConsiderationPratik Patel
 
Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layoutRobin Gulati
 
Diesel Production: Material Balance
Diesel Production: Material BalanceDiesel Production: Material Balance
Diesel Production: Material BalancePratik Patel
 
Diesel Production: Process Flow Diagram
Diesel Production: Process Flow DiagramDiesel Production: Process Flow Diagram
Diesel Production: Process Flow DiagramPratik Patel
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments DesignPratik Patel
 
Diesel Production: Site Location
Diesel Production: Site LocationDiesel Production: Site Location
Diesel Production: Site LocationPratik Patel
 
Diesel Production: Energy Balance
Diesel Production: Energy BalanceDiesel Production: Energy Balance
Diesel Production: Energy BalancePratik Patel
 
Introduction to Diesel fuel
Introduction to Diesel fuelIntroduction to Diesel fuel
Introduction to Diesel fuelPratik Patel
 
Diesel Production: Cost Estimation
Diesel Production: Cost EstimationDiesel Production: Cost Estimation
Diesel Production: Cost EstimationPratik Patel
 
Diesel Production: Plant Layout
Diesel Production: Plant LayoutDiesel Production: Plant Layout
Diesel Production: Plant LayoutPratik Patel
 
Diesel fuel Literature Review
Diesel fuel Literature ReviewDiesel fuel Literature Review
Diesel fuel Literature ReviewPratik Patel
 

Destaque (20)

Diethyl Ether (DEE): Equipments Design
Diethyl Ether (DEE): Equipments DesignDiethyl Ether (DEE): Equipments Design
Diethyl Ether (DEE): Equipments Design
 
Diethyl Ether (DEE): Energy Balance
Diethyl Ether (DEE): Energy BalanceDiethyl Ether (DEE): Energy Balance
Diethyl Ether (DEE): Energy Balance
 
Diethyl Ether (DEE): Introduction
Diethyl Ether (DEE): IntroductionDiethyl Ether (DEE): Introduction
Diethyl Ether (DEE): Introduction
 
Diethyl Ether (DEE): Literature Review
Diethyl Ether (DEE): Literature ReviewDiethyl Ether (DEE): Literature Review
Diethyl Ether (DEE): Literature Review
 
Diethyl Ether (DEE): Material balance
Diethyl Ether (DEE): Material balanceDiethyl Ether (DEE): Material balance
Diethyl Ether (DEE): Material balance
 
Diethyl Ether (DEE): The Conclusion
Diethyl Ether (DEE): The ConclusionDiethyl Ether (DEE): The Conclusion
Diethyl Ether (DEE): The Conclusion
 
Industrial production of diethyl ether
Industrial production of diethyl etherIndustrial production of diethyl ether
Industrial production of diethyl ether
 
Diethyl Ether (DEE): Cost estimation of Plant
Diethyl Ether (DEE): Cost estimation of PlantDiethyl Ether (DEE): Cost estimation of Plant
Diethyl Ether (DEE): Cost estimation of Plant
 
Diethyl Ether (DEE): Safety and Health Consideration
Diethyl Ether (DEE): Safety and Health ConsiderationDiethyl Ether (DEE): Safety and Health Consideration
Diethyl Ether (DEE): Safety and Health Consideration
 
Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layout
 
Dimethyl ether (dme)
Dimethyl ether (dme)Dimethyl ether (dme)
Dimethyl ether (dme)
 
Diesel Production: Material Balance
Diesel Production: Material BalanceDiesel Production: Material Balance
Diesel Production: Material Balance
 
Diesel Production: Process Flow Diagram
Diesel Production: Process Flow DiagramDiesel Production: Process Flow Diagram
Diesel Production: Process Flow Diagram
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments Design
 
Diesel Production: Site Location
Diesel Production: Site LocationDiesel Production: Site Location
Diesel Production: Site Location
 
Diesel Production: Energy Balance
Diesel Production: Energy BalanceDiesel Production: Energy Balance
Diesel Production: Energy Balance
 
Introduction to Diesel fuel
Introduction to Diesel fuelIntroduction to Diesel fuel
Introduction to Diesel fuel
 
Diesel Production: Cost Estimation
Diesel Production: Cost EstimationDiesel Production: Cost Estimation
Diesel Production: Cost Estimation
 
Diesel Production: Plant Layout
Diesel Production: Plant LayoutDiesel Production: Plant Layout
Diesel Production: Plant Layout
 
Diesel fuel Literature Review
Diesel fuel Literature ReviewDiesel fuel Literature Review
Diesel fuel Literature Review
 

Semelhante a Diethyl Ether (DEE): Site Selection and Plant Layout

3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant considerationayimsevenfold
 
Food engg design & economics - Chap 2.ppt
Food engg design & economics - Chap 2.pptFood engg design & economics - Chap 2.ppt
Food engg design & economics - Chap 2.pptMadan Karki
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planningpragna1510
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planningpragna1510
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304kriti201
 
Job Layout
Job LayoutJob Layout
Job LayoutBahzad5
 
Plant location and Layout
Plant location and LayoutPlant location and Layout
Plant location and Layoutanuragbhai
 
Pharma factory location
Pharma factory locationPharma factory location
Pharma factory locationtwilight89
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4ahsanrabbani
 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxBekithemba2
 
Technical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsTechnical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsMeghaSingh506383
 
presentation slide
 presentation slide presentation slide
presentation slideSmit Javiya
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdfahsansaeed78
 

Semelhante a Diethyl Ether (DEE): Site Selection and Plant Layout (20)

Chapter 2 Plant Location
Chapter 2 Plant LocationChapter 2 Plant Location
Chapter 2 Plant Location
 
3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration3 4 chemplantdesign-general plant consideration
3 4 chemplantdesign-general plant consideration
 
Food engg design & economics - Chap 2.ppt
Food engg design & economics - Chap 2.pptFood engg design & economics - Chap 2.ppt
Food engg design & economics - Chap 2.ppt
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planning
 
Plant location and lay out planning
Plant location and lay out planningPlant location and lay out planning
Plant location and lay out planning
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304
 
Job Layout
Job LayoutJob Layout
Job Layout
 
Plant location and Layout
Plant location and LayoutPlant location and Layout
Plant location and Layout
 
Pharma factory location
Pharma factory locationPharma factory location
Pharma factory location
 
Site layout cpm module4
Site layout cpm module4Site layout cpm module4
Site layout cpm module4
 
Unit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdfUnit 6 A Construction Equipments for civil engineering.pdf
Unit 6 A Construction Equipments for civil engineering.pdf
 
Construction Equipment used in construction projects
Construction Equipment used in construction projectsConstruction Equipment used in construction projects
Construction Equipment used in construction projects
 
Plant location and layout in any industry
Plant location and layout in any industryPlant location and layout in any industry
Plant location and layout in any industry
 
Ops class4
Ops class4Ops class4
Ops class4
 
Site selection and plant layout
Site selection and plant layoutSite selection and plant layout
Site selection and plant layout
 
Lecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptxLecture_1_J_Tanyanyiwa.pptx
Lecture_1_J_Tanyanyiwa.pptx
 
Technical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjsTechnical analysis in project.khudshfkwjjjjjjjjjjs
Technical analysis in project.khudshfkwjjjjjjjjjjs
 
presentation slide
 presentation slide presentation slide
presentation slide
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf
 
unit-2.pdf
unit-2.pdfunit-2.pdf
unit-2.pdf
 

Último

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 

Último (20)

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Diethyl Ether (DEE): Site Selection and Plant Layout

  • 1. 46 CHAPTER 6 SITE SELECTION AND PLANT LAYOUT In this chapter factors for plant location selection and site selection also ideal location is suggested. [15] 6.1 Factors affecting the selection of the plant location: Proper layout includes arrangement of processing areas, and handling areas in efficient co- ordination and with regard to such factors as: Ø New site development or addition to previously developed Ø site Type and quantity of the product to be produced Ø Type of process and product control Ø Operational convenience and accessibility Ø Economic distribution of utilities and services like water, process steam, and power Ø Type of building and building code requirements Ø Health and safety considerations including possible hazards of fire, explosion and fumes Ø Waste disposal problems Ø Auxiliary equipment Ø Space available and space require Ø Roads and rail roads Ø Possible future expansion Ø Sensible use of floor and elevation space Cost of construction can be minimized by adopting a layout that gives shortest run of connecting pipes between equipments and least amount of structural steel work, but this is not necessarily the best option for operation and maintenance. Following care is taken: Ø The base of column must be elevated and provided with necessary net positive suction head to a pump. Ø Two escape routes for operators are provided from each level in process buildings. Ø Equipments should be located so that it can be conveniently tied with any future expansion of process. Space must be left on pipe alloys for future needs and services. Considering all factors, ideal plant layout for our plant is as under:
  • 2. 47 Ø Process units and ancillary buildings are laid out to give most economical and personnel around the site. Ø Hazardous processes are at a safe distance from other building. Ø Consideration for future expansion is economically justified. Ø Minimum time is spent by personnel in travelling between buildings. Ø Administrative offices and laboratories are at a considerable distance from places where hazardous processes take place. Ø Auxiliary buildings are placed on different site. Ø Each equipment is at a distance of 2x2 m from each other. Ø Control room is located adjacent to processing units, but potentially hazardous processes are sited at a safer distance. Ø Access roads are provided to each part of plant for construction operation and maintenance. Ø Storage tanks with hazardous materials are at least 10 m from site boundary. Ø Utility buildings are sited with respect to most economical run of pipe to and from process unit. 6.2 Selection of plant site: Selection of plant site plays a very important role in the success of a chemical plant. If plant is not located in the most economically favorable position, the competitive advantage of process, so carefully engineered during research and development phases can be wiped out. The following are the reasons of this plant site: Ø Raw material sources: The major raw material for the plant is ethanol. The location of an industry contributes more towards the choice of a plant site than any other factor. Not only should this but the supply of basic raw materials be controlled directly by the user. The physical distance is not the only controlling factor in the source of raw materials, for purchase price and buying expenses base point pricing, stock and reliability are also determinates. Ø Market location: The location should be chosen if possible which has several competing rails, roads and water ways as in order that the competition will help to maintain low rates and give
  • 3. 48 better services. The relation of railway to market is as close that no pains should be spared in making a careful investigation of freight rates before deciding upon a plant location. Ø Labor resources: Before locating an industry in any particular locality, a careful study of the supply of the available labors must be made. Factors to be considered in labor studies are supply, kind, diversity, intelligence, wage scale, regulations, efficiency and cost. Labors sometimes stay at a great distance from the site and hence what may have appeared cheap location develops into a very expensive one because of the inefficiency of labor and high turnover. Industrial housing, safety-first movement, welfare institution, better sanitation, launch room etc. have all contributed to the solution of labor problems. Skilled as well as unskilled persons are easily available. Ø Land costs: The price of land also plays quite important in the location. By selecting the plant in the backward or subsidized area the price is reduced considerably. Moreover selecting the area in backward area also helps in getting subsidies like sales tax etc. This helps a lot in the price of finished goods and saves the money that can be used for work capitals. Ø Utilities (power, water, etc.): Power for chemical industry is primarily obtained from the coal, water and oil. These fuels supply the most flexible and economical source in as much as they provide for the generation of the steam both processing and electricity production. Water for industrial purpose can be obtained from one or two general sources: plant’s own source or municipal supply. Here a large demand of water is needed, so company’s own water source is required which is satisfied by GIDC wells. Ø Effluent disposal: Disposal of waste water and waste product is frequently a problem for the chemical plant and therefore must be given serious consideration in choosing the site. Accurate information on the quality and quantity of industrial waste is necessary to design waste collection system.
  • 4. 49 Ø Climate: Excessive hot or cold climate necessitates construction of protective shelters and effect the economic operation of the plant. Hence this factor should be examined when picking a plant site. Ø Taxation &legal restriction: State and local tax rates on property, income, unemployment, insurance and similar items vary from one location to another. Similarly, local regulation on zoning, building codes, nuisance aspects and transportation facilities can have a major influence on the final choice of a plant site. In fact, zoning difficulties can often be much more important in terms of cost and time delays than many of the factors discussed in the proceeding section. Ø Site characteristics: The characteristics of the land at proposed plant site should be examined carefully. The topography of the trace of land and the soil structure must be considered, since they may have a pronounced effect on construction costs. The cost of the land is important. The new plant should be considered for construction at a location where additional space for expansion is available. Ø Community factors: Cultural and recreational facilities like mosques, temples, libraries, schools, civic theatres, concert associations etc. can have an effect on the location. 6.3 Plant layout: The economic construction and efficient operation of a process depend on how well the plant and equipment specified on the process flow sheet is laid out. The principal factors to be considered are: 1. Economic consideration: construction and operating costs. 2. The process requirement. 3. Convenience of operation. 4. Convenience of maintenance 5. Safety. 6. Future expansion 7. Modular construction
  • 6. 51 Costs: The cost of construction can be minimized by adopting a layout that gives the shortest run of connecting pipe between equipment, and the least amount of structural steel works. Operation: Equipment that needs to have frequent operator attention should be located convenient to the control room. Valves, sample points and instruments should be located at convenient positions and heights. Sufficient working space and headroom must be provided to allow easy access to equipments. Safety: Blast walls may be needed to isolate potentially hazardous equipment, and confine the effects of an explosion. At least two escape routes for operators must be provided from each level in process buildings. Plant expansion: Equipment should be located so that it can be conveniently tied in with future expansion of the process. Modular construction: In recent years there has been a move to assemble sections of plant at the plant manufacturer’s site. These modules will include the equipment, structural steel, piping and instrumentation. The modules are then transported to the plant site, by road or sea. General consideration: Open, structural steelwork, building is normally used for process equipment; closed buildings are only used for process operations that require protection from the weather. 6.4 Ideal Location: Nearby DAHEJ, Bharuch Based on the above mention conditions, the Diethyl ether (DEE) manufacturing plant can be located nearby Dahej, Bharuch.
  • 7. 52 Ø There is an easy transportation of raw material because of easy availability of Railway and Road. Ø This location is very near to sea so cheap availability of water and shipment in international market is also major advantage. Ø It is industrially developed area so we can also get land by comfortable price. Ø At this location, unskilled labors are easily available.