This workshop
• What’s in it for me?
• A more constructive approach to “risks”
• Group exercises
• From uncertainties to actions
What’s in it for me?
The risk register
A bad thing that
might happen
Categories of action
Hardware will arrive too late
Order hardware in good time
http://www.clipartbest.com/clipart-dT8oGAATe
Categories of action
Supplier insufficiently skilled
Supplier has been selected via
rigorous process
http://www.clipartbest.com/clipart-dT8oGAATe
Categories of action
Loss of intellectual property
Contractual constraints
http://www.clipartbest.com/clipart-dT8oGAATe
How to look at risks* more
constructively
* So-called “risks”
Two recent “risks”
• Our boss might not like it
• Our competitor releases in Germany first
1. Flip it round
• Risk… or opportunity?
• Let’s be ready to exploit that
• Let’s be open to doing better than planned
http://www.cheekymonkeycomedy.com/whats-missing-in-screenwriting/
1. Flip it round
• Our boss might not like it
– …or he might
• Our competitor releases in Germany first
– …or we might
2. Find the variability
• Look past the “risk event”
• There are gradations of badness… and
goodness
http://www.seducingwithstyle.com/style-blog/page/15/
2. Find the variability
• Our boss might not like it
– …or he might slightly dislike it
– …and he may change his mind next week
• Our competitor releases in Germany first
– …by one year, three months, 24 hours…?
3. Zoom out
• It’s not a single, isolated thing
• It’s got fuzzy edges
• Zoom out to see the larger whole
http://www.vpul.upenn.edu/alcohol/marijuana.php
3. Zoom out
• The unhappy boss
– Isn’t this really about… stakeholder
engagement?
• Our competitor releases in Germany first
– What about features, pricing, marketing…?
– What about the next time?
– Isn’t this really about… time to market?
Warm-up exercise
Let’s rethink some so-
called risks…
Warm-up exercise
“Failure of client to pay fees”
US engineering company wants to provide
water treatment facilities in China
Warm-up exercise
“Regulators decide to regulate VCs but the
chosen regulatory approach fails”
European Banking Authority document on
governance and regulation of virtual
currencies (VCs).
Warm-up exercise
“The policy design for some aspects of the
future organisation is incomplete. [...] So risk
that Bill proceeds on the basis of
incomplete/flawed design”
Leaked document on Andrew Lansley’s 2012
NHS reforms
Exercise
• Look at the business case and risks
• Turn each “risk” into an uncertainty
– Flip it round
– Find the variability
– Zoom out. Isn’t this really about…?
From uncertainties to actions
The ideal: Change the way we
operate
• Change the process
• Change the environment
• Because that “risk” is part of a larger thing
• This requires imagination
Changing the way we operate
• The unhappy boss
– Continuous stakeholder engagement
• Our competitor releases in Germany first
– Improve time to market, consistently
• Customer who might not pay on time
– Incentivise early (or advance) payment
Zooming out, finding themes
Summary
• “A risk”  Uncertainty
• Zoom out
• Handle by changing the process
• Where next:
– Matthew Leitch
– Intelligent Internal Control and Risk Management
– http://www.workinginuncertainty.co.uk
http://niksilver.com
@pigsaw

Mais conteúdo relacionado

Mais procurados

Test Driven Development – how it benefits business and teams alike
Test Driven Development – how it benefits business and teams alikeTest Driven Development – how it benefits business and teams alike
Test Driven Development – how it benefits business and teams alike
Scrum Australia Pty Ltd
 
Agile and the nature of decision making
Agile and the nature of decision makingAgile and the nature of decision making
Agile and the nature of decision making
drewz lin
 

Mais procurados (20)

Crisis Management Powerpoint Presentation Slides
Crisis Management Powerpoint Presentation SlidesCrisis Management Powerpoint Presentation Slides
Crisis Management Powerpoint Presentation Slides
 
Agile project management - everything you want to know but were afraid to ask...
Agile project management - everything you want to know but were afraid to ask...Agile project management - everything you want to know but were afraid to ask...
Agile project management - everything you want to know but were afraid to ask...
 
Does the project manager stand a chance?
Does the project manager stand a chance?Does the project manager stand a chance?
Does the project manager stand a chance?
 
OPERATION DEBRIEF: The Secret Weapon of High-Performing Ops Teams
OPERATION DEBRIEF: The Secret Weapon of High-Performing Ops TeamsOPERATION DEBRIEF: The Secret Weapon of High-Performing Ops Teams
OPERATION DEBRIEF: The Secret Weapon of High-Performing Ops Teams
 
Test Driven Development – how it benefits business and teams alike
Test Driven Development – how it benefits business and teams alikeTest Driven Development – how it benefits business and teams alike
Test Driven Development – how it benefits business and teams alike
 
Risk Management Framework - Dr. Mustafa Degerli
Risk Management Framework - Dr. Mustafa DegerliRisk Management Framework - Dr. Mustafa Degerli
Risk Management Framework - Dr. Mustafa Degerli
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Managing agile teams
Managing agile teamsManaging agile teams
Managing agile teams
 
Lean Six Sigma Black Belt Training Part 3
Lean Six Sigma Black Belt Training Part 3Lean Six Sigma Black Belt Training Part 3
Lean Six Sigma Black Belt Training Part 3
 
Presentations - DAY 1 - NXT 2019: The Future of EHS - eCompliance
Presentations - DAY 1 - NXT 2019: The Future of EHS - eCompliancePresentations - DAY 1 - NXT 2019: The Future of EHS - eCompliance
Presentations - DAY 1 - NXT 2019: The Future of EHS - eCompliance
 
Agile and the nature of decision making
Agile and the nature of decision makingAgile and the nature of decision making
Agile and the nature of decision making
 
A Comprehensive Overview and Interpretation of Risk and Uncertainty in Projec...
A Comprehensive Overview and Interpretation of Risk and Uncertainty in Projec...A Comprehensive Overview and Interpretation of Risk and Uncertainty in Projec...
A Comprehensive Overview and Interpretation of Risk and Uncertainty in Projec...
 
Pete Measey, Agile project governance
Pete Measey, Agile project governancePete Measey, Agile project governance
Pete Measey, Agile project governance
 
Five things before you go Agile
Five things before you go AgileFive things before you go Agile
Five things before you go Agile
 
How to Improve Your Business Agility with Flawless Execution
How to Improve Your Business Agility with Flawless ExecutionHow to Improve Your Business Agility with Flawless Execution
How to Improve Your Business Agility with Flawless Execution
 
Enabling Flexible & Skilled Cross-Functional Teams within Agile & DevOps Orga...
Enabling Flexible & Skilled Cross-Functional Teams within Agile & DevOps Orga...Enabling Flexible & Skilled Cross-Functional Teams within Agile & DevOps Orga...
Enabling Flexible & Skilled Cross-Functional Teams within Agile & DevOps Orga...
 
Risk Management Plan Powerpoint Presentation Slides
Risk Management Plan Powerpoint Presentation SlidesRisk Management Plan Powerpoint Presentation Slides
Risk Management Plan Powerpoint Presentation Slides
 
Pm risks-and-constraints
Pm risks-and-constraintsPm risks-and-constraints
Pm risks-and-constraints
 
Corporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuffCorporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuff
 
When Will This Be Done?
When Will This Be Done?When Will This Be Done?
When Will This Be Done?
 

Destaque

Diane goodman Herdsa 2013 subm
Diane goodman Herdsa 2013 submDiane goodman Herdsa 2013 subm
Diane goodman Herdsa 2013 subm
Diane Goodman
 
Announcements - Week of March 4-10
Announcements - Week of March 4-10Announcements - Week of March 4-10
Announcements - Week of March 4-10
wlbcmusic
 
EQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEED
EQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEEDEQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEED
EQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEED
Equitech IT
 

Destaque (12)

Diane goodman Herdsa 2013 subm
Diane goodman Herdsa 2013 submDiane goodman Herdsa 2013 subm
Diane goodman Herdsa 2013 subm
 
Middle pages
Middle pagesMiddle pages
Middle pages
 
The Building Monitor Ad
The Building Monitor AdThe Building Monitor Ad
The Building Monitor Ad
 
Reliability
ReliabilityReliability
Reliability
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Announcements - Week of March 4-10
Announcements - Week of March 4-10Announcements - Week of March 4-10
Announcements - Week of March 4-10
 
Everyone shall taste death
Everyone shall taste deathEveryone shall taste death
Everyone shall taste death
 
EQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEED
EQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEEDEQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEED
EQUIPMENT RENTALS TO SUITE YOUR COMPANIES NEED
 
ಭೂಮಿ ಆಕಾಶದಲ್ಲಿರುವ ಪ್ರತಿಯೊಂದು ವಸ್ತುವೂ ಅಲ್ಲಾಹನನ್ನು ಜಪಿಸಿದೆ
ಭೂಮಿ ಆಕಾಶದಲ್ಲಿರುವ ಪ್ರತಿಯೊಂದು ವಸ್ತುವೂ ಅಲ್ಲಾಹನನ್ನು ಜಪಿಸಿದೆಭೂಮಿ ಆಕಾಶದಲ್ಲಿರುವ ಪ್ರತಿಯೊಂದು ವಸ್ತುವೂ ಅಲ್ಲಾಹನನ್ನು ಜಪಿಸಿದೆ
ಭೂಮಿ ಆಕಾಶದಲ್ಲಿರುವ ಪ್ರತಿಯೊಂದು ವಸ್ತುವೂ ಅಲ್ಲಾಹನನ್ನು ಜಪಿಸಿದೆ
 
Identificacion Elementos clasicos
Identificacion Elementos clasicosIdentificacion Elementos clasicos
Identificacion Elementos clasicos
 
Marienismo
MarienismoMarienismo
Marienismo
 
Iris Klaßen: Für Projekte werben
Iris Klaßen: Für Projekte werbenIris Klaßen: Für Projekte werben
Iris Klaßen: Für Projekte werben
 

Semelhante a Risk management for the Agile world

Quality & the Construction Contractor
Quality & the Construction ContractorQuality & the Construction Contractor
Quality & the Construction Contractor
DPSchneider
 
[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso
[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso
[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso
EloGroup
 

Semelhante a Risk management for the Agile world (20)

Rich Mironov - Product Management Auckland Talk Slides
Rich Mironov - Product Management Auckland Talk SlidesRich Mironov - Product Management Auckland Talk Slides
Rich Mironov - Product Management Auckland Talk Slides
 
Quality & the Construction Contractor
Quality & the Construction ContractorQuality & the Construction Contractor
Quality & the Construction Contractor
 
spiralmodel -1
 spiralmodel -1 spiralmodel -1
spiralmodel -1
 
Four Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich MironovFour Laws of Tech Product Economics - Rich Mironov
Four Laws of Tech Product Economics - Rich Mironov
 
Challenges of Outsourcing the Mainframe (v1.2)
Challenges of Outsourcing the Mainframe (v1.2)Challenges of Outsourcing the Mainframe (v1.2)
Challenges of Outsourcing the Mainframe (v1.2)
 
Technical and Product Debt Management
Technical and Product Debt ManagementTechnical and Product Debt Management
Technical and Product Debt Management
 
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
 
Lean for Business
Lean for BusinessLean for Business
Lean for Business
 
Todd little - Risky Business | Real Options for Business Agility
Todd little -  Risky Business | Real Options for Business AgilityTodd little -  Risky Business | Real Options for Business Agility
Todd little - Risky Business | Real Options for Business Agility
 
Rims 2016 Global supply chain risk and resiliency
Rims 2016 Global supply chain risk and resiliencyRims 2016 Global supply chain risk and resiliency
Rims 2016 Global supply chain risk and resiliency
 
Non traditional product financing
Non traditional product financingNon traditional product financing
Non traditional product financing
 
Ethar Alali - Agile Yorkshire September 2015
Ethar Alali - Agile Yorkshire September 2015Ethar Alali - Agile Yorkshire September 2015
Ethar Alali - Agile Yorkshire September 2015
 
Lean Kanban India 2019 Conference | Risky Business: Real Options for Business...
Lean Kanban India 2019 Conference | Risky Business: Real Options for Business...Lean Kanban India 2019 Conference | Risky Business: Real Options for Business...
Lean Kanban India 2019 Conference | Risky Business: Real Options for Business...
 
Closets Expo PowerPoint
Closets Expo PowerPointClosets Expo PowerPoint
Closets Expo PowerPoint
 
The Startup Lifecycle (Presented by CEI and friends)
The Startup Lifecycle (Presented by CEI and friends)The Startup Lifecycle (Presented by CEI and friends)
The Startup Lifecycle (Presented by CEI and friends)
 
Lean Startup talk at Business Bootcamp, Brunel
Lean Startup talk at Business Bootcamp, BrunelLean Startup talk at Business Bootcamp, Brunel
Lean Startup talk at Business Bootcamp, Brunel
 
2019 01-design thinking-for architects
2019 01-design thinking-for architects2019 01-design thinking-for architects
2019 01-design thinking-for architects
 
Customer Value and What Things are Worth (DIT Product Mgmt)
Customer Value and What Things are Worth (DIT Product Mgmt)Customer Value and What Things are Worth (DIT Product Mgmt)
Customer Value and What Things are Worth (DIT Product Mgmt)
 
[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso
[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso
[Process Day 2011] Alec Sharp – Making Process Real Engaging the CXOs Recurso
 
Process Day 2010 - Alec Sharp – Making Process Real Engaging the CXOs Recurso
Process Day 2010 - Alec Sharp – Making Process Real Engaging the CXOs RecursoProcess Day 2010 - Alec Sharp – Making Process Real Engaging the CXOs Recurso
Process Day 2010 - Alec Sharp – Making Process Real Engaging the CXOs Recurso
 

Último

#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
drm1699
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
brennadilys816
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
doktercalysta
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
nafizanafzal
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Último (20)

#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
#Mtp-Kit Prices » Qatar. Doha (+27737758557) Abortion Pills For Sale In Doha,...
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
Stages of Startup Funding - An Explainer
Stages of Startup Funding - An ExplainerStages of Startup Funding - An Explainer
Stages of Startup Funding - An Explainer
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
MEANING AND CHARACTERISTICS OF TAXATION.
MEANING AND CHARACTERISTICS OF TAXATION.MEANING AND CHARACTERISTICS OF TAXATION.
MEANING AND CHARACTERISTICS OF TAXATION.
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
Raising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesRaising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE Ventures
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
 

Risk management for the Agile world

  • 1. Risk management for the Agile world Nik Silver for Agile Cambridge 2015 http://niksilver.com @pigsaw
  • 2. This workshop • What’s in it for me? • A more constructive approach to “risks” • Group exercises • From uncertainties to actions
  • 3. What’s in it for me?
  • 4. The risk register A bad thing that might happen
  • 5. Categories of action Hardware will arrive too late Order hardware in good time http://www.clipartbest.com/clipart-dT8oGAATe
  • 6. Categories of action Supplier insufficiently skilled Supplier has been selected via rigorous process http://www.clipartbest.com/clipart-dT8oGAATe
  • 7. Categories of action Loss of intellectual property Contractual constraints http://www.clipartbest.com/clipart-dT8oGAATe
  • 8. How to look at risks* more constructively * So-called “risks”
  • 9. Two recent “risks” • Our boss might not like it • Our competitor releases in Germany first
  • 10. 1. Flip it round • Risk… or opportunity? • Let’s be ready to exploit that • Let’s be open to doing better than planned http://www.cheekymonkeycomedy.com/whats-missing-in-screenwriting/
  • 11. 1. Flip it round • Our boss might not like it – …or he might • Our competitor releases in Germany first – …or we might
  • 12. 2. Find the variability • Look past the “risk event” • There are gradations of badness… and goodness http://www.seducingwithstyle.com/style-blog/page/15/
  • 13. 2. Find the variability • Our boss might not like it – …or he might slightly dislike it – …and he may change his mind next week • Our competitor releases in Germany first – …by one year, three months, 24 hours…?
  • 14. 3. Zoom out • It’s not a single, isolated thing • It’s got fuzzy edges • Zoom out to see the larger whole http://www.vpul.upenn.edu/alcohol/marijuana.php
  • 15. 3. Zoom out • The unhappy boss – Isn’t this really about… stakeholder engagement? • Our competitor releases in Germany first – What about features, pricing, marketing…? – What about the next time? – Isn’t this really about… time to market?
  • 16.
  • 17. Warm-up exercise Let’s rethink some so- called risks…
  • 18. Warm-up exercise “Failure of client to pay fees” US engineering company wants to provide water treatment facilities in China
  • 19. Warm-up exercise “Regulators decide to regulate VCs but the chosen regulatory approach fails” European Banking Authority document on governance and regulation of virtual currencies (VCs).
  • 20. Warm-up exercise “The policy design for some aspects of the future organisation is incomplete. [...] So risk that Bill proceeds on the basis of incomplete/flawed design” Leaked document on Andrew Lansley’s 2012 NHS reforms
  • 21. Exercise • Look at the business case and risks • Turn each “risk” into an uncertainty – Flip it round – Find the variability – Zoom out. Isn’t this really about…?
  • 23. The ideal: Change the way we operate • Change the process • Change the environment • Because that “risk” is part of a larger thing • This requires imagination
  • 24. Changing the way we operate • The unhappy boss – Continuous stakeholder engagement • Our competitor releases in Germany first – Improve time to market, consistently • Customer who might not pay on time – Incentivise early (or advance) payment
  • 26. Summary • “A risk”  Uncertainty • Zoom out • Handle by changing the process • Where next: – Matthew Leitch – Intelligent Internal Control and Risk Management – http://www.workinginuncertainty.co.uk http://niksilver.com @pigsaw

Notas do Editor

  1. If you’re successful with agile then you’ll get to work on bigger projects (that aren’t just software) and be asked to review business cases (that do more than create software). And those projects have risks that Agile practices can’t help with. Those risks are presented in “risk registers”. But risk registers are as helpful to managing risk as waterfall-style Gantt charts are to predicting delivery dates. This workshop is to provide just the first stepping stone to more effective ways of dealing with those project issues, and provide some pointers to where to go next.
  2. You’ve broken out of the tech team and now people want to use your skills in bigger projects. This is what you’ll come across…
  3. And they’ll fall like dominos
  4. I’ve found that actions typically fall into one of three categories, none of which are very useful.
  5. So the risk register said we were worried about this, but we were really careful about selecting the supplier, so it’s okay now. So why is it on the risk register? Or is there something you’re still worried about – in which case a past action isn’t going to help us.
  6. From a business case I was asked to review… This is now your problem. You’ve been handed the risk register. There are real potential problems there. But the actions aren’t helpful. How can we deal with these for real?
  7. I’ve not asked for ideas for actions, because I’m not convinced we’ll come up with much that’s useful. Instead, I’m going to look at some more practical ways of working with those so-called “risks”.
  8. As a running example, I’m going to use some risks I’ve heard of recently in different companies. (1) Our boss says he wants the product “punchy” but won’t elaborate. We’re afraid we’ll deliver the product after six months and he’ll hate it. We can’t even write this risk down because it looks like we’re dysfunctional. (2) Our competitor launches in Germany before us – but we’ve got revenue riding on the fact that we launch first. I used to be flummoxed by these kind of things. But now I’m more confident, because I look at them differently.
  9. Things can be good as well as bad. What is the flip side?
  10. It’s not just “bad thing happens or it doesn’t”. It’s not black and white. There are shades of grey. And of course that’s true for good things as well as bad things.
  11. There’s a world of difference between being beaten by our competitor by one year, three months, or 24 hours.
  12. Zoom out. Look at the bigger picture.
  13. For the second one, there’s much more to a successful product that being first to launch.
  14. Here’s how I sum up those three things on one slide.
  15. Now I want us to use those techniques to tackle the so-called “risks” we’ve written down. But as a warm-up, let’s first do some together. These are all examples I’ve found elsewhere.
  16. This example is something being taught to engineering students, explaining risk registers to them. Is there a positive? Client may pay fees earlier than expected. They may pay for some things in advance. Is it variable? They pay variable days in advance, or variable days late. What if we zoom out? Perhaps this really about incentives for the client to pay. Perhaps we can structure things so there is an incentive for the client to pay early, or pay ahead.
  17. This is from an EBA report researching virtual currencies, and exploring possibilities for regulating things like Bitcoin. This is from their risk register. Is there a positive? The regulatory approach is so good it can be applied back to FCs. Is it variable? Yes, it may be successful or unsuccessful (better or worse) for different participants and players, in different circumstances. What if we zoom out? Perhaps this is really about… our relationship with the VC world/community. Perhaps it points to our inability to experiment with or investigate regulatory options in a safe and informative environment. Maybe that’s the real problem we should be addressing.
  18. This is from a leaked risk register in which civil servants set out potential problems for the parliamentary Bill for Andrew Lansley’s 2012 NHS re-org. Let’s apply our techniques… Is there a positive? Yes. We may have more clarity than the Bill needs and might use that to advance changes sooner. Is it variable? Yes, there are degrees of incompleteness. What if we zoom out? Perhaps the Bill is tied too closely to the detailed design. Perhaps we should architect the Bill so that it aligns to the principles of the re-org, not the details.
  19. Now it would be great if I could give you all the answers, but I’m afraid I can’t. I did say this was only a starter. However, I can give you some ideas about where to go next, and how to deal with these practically.
  20. A great way to handle uncertainty naturally is by changing the environment… by moving the playing field.
  21. These are hard to implement. But it’s better to tackle the difficult-but-right problem than the easy-but-wrong one.
  22. A risk register starts us off with point risks. But when you zoom out and look at things in a more rounded way, those point risks can start appearing as small examples of bigger themes. And then we might find big solutions. S/w dev address by agile. Product/market fit addressed by Lean Startup. They both deal with uncertainty by creating a feedback loop. If you’ve got business lines that are uncertainty then try portfolio diversification.
  23. If you want to know more, here is where I’ve found my inspiration.