1. Rig #: BENNEVIS PIC Signature Approving JSA:
Work Activity (Job): MA 038 PAINTING ON DERRICK SET
Work Team (Crew Members):
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
- Inform Drlr
- Clean area prior to painting
- NETTOYER LA SURFACE AVANT
DE PEINDRE
- INFORMER LE DRILLER
- Dirt enter eyes
- Wire from wire brush enters fingers / eye
- SALETE DANS LES YEUX
- DENT DE LA BROSE METALLIQUE DANS LES
DOIGTS / L’OEIL
- Wear all the correct PPE
- Wear gloves and goggles
- Wear dust mask
- METTRE LES PPES ADEQUATS
- PORTER DES GANTS ET DES LUNETTES
PROTECTRICE
- PORTER UN MASQUE ANTI-POUSSIERE
- Paint at height
- Paint areas that have been
cleaned
- FAIRE DE LA PEINTURE EN
HAUTEUR
- PEINDRE LES ZONES QUI ETE
NETTOYEES
- Falling
- Paint on hands
- Hoses burst
- CHUTE
- PEINTURE SUR LES MAINS
- RUPTURE DE FLEXIBLE
- If ladder used, ensure it is secured
- Wear safety harness
- Wear gloves
- Wear dust mask
- Do not work in the mud hose vicinity
- SI ON UTILISE UNE ECHELLE, LA SECURISEE
- PORTAIS LES HARNAIS DE SECURITE
- PORTER DES GANTS
- PORTER UN MASQUE ANT-POUSSIERE
- NE PAS TRAVAILLER PRES DE FLEXIBLE DE
BOUE
- Clean up area after painting
- FAIRE LE NETTOYAGE APRES
AVOIR FINI
- Tripping hazards
- Rags lying around
- RISQUE DE TREBUCHEMENT
- CHIFFONS TRAINANT
- Remove all old paint cans
- Ensure good housekeeping
- ENLEVER TOUS LES ANCIENS POTS DE
PEINTURE
- ASSURER UN BON NETTOYAGE
Safety Equipment To Do This Job
Hard Hats ( Cotton Gloves ( Face Shield ( Fire Extinguishers (
Safety Boots ( Work Vest ( Goggles ( Lockout/Tagout (
Uncontrolled When Printed Page 1
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
2. Safety Glasses ( Safety Harness ( Barricades ( Work Permit Required (
Uncontrolled When Printed Page 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2