FAILURE OF EARTHEN DAMS

NAME- SABYASACHI SWAIN
SUBJECT- THEORY OF SEEPAGE
M.TECH 1ST YEAR
BRANCH- WRD & IE
ROLL NO- 13244006
FAILURE OF EARTHEN DAMS
• Earth dams are less rigid and hence more
susceptible to failure.

• An earthen dam may fail due to improper
designs, faulty constructions, or lack of
maintenance etc.
FAILURE OF EARTHEN DAMS
• The various causes leading to the failure
of earth dam can be grouped into
following three categories1. Hydraulic failures
2. Seepage failures
3. Structural failures
FAILURE OF EARTHEN DAMS
1. HYDRAULIC FAILURES-

• About 40% of earth dam failures have
been attributed to these causes.
• The failure under this category may occur
due to the following reasons:
FAILURE OF EARTHEN DAMS
a) Overtopping failure:
The water may overtop the dam , if
•
•
•



The design flood is under-estimated.
The spillway is of insufficient capacity.
The spillway gates are not properly
operated.
Sufficient freeboard should, therefore be
provided.
FAILURE OF EARTHEN DAMS
b) Erosion of upstream face:
• The wave action due to the wind and tides will
cause the erosion of the dam material at the
upstream face, if the material could not
sustain wave velocity.

• It will lead to washing out of the dam material
or overturning of the protection slab or slip of
the upstream face.
FAILURE OF EARTHEN DAMS
Safety measures:
Upstream stone pitching .
Provision of riprap.

Proper design.
FAILURE OF EARTHEN DAMS
c) Cracking due to frost action:
• Frost in the upper portion of the dam may
cause heaving and cracking of the soil with
dangerous seepage and consequent failure.
An additional freeboard allowance should be
provided for dams in areas of low
temperatures.
FAILURE OF EARTHEN DAMS
d) Erosion of the downstream slope by
gully formation:
• Heavy rains falling over the downstream face
• The erosive action of moving water

• The formation of gullies on the downstream
face , leading to dam failure.
FAILURE OF EARTHEN DAMS
Proper maintenance.
Filling the cuts from time to time , especially
during rainy season.
Grassing the slopes.
Providing proper berms at suitable heights.
FAILURE OF EARTHEN DAMS

Provision of berms in an earthen dam
FAILURE OF EARTHEN DAMS
e) Toe erosion:
• Similar to the wave action at the upstream of
the dam, downstream dam slope is also
susceptible for erosion by the downward
water.
• Erosion due to the cross-currents that may
come from the spillway buckets.
• Erosion due to tailwater.
FAILURE OF EARTHEN DAMS
Provision of a downstream slope pitching or a
riprap up to a height slightly above the normal
tail water depth.

By providing the rock toe drainage.
Sidewalls of the spillway must be of sufficient
height and length.
FAILURE OF EARTHEN DAMS
2. SEEPAGE FAILURES• Uncontrolled or concentrated seepage
through dam body or foundation may lead to
failure of the dam.
• Piping (through foundation and dam body)
• Sloughing
FAILURE OF EARTHEN DAMS
• Piping is the progressive erosion and
subsequent removal of soil grains from within
the body or foundation of the dam.

• Sloughing is the progressive removal of soil
from the wet downstream face.
• More than one-third of the earth dams have
failed due to these reasons.
FAILURE OF EARTHEN DAMS
(a)Piping through foundations:
• When highly permeable cavities or strata of
coarse sand or gravel are present in the
foundation, water may seep at a huge rate
through them.
• This concentrated flow at a high gradient
may erode the soil.
• Increased flow of water and soil results in
creation of hollows below the
foundation, into which the dam may sink
down.
FAILURE OF EARTHEN DAMS

Piping through the dam foundation
FAILURE OF EARTHEN DAMS
(b) Piping through dam body:
• When concentrated flow channels get
developed in the body of the dam, soil may be
removed as in case of foundation piping.
• Formation of hollows in the dam body and
subsequent subsidence of the dam body.
• Flow channels develop due to faulty
construction, insufficient compaction, cracks
in embankment due to settlement, shrinkage
cracks etc.
FAILURE OF EARTHEN DAMS

Piping through the dam body
FAILURE OF EARTHEN DAMS
All these can be removed by better
construction and better maintenance of dam
embankment.

Thorough compaction of soils near the outlet
conduits and preventing the leakage through
them to avoid contact seepage.
For pervious seams in foundation, relief drain
with filter can be provided.
FAILURE OF EARTHEN DAMS
(c) Sloughing:
• If the seepage line exists at the downstream
face of the dam, the portion of the toe of the
dam below the exit point will always remain in
the wet condition.
• This will cause the reduction of the stability of
the slope and small size sliding may occur.
• The repetition of wetting and sliding will
continue further to cause dam failure, termed
as sloughing.
FAILURE OF EARTHEN DAMS
3. STRUCTURAL FAILURES• About 25% of overall dam failures.
• Generally, these are caused by shear failures
leading to sliding.
FAILURE OF EARTHEN DAMS
(a)Failure due to the pore water pressure:
• Excessive pore water pressure in confined seams
of sand and silt, artesian pressure in
abutments, etc. may reduce shear strength of
soil.
• Loose sand foundation may fail by
liquefaction or flow slides.
Adequate compaction of soil.
FAILURE OF EARTHEN DAMS
(b) Upstream slope failure:
• Steep slope, weak embankment soil, sudden
drawdown of reservoir.
• Cause the seepage force acting along the
sliding direction causing increase of the
driving force for slope direction.
• Seldom lead to catastrophic failures.
Can be avoided by flatten slopes, provision of
rock berms and better operating rules.
FAILURE OF EARTHEN DAMS

Upstream slope slide due to sudden drawdown
FAILURE OF EARTHEN DAMS
(c) Downstream slope failure:
• When the reservoir is at maximum level and if
the steady stage seepage is at maximum
rate, the downstream slope is more
vulnerable to slide due to seepage force acting
in the direction of driving force for the sliding.
Flatten slope, better soil, increased
compaction, internal drainage with protective
filters and surface drainage facilities.
FAILURE OF EARTHEN DAMS

Downstream slope slide during full reservoir condition
FAILURE OF EARTHEN DAMS
(d) Foundation slide:
• The dam body as a whole may slide, if the
foundation is from the silt or soft soil.
• The slow consolidation process and expansion
of clay soils due to the saturation will decrease
the shear strength of the foundation soil.
Flatten slopes, broad berms, stabilization of
soil, deep drain trenches with protective filters
for drainage, relief wells.
FAILURE OF EARTHEN DAMS

Sliding due to soft or weak foundation
FAILURE OF EARTHEN DAMS
(e) Other modes:
• Failure by spreading.
• Failure by leaching.
• Failure due to earthquake – most devastating
of all types of failures.
Proper design, regular inspection and better
operating rules.
REFERENCES
Garg, S.K., (2012), “Irrigation Engineering and
Hydraulic Structures.” 24th Edition, Khanna
Publishers.
Wallingford H.R.,(2008), “Dam Breach Floods –
An Introduction”, www.hrwallingford.com.
Dam Failure- Wikipedia, the free encyclopedia.
en.wikipedia.org/wiki/Dam_failure.
Creager, W.P., Justin, J.D. and Hinds, J., (1955),
“Engineering for Dams.” Vol. 3, 1st
Edition, John Wiley & Sons,INC., Chapman &
Hall, LTD.
THANK YOU

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

River training works lecture
River training works lectureRiver training works lecture
River training works lecture
 
Spillways
SpillwaysSpillways
Spillways
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classification
 
Using HEC-RAS to assess flash floods risk in arid regions
Using HEC-RAS to assess flash floods risk in arid regionsUsing HEC-RAS to assess flash floods risk in arid regions
Using HEC-RAS to assess flash floods risk in arid regions
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 
Spillways
SpillwaysSpillways
Spillways
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwe
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flow
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Diversionheadworks
DiversionheadworksDiversionheadworks
Diversionheadworks
 
River engineering
River engineeringRiver engineering
River engineering
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Spillways
SpillwaysSpillways
Spillways
 
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
unit 4 vsem cross drainage works & srturcture water resource engineering Siph...
 

Semelhante a Presentation st sabya (20)

Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
earthquake failure.pptx by cmr technical campus students
earthquake failure.pptx by cmr technical campus studentsearthquake failure.pptx by cmr technical campus students
earthquake failure.pptx by cmr technical campus students
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Embankment dam
Embankment damEmbankment dam
Embankment dam
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineering
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Lec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptxLec-00-Weir&Barrages.pptx
Lec-00-Weir&Barrages.pptx
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
Geological Considerations - Dam
Geological Considerations - DamGeological Considerations - Dam
Geological Considerations - Dam
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Dams
DamsDams
Dams
 
Dams.ppt
Dams.pptDams.ppt
Dams.ppt
 
Dam presentation
Dam presentationDam presentation
Dam presentation
 
06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Geology of Dams & Reservoirs
Geology of Dams & ReservoirsGeology of Dams & Reservoirs
Geology of Dams & Reservoirs
 

Último

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Último (20)

Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Presentation st sabya

  • 1. FAILURE OF EARTHEN DAMS NAME- SABYASACHI SWAIN SUBJECT- THEORY OF SEEPAGE M.TECH 1ST YEAR BRANCH- WRD & IE ROLL NO- 13244006
  • 2. FAILURE OF EARTHEN DAMS • Earth dams are less rigid and hence more susceptible to failure. • An earthen dam may fail due to improper designs, faulty constructions, or lack of maintenance etc.
  • 3. FAILURE OF EARTHEN DAMS • The various causes leading to the failure of earth dam can be grouped into following three categories1. Hydraulic failures 2. Seepage failures 3. Structural failures
  • 4. FAILURE OF EARTHEN DAMS 1. HYDRAULIC FAILURES- • About 40% of earth dam failures have been attributed to these causes. • The failure under this category may occur due to the following reasons:
  • 5. FAILURE OF EARTHEN DAMS a) Overtopping failure: The water may overtop the dam , if • • •  The design flood is under-estimated. The spillway is of insufficient capacity. The spillway gates are not properly operated. Sufficient freeboard should, therefore be provided.
  • 6. FAILURE OF EARTHEN DAMS b) Erosion of upstream face: • The wave action due to the wind and tides will cause the erosion of the dam material at the upstream face, if the material could not sustain wave velocity. • It will lead to washing out of the dam material or overturning of the protection slab or slip of the upstream face.
  • 7. FAILURE OF EARTHEN DAMS Safety measures: Upstream stone pitching . Provision of riprap. Proper design.
  • 8. FAILURE OF EARTHEN DAMS c) Cracking due to frost action: • Frost in the upper portion of the dam may cause heaving and cracking of the soil with dangerous seepage and consequent failure. An additional freeboard allowance should be provided for dams in areas of low temperatures.
  • 9. FAILURE OF EARTHEN DAMS d) Erosion of the downstream slope by gully formation: • Heavy rains falling over the downstream face • The erosive action of moving water • The formation of gullies on the downstream face , leading to dam failure.
  • 10. FAILURE OF EARTHEN DAMS Proper maintenance. Filling the cuts from time to time , especially during rainy season. Grassing the slopes. Providing proper berms at suitable heights.
  • 11. FAILURE OF EARTHEN DAMS Provision of berms in an earthen dam
  • 12. FAILURE OF EARTHEN DAMS e) Toe erosion: • Similar to the wave action at the upstream of the dam, downstream dam slope is also susceptible for erosion by the downward water. • Erosion due to the cross-currents that may come from the spillway buckets. • Erosion due to tailwater.
  • 13. FAILURE OF EARTHEN DAMS Provision of a downstream slope pitching or a riprap up to a height slightly above the normal tail water depth. By providing the rock toe drainage. Sidewalls of the spillway must be of sufficient height and length.
  • 14. FAILURE OF EARTHEN DAMS 2. SEEPAGE FAILURES• Uncontrolled or concentrated seepage through dam body or foundation may lead to failure of the dam. • Piping (through foundation and dam body) • Sloughing
  • 15. FAILURE OF EARTHEN DAMS • Piping is the progressive erosion and subsequent removal of soil grains from within the body or foundation of the dam. • Sloughing is the progressive removal of soil from the wet downstream face. • More than one-third of the earth dams have failed due to these reasons.
  • 16. FAILURE OF EARTHEN DAMS (a)Piping through foundations: • When highly permeable cavities or strata of coarse sand or gravel are present in the foundation, water may seep at a huge rate through them. • This concentrated flow at a high gradient may erode the soil. • Increased flow of water and soil results in creation of hollows below the foundation, into which the dam may sink down.
  • 17. FAILURE OF EARTHEN DAMS Piping through the dam foundation
  • 18. FAILURE OF EARTHEN DAMS (b) Piping through dam body: • When concentrated flow channels get developed in the body of the dam, soil may be removed as in case of foundation piping. • Formation of hollows in the dam body and subsequent subsidence of the dam body. • Flow channels develop due to faulty construction, insufficient compaction, cracks in embankment due to settlement, shrinkage cracks etc.
  • 19. FAILURE OF EARTHEN DAMS Piping through the dam body
  • 20. FAILURE OF EARTHEN DAMS All these can be removed by better construction and better maintenance of dam embankment. Thorough compaction of soils near the outlet conduits and preventing the leakage through them to avoid contact seepage. For pervious seams in foundation, relief drain with filter can be provided.
  • 21. FAILURE OF EARTHEN DAMS (c) Sloughing: • If the seepage line exists at the downstream face of the dam, the portion of the toe of the dam below the exit point will always remain in the wet condition. • This will cause the reduction of the stability of the slope and small size sliding may occur. • The repetition of wetting and sliding will continue further to cause dam failure, termed as sloughing.
  • 22. FAILURE OF EARTHEN DAMS 3. STRUCTURAL FAILURES• About 25% of overall dam failures. • Generally, these are caused by shear failures leading to sliding.
  • 23. FAILURE OF EARTHEN DAMS (a)Failure due to the pore water pressure: • Excessive pore water pressure in confined seams of sand and silt, artesian pressure in abutments, etc. may reduce shear strength of soil. • Loose sand foundation may fail by liquefaction or flow slides. Adequate compaction of soil.
  • 24. FAILURE OF EARTHEN DAMS (b) Upstream slope failure: • Steep slope, weak embankment soil, sudden drawdown of reservoir. • Cause the seepage force acting along the sliding direction causing increase of the driving force for slope direction. • Seldom lead to catastrophic failures. Can be avoided by flatten slopes, provision of rock berms and better operating rules.
  • 25. FAILURE OF EARTHEN DAMS Upstream slope slide due to sudden drawdown
  • 26. FAILURE OF EARTHEN DAMS (c) Downstream slope failure: • When the reservoir is at maximum level and if the steady stage seepage is at maximum rate, the downstream slope is more vulnerable to slide due to seepage force acting in the direction of driving force for the sliding. Flatten slope, better soil, increased compaction, internal drainage with protective filters and surface drainage facilities.
  • 27. FAILURE OF EARTHEN DAMS Downstream slope slide during full reservoir condition
  • 28. FAILURE OF EARTHEN DAMS (d) Foundation slide: • The dam body as a whole may slide, if the foundation is from the silt or soft soil. • The slow consolidation process and expansion of clay soils due to the saturation will decrease the shear strength of the foundation soil. Flatten slopes, broad berms, stabilization of soil, deep drain trenches with protective filters for drainage, relief wells.
  • 29. FAILURE OF EARTHEN DAMS Sliding due to soft or weak foundation
  • 30. FAILURE OF EARTHEN DAMS (e) Other modes: • Failure by spreading. • Failure by leaching. • Failure due to earthquake – most devastating of all types of failures. Proper design, regular inspection and better operating rules.
  • 31. REFERENCES Garg, S.K., (2012), “Irrigation Engineering and Hydraulic Structures.” 24th Edition, Khanna Publishers. Wallingford H.R.,(2008), “Dam Breach Floods – An Introduction”, www.hrwallingford.com. Dam Failure- Wikipedia, the free encyclopedia. en.wikipedia.org/wiki/Dam_failure. Creager, W.P., Justin, J.D. and Hinds, J., (1955), “Engineering for Dams.” Vol. 3, 1st Edition, John Wiley & Sons,INC., Chapman & Hall, LTD.