13. Fmn cuttings 400 mtr GSB 15 Cm D/Layer 400 mtr S/R/Wall 75x3 mtr (in 3 Steps) S/R/Wall 75x4 mtr (in 4 Steps) S/B/Wall 50x2 mtr (in 2 Steps) Fmn Washed away from Km 41.400 to 41.800 400x6 mtr 2000-01 6 C/R/Wall 24x6 mtr S/B/Wall 70x3 mtr Fmn Breached at Km 41.55 of size 24x3.00 mtr 2001-02 5 S/Wall 20x12 mtr Fmn Breached at Km 41.70 of size 20x3.50 mtr 2002-2003 4 NIL 2003-04 3 Sausage T/wall 20x5 mtr Sausage R/wall 24x6 mtr Fmn damaged Km 41.730 20x3.10 mtr Km 41.550 to 41.650 Sausage carpeting 100x11 mtr Km 41.55 to 41.650 Km 41.370 to 41.550 Sausage carpeting 180 mtr x 5.50 mtr Fmn Sinking Km 41.370 to 41.550 2004-05 2 Fmn cutting HR 150x2.60x4.20 mtr Km 41.60 to 41.75 (150x2.60x3.00) Fmn cutting SMB 300x2.60x2.30 mtr Fmn Sinking Km 41.30 to 41.60 (300x2.60x2.10) 2005-06 1 Restoration work carried out Damages occurred in Jumja Year S/No