INTRODUCTION
THE BETTER WAY TO SMART STADIUMS:
STRUCTURAL AND
ARCHITECTURAL PRINCIPLES
 Contents and functions
 Symmetry and differences
 Three-dimensional perspective
 Syntax of the stadium
 Structural Expressionism
 Creative use of space
 Integrating stadium, city, and landscape
EDEN GARDENS CRICKET STADIUM
 Year Established: 1864
 Location: Kolkata, West Bengal, India
 Capacity: 67,549 seats (increasing to
>100K)
 Field Size: 168 m x 141 m
 Used for : Cricket Twenty 20’s, ODIs &
Test Matches
 Owner: Cricket Association of Bengal
(Previously Calcutta Cricket Club)
 Architect: Earlier British Construction
Company. Presently VMS Consultant.
 Contractor: Cricket Association of
Bengal
 Structural Engineers: Stantec , HCP
Design & Planning and Management Pvt.
Ltd.
A Brief Layout
EDEN GARDENS CRICKET STADIUM
A Unique Structure
 Iconic Cricket Stadium due to its location in Kolkata.
 Biggest in India and officially compared to Melbourne Cricket
Ground.
 Two storey balcony structure.
Structural Challenges
 To construct sheds and light barriers.
 Elite competitive facilities – Washrooms,
Sightlines, way findings and circulations.
Solutions
 A new eye-catching facade and roof
re-establishment.
 Green construction and structure. A
complete new interior re
development.
MELBOURNE CRICKET GROUND
 Other Name: The G
 Location: Yarra Park, Melbourne,
Australia
 Capacity: 100,024 seats
 Field Size: 171 m x 146 m
 Used for : Cricket Test, Twenty 20’s &
ODIs
 Construction Time: Developed
periodically. (1838 – 1956)
 Cost: 150 million USD $ (2008 – 2012)
 Architecture: Cox Architecture (2012)
 Contractor: Mr. Warren Bonello
 Structural Engineers: Construction
Engineering Australia Pvt. Ltd. (2012)
A Brief Layout
MELBOURNE CRICKET GROUND
A Unique Structure
 Transparent walls engage approaching patrons as they arrive
Gates 1, 2 & 3. (Three Atrium Entrances)
 Underground car parking.
 Sightlines from all seats are uninterrupted.
Structural Challenges
 To construct and increase the space.
 To re innovate the interiors.
 Increase the brightness in the seating
areas.
Solutions
 Implementing underground space.
 Green construction and structure.
 Capping the new stand is a hybrid
roof, part metal and part glass.
LORD’S CRICKET STADIUM
 Name: Named after Thomas Lord
 Location: Saint John’s Wood Road,
London, NW8 8QN, United Kingdom
 Capacity: 28000 seats
 First Opened: June 22nd 1814
 Used for : International Cricket
 Construction Time: 33 months
 Cost: £ 200 million
 Architect: Jan Kalicky
 Architectural Style: Victorian and
Hightech Architecture
 Construction for Redevelopment: Bam
Construction gets the contract to widen
the space field in 2015.
A Brief Layout
LORD’S CRICKET STADIUM
A Unique Structure
 Media centre: 1st aluminum, semi-monocoque building in
the world.
 Field: Significant slope across the field.
 Grace gate.
Solutions
Structural
Challenges
Water logged in the outfield during
rainy season.
Replacement and upgrade of iconic
Mount Stand Canopy.
Sanitary system designed properly.
Use of working Platform Nets.
LORD’S CRICKET STADIUM
Events
 Cricket Matches
 1st Test 21st July 1884
England Vs Australia
 1st ODI 26th August 1972
England Vs Australia
 Other Events
 Archery – 2012 Summer
Olympics
 Baseball Game –
During THE GREAT
WARS
BEIJING NATIONAL STADIUM
 Other Name: Bird’s Nest
 Location: Beijing, China
 Capacity: 80000 (incresed to 91K in
2008)
 Size: 330m x 220m x 69.2m (LxBxH)
 Used for : Olympic Games
 Construction Time: 52 months
 Cost: 428 million USD $
 Architect: Herzog & De Meuron,
ArupSport, China Architectural &
Research Group, Ai Weiwei
 Contractor: CITIV Internationals
Contracting INC.
 Structural Engineers: Arup Group
Limited (ARUP)
 Workers: 9000
A Brief Layout
BEIJING NATIONAL STADIUM
A Unique Structure
 It looks like a bird’s nest because the steel looks like twigs that
are twisted together.
 The design of steel beams was taken from Chinese Ceramics
study.
 Red Concrete seating Bowl & Outer Steel Frame around it.
Structural Challenges
 To hide supports for the retractable roof.
 To construct a shopping Mall and a
hotel.
 To use stadium light to disperse within.
Solutions
 Implemented steel beams.
 Green construction and structure.
 Spiral and convex outlook of the
structure. Using reflective glasses.
CAPE TOWN STADIUM
 Previous Name: Green Point Stadium
 Location: Fritz Sonnenberg road, Green
Point, Cape town
 Capacity: 55000 (After removal of 13000
temporary seats)
 Field Size: 290mX 265mX 48m
 Used for : 2010 FIFA Football World Cup
 Construction Time: 33 months
 Cost: 4 billion ₹
 Architect: GMP Architects, Louis Carol &
Associates, Point Architects.
 Contractors: Murray & Roberts, WBHO
 Structural Engineers: BKS, Henry Fagan
& Partners, KFD Wilkinson, Goba, Iliso,
Arcus Gibb
 Work force: Construction Staff-300,
Labour- 2300, Cranes-21, Project Agent-10
A Brief Layout
CAPE TOWN STADIUM
A Unique Structure
 The stadium looks like a bicycle wheel from above.
 The roof is suspended and lightweight one.
 The entire roof is made by a curved laminated glass.
 The stadium changes it’s colour in different times.
Structural Challenges
 To maintain the height of the stadium.
 To enhance the environment rather
destroying it.
 To use natural light as much as possible
 To resist upturns by wind.
Solutions
 Elevated ground
 Green construction and structure
 Truss girder system with heavy glass
roofing resist wind upturn.
CAPE TOWN STADIUM
Events
 2010 FIFA World Cup:
 Five first round
matches
 One second round
match
 One quarter final
match
 One semi final match
 Musical Tours and Concerts:
 COLDPLAY- October 2011
 LINKIN PARK- Living things
world tour on December 2012
 RIHANNA- October 2013
 Eminem- February 2014
MARACANA STADIUM
 Full Name: Estadio Tornalista Mario Filho
 Location: Rio de Janeiro ,Brazil
 Capacity: 78,838 seats
 Field Size: 105 m x 68 m
 Used for : Football, Twenty 20’s & ODIs
 Construction Time: Developed
periodically. (1948– 2013)
 Cost: 150 million USD $ (2008 – 2012)
 Architecture: Waidir Ramos
Raphael Galvao
Miguel Feleman
 Structural Engineers: Sika Brazil,
A Brief Layout
MARACANA STADIUM
A Unique Structure
 The renovation converted Maracana stadium into a new roof to
cover the entire public area added on the top of five storey –
structure.
 To improve access & security four additional entry / exit added
to the existing two.
Structural Challenges
 To construct and increase the space.
 To re innovate the interiors.
 Increase the brightness in the seating
areas.
Solutions
 Implementing underground space.
 Green construction and structure.
 Capping the new stand is a hybrid
roof, part metal and part glass.
CONCLUSION
 Stadiums are an asset of any country, they
should be well taken care of.
 Construction must be of possible minimum cost
and even after the construction it should
support the socio-economic scenario.
 There is a great chance of employment during
and after construction work.
 Large scale industries emerges on the place like
Hotels, Tourist spots, Business centres etc.
Stadiums That Changed The Game - Structure Development Of Stadiums

Mais conteúdo relacionado

Mais procurados

Dubai sports city uae
Dubai sports city uaeDubai sports city uae
Dubai sports city uae
HLB Hamt
 
Stadium Design Project Details
Stadium Design Project DetailsStadium Design Project Details
Stadium Design Project Details
celsesser
 

Mais procurados (20)

presentation on jln stadium
presentation on jln stadiumpresentation on jln stadium
presentation on jln stadium
 
Final
FinalFinal
Final
 
Sports complex
Sports complexSports complex
Sports complex
 
SPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHI
SPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHISPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHI
SPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHI
 
Jns stadium, Delhi.
Jns stadium, Delhi.Jns stadium, Delhi.
Jns stadium, Delhi.
 
Forum mall bangalore case study
Forum mall bangalore case studyForum mall bangalore case study
Forum mall bangalore case study
 
Stadium
StadiumStadium
Stadium
 
CLUB HOUSE DESKTOP STUDY
CLUB HOUSE DESKTOP STUDYCLUB HOUSE DESKTOP STUDY
CLUB HOUSE DESKTOP STUDY
 
Orion mall - Bangalore
Orion mall - BangaloreOrion mall - Bangalore
Orion mall - Bangalore
 
Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016
 
Yamuna sports complex
Yamuna sports complexYamuna sports complex
Yamuna sports complex
 
Siri fort sport complex
Siri fort sport complexSiri fort sport complex
Siri fort sport complex
 
Multicomplex and Commercial Complex
Multicomplex  and Commercial ComplexMulticomplex  and Commercial Complex
Multicomplex and Commercial Complex
 
ATLANTIS - THE CLUB - AT JAYPEE INTEGRATED SPORETS COMPLEX GREATER NOIDA
ATLANTIS - THE CLUB  - AT  JAYPEE INTEGRATED SPORETS COMPLEX GREATER NOIDAATLANTIS - THE CLUB  - AT  JAYPEE INTEGRATED SPORETS COMPLEX GREATER NOIDA
ATLANTIS - THE CLUB - AT JAYPEE INTEGRATED SPORETS COMPLEX GREATER NOIDA
 
Dubai sports city uae
Dubai sports city uaeDubai sports city uae
Dubai sports city uae
 
Residential cum Commercial Building
Residential cum Commercial BuildingResidential cum Commercial Building
Residential cum Commercial Building
 
Shyam Thesis Report
Shyam Thesis ReportShyam Thesis Report
Shyam Thesis Report
 
shopping mall case study
shopping mall case studyshopping mall case study
shopping mall case study
 
Stadium Design Project Details
Stadium Design Project DetailsStadium Design Project Details
Stadium Design Project Details
 
Water supply in DB mall Bhopal
Water supply in DB mall BhopalWater supply in DB mall Bhopal
Water supply in DB mall Bhopal
 

Destaque

ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIPATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
maria laura santamarina
 
Notre Ville Nea Smyrni
Notre Ville Nea SmyrniNotre Ville Nea Smyrni
Notre Ville Nea Smyrni
gueste6341a6
 
XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1
Michela Turrin
 
2010 FIFA World Cup in South Africa: Visualising the experience
2010 FIFA World Cupin South Africa: Visualising the experience2010 FIFA World Cupin South Africa: Visualising the experience
2010 FIFA World Cup in South Africa: Visualising the experience
Cape Town Partnership
 
Battle Of Stamford Bridge
Battle Of  Stamford  BridgeBattle Of  Stamford  Bridge
Battle Of Stamford Bridge
Brayton College
 
Buildings_BIM Projects_V05
Buildings_BIM Projects_V05Buildings_BIM Projects_V05
Buildings_BIM Projects_V05
Steve Colomb
 
Atos global insight of making stadium smart smart stadium it leaders round ...
Atos global insight of making stadium smart   smart stadium it leaders round ...Atos global insight of making stadium smart   smart stadium it leaders round ...
Atos global insight of making stadium smart smart stadium it leaders round ...
Huawei Enterprise
 
How To Build A World Cup Cricket Stadium With Emotional Intelligence
How To Build A World Cup Cricket Stadium With Emotional IntelligenceHow To Build A World Cup Cricket Stadium With Emotional Intelligence
How To Build A World Cup Cricket Stadium With Emotional Intelligence
galbabright
 

Destaque (20)

Stadium Project
Stadium ProjectStadium Project
Stadium Project
 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadium
 
Report on stadium constructio2n
Report on stadium constructio2nReport on stadium constructio2n
Report on stadium constructio2n
 
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIPATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
 
Rice Eccles stadium
Rice Eccles stadiumRice Eccles stadium
Rice Eccles stadium
 
Notre Ville Nea Smyrni
Notre Ville Nea SmyrniNotre Ville Nea Smyrni
Notre Ville Nea Smyrni
 
XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1
 
2313 – al arabi stadium upgrade-structural presentation
2313 – al arabi stadium upgrade-structural presentation2313 – al arabi stadium upgrade-structural presentation
2313 – al arabi stadium upgrade-structural presentation
 
Ppt on stadium construction
Ppt on stadium constructionPpt on stadium construction
Ppt on stadium construction
 
Stadium Design and Reference Guide with Meru Networks WLAN
Stadium Design and Reference Guide with Meru Networks WLANStadium Design and Reference Guide with Meru Networks WLAN
Stadium Design and Reference Guide with Meru Networks WLAN
 
2010 FIFA World Cup in South Africa: Visualising the experience
2010 FIFA World Cupin South Africa: Visualising the experience2010 FIFA World Cupin South Africa: Visualising the experience
2010 FIFA World Cup in South Africa: Visualising the experience
 
Arena da Amazônia: Os Desafios do Escopo, Prazo e Custo
Arena da Amazônia: Os Desafios do Escopo, Prazo e CustoArena da Amazônia: Os Desafios do Escopo, Prazo e Custo
Arena da Amazônia: Os Desafios do Escopo, Prazo e Custo
 
Arena Amazonia Roof -> Design, Fabrication & Erection
Arena Amazonia Roof -> Design, Fabrication & ErectionArena Amazonia Roof -> Design, Fabrication & Erection
Arena Amazonia Roof -> Design, Fabrication & Erection
 
Football Stadium Roof Truss Steelwork
Football Stadium Roof Truss SteelworkFootball Stadium Roof Truss Steelwork
Football Stadium Roof Truss Steelwork
 
Football Stadium Truss Base Detail
Football Stadium Truss Base DetailFootball Stadium Truss Base Detail
Football Stadium Truss Base Detail
 
Battle Of Stamford Bridge
Battle Of  Stamford  BridgeBattle Of  Stamford  Bridge
Battle Of Stamford Bridge
 
MA Chidambaram Cricket Stadium by VME Precast
MA Chidambaram Cricket Stadium by VME Precast MA Chidambaram Cricket Stadium by VME Precast
MA Chidambaram Cricket Stadium by VME Precast
 
Buildings_BIM Projects_V05
Buildings_BIM Projects_V05Buildings_BIM Projects_V05
Buildings_BIM Projects_V05
 
Atos global insight of making stadium smart smart stadium it leaders round ...
Atos global insight of making stadium smart   smart stadium it leaders round ...Atos global insight of making stadium smart   smart stadium it leaders round ...
Atos global insight of making stadium smart smart stadium it leaders round ...
 
How To Build A World Cup Cricket Stadium With Emotional Intelligence
How To Build A World Cup Cricket Stadium With Emotional IntelligenceHow To Build A World Cup Cricket Stadium With Emotional Intelligence
How To Build A World Cup Cricket Stadium With Emotional Intelligence
 

Semelhante a Stadiums That Changed The Game - Structure Development Of Stadiums

MCG Concrete 2005 050725
MCG Concrete 2005 050725MCG Concrete 2005 050725
MCG Concrete 2005 050725
Mark Sheldon
 
PanAm Sports Cov&SampleSpread_SM
PanAm Sports Cov&SampleSpread_SMPanAm Sports Cov&SampleSpread_SM
PanAm Sports Cov&SampleSpread_SM
Pamela Young
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
CASE STUDY in j (tree,land,urb2>(1).pptx
CASE STUDY in j (tree,land,urb2>(1).pptxCASE STUDY in j (tree,land,urb2>(1).pptx
CASE STUDY in j (tree,land,urb2>(1).pptx
manarfcb13
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
Katie Frost
 
Gb2011 frank e_goodwin_iza
Gb2011 frank e_goodwin_izaGb2011 frank e_goodwin_iza
Gb2011 frank e_goodwin_iza
Galvabrasil
 
HG portfolio low res
HG portfolio low resHG portfolio low res
HG portfolio low res
Hina Gazi
 

Semelhante a Stadiums That Changed The Game - Structure Development Of Stadiums (20)

MCG Concrete 2005 050725
MCG Concrete 2005 050725MCG Concrete 2005 050725
MCG Concrete 2005 050725
 
IABSE 2002
IABSE 2002IABSE 2002
IABSE 2002
 
PanAm Sports Cov&SampleSpread_SM
PanAm Sports Cov&SampleSpread_SMPanAm Sports Cov&SampleSpread_SM
PanAm Sports Cov&SampleSpread_SM
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
CASE STUDY in j (tree,land,urb2>(1).pptx
CASE STUDY in j (tree,land,urb2>(1).pptxCASE STUDY in j (tree,land,urb2>(1).pptx
CASE STUDY in j (tree,land,urb2>(1).pptx
 
Pp success n failure project
Pp success n failure projectPp success n failure project
Pp success n failure project
 
Linkedin3
Linkedin3Linkedin3
Linkedin3
 
Cangilla project management portfolio (1)
Cangilla project management portfolio (1)Cangilla project management portfolio (1)
Cangilla project management portfolio (1)
 
Beijing national stadium
Beijing national stadiumBeijing national stadium
Beijing national stadium
 
Comparative Analysis of Lezza Soho, bTi Landmark, Pinacle Tower & GP House.pptx
Comparative Analysis of Lezza Soho, bTi Landmark, Pinacle Tower & GP House.pptxComparative Analysis of Lezza Soho, bTi Landmark, Pinacle Tower & GP House.pptx
Comparative Analysis of Lezza Soho, bTi Landmark, Pinacle Tower & GP House.pptx
 
National tennis court
National tennis courtNational tennis court
National tennis court
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
 
Gb2011 frank e_goodwin_iza
Gb2011 frank e_goodwin_izaGb2011 frank e_goodwin_iza
Gb2011 frank e_goodwin_iza
 
International
InternationalInternational
International
 
high tech building
high tech buildinghigh tech building
high tech building
 
Beijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptxBeijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptx
 
HG portfolio low res
HG portfolio low resHG portfolio low res
HG portfolio low res
 

Último

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Stadiums That Changed The Game - Structure Development Of Stadiums

  • 1.
  • 2. INTRODUCTION THE BETTER WAY TO SMART STADIUMS:
  • 3. STRUCTURAL AND ARCHITECTURAL PRINCIPLES  Contents and functions  Symmetry and differences  Three-dimensional perspective  Syntax of the stadium  Structural Expressionism  Creative use of space  Integrating stadium, city, and landscape
  • 4. EDEN GARDENS CRICKET STADIUM  Year Established: 1864  Location: Kolkata, West Bengal, India  Capacity: 67,549 seats (increasing to >100K)  Field Size: 168 m x 141 m  Used for : Cricket Twenty 20’s, ODIs & Test Matches  Owner: Cricket Association of Bengal (Previously Calcutta Cricket Club)  Architect: Earlier British Construction Company. Presently VMS Consultant.  Contractor: Cricket Association of Bengal  Structural Engineers: Stantec , HCP Design & Planning and Management Pvt. Ltd. A Brief Layout
  • 5. EDEN GARDENS CRICKET STADIUM A Unique Structure  Iconic Cricket Stadium due to its location in Kolkata.  Biggest in India and officially compared to Melbourne Cricket Ground.  Two storey balcony structure. Structural Challenges  To construct sheds and light barriers.  Elite competitive facilities – Washrooms, Sightlines, way findings and circulations. Solutions  A new eye-catching facade and roof re-establishment.  Green construction and structure. A complete new interior re development.
  • 6. MELBOURNE CRICKET GROUND  Other Name: The G  Location: Yarra Park, Melbourne, Australia  Capacity: 100,024 seats  Field Size: 171 m x 146 m  Used for : Cricket Test, Twenty 20’s & ODIs  Construction Time: Developed periodically. (1838 – 1956)  Cost: 150 million USD $ (2008 – 2012)  Architecture: Cox Architecture (2012)  Contractor: Mr. Warren Bonello  Structural Engineers: Construction Engineering Australia Pvt. Ltd. (2012) A Brief Layout
  • 7. MELBOURNE CRICKET GROUND A Unique Structure  Transparent walls engage approaching patrons as they arrive Gates 1, 2 & 3. (Three Atrium Entrances)  Underground car parking.  Sightlines from all seats are uninterrupted. Structural Challenges  To construct and increase the space.  To re innovate the interiors.  Increase the brightness in the seating areas. Solutions  Implementing underground space.  Green construction and structure.  Capping the new stand is a hybrid roof, part metal and part glass.
  • 8. LORD’S CRICKET STADIUM  Name: Named after Thomas Lord  Location: Saint John’s Wood Road, London, NW8 8QN, United Kingdom  Capacity: 28000 seats  First Opened: June 22nd 1814  Used for : International Cricket  Construction Time: 33 months  Cost: £ 200 million  Architect: Jan Kalicky  Architectural Style: Victorian and Hightech Architecture  Construction for Redevelopment: Bam Construction gets the contract to widen the space field in 2015. A Brief Layout
  • 9. LORD’S CRICKET STADIUM A Unique Structure  Media centre: 1st aluminum, semi-monocoque building in the world.  Field: Significant slope across the field.  Grace gate. Solutions Structural Challenges Water logged in the outfield during rainy season. Replacement and upgrade of iconic Mount Stand Canopy. Sanitary system designed properly. Use of working Platform Nets.
  • 10. LORD’S CRICKET STADIUM Events  Cricket Matches  1st Test 21st July 1884 England Vs Australia  1st ODI 26th August 1972 England Vs Australia  Other Events  Archery – 2012 Summer Olympics  Baseball Game – During THE GREAT WARS
  • 11. BEIJING NATIONAL STADIUM  Other Name: Bird’s Nest  Location: Beijing, China  Capacity: 80000 (incresed to 91K in 2008)  Size: 330m x 220m x 69.2m (LxBxH)  Used for : Olympic Games  Construction Time: 52 months  Cost: 428 million USD $  Architect: Herzog & De Meuron, ArupSport, China Architectural & Research Group, Ai Weiwei  Contractor: CITIV Internationals Contracting INC.  Structural Engineers: Arup Group Limited (ARUP)  Workers: 9000 A Brief Layout
  • 12. BEIJING NATIONAL STADIUM A Unique Structure  It looks like a bird’s nest because the steel looks like twigs that are twisted together.  The design of steel beams was taken from Chinese Ceramics study.  Red Concrete seating Bowl & Outer Steel Frame around it. Structural Challenges  To hide supports for the retractable roof.  To construct a shopping Mall and a hotel.  To use stadium light to disperse within. Solutions  Implemented steel beams.  Green construction and structure.  Spiral and convex outlook of the structure. Using reflective glasses.
  • 13. CAPE TOWN STADIUM  Previous Name: Green Point Stadium  Location: Fritz Sonnenberg road, Green Point, Cape town  Capacity: 55000 (After removal of 13000 temporary seats)  Field Size: 290mX 265mX 48m  Used for : 2010 FIFA Football World Cup  Construction Time: 33 months  Cost: 4 billion ₹  Architect: GMP Architects, Louis Carol & Associates, Point Architects.  Contractors: Murray & Roberts, WBHO  Structural Engineers: BKS, Henry Fagan & Partners, KFD Wilkinson, Goba, Iliso, Arcus Gibb  Work force: Construction Staff-300, Labour- 2300, Cranes-21, Project Agent-10 A Brief Layout
  • 14. CAPE TOWN STADIUM A Unique Structure  The stadium looks like a bicycle wheel from above.  The roof is suspended and lightweight one.  The entire roof is made by a curved laminated glass.  The stadium changes it’s colour in different times. Structural Challenges  To maintain the height of the stadium.  To enhance the environment rather destroying it.  To use natural light as much as possible  To resist upturns by wind. Solutions  Elevated ground  Green construction and structure  Truss girder system with heavy glass roofing resist wind upturn.
  • 15. CAPE TOWN STADIUM Events  2010 FIFA World Cup:  Five first round matches  One second round match  One quarter final match  One semi final match  Musical Tours and Concerts:  COLDPLAY- October 2011  LINKIN PARK- Living things world tour on December 2012  RIHANNA- October 2013  Eminem- February 2014
  • 16. MARACANA STADIUM  Full Name: Estadio Tornalista Mario Filho  Location: Rio de Janeiro ,Brazil  Capacity: 78,838 seats  Field Size: 105 m x 68 m  Used for : Football, Twenty 20’s & ODIs  Construction Time: Developed periodically. (1948– 2013)  Cost: 150 million USD $ (2008 – 2012)  Architecture: Waidir Ramos Raphael Galvao Miguel Feleman  Structural Engineers: Sika Brazil, A Brief Layout
  • 17. MARACANA STADIUM A Unique Structure  The renovation converted Maracana stadium into a new roof to cover the entire public area added on the top of five storey – structure.  To improve access & security four additional entry / exit added to the existing two. Structural Challenges  To construct and increase the space.  To re innovate the interiors.  Increase the brightness in the seating areas. Solutions  Implementing underground space.  Green construction and structure.  Capping the new stand is a hybrid roof, part metal and part glass.
  • 18. CONCLUSION  Stadiums are an asset of any country, they should be well taken care of.  Construction must be of possible minimum cost and even after the construction it should support the socio-economic scenario.  There is a great chance of employment during and after construction work.  Large scale industries emerges on the place like Hotels, Tourist spots, Business centres etc.