SlideShare uma empresa Scribd logo
1 de 8
Page 1 of 8
MARIPITCHAI. V
+966 502137921 / +966 582886771 / maripitchai@yahoo.co.in; maripitchai2011@hotmail.com
OBJECVTIVE
Seeking a challenging position in MECHANICAL ENGINEERING, HVAC, FIRE FIGHTING
PIPING, PLUMBING, CHILLED WATER PLANT, NATURAL GAS PIPING, and AIR
CONDITION & REFRIGERATION SERVICES where my technical, management and
leadership skills can be effectively used.
SUMMARY
14+ years of service in HVAC, Fire fighting piping, Plumbing, Chilled water plant piping,
Natural gas piping, Air-conditioning & refrigeration and all electrical equipments
Solid working experience in high-performance building projects
In depth knowledge of mechanical systems
Excellent verbal and written communication skills
Ability to communicate effectively
Ability to work well both independently and in a team
Ability to analyze the requirements and offer appropriate solutions
Rich experience in handling clients and large projects.
Excellent communication skills
Exposure to computers
JOB HISTORY
April 2010 to Till Date ………. SENIOR HEAD MEP PROJECT ENGINEER
Work Location: Al – Khobar, Kingdom of Saudi Arabia.
Equipments Handled: Central Plant, AHU, FCU, Packaged A/C, Ductable A/C and Split
A/C, Plumbing, Gas Pipe Line, Oxygen pipe line, organ pipe line, oily water
pipe line, portable water pipe line, fire water pipe line, natural gas pipe line,
industrial water drainage, chilled water pipe line, civil construction work and
electrical work and mechanical work etc..
Roles and Responsibilities
 Assist project management by proactively managing the project budget by controlling
expenses administering owner and subcontractor billings identifying work not covered
by subcontractor scope of work/budget and ensuring the success of office support
functions related to the overall cost scheduled completion
 Establish procedures for controlling contract drawings
Page 2 of 8
 Initiate set-up of the job management system
 Assist with the scopes of work bid package development and help solicit
subcontractors suppliers
 Initiate the building permit process
 Assist in the development of the site utilization plan
 Assist project manager / superintendent in the review coordination of the loss
 Develop submittal log participate in subcontractor project orientation meetings
communicate and coordinate submittals and coordination drawings with
subcontractors the superintendent
 Actively participates in subcontractor project orientation
 Responsible for proactive administration of reviewing and processing all submittal
data and shop drawings to make sure project schedules are expedited materials are
delivered on time
 Conduct preconstruction meetings with
 Serve as the onsite quality manager for assigned trades by verifying subcontractor
deliveries meet approved submittal requirements
 Attend and participates in meetings with architect/engineer and owner
representatives provides information assists the project manager in the preparation of
progress reports/meeting minutes
 Distribute proposal change documents to subcontractors/suppliers assists in
collecting pricing and/or prepares change proposal requests for internal pricing review
 Ensure all clarifications changes directives and rfis are updated on the - as-built -
drawings and are fully coordinated with company supervision all
subcontractor/suppliers
 Responsible for submitting owner required close-out documents and assisting
subcontractors /suppliers in scheduling owner required training documentation
 Build effective relationships with customers design team subcontractors suppliers and
user groups that reflect and support company core values meets or exceeds the
customer expectations
 Actively participates in industry client community relations to enhance company
image
 Promote company creed, communicates company vision and purpose through
service talent choices
 Serve as a role model promotes professional behavior
 Participate in personal career development through on-the-job training attends
operations classroom training programs assists in the development of interns / co-ops
 Planning and material organization
 Daily site visit.
 Contractor arrangement in site.
 Co – ordinate with customer
Page 3 of 8
 Daily work report submitted with manager.
 Alteration work to be submitted proper drawings
 Monthly time sheet checking
 Vendor Management
 Payment Co-ordination
 Customer Satisfaction management
 Project report preparation
 Daily site schedule and match with project schedule and co ordinate with customer.
Jan 2009 to March 2010 ……. Senior Engineer
M/S CADMAX TECHNOLOGIES (VOLTAS Consultant – Malabar Area), Kerala
Work Location: Malabar Area.
Equipments Handled: Central Plant, AHU, FCU, Packaged A/C, Ductable A/C and Split A/C
Roles and Responsibilities
 Provided plumbing and electrical work specifications for all projects.
 Ensured project completion in timely manner.
 Prepared and revised project cost estimates as needed.
 Performed project schematic design evaluation to ensure compliance with MEP work.
 Processed design change requests in coordination with A & E consultants.
 Monitored staff performance and hired supplementary personnel as needed.
 Supervised construction progress to ensure accordance with company quality
standards.
 Maintained strong channels of communication with managers, consultants and
clients.
 Ensured smooth progress of project plumbing and electrical processes.
 Maintained and updated location fire safety facilities as required.
 Drafted equipment reports for residential and commercial building applications.
 Evaluated and revised drafted drawing dimensions as needed.
 Designed industrial project mechanical work in cost-effective manner.
 Estimated heat load per organizational norms and standards.
 Planning and material organization
 Vendor Management
 Payment Co-ordination
 Customer Satisfaction management
 Project report preparation
Dec 2006 to Dec 2008……. Maintenance Engineer
M/S SAJ FLIGHT SERVICES PVT LTD, Chennai
Work Location: South India (Current in Kerala)
Page 4 of 8
Equipments Handling: Air Conditioners, Central Plants, Package A/C, Window A/C, Split
A/C, Transformer, Generator, Water Treatment Plant, Dishwashing Machine,
Cold Room, Deep Freezer, Blast Chiller, etc,
Roles and Responsibilities
 Managing of the mechanical manpower for the area & assigning specific
responsibilities according to their experiences and skills.
 Maintain & Repair Mechanical equipment (Rotary equipment such as Pumps,
Gearboxes and Valves). (Maintenance)
 Design and develop engineering components
 Give day to day technical support for breakdown diagnostics & repair, including risk
and failure analysis.
 Improve & update the maintenance (preventive & predictive) program regularly.
Identify, update & continuously improve equipment reliability
 Identify, select & update the required spare part list.
 Controlling work performance & monitoring work quality and taking corrective action
to solve any problem rapidly
 Daily / Weekly / Monthly maintenance check list
 Generator working schedule and maintenance
 Water purification Hygienic report
 Purchase of maintenance materials
 Daily temperature for cold room A/C
 Monthly maintenance cost analysis
Oct 2004 to Dec 2006……. Project & Service Engineer
M/S EAKCON SYSTEM PVT LTD, Chennai
Work Location: Head Office & Branches
Equipments Handled: Air Conditioners, Central Plants, Cold Room, Deep freezer, Clean
Room, Hot Room, Milk Cooler, Blast Chiller, Ice Cream Cooler, etc,
Roles and Responsibilities
 Monitored projects and ensured its proper execution.
 Prepared the submittals required for the materials and ensured that they were in
compliance with the specifications.
 Inspected the material and escalated all issues to the consultants.
 Organized the working of the project, procured the major items such as pumps and
exhaust fans.
Page 5 of 8
 Evaluated the job performed and provided the necessary follow up for payments.
 Developed drawings for the job close out and prepared the O&M manuals.
 Scheduled the project and performed monthly audits and ensured that the project
timeline was maintained.
 Provided technical support to the Sales and Engineering team.
 Developed the engineering equipment submittal and prepared contract drawings.
 Evaluated the engineering drawings and coordinated to install the required
equipments.
 Assisted the customer and reviewed the work, gathered the customer’s requirement
and obtained a deadline for the project.
 High Monitored the project and tracked the delivery of the materials to the site,
ensured that the shipping schedule meet the project schedule.
 Documented project progress and submitted all financial projects to management.
 Day to day complaints management
 AMC Proposal / collection / renewal
 Cold room service
 Vendor management
 Project / Material Organization to sites
 Customer satisfaction management
Sep 2003 to Oct 2004……. Project Engineer
M/S ETA ENGINEERING LTD, Chennai
Work Location: Chennai
Equipments Handled: Central Plant, AHU, FCU, Packaged A/C, Ductable A/C and Split
A/C
Roles and Responsibilities
 Responsible for handling the entire process of project turnover starting from project
initiation to the delivery stage
 Perform the tasks of evaluating the scope of supply and commercial bid of the project
 Responsible for conducting preventive maintenance and prepare lay out of control
circuits
Page 6 of 8
 Handle the tasks of providing service engineer required for repairing maintaining
plumbing systems after the commissioning stage
 Perform responsibilities of providing support to project managers to ensure
successful completion of the project
 Assigned the tasks of generating I/O summary as well as perform product
development.
 Responsible for ensuring that the technical parameters and compliance process are
supplied as outlined in the contract documents
 Handled the tasks of identifying opportunities to decrease the consumption of energy
at facilities
 Performed responsibilities of providing support to the senior engineer in planning the
design phase of the project
 Responsible for providing recommendations to clients regarding systems that need
replacement
 Handled the tasks of assisting senior engineers in planning and installing materials
 Planning and material organization
 Vendor Management
 Payment Co-ordination
 Customer Satisfaction management
 Project report preparation
Aug 2002 to Aug 2003……. Service Engineer
M/S BLUES STAR LTD, Chennai
Work Location: Chennai
Equipments Handled: Air Conditioners, Cold Room, Deep Freezer, Central Plants, etc.
Roles and Responsibilities
 Attending break down calls and service report preparation
 Scheduling PM services
 AMC management and renewals
 Site Visits and Vendor management
 Payment Co-ordination
 Customer Satisfaction management
Jun 2001 to Jul 2002……. Technician
Page 7 of 8
M/S AEROMATIC SYSTEM, Chennai
Work Location: Chennai
Equipments Handled: Air Conditioners, Cold Room, Deep Freezer, etc.
Roles and Responsibilities
 Servicing of Air-conditioners
 Servicing of Cold rooms
 Servicing of Deep freezers
ACADEMIC HISTORY
SSLC
Diploma in Mechanical Engineering
AUTO CAD 2010
ADDITIONAL QUALIFICATIONS
Microsoft Office and Internet
Auto CAD (2D and isometric drawing)
Driving License – LMV (International driving License)
PERSONAL DETAILS
Father’s Name : R. Vilvanathan
Date of Birth : 07th January 1983
Religion : Hindu
Marital Status : Married
Settled at : Morayur, Malappuram
Languages Known : Tamil, English and Malayalam, Hindi, Arabic.
Page 8 of 8
Residential Address : House Name: K P house,
Address: NEAR VHMHS SCHOOL, MORAYUR,
District and Pin Code: MALAPURAM Dist, pin: 673649.
Saudi Mobile No: 966 502137921
Yours truly,
Maripitchai V

Mais conteúdo relacionado

Mais procurados

LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6Rajshekharan M
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY AROKIAM
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updatedMohammed Hashim
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EEwaseem odeh
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009guest3e8191
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedulesaieq
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussainZahir Hussain
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123abdul suboor
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi Shankar
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 

Mais procurados (20)

LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Facility maintenance In-charge CV updated
Facility maintenance In-charge  CV updatedFacility maintenance In-charge  CV updated
Facility maintenance In-charge CV updated
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
 
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
Resume of zahir hussain
Resume of zahir hussainResume of zahir hussain
Resume of zahir hussain
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Naveen HVAC
Naveen HVACNaveen HVAC
Naveen HVAC
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
CV
CVCV
CV
 
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
 
PROJECT ENGINEER
PROJECT ENGINEERPROJECT ENGINEER
PROJECT ENGINEER
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123
 
Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015Ravi cv on 5 th april 2015
Ravi cv on 5 th april 2015
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
RESUME - Rajesh
RESUME - RajeshRESUME - Rajesh
RESUME - Rajesh
 

Destaque

China and the South China Sea ACC
China and the South China Sea ACCChina and the South China Sea ACC
China and the South China Sea ACCEugenia Witherow
 
75 лет начала блокады Ленинграда
75 лет начала блокады Ленинграда75 лет начала блокады Ленинграда
75 лет начала блокады Ленинградаkatya bokunova
 
History of-silverlight-versions-and-its-features-CRB-Tech
History of-silverlight-versions-and-its-features-CRB-TechHistory of-silverlight-versions-and-its-features-CRB-Tech
History of-silverlight-versions-and-its-features-CRB-TechPooja Gaikwad
 
Consumer Demographic and lifestyle
Consumer Demographic and lifestyleConsumer Demographic and lifestyle
Consumer Demographic and lifestyleHarshal Verma
 
PRESENTATION_FIE2016
PRESENTATION_FIE2016PRESENTATION_FIE2016
PRESENTATION_FIE2016WAJID HUSSAIN
 
قال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسية
قال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسيةقال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسية
قال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسيةAlexandria University, Egypt
 
Shahid Lecture-2- MKAG1273
Shahid Lecture-2- MKAG1273Shahid Lecture-2- MKAG1273
Shahid Lecture-2- MKAG1273nchakori
 
RFC 2196 Site Security Handbook
RFC 2196 Site Security HandbookRFC 2196 Site Security Handbook
RFC 2196 Site Security HandbookDavid Sweigert
 
لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..
لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..
لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..Alexandria University, Egypt
 

Destaque (13)

The game
The gameThe game
The game
 
China and the South China Sea ACC
China and the South China Sea ACCChina and the South China Sea ACC
China and the South China Sea ACC
 
Diapositivasss dva
Diapositivasss dvaDiapositivasss dva
Diapositivasss dva
 
75 лет начала блокады Ленинграда
75 лет начала блокады Ленинграда75 лет начала блокады Ленинграда
75 лет начала блокады Ленинграда
 
History of-silverlight-versions-and-its-features-CRB-Tech
History of-silverlight-versions-and-its-features-CRB-TechHistory of-silverlight-versions-and-its-features-CRB-Tech
History of-silverlight-versions-and-its-features-CRB-Tech
 
Chair
ChairChair
Chair
 
Consumer Demographic and lifestyle
Consumer Demographic and lifestyleConsumer Demographic and lifestyle
Consumer Demographic and lifestyle
 
PRESENTATION_FIE2016
PRESENTATION_FIE2016PRESENTATION_FIE2016
PRESENTATION_FIE2016
 
قال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسية
قال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسيةقال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسية
قال البابا تواضروس الثاني، بابا الإسكندرية وبطريرك الكرازة المرقسية
 
Shahid Lecture-2- MKAG1273
Shahid Lecture-2- MKAG1273Shahid Lecture-2- MKAG1273
Shahid Lecture-2- MKAG1273
 
Otimização dos métodos de imagem
Otimização dos métodos de imagemOtimização dos métodos de imagem
Otimização dos métodos de imagem
 
RFC 2196 Site Security Handbook
RFC 2196 Site Security HandbookRFC 2196 Site Security Handbook
RFC 2196 Site Security Handbook
 
لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..
لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..
لو بتسوق .. 11 حاجة لازم تعرفها عن عربيتك ..
 

Semelhante a Mari cv - office

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)Shiraz khan
 
Abdul Hai-11 CV
Abdul Hai-11 CVAbdul Hai-11 CV
Abdul Hai-11 CVHai Abdul
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerCHETAN SHARMA
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerOmer Mohammed
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5Ramiz Siddiq
 
MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)GHANSHYAM KHATRI
 
Mohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdfMohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdfmohammedattique
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operationrias ahamed
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 

Semelhante a Mari cv - office (20)

jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
 
Henry CV
Henry CVHenry CV
Henry CV
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
cv PERWEZ
cv PERWEZcv PERWEZ
cv PERWEZ
 
Abdul Hai-11 CV
Abdul Hai-11 CVAbdul Hai-11 CV
Abdul Hai-11 CV
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
CV_RBMerida
CV_RBMeridaCV_RBMerida
CV_RBMerida
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
Ahmad Haddad
Ahmad HaddadAhmad Haddad
Ahmad Haddad
 
MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)
 
Mohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdfMohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdf
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 

Mari cv - office

  • 1. Page 1 of 8 MARIPITCHAI. V +966 502137921 / +966 582886771 / maripitchai@yahoo.co.in; maripitchai2011@hotmail.com OBJECVTIVE Seeking a challenging position in MECHANICAL ENGINEERING, HVAC, FIRE FIGHTING PIPING, PLUMBING, CHILLED WATER PLANT, NATURAL GAS PIPING, and AIR CONDITION & REFRIGERATION SERVICES where my technical, management and leadership skills can be effectively used. SUMMARY 14+ years of service in HVAC, Fire fighting piping, Plumbing, Chilled water plant piping, Natural gas piping, Air-conditioning & refrigeration and all electrical equipments Solid working experience in high-performance building projects In depth knowledge of mechanical systems Excellent verbal and written communication skills Ability to communicate effectively Ability to work well both independently and in a team Ability to analyze the requirements and offer appropriate solutions Rich experience in handling clients and large projects. Excellent communication skills Exposure to computers JOB HISTORY April 2010 to Till Date ………. SENIOR HEAD MEP PROJECT ENGINEER Work Location: Al – Khobar, Kingdom of Saudi Arabia. Equipments Handled: Central Plant, AHU, FCU, Packaged A/C, Ductable A/C and Split A/C, Plumbing, Gas Pipe Line, Oxygen pipe line, organ pipe line, oily water pipe line, portable water pipe line, fire water pipe line, natural gas pipe line, industrial water drainage, chilled water pipe line, civil construction work and electrical work and mechanical work etc.. Roles and Responsibilities  Assist project management by proactively managing the project budget by controlling expenses administering owner and subcontractor billings identifying work not covered by subcontractor scope of work/budget and ensuring the success of office support functions related to the overall cost scheduled completion  Establish procedures for controlling contract drawings
  • 2. Page 2 of 8  Initiate set-up of the job management system  Assist with the scopes of work bid package development and help solicit subcontractors suppliers  Initiate the building permit process  Assist in the development of the site utilization plan  Assist project manager / superintendent in the review coordination of the loss  Develop submittal log participate in subcontractor project orientation meetings communicate and coordinate submittals and coordination drawings with subcontractors the superintendent  Actively participates in subcontractor project orientation  Responsible for proactive administration of reviewing and processing all submittal data and shop drawings to make sure project schedules are expedited materials are delivered on time  Conduct preconstruction meetings with  Serve as the onsite quality manager for assigned trades by verifying subcontractor deliveries meet approved submittal requirements  Attend and participates in meetings with architect/engineer and owner representatives provides information assists the project manager in the preparation of progress reports/meeting minutes  Distribute proposal change documents to subcontractors/suppliers assists in collecting pricing and/or prepares change proposal requests for internal pricing review  Ensure all clarifications changes directives and rfis are updated on the - as-built - drawings and are fully coordinated with company supervision all subcontractor/suppliers  Responsible for submitting owner required close-out documents and assisting subcontractors /suppliers in scheduling owner required training documentation  Build effective relationships with customers design team subcontractors suppliers and user groups that reflect and support company core values meets or exceeds the customer expectations  Actively participates in industry client community relations to enhance company image  Promote company creed, communicates company vision and purpose through service talent choices  Serve as a role model promotes professional behavior  Participate in personal career development through on-the-job training attends operations classroom training programs assists in the development of interns / co-ops  Planning and material organization  Daily site visit.  Contractor arrangement in site.  Co – ordinate with customer
  • 3. Page 3 of 8  Daily work report submitted with manager.  Alteration work to be submitted proper drawings  Monthly time sheet checking  Vendor Management  Payment Co-ordination  Customer Satisfaction management  Project report preparation  Daily site schedule and match with project schedule and co ordinate with customer. Jan 2009 to March 2010 ……. Senior Engineer M/S CADMAX TECHNOLOGIES (VOLTAS Consultant – Malabar Area), Kerala Work Location: Malabar Area. Equipments Handled: Central Plant, AHU, FCU, Packaged A/C, Ductable A/C and Split A/C Roles and Responsibilities  Provided plumbing and electrical work specifications for all projects.  Ensured project completion in timely manner.  Prepared and revised project cost estimates as needed.  Performed project schematic design evaluation to ensure compliance with MEP work.  Processed design change requests in coordination with A & E consultants.  Monitored staff performance and hired supplementary personnel as needed.  Supervised construction progress to ensure accordance with company quality standards.  Maintained strong channels of communication with managers, consultants and clients.  Ensured smooth progress of project plumbing and electrical processes.  Maintained and updated location fire safety facilities as required.  Drafted equipment reports for residential and commercial building applications.  Evaluated and revised drafted drawing dimensions as needed.  Designed industrial project mechanical work in cost-effective manner.  Estimated heat load per organizational norms and standards.  Planning and material organization  Vendor Management  Payment Co-ordination  Customer Satisfaction management  Project report preparation Dec 2006 to Dec 2008……. Maintenance Engineer M/S SAJ FLIGHT SERVICES PVT LTD, Chennai Work Location: South India (Current in Kerala)
  • 4. Page 4 of 8 Equipments Handling: Air Conditioners, Central Plants, Package A/C, Window A/C, Split A/C, Transformer, Generator, Water Treatment Plant, Dishwashing Machine, Cold Room, Deep Freezer, Blast Chiller, etc, Roles and Responsibilities  Managing of the mechanical manpower for the area & assigning specific responsibilities according to their experiences and skills.  Maintain & Repair Mechanical equipment (Rotary equipment such as Pumps, Gearboxes and Valves). (Maintenance)  Design and develop engineering components  Give day to day technical support for breakdown diagnostics & repair, including risk and failure analysis.  Improve & update the maintenance (preventive & predictive) program regularly. Identify, update & continuously improve equipment reliability  Identify, select & update the required spare part list.  Controlling work performance & monitoring work quality and taking corrective action to solve any problem rapidly  Daily / Weekly / Monthly maintenance check list  Generator working schedule and maintenance  Water purification Hygienic report  Purchase of maintenance materials  Daily temperature for cold room A/C  Monthly maintenance cost analysis Oct 2004 to Dec 2006……. Project & Service Engineer M/S EAKCON SYSTEM PVT LTD, Chennai Work Location: Head Office & Branches Equipments Handled: Air Conditioners, Central Plants, Cold Room, Deep freezer, Clean Room, Hot Room, Milk Cooler, Blast Chiller, Ice Cream Cooler, etc, Roles and Responsibilities  Monitored projects and ensured its proper execution.  Prepared the submittals required for the materials and ensured that they were in compliance with the specifications.  Inspected the material and escalated all issues to the consultants.  Organized the working of the project, procured the major items such as pumps and exhaust fans.
  • 5. Page 5 of 8  Evaluated the job performed and provided the necessary follow up for payments.  Developed drawings for the job close out and prepared the O&M manuals.  Scheduled the project and performed monthly audits and ensured that the project timeline was maintained.  Provided technical support to the Sales and Engineering team.  Developed the engineering equipment submittal and prepared contract drawings.  Evaluated the engineering drawings and coordinated to install the required equipments.  Assisted the customer and reviewed the work, gathered the customer’s requirement and obtained a deadline for the project.  High Monitored the project and tracked the delivery of the materials to the site, ensured that the shipping schedule meet the project schedule.  Documented project progress and submitted all financial projects to management.  Day to day complaints management  AMC Proposal / collection / renewal  Cold room service  Vendor management  Project / Material Organization to sites  Customer satisfaction management Sep 2003 to Oct 2004……. Project Engineer M/S ETA ENGINEERING LTD, Chennai Work Location: Chennai Equipments Handled: Central Plant, AHU, FCU, Packaged A/C, Ductable A/C and Split A/C Roles and Responsibilities  Responsible for handling the entire process of project turnover starting from project initiation to the delivery stage  Perform the tasks of evaluating the scope of supply and commercial bid of the project  Responsible for conducting preventive maintenance and prepare lay out of control circuits
  • 6. Page 6 of 8  Handle the tasks of providing service engineer required for repairing maintaining plumbing systems after the commissioning stage  Perform responsibilities of providing support to project managers to ensure successful completion of the project  Assigned the tasks of generating I/O summary as well as perform product development.  Responsible for ensuring that the technical parameters and compliance process are supplied as outlined in the contract documents  Handled the tasks of identifying opportunities to decrease the consumption of energy at facilities  Performed responsibilities of providing support to the senior engineer in planning the design phase of the project  Responsible for providing recommendations to clients regarding systems that need replacement  Handled the tasks of assisting senior engineers in planning and installing materials  Planning and material organization  Vendor Management  Payment Co-ordination  Customer Satisfaction management  Project report preparation Aug 2002 to Aug 2003……. Service Engineer M/S BLUES STAR LTD, Chennai Work Location: Chennai Equipments Handled: Air Conditioners, Cold Room, Deep Freezer, Central Plants, etc. Roles and Responsibilities  Attending break down calls and service report preparation  Scheduling PM services  AMC management and renewals  Site Visits and Vendor management  Payment Co-ordination  Customer Satisfaction management Jun 2001 to Jul 2002……. Technician
  • 7. Page 7 of 8 M/S AEROMATIC SYSTEM, Chennai Work Location: Chennai Equipments Handled: Air Conditioners, Cold Room, Deep Freezer, etc. Roles and Responsibilities  Servicing of Air-conditioners  Servicing of Cold rooms  Servicing of Deep freezers ACADEMIC HISTORY SSLC Diploma in Mechanical Engineering AUTO CAD 2010 ADDITIONAL QUALIFICATIONS Microsoft Office and Internet Auto CAD (2D and isometric drawing) Driving License – LMV (International driving License) PERSONAL DETAILS Father’s Name : R. Vilvanathan Date of Birth : 07th January 1983 Religion : Hindu Marital Status : Married Settled at : Morayur, Malappuram Languages Known : Tamil, English and Malayalam, Hindi, Arabic.
  • 8. Page 8 of 8 Residential Address : House Name: K P house, Address: NEAR VHMHS SCHOOL, MORAYUR, District and Pin Code: MALAPURAM Dist, pin: 673649. Saudi Mobile No: 966 502137921 Yours truly, Maripitchai V