Supply Chain Network Design

       An Overview
Supply Chain Network Design
What is it?

  Supply Chain Network Design is a strategic exercise undertaken to evaluate and
  recommend changes to the physical supply chain of a company consisting of
  1. Inbound RM Movement from suppliers
  2. Inbound RM Storage locations
  3. Manufacturing locations and capacities
  4. Outbound FG movement to customers
  5. Outbound FG storage locations

                                   To Impact

  1.   Asset Utilizations
  2.   Total Landed cost incurred to service customer demand
  3.   While maintaining desired service levels
  4.   To improve operating margins
Supply Chain Network Design
Why is it important?

  Key Points
  1. Physical Network Decisions impact fixed costs of the supply
     chain network

  2. These decisions, once taken and implemented, require effort
     and costs to change . So a detailed analysis of outcomes and
     scenarios is important

  3. Multiple changes to the network – new products, new markets
     to serve, alternate modes of transport may make the existing
     network sub optimal. Hence a network design study becomes
     important.
Supply Chain Network Design
Key Triggers for this Study- A mix of external and internal factors

  1. External Factors
       a) Changes in government regulations( eg: Introduction of GST in India,
          Changes in Manufacturing incentives given by government) which
          impact supply chain networks
       b) Changes in business environment which may force a relook at supply
          chain network

  1. Internal Factors
       a) Aggressive growth plans/investment plans of companies and hence a
          need to check the suitability of network to support the plans
       b) Introduction of new revenue streams – new products, new markets and
          the need to design networks to support them
       c) Mergers/Acquisitions and need to rationalize and design supply chain
          network for new entity
       d) Need of companies to periodically revalidate and rationalize the
          existing supply chain network
Supply Chain Network Design
Some Questions which can be Answered

  1.   What is the most profitable supplier-plant-warehouse-market mapping for
       material flows?
  2.   How many warehouses are needed in the network ? Where should they be
       located? What is the estimated size of warehouses ?
  3.   What is the desirable mode mix for servicing demand?

  4.   What is the best location for setting up a new plant? What should be the
       capacity expansion rollout plan – where, how much, when?
  5.   Should capacity be ramped up in existing plant or should a new plant be
       setup?

  6.   Own/Rent Decisions( eg: Subcontract v/s Own Build Up)
  7.   On/Off Decisions: At what level of demand should a new warehouse be
       activated? Or a new manufacturing line be setup?
  8.   Is the current network geared to support the company’s growth plans?
  9.   How do government incentives and tax policies impact the supply chain
       network?
Supply Chain Network Design
The Approach

1. Analyze business strategy for the medium/long term (2 to       6.  Build Baseline scenario
   6 years)                                                          a) Ensure data accuracy and completeness.
2. Identify supply chain objectives required to meet business        b) To validate the model for
   strategy.                                                              representativeness to current network.
3. Identify most likely business scenarios related to                c) Get incremental improvements in current
    a. Marketplace – competition, demand, pricing, new                    operations
        products/markets                                          7. Simulate scenarios
    b. Operational – capacity usage, costs, logistics,               a) Check the current network’s ability to
        warehouse consolidation.                                          handle them
    c. Strategy – outsourcing, contract manufacturing, M&A,          b) Determine network changes required to
        expansion.                                                        handle marketplace scenarios.
4. Validate the scenarios. Build a final list.                    8. Develop management reports and evaluate
5. Finalize the evaluation criteria for the scenario simulation       scenario results.
    a. Service level                                                 a) Compare against baseline scenarios –
    b. Revenues (sales volumes)                                           costs, profits, utilization.
    c. Total Landed Cost                                             b) Supply chain robustness assessment
    d. Asset utilization (percentage usage of supply chain        9. Select suitable network strategy to meet
        resources)                                                    supply chain objectives.
                                                                  10. (Optional) Build implementation plan for the
                                                                      selected strategy
                                                                  11. (Optional) Undertake
                                                                      implementation/execution of implementation
                                                                      plan.
Supply Chain Network Design
Key Activities

                                                                                                  SCENARIO RESULT,
                                      BUILD, ANALYZE & BASELINE
               UNDERSTAND STRATEGY                                  SCENARIO PREPARATION,             SENSITIVITY
 PREP PHASE                              CURRENT NETWORK
                   and OBJECTIVES                                     MODELING and ANALYSIS          ANALYSIS,FINAL
                                                 MODEL
                                                                                                       STRATEGY
                    Step 1                  Step 2                      Step 3                       Step 4
              Activities:             Activities:                 Activities:                  Activities:
              1. Understand           1. Baseline current         1. Identify and finalize     1. Comparison of
                 business strategy       physical network            business scenarios –         scenario results
                 for short/mid/long   2. Baseline current            Scenario identification      with baseline
                 term                    linkages, service           workshops                 2. Interpret &
              2. Identify supply         levels and costs         2. Finalize evaluation          validate solutions
                 chain objectives     3. Validate baseline           criteria                  3. Sensitivity analysis
                 required to meet        model results            3. Detail new set of date       to measure
                 business strategy    4. Validation of the           inputs & constraints         robustness
                                         costing models and       4. Simulate scenarios        4. Network strategy
                                         assumptions used to      5. Perform network              recommendations
                                         construct the model         analysis for scenarios    5. Value potential
                                                                                                  summary
 Required data identification, aggregation, extraction and validation
                                      Deliverable:                  Deliverable:               Deliverable:
                                      1. Validated baseline         1. Final scenario list     1. Sensitivity report
                                         model                      2. Evaluation criteria     2. Network strategy
                                                                    3. Scenario results           recommendation
                                                                                                  and value
                                                                                                  potential
Supply Chain Network Design
Key Inputs

                      LOGISTICS                                        PRODUCTION
     1.  Current Hubs & Warehouses(WH)                  1.   Plants (Own & Sub Contracted)
     2.  Current Plant Locations                        2.   Line production capabilities (product mix)
     3.  Product specific Plant-WH linkages             3.   Line-Product production capacities.
     4.  Product specific Hub-WH linkages               4.   RM , PM & Conversion costs at plant
     5.  Linkages -WH and Towns/Markets                      locations
     6.  Weight Volume definitions -SKU’s and           5.   Capacity Ramp up plans, if any
         Transport Modes                                6.   Applicable Taxes
     7. Dispatches for year/time period                 7.   Applicable incentives at plants
         considered in baseline
     8. Sub-Contracted purchases, Inter WH flows,
         BOH & EOH stocks                                                  OTHERS
     9. Applicable Taxes on movement of goods           1.   Product aggregation approach
     10. Primary freight costs                          2.   Discontinued products
     11. Secondary freight costs                        3.   New launched products
     12. WH Fixed and Variable (handling) costs         4.   Markets-Products that are directly served
                                                             from Plants
               SALES & MARKETING                        5.   Net realization price of products
     1.   Validated Sales data
     2.   Sales Projections/Forecasts for years under
          study                                                      SCENARIO DATA
     3.   Market Definitions(Districts/Towns)           1.   Cost and Capacity data, as required ,
                                                             depending on scenarios
Supply Chain Network Design
Key Assumptions for Analysis

     Model Design Elements

     Time Horizon for Study

     Product Representation for Analysis( SKU or Brand Pack etc.)

     Geographical Representation( Town/Market/ State)

     Transportation Modes to be included( Road, Rail, Air, Sea)

     Service Assumptions, if any including predefined linkages for material flow

     Demand Assumptions

     Scenario Assumptions

     Channel Assumption - Channels to be considered for analysis

     Cost Assumptions( for example, analysis to be done based on operational costs etc.)
Supply Chain Network Design
Representative Model of Supply Chain – An Illustration

                       Objective:             Build a analytical model to represent the supply chain structure, key processes,
                                              constraints and cost that is representative of the actual operations.
                                              Once built and validated, this will be used for running simulations to evaluate
                                              future state network structure.



1.   RM & PM Costs
2.   CC Cost
3.   Capacities                            Company Network                                               Markets
4.   Line Capability
                                                                    WH
5.   Excise, IT Benefit




               Plant




           Contract Manf.                                                                                            1. Demand
                                                                                                                        projections by
                          1. Valid O-D pairs, by product:                                                               Market & Product
                             a. Plant-WH                     1. WH handling costs                   Distributors
                                                                                                                     2. For Time Horizon
                             b. WH-WH                        2. WH Market linkages                                      under study
                          2. Freight cost                    3. Delivery charges
Supply Chain Network Design
Illustration of an Approach



                      Network Model               Network Model
                         Design                       Build
       As-Is
   Understanding        Current Network &
                                                        Validation
                    Projections Data Collection
                                                                         Baseline on
                                                                       Current Network     Location/Mode
                                                                                           Mix Short Listing
                                                                        (Build Model &      for Evaluation
                                                                       Validate Results)



                         New
                   Network(WH/Hub)          New Plant Location       Current Capacity
                      Assessment               Assessment              Assessment              Scenario
    Result Set &
                                                                                             Identification
      Reports                      New Network                         Potential Plants
                   Validation                           Validation                            Workshops
                                   Data Collection                     Data Collection
Supply Chain Network Design
Analysis Tool


  A. Analysis use Operational Research tools which are based on industry
      standard solvers


  B. Tools:
           1. Linear Program + Integer Program based
           2. Used for evaluation of all scenarios (Plants, WH, Capacity etc.)
Supply Chain Network Design
The Baseline Network Model

                 1. To Ensure accuracy of supply chain network model to correctly reflect the
                    company supply chain structure, constraints and costs. All future state scenario
      WHY           results are compared against the baseline model results to understand extent
                    of possible improvement
                 2. To understand opportunities for improvement in the current existing network

                    Input past 1 year or 6 months shipment/dispatches as demand data
                    Input the production and material flow constraints. Input the costs in the
      HOW            model
                    Publish the optimized model( from analysis tool) material flows and costs for
                     comparison against actual data

                    Material flows should be along feasible lanes and representative of actual
                     flows. Differences need to be analyzed
                    Costs suggested by optimized model should be representative of actual costs.
   VALIDATION
                     The difference needs to be analyzed as possible improvements in current
     POINTS
                     network
                    Demand satisfaction suggested by optimized model should be in line with
                     actual
Supply Chain Network Design
Identification of Scenario Options

   1. Based on business plan priorities and future strategy of the company.
       a) Eg: The need to service focus markets with better service levels. Hence the supply chain
           network options need to be considered accordingly
       b) Eg: Decision to acquire another company and hence arriving at network rationalization
           scenarios
   2. Based on competitive benchmarks of supply chain network
   3. Based on supply chain networks of companies in other industries with similar characteristics
   4. Based on state of and development of logistics infrastructure
   5. Based on perceived market trends of freight rates etc.
   6. Based on clean slate approach
       a) Eg: If the complete supply chain network needs to be redrawn again, what would be the
           new network
       b) The approach for this involves taking the demand distribution into consideration and
           selecting a series of inventory points or supply points on a clean slate, so that goods travel
           least distance. Objective is to minimize MT(weight)*KM(distance) index

   Scenario Results are compared to baseline results on multiple objectives/metrics
   1. Overall Profit as given by the optimized network models
   2. Service levels defined in terms of lead time required to reach markets
   3. Total landed cost to markets
Supply Chain Network Design
Sensitivity Tests

  1. To check the robustness of proposed network( current network or based on
     scenario analysis results). A set of simulation studies done by varying the key
     inputs

  Typical Tests:
  1. Based on varying demand
       a) Eg: If demand projection is increased by 20% then which capacities become
           constrained
       b) Eg: If demand projection is decreased by 20% then do all proposed warehouse
           still remain active or some of them get deactivated
  2. Based on varying freights
       a) Eg: If road freights increase by 20% in comparison to freights of other modes
           what is the impact on the network
  3. Based on Activation/Deactivation of Options and its impact
       a) Activation/Deactivation of warehouses
       b) Activation/Deactivation of modes available for material movement
       c) Activation/Deactivation of alternate lines of production or alternate plants
Supply Chain Network Design
Analysis Output – Illustration1


                   2012                    Curr N/W(Baseline)   Scenario1
                COST_TYPE                        VALUE           VALUE          Difference
                   Inter WH FREIGHT COST
                      WH HANDLING COST
                          INCENTIVE COST
                         PACKAGING COST
                   PRIMARY FREIGHT COST
                 PRIMARY HANDLING COST
                        PRODUCTION COST
                      RAW MATERIAL COST
                SECONDARY FREIGHT COST
              SECONDARY HANDLING COST
                           WH FIXED COST
             TOTAL SYSTEM COST


      If Total System Cost(Scenario1) < Total System Cost(Baseline) then Scenario1
      recommendations can be considered.
Supply Chain Network Design
Analysis Output – Illustration2
                                                  With 2 Plants            Opportunity Size   %age
     Proposed New WH      (in million
                                         Current Network     New Network
      Structure Results      INR)
                            2010-11
                            2011-12
                            2012-13

                                                                               Opportunity
                                                     With 2 Plant                             %age
          If WH5                                                                  Size
         is closed                                                 New
                           (in million
                                           Current Network     Network+Close
                              INR)
                                                                   WH5
                            2010-11
                            2011-12
                            2012-13

                                                                               Opportunity
                                                     With 2 Plants                Size        %age
      If HUB1 is closed    (in million                    New Network+Close
                              INR)        Current Network        HUB1

                            2010-11
                            2011-12
                            2012-13
Supply Chain Network Design
Analysis Output




    Current Network              New Network
    (Baseline)
                              1. Recommendations
    Scenario Results          2. Opportunity Size
                              3. Reasons for
    Sensitivity Tests            Opportunity Size
Supply Chain Network Design
Success Factors for Study

 1.   Data Availability
          Timely
          Accurate
          Comprehensive
          Right Format
 2.   Robust business scenarios identification and analysis
 3.   Engagement Ownership & Involvement
          Active participation & involvement from company personnel across departments
          Championing the project objectives within company’s internal organization by
           PMO and Business champions
Thank You

Mais conteúdo relacionado

Mais procurados

Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain ManagementOni Sharma
 
Optimization in supply chain
Optimization in supply chainOptimization in supply chain
Optimization in supply chainarun mishra
 
3.Medium Access Control
3.Medium Access Control3.Medium Access Control
3.Medium Access ControlSonali Chauhan
 
Logistics costing ppt
Logistics costing pptLogistics costing ppt
Logistics costing pptMukul kale
 
Importance of documentation to system analysis
Importance of documentation to system analysisImportance of documentation to system analysis
Importance of documentation to system analysis'Femi Akin-Laguda
 
Importance & Principles of Modeling from UML Designing
Importance & Principles of Modeling from UML DesigningImportance & Principles of Modeling from UML Designing
Importance & Principles of Modeling from UML DesigningABHISHEK KUMAR
 
Process variation and continuous improvements
Process variation and continuous improvementsProcess variation and continuous improvements
Process variation and continuous improvementsTarek Elneil
 
Demand assigned and packet reservation multiple access
Demand assigned and packet reservation multiple accessDemand assigned and packet reservation multiple access
Demand assigned and packet reservation multiple accessGowriLatha1
 
Principles of logistics_information
Principles of logistics_informationPrinciples of logistics_information
Principles of logistics_informationMuthuPandi100
 
Common protocols
Common protocolsCommon protocols
Common protocolsMr SMAK
 
9-supply Chain Design. OPerations Management
9-supply Chain Design. OPerations Management9-supply Chain Design. OPerations Management
9-supply Chain Design. OPerations ManagementAaDi Malik
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringDarshan Shah
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementSagar Gadekar
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop schedulingSujeet TAMBE
 
Presentation on cyclic redundancy check (crc)
Presentation on cyclic redundancy check (crc)Presentation on cyclic redundancy check (crc)
Presentation on cyclic redundancy check (crc)Sudhanshu Srivastava
 
Communication costs in parallel machines
Communication costs in parallel machinesCommunication costs in parallel machines
Communication costs in parallel machinesSyed Zaid Irshad
 
Supply Chain Best Practices
Supply Chain Best PracticesSupply Chain Best Practices
Supply Chain Best PracticesTom Craig
 

Mais procurados (20)

Conditional branches
Conditional branchesConditional branches
Conditional branches
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Optimization in supply chain
Optimization in supply chainOptimization in supply chain
Optimization in supply chain
 
3.Medium Access Control
3.Medium Access Control3.Medium Access Control
3.Medium Access Control
 
Logistics costing ppt
Logistics costing pptLogistics costing ppt
Logistics costing ppt
 
Importance of documentation to system analysis
Importance of documentation to system analysisImportance of documentation to system analysis
Importance of documentation to system analysis
 
Importance & Principles of Modeling from UML Designing
Importance & Principles of Modeling from UML DesigningImportance & Principles of Modeling from UML Designing
Importance & Principles of Modeling from UML Designing
 
Queueing theory
Queueing theoryQueueing theory
Queueing theory
 
Process variation and continuous improvements
Process variation and continuous improvementsProcess variation and continuous improvements
Process variation and continuous improvements
 
Demand assigned and packet reservation multiple access
Demand assigned and packet reservation multiple accessDemand assigned and packet reservation multiple access
Demand assigned and packet reservation multiple access
 
Principles of logistics_information
Principles of logistics_informationPrinciples of logistics_information
Principles of logistics_information
 
Common protocols
Common protocolsCommon protocols
Common protocols
 
9-supply Chain Design. OPerations Management
9-supply Chain Design. OPerations Management9-supply Chain Design. OPerations Management
9-supply Chain Design. OPerations Management
 
Production planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, MonitoringProduction planning, routing, scheduling, Activating, Monitoring
Production planning, routing, scheduling, Activating, Monitoring
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Presentation on cyclic redundancy check (crc)
Presentation on cyclic redundancy check (crc)Presentation on cyclic redundancy check (crc)
Presentation on cyclic redundancy check (crc)
 
Communication costs in parallel machines
Communication costs in parallel machinesCommunication costs in parallel machines
Communication costs in parallel machines
 
Supply Chain Best Practices
Supply Chain Best PracticesSupply Chain Best Practices
Supply Chain Best Practices
 
Black hole attack
Black hole attackBlack hole attack
Black hole attack
 

Destaque (10)

Introduction to supply chain management.ppthere
Introduction to supply chain management.ppthereIntroduction to supply chain management.ppthere
Introduction to supply chain management.ppthere
 
GDP
GDPGDP
GDP
 
Good distribution practices for API's
Good distribution practices for API'sGood distribution practices for API's
Good distribution practices for API's
 
GMP Training
GMP TrainingGMP Training
GMP Training
 
Basics of FDA GMP Training
Basics of FDA GMP TrainingBasics of FDA GMP Training
Basics of FDA GMP Training
 
Good Manufacturing Practices
Good Manufacturing PracticesGood Manufacturing Practices
Good Manufacturing Practices
 
Presentation on supply chain management
Presentation on supply chain managementPresentation on supply chain management
Presentation on supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply Chain Performance
Supply Chain PerformanceSupply Chain Performance
Supply Chain Performance
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 

Semelhante a Network Optimization

S-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based Applications
S-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based ApplicationsS-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based Applications
S-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based Applicationsvirtual-campus
 
Developing Supply Chain Roadmap
Developing Supply Chain RoadmapDeveloping Supply Chain Roadmap
Developing Supply Chain Roadmapsinghmk74
 
Setanta Systems - Supply Chain Report and Analyses Module
Setanta Systems - Supply Chain Report and Analyses ModuleSetanta Systems - Supply Chain Report and Analyses Module
Setanta Systems - Supply Chain Report and Analyses ModuleSeabrook Technology Group
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertisesstein90
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseMike Romeri
 
AMC Optimized Data Protection Strategy
AMC Optimized Data Protection StrategyAMC Optimized Data Protection Strategy
AMC Optimized Data Protection Strategytcollins3413
 
Bill Stankiewicz Scope 2010 Supply Chains For The 21st Century
Bill Stankiewicz Scope 2010 Supply Chains For The 21st CenturyBill Stankiewicz Scope 2010 Supply Chains For The 21st Century
Bill Stankiewicz Scope 2010 Supply Chains For The 21st CenturyBillStankiewicz
 
Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...Plan4Demand
 
Paper sharing_Digital servitization of symbiotic service composition in produ...
Paper sharing_Digital servitization of symbiotic service composition in produ...Paper sharing_Digital servitization of symbiotic service composition in produ...
Paper sharing_Digital servitization of symbiotic service composition in produ...YOU SHENG CHEN
 
43194352-Feasibility-study.ppt
43194352-Feasibility-study.ppt43194352-Feasibility-study.ppt
43194352-Feasibility-study.pptIsmathIqbal2
 
Lacey coverage dallas-june20_2006
Lacey coverage dallas-june20_2006Lacey coverage dallas-june20_2006
Lacey coverage dallas-june20_2006Obsidian Software
 
HITSC 2010 06-30 slides
HITSC 2010 06-30 slidesHITSC 2010 06-30 slides
HITSC 2010 06-30 slidesBrian Ahier
 
A study on six sigma techniques and its application in reduction of seat reje...
A study on six sigma techniques and its application in reduction of seat reje...A study on six sigma techniques and its application in reduction of seat reje...
A study on six sigma techniques and its application in reduction of seat reje...Hitesh Kothari
 
Generic work description
Generic work descriptionGeneric work description
Generic work descriptionTapio Meskanen
 
Definio Reply Offering
Definio Reply OfferingDefinio Reply Offering
Definio Reply OfferingDefinioReply
 
Simulating a PhD: My journey and future research directions
Simulating a PhD: My journey and future research directionsSimulating a PhD: My journey and future research directions
Simulating a PhD: My journey and future research directionsmilesweaver
 
Track and Trace Solution Details
Track and Trace Solution DetailsTrack and Trace Solution Details
Track and Trace Solution DetailsPropix Technologies
 

Semelhante a Network Optimization (20)

S-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based Applications
S-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based ApplicationsS-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based Applications
S-CUBE LP: Multi-layer Monitoring and Adaptation of Service Based Applications
 
Developing Supply Chain Roadmap
Developing Supply Chain RoadmapDeveloping Supply Chain Roadmap
Developing Supply Chain Roadmap
 
Setanta Systems - Supply Chain Report and Analyses Module
Setanta Systems - Supply Chain Report and Analyses ModuleSetanta Systems - Supply Chain Report and Analyses Module
Setanta Systems - Supply Chain Report and Analyses Module
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertise
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertise
 
AMC Optimized Data Protection Strategy
AMC Optimized Data Protection StrategyAMC Optimized Data Protection Strategy
AMC Optimized Data Protection Strategy
 
Bill Stankiewicz Scope 2010 Supply Chains For The 21st Century
Bill Stankiewicz Scope 2010 Supply Chains For The 21st CenturyBill Stankiewicz Scope 2010 Supply Chains For The 21st Century
Bill Stankiewicz Scope 2010 Supply Chains For The 21st Century
 
Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...
 
Paper sharing_Digital servitization of symbiotic service composition in produ...
Paper sharing_Digital servitization of symbiotic service composition in produ...Paper sharing_Digital servitization of symbiotic service composition in produ...
Paper sharing_Digital servitization of symbiotic service composition in produ...
 
Scm models
Scm modelsScm models
Scm models
 
43194352-Feasibility-study.ppt
43194352-Feasibility-study.ppt43194352-Feasibility-study.ppt
43194352-Feasibility-study.ppt
 
Lacey coverage dallas-june20_2006
Lacey coverage dallas-june20_2006Lacey coverage dallas-june20_2006
Lacey coverage dallas-june20_2006
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
HITSC 2010 06-30 slides
HITSC 2010 06-30 slidesHITSC 2010 06-30 slides
HITSC 2010 06-30 slides
 
A study on six sigma techniques and its application in reduction of seat reje...
A study on six sigma techniques and its application in reduction of seat reje...A study on six sigma techniques and its application in reduction of seat reje...
A study on six sigma techniques and its application in reduction of seat reje...
 
Generic work description
Generic work descriptionGeneric work description
Generic work description
 
Definio Reply Offering
Definio Reply OfferingDefinio Reply Offering
Definio Reply Offering
 
Simulating a PhD: My journey and future research directions
Simulating a PhD: My journey and future research directionsSimulating a PhD: My journey and future research directions
Simulating a PhD: My journey and future research directions
 
Pp chap006
Pp chap006Pp chap006
Pp chap006
 
Track and Trace Solution Details
Track and Trace Solution DetailsTrack and Trace Solution Details
Track and Trace Solution Details
 

Network Optimization

  • 1. Supply Chain Network Design An Overview
  • 2. Supply Chain Network Design What is it? Supply Chain Network Design is a strategic exercise undertaken to evaluate and recommend changes to the physical supply chain of a company consisting of 1. Inbound RM Movement from suppliers 2. Inbound RM Storage locations 3. Manufacturing locations and capacities 4. Outbound FG movement to customers 5. Outbound FG storage locations To Impact 1. Asset Utilizations 2. Total Landed cost incurred to service customer demand 3. While maintaining desired service levels 4. To improve operating margins
  • 3. Supply Chain Network Design Why is it important? Key Points 1. Physical Network Decisions impact fixed costs of the supply chain network 2. These decisions, once taken and implemented, require effort and costs to change . So a detailed analysis of outcomes and scenarios is important 3. Multiple changes to the network – new products, new markets to serve, alternate modes of transport may make the existing network sub optimal. Hence a network design study becomes important.
  • 4. Supply Chain Network Design Key Triggers for this Study- A mix of external and internal factors 1. External Factors a) Changes in government regulations( eg: Introduction of GST in India, Changes in Manufacturing incentives given by government) which impact supply chain networks b) Changes in business environment which may force a relook at supply chain network 1. Internal Factors a) Aggressive growth plans/investment plans of companies and hence a need to check the suitability of network to support the plans b) Introduction of new revenue streams – new products, new markets and the need to design networks to support them c) Mergers/Acquisitions and need to rationalize and design supply chain network for new entity d) Need of companies to periodically revalidate and rationalize the existing supply chain network
  • 5. Supply Chain Network Design Some Questions which can be Answered 1. What is the most profitable supplier-plant-warehouse-market mapping for material flows? 2. How many warehouses are needed in the network ? Where should they be located? What is the estimated size of warehouses ? 3. What is the desirable mode mix for servicing demand? 4. What is the best location for setting up a new plant? What should be the capacity expansion rollout plan – where, how much, when? 5. Should capacity be ramped up in existing plant or should a new plant be setup? 6. Own/Rent Decisions( eg: Subcontract v/s Own Build Up) 7. On/Off Decisions: At what level of demand should a new warehouse be activated? Or a new manufacturing line be setup? 8. Is the current network geared to support the company’s growth plans? 9. How do government incentives and tax policies impact the supply chain network?
  • 6. Supply Chain Network Design The Approach 1. Analyze business strategy for the medium/long term (2 to 6. Build Baseline scenario 6 years) a) Ensure data accuracy and completeness. 2. Identify supply chain objectives required to meet business b) To validate the model for strategy. representativeness to current network. 3. Identify most likely business scenarios related to c) Get incremental improvements in current a. Marketplace – competition, demand, pricing, new operations products/markets 7. Simulate scenarios b. Operational – capacity usage, costs, logistics, a) Check the current network’s ability to warehouse consolidation. handle them c. Strategy – outsourcing, contract manufacturing, M&A, b) Determine network changes required to expansion. handle marketplace scenarios. 4. Validate the scenarios. Build a final list. 8. Develop management reports and evaluate 5. Finalize the evaluation criteria for the scenario simulation scenario results. a. Service level a) Compare against baseline scenarios – b. Revenues (sales volumes) costs, profits, utilization. c. Total Landed Cost b) Supply chain robustness assessment d. Asset utilization (percentage usage of supply chain 9. Select suitable network strategy to meet resources) supply chain objectives. 10. (Optional) Build implementation plan for the selected strategy 11. (Optional) Undertake implementation/execution of implementation plan.
  • 7. Supply Chain Network Design Key Activities SCENARIO RESULT, BUILD, ANALYZE & BASELINE UNDERSTAND STRATEGY SCENARIO PREPARATION, SENSITIVITY PREP PHASE CURRENT NETWORK and OBJECTIVES MODELING and ANALYSIS ANALYSIS,FINAL MODEL STRATEGY Step 1 Step 2 Step 3 Step 4 Activities: Activities: Activities: Activities: 1. Understand 1. Baseline current 1. Identify and finalize 1. Comparison of business strategy physical network business scenarios – scenario results for short/mid/long 2. Baseline current Scenario identification with baseline term linkages, service workshops 2. Interpret & 2. Identify supply levels and costs 2. Finalize evaluation validate solutions chain objectives 3. Validate baseline criteria 3. Sensitivity analysis required to meet model results 3. Detail new set of date to measure business strategy 4. Validation of the inputs & constraints robustness costing models and 4. Simulate scenarios 4. Network strategy assumptions used to 5. Perform network recommendations construct the model analysis for scenarios 5. Value potential summary Required data identification, aggregation, extraction and validation Deliverable: Deliverable: Deliverable: 1. Validated baseline 1. Final scenario list 1. Sensitivity report model 2. Evaluation criteria 2. Network strategy 3. Scenario results recommendation and value potential
  • 8. Supply Chain Network Design Key Inputs LOGISTICS PRODUCTION 1. Current Hubs & Warehouses(WH) 1. Plants (Own & Sub Contracted) 2. Current Plant Locations 2. Line production capabilities (product mix) 3. Product specific Plant-WH linkages 3. Line-Product production capacities. 4. Product specific Hub-WH linkages 4. RM , PM & Conversion costs at plant 5. Linkages -WH and Towns/Markets locations 6. Weight Volume definitions -SKU’s and 5. Capacity Ramp up plans, if any Transport Modes 6. Applicable Taxes 7. Dispatches for year/time period 7. Applicable incentives at plants considered in baseline 8. Sub-Contracted purchases, Inter WH flows, BOH & EOH stocks OTHERS 9. Applicable Taxes on movement of goods 1. Product aggregation approach 10. Primary freight costs 2. Discontinued products 11. Secondary freight costs 3. New launched products 12. WH Fixed and Variable (handling) costs 4. Markets-Products that are directly served from Plants SALES & MARKETING 5. Net realization price of products 1. Validated Sales data 2. Sales Projections/Forecasts for years under study SCENARIO DATA 3. Market Definitions(Districts/Towns) 1. Cost and Capacity data, as required , depending on scenarios
  • 9. Supply Chain Network Design Key Assumptions for Analysis Model Design Elements Time Horizon for Study Product Representation for Analysis( SKU or Brand Pack etc.) Geographical Representation( Town/Market/ State) Transportation Modes to be included( Road, Rail, Air, Sea) Service Assumptions, if any including predefined linkages for material flow Demand Assumptions Scenario Assumptions Channel Assumption - Channels to be considered for analysis Cost Assumptions( for example, analysis to be done based on operational costs etc.)
  • 10. Supply Chain Network Design Representative Model of Supply Chain – An Illustration Objective: Build a analytical model to represent the supply chain structure, key processes, constraints and cost that is representative of the actual operations. Once built and validated, this will be used for running simulations to evaluate future state network structure. 1. RM & PM Costs 2. CC Cost 3. Capacities Company Network Markets 4. Line Capability WH 5. Excise, IT Benefit Plant Contract Manf. 1. Demand projections by 1. Valid O-D pairs, by product: Market & Product a. Plant-WH 1. WH handling costs Distributors 2. For Time Horizon b. WH-WH 2. WH Market linkages under study 2. Freight cost 3. Delivery charges
  • 11. Supply Chain Network Design Illustration of an Approach Network Model Network Model Design Build As-Is Understanding Current Network & Validation Projections Data Collection Baseline on Current Network Location/Mode Mix Short Listing (Build Model & for Evaluation Validate Results) New Network(WH/Hub) New Plant Location Current Capacity Assessment Assessment Assessment Scenario Result Set & Identification Reports New Network Potential Plants Validation Validation Workshops Data Collection Data Collection
  • 12. Supply Chain Network Design Analysis Tool A. Analysis use Operational Research tools which are based on industry standard solvers B. Tools: 1. Linear Program + Integer Program based 2. Used for evaluation of all scenarios (Plants, WH, Capacity etc.)
  • 13. Supply Chain Network Design The Baseline Network Model 1. To Ensure accuracy of supply chain network model to correctly reflect the company supply chain structure, constraints and costs. All future state scenario WHY results are compared against the baseline model results to understand extent of possible improvement 2. To understand opportunities for improvement in the current existing network  Input past 1 year or 6 months shipment/dispatches as demand data  Input the production and material flow constraints. Input the costs in the HOW model  Publish the optimized model( from analysis tool) material flows and costs for comparison against actual data  Material flows should be along feasible lanes and representative of actual flows. Differences need to be analyzed  Costs suggested by optimized model should be representative of actual costs. VALIDATION The difference needs to be analyzed as possible improvements in current POINTS network  Demand satisfaction suggested by optimized model should be in line with actual
  • 14. Supply Chain Network Design Identification of Scenario Options 1. Based on business plan priorities and future strategy of the company. a) Eg: The need to service focus markets with better service levels. Hence the supply chain network options need to be considered accordingly b) Eg: Decision to acquire another company and hence arriving at network rationalization scenarios 2. Based on competitive benchmarks of supply chain network 3. Based on supply chain networks of companies in other industries with similar characteristics 4. Based on state of and development of logistics infrastructure 5. Based on perceived market trends of freight rates etc. 6. Based on clean slate approach a) Eg: If the complete supply chain network needs to be redrawn again, what would be the new network b) The approach for this involves taking the demand distribution into consideration and selecting a series of inventory points or supply points on a clean slate, so that goods travel least distance. Objective is to minimize MT(weight)*KM(distance) index Scenario Results are compared to baseline results on multiple objectives/metrics 1. Overall Profit as given by the optimized network models 2. Service levels defined in terms of lead time required to reach markets 3. Total landed cost to markets
  • 15. Supply Chain Network Design Sensitivity Tests 1. To check the robustness of proposed network( current network or based on scenario analysis results). A set of simulation studies done by varying the key inputs Typical Tests: 1. Based on varying demand a) Eg: If demand projection is increased by 20% then which capacities become constrained b) Eg: If demand projection is decreased by 20% then do all proposed warehouse still remain active or some of them get deactivated 2. Based on varying freights a) Eg: If road freights increase by 20% in comparison to freights of other modes what is the impact on the network 3. Based on Activation/Deactivation of Options and its impact a) Activation/Deactivation of warehouses b) Activation/Deactivation of modes available for material movement c) Activation/Deactivation of alternate lines of production or alternate plants
  • 16. Supply Chain Network Design Analysis Output – Illustration1 2012 Curr N/W(Baseline) Scenario1 COST_TYPE VALUE VALUE Difference Inter WH FREIGHT COST WH HANDLING COST INCENTIVE COST PACKAGING COST PRIMARY FREIGHT COST PRIMARY HANDLING COST PRODUCTION COST RAW MATERIAL COST SECONDARY FREIGHT COST SECONDARY HANDLING COST WH FIXED COST TOTAL SYSTEM COST If Total System Cost(Scenario1) < Total System Cost(Baseline) then Scenario1 recommendations can be considered.
  • 17. Supply Chain Network Design Analysis Output – Illustration2 With 2 Plants Opportunity Size %age Proposed New WH (in million Current Network New Network Structure Results INR) 2010-11 2011-12 2012-13 Opportunity With 2 Plant %age If WH5 Size is closed New (in million Current Network Network+Close INR) WH5 2010-11 2011-12 2012-13 Opportunity With 2 Plants Size %age If HUB1 is closed (in million New Network+Close INR) Current Network HUB1 2010-11 2011-12 2012-13
  • 18. Supply Chain Network Design Analysis Output Current Network New Network (Baseline) 1. Recommendations Scenario Results 2. Opportunity Size 3. Reasons for Sensitivity Tests Opportunity Size
  • 19. Supply Chain Network Design Success Factors for Study 1. Data Availability  Timely  Accurate  Comprehensive  Right Format 2. Robust business scenarios identification and analysis 3. Engagement Ownership & Involvement  Active participation & involvement from company personnel across departments  Championing the project objectives within company’s internal organization by PMO and Business champions