CHENNAI METRO RAIL PROJECT ECV-02 /03<br />WORK METHOD STATEMENT<br />PROCEDURE FOR SURVEY-WMS-1A<br />DISCIPLINECivilMechanicalElectricalGeneral<br />ContactDocument controlNAME:  S.BalajiTopographical SurveyQMS/D/CMP/WMS- 1ATel:09600091870Action RequiredEmail:sbj@lntecc.comFor informationFor Approval<br />Preparation & IssueNamePositionSignatureDatePrepared byS.KavinkumarPlanning Manager02-03-2010Reviewed byK.NarasimhanConstruction Manager02-03-2010Approved byS.BalajiProject Manager03-03-2010This submission is considered ready for review and complies with contract other than stated herewith.Approved by(GCC)<br />This document consists of 5 pages including this page<br />CONTENTS<br />Sl No.ContentPage no.01Preamble302Manpower, Machineries & Equipment303Work Methodology404Environment, Health & Safety505Formats / Reports5<br />SURVEY METHODOLOGY<br />FOR CHENNAI METRO PROJECT-VIADUCT SURVEY CHENNAI<br />INTRODUCTION:<br /> The following mentioned methodology shall be adopted by M/s National Survey and Engineers for carrying out topographical survey for the projects ECV02 & ECV03 of CMRL phase I for the sector Ashok Nagar to St. Thomas mount and from Saidapet to OTA.<br />1. PREAMBLE.<br />The object of this Method Statement is to lay down a procedure for survey works of the Project such as setting out the horizontal and vertical control points, setting out the project highway alignment and taking Original Ground Levels of the project highway etc,. <br />   <br /> 2. MANPOWER, MACHINERY & EQUIPMENT: <br /> 2.1       MANPOWER:<br />Sl.NoDescriptionRequirementRemarks1Survey Engineer12Surveyors23Helper4<br />2.2     MACHINERY & EQUIPMENT: <br />Sl.NoDescriptionRequirementRemarks1Total Station with Sighting Prism22Auto level23Leveling Staff44Measuring Tape45Other ToolsAs per the site Requirement<br />Apparatus:  The following survey instruments shall be deployed for the survey job:<br />Leica GX1230 Differential GPS with L1 and L2 frequency   - 1 Base and 1 Rover.<br />  Electronic Total Station instruments   - 2 to 3 No.<br />Digital Level DN10.<br />3. WORK METHODOLOGY:<br />Pillars Fixing<br />DGPS Network survey for the proposed area.<br />Leveling to connect all network stations<br />Detailed topo Survey.<br /> 3.1 PILLAR FIXING: <br />RCC Pillars of both GPS and secondary pillars as prescribed size shall be fixed at the locations along the stretch as decided by the site Engineer-in-charge.<br /> 3.2 DGPS network Survey:<br />After making reconnaissance survey of the area, DGPS network station is selected to fix          Primary Control Points for the interval of every 5km.<br />Data Collection:<br />Keeping the DGPS Receiver at 0 km chainage and another DGPS Receiver at 5th km control station point, the data shall be collected using satellites for maximum duration of 1 hour simultaneously.   In the similar manner, the data is collected for all other Primary control points.<br />Processing:  <br />The collected DGPS data is downloaded from the Receivers to the Computer and the data is processed using the Leica Geo Office software until the ambiguity is resolved. <br />Processing Parameters: <br />Ellipsoid:                 WGS-84 <br />Semi Major Axis (a):          6378137.00<br />Flattening (1/f):                298.257223563<br />Projection:              UTM <br />Zone width:   6  wide<br />False Easting:        500000 at CM <br />           Scale Factor at CM:  0.9996<br />          False Northing:      0.000 at Equator<br />After processing the data, we get Slope/Grid distance and Azimuth between the stations as well as co-ordinates in WGS-84 system. <br />Chainage marking:<br /> Chainage shall be marked from starting point to end point at every 20 m interval to facilitate to take cross section details<br />Horizontal Traverse Survey:<br />  Horizontal traverse stations at 200-250 m interval shall be established all along the route of survey. Using the Electronic Total Station instrument horizontal traverse shall be carried from one DGPS station to another station taking angles and distance in both faces left and face right values.  In addition to this, we establish Traverse stations at various intervals to facilitate detailed topographical survey. The horizontal traverse accuracy shall be 1 in 20000.<br />3.3 Leveling:<br />     The entire Primary, secondary and all Traverse stations are connected by using Digital level from the known or identified BM to get the elevation or height. The leveling accuracy shall be 12√k.<br />3.4 Detailed Topographical Survey:<br /> From the established primary, secondary and Traverse stations as per specifications all the existing features, shall be captured by using Electronic Total Station.<br />Drawing:<br /> The field data collected with DGPS and Electronic Total Station instruments would be downloaded into computer and as per code drawing will be prepared using Auto CAD. Drawing print out copy shall be taken to field to cross check with ground features.  If there is any omission that shall be rectified.  Final drawing shall be submitted with all field data in soft copy and report in hard copy.<br />4. Environment Health & Safety:<br /> All the staff and work men shall be provided with necessary personal protective equipment.(Safety jackets, safety helmets and safety shoes) always at site.<br />All the works shall be carried out in order to maintain clean environment and no damage will occur to any property or public amenities.<br />5. Reports<br />The field data collected with DGPS and electronic Total station instruments shall be downloaded into computer and as per code drawing shall be prepared in AutoCAD. Drawing printout copy shall be taken to field and physically cross checked. If there is any omissions or commission shall be rectified. Final drawing shall be submitted with all field data in soft copy and reports in hard copy.<br />
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10
Cmp wms -1 a-survey-rev.1- 03-03-10

Mais conteúdo relacionado

Mais de Siddhartha Bhamidipati (19)

Gen. ref. book
Gen. ref. bookGen. ref. book
Gen. ref. book
 
Ch 4-water
Ch 4-waterCh 4-water
Ch 4-water
 
ISO 9001 -2008
ISO  9001 -2008ISO  9001 -2008
ISO 9001 -2008
 
Rev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigationRev 01 dt 01.03.2010 - soil investigation
Rev 01 dt 01.03.2010 - soil investigation
 
4648
46484648
4648
 
432 1
432 1432 1
432 1
 
1200 5
1200 51200 5
1200 5
 
1200 5
1200 51200 5
1200 5
 
1200 4
1200 41200 4
1200 4
 
1200 3
1200 31200 3
1200 3
 
1200 2
1200 21200 2
1200 2
 
1200 1
1200 11200 1
1200 1
 
1199
11991199
1199
 
784
784784
784
 
783
783783
783
 
Ac02 nit
Ac02 nitAc02 nit
Ac02 nit
 
Ac02 itt
Ac02 ittAc02 itt
Ac02 itt
 
Axial%20 load%20test%20procedures%20for%20pile%20foundations
Axial%20 load%20test%20procedures%20for%20pile%20foundationsAxial%20 load%20test%20procedures%20for%20pile%20foundations
Axial%20 load%20test%20procedures%20for%20pile%20foundations
 
construction safety
construction safetyconstruction safety
construction safety
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 

Cmp wms -1 a-survey-rev.1- 03-03-10

  • 1. CHENNAI METRO RAIL PROJECT ECV-02 /03<br />WORK METHOD STATEMENT<br />PROCEDURE FOR SURVEY-WMS-1A<br />DISCIPLINECivilMechanicalElectricalGeneral<br />ContactDocument controlNAME: S.BalajiTopographical SurveyQMS/D/CMP/WMS- 1ATel:09600091870Action RequiredEmail:sbj@lntecc.comFor informationFor Approval<br />Preparation & IssueNamePositionSignatureDatePrepared byS.KavinkumarPlanning Manager02-03-2010Reviewed byK.NarasimhanConstruction Manager02-03-2010Approved byS.BalajiProject Manager03-03-2010This submission is considered ready for review and complies with contract other than stated herewith.Approved by(GCC)<br />This document consists of 5 pages including this page<br />CONTENTS<br />Sl No.ContentPage no.01Preamble302Manpower, Machineries & Equipment303Work Methodology404Environment, Health & Safety505Formats / Reports5<br />SURVEY METHODOLOGY<br />FOR CHENNAI METRO PROJECT-VIADUCT SURVEY CHENNAI<br />INTRODUCTION:<br /> The following mentioned methodology shall be adopted by M/s National Survey and Engineers for carrying out topographical survey for the projects ECV02 & ECV03 of CMRL phase I for the sector Ashok Nagar to St. Thomas mount and from Saidapet to OTA.<br />1. PREAMBLE.<br />The object of this Method Statement is to lay down a procedure for survey works of the Project such as setting out the horizontal and vertical control points, setting out the project highway alignment and taking Original Ground Levels of the project highway etc,. <br /> <br /> 2. MANPOWER, MACHINERY & EQUIPMENT: <br /> 2.1 MANPOWER:<br />Sl.NoDescriptionRequirementRemarks1Survey Engineer12Surveyors23Helper4<br />2.2 MACHINERY & EQUIPMENT: <br />Sl.NoDescriptionRequirementRemarks1Total Station with Sighting Prism22Auto level23Leveling Staff44Measuring Tape45Other ToolsAs per the site Requirement<br />Apparatus: The following survey instruments shall be deployed for the survey job:<br />Leica GX1230 Differential GPS with L1 and L2 frequency - 1 Base and 1 Rover.<br /> Electronic Total Station instruments - 2 to 3 No.<br />Digital Level DN10.<br />3. WORK METHODOLOGY:<br />Pillars Fixing<br />DGPS Network survey for the proposed area.<br />Leveling to connect all network stations<br />Detailed topo Survey.<br /> 3.1 PILLAR FIXING: <br />RCC Pillars of both GPS and secondary pillars as prescribed size shall be fixed at the locations along the stretch as decided by the site Engineer-in-charge.<br /> 3.2 DGPS network Survey:<br />After making reconnaissance survey of the area, DGPS network station is selected to fix Primary Control Points for the interval of every 5km.<br />Data Collection:<br />Keeping the DGPS Receiver at 0 km chainage and another DGPS Receiver at 5th km control station point, the data shall be collected using satellites for maximum duration of 1 hour simultaneously. In the similar manner, the data is collected for all other Primary control points.<br />Processing: <br />The collected DGPS data is downloaded from the Receivers to the Computer and the data is processed using the Leica Geo Office software until the ambiguity is resolved. <br />Processing Parameters: <br />Ellipsoid: WGS-84 <br />Semi Major Axis (a): 6378137.00<br />Flattening (1/f): 298.257223563<br />Projection: UTM <br />Zone width: 6 wide<br />False Easting: 500000 at CM <br /> Scale Factor at CM: 0.9996<br /> False Northing: 0.000 at Equator<br />After processing the data, we get Slope/Grid distance and Azimuth between the stations as well as co-ordinates in WGS-84 system. <br />Chainage marking:<br /> Chainage shall be marked from starting point to end point at every 20 m interval to facilitate to take cross section details<br />Horizontal Traverse Survey:<br /> Horizontal traverse stations at 200-250 m interval shall be established all along the route of survey. Using the Electronic Total Station instrument horizontal traverse shall be carried from one DGPS station to another station taking angles and distance in both faces left and face right values. In addition to this, we establish Traverse stations at various intervals to facilitate detailed topographical survey. The horizontal traverse accuracy shall be 1 in 20000.<br />3.3 Leveling:<br /> The entire Primary, secondary and all Traverse stations are connected by using Digital level from the known or identified BM to get the elevation or height. The leveling accuracy shall be 12√k.<br />3.4 Detailed Topographical Survey:<br /> From the established primary, secondary and Traverse stations as per specifications all the existing features, shall be captured by using Electronic Total Station.<br />Drawing:<br /> The field data collected with DGPS and Electronic Total Station instruments would be downloaded into computer and as per code drawing will be prepared using Auto CAD. Drawing print out copy shall be taken to field to cross check with ground features. If there is any omission that shall be rectified. Final drawing shall be submitted with all field data in soft copy and report in hard copy.<br />4. Environment Health & Safety:<br /> All the staff and work men shall be provided with necessary personal protective equipment.(Safety jackets, safety helmets and safety shoes) always at site.<br />All the works shall be carried out in order to maintain clean environment and no damage will occur to any property or public amenities.<br />5. Reports<br />The field data collected with DGPS and electronic Total station instruments shall be downloaded into computer and as per code drawing shall be prepared in AutoCAD. Drawing printout copy shall be taken to field and physically cross checked. If there is any omissions or commission shall be rectified. Final drawing shall be submitted with all field data in soft copy and reports in hard copy.<br />