JERES-J-607
Burner Management Systems
for SRU Trains
Revision
0
Responsibility
JER Engineering
29 April
2008
Jubail Export Refinery
Engineering Standards
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 2 of 24
Revision Tracking
Revision Revision Date Scope of Revision
0 29 April 2008 Issued for a bid package.
01 31 March 2008 Issued for Bid package only for review.
00 03 February 2007
First draft issued is based on Saudi Aramco SAES-J-607 “Burner
Management Systems for SRU Trains” issue date 14 November, 2005.
Document was modified to incorporate amendments and modifications.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 3 of 24
Table of Contents
Section Contents Page
1 Scope 4
2 Conflicts, Deviations and Clarifications 4
3 References 4
4 Definitions 6
5 General Requirements 8
6 Burner Management System- Hardware Requirements 9
7 Burner Management System – Logic Requirements 9
8 Pilot System 12
9 Burner System 15
10 Flame Monitoring System 16
11 Control Room and Local BMS Interface 18
12 Installation 19
13 Documentation 20
14 Testing and Inspection 21
Appendix
I Figures 22
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 4 of 24
1 Scope
1.1 This engineering standard establishes minimum requirements for the design,
construction and installation of burner management systems (BMS) for the gas fired
equipment in sulfur recovery unit (SRU) trains. SRU trains have typically 5
independently fired furnaces. The BMS system for each fired furnace is defined
herein.
1.2 Emphasis is placed on the use of a reliable Burner Management System (BMS),
incorporating flame monitoring, safety interlocks, light-off and purge permissives,
and alarms and trip functions as defined in NFPA 85. Requirements of NFPA 85
shall be applied to the BMS systems used on SRU trains. However, conflicting
requirements specified in this standard shall take precedence over NFPA 85.
1.3 A BMS is considered a specific type of Emergency Shutdown System (ESD). As
such, all requirements of JERES-J-601 apply to this standard, except as noted herein.
1.4 The BMS requirements specified in this standard are considered prescriptive and the
application of ANSI/ISA-84.00.01-2004 (IEC 61511 Mod), including establishment
and validation of SIL levels, is not required.
1.5 This standard specifies the minimum BMS requirements for new SRU projects.
BMS upgrade projects to existing SRU trains may reduce the minimum requirements
of this standard to maintain consistency with other SRU units, when approved by the
Saudi Aramco Proponent Organization.
2 Conflicts, Deviations and Clarifications
2.1 Any conflicts between this standard and other applicable Company Engineering
Standards (JERES), Material Specifications (JERMS), Standard Drawings (JERSD),
Engineering Procedures (JEREP), Company Forms or Industry standards,
specifications, Codes and forms shall be brought to the attention of Company
Representative by the Contractor for resolution.
Until the resolution is officially made by the Company Representative, the most
stringent requirement shall govern.
2.2 Where a licensor specification is more stringent than those of this standard, the
Licensor’s specific requirement shall apply.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 5 of 24
2.3 Where applicable Codes or Standards are not called by this standard or its
requirements are not clear, it shall be brought to attention of Company
Representative by Contractor for resolution.
2.4 Direct all requests for deviations or clarifications in writing to the Company or its
Representative who shall follow internal Company procedure and provide final
resolution.
3 References
The selection of material and equipment, and the design, construction, maintenance,
and repair of equipment and facilities covered by this standard shall comply with the
latest edition of the references listed below as of the CUT-OFF DATE as specified
in the Contract unless otherwise noted.
3.1 Jubail Export Refinery References
Jubail Export Refinery Engineering Procedure
Jubail Export Refinery Engineering Standards
JERES-F-001 Process Fired Heaters
JERES-J-002 Technically Acceptable Instruments
JERES-J-003 Basic Design Criteria
JERES-J-601 Emergency Shutdown and Isolation Systems
JERES-J-902 Electrical Systems for Instrumentation
Jubail Export Refinery Materials System Specifications
JERMS-L-4051 Ball Valves, (API SPEC 6D)
JERMS-J-4617 Flame Monitoring Systems
JERMS-J-4623 Programmable Controller Based ESD Systems
JERMS-J-4716 Pneumatic Actuators On-Off Service
3.2 National and Industry Standards
National Fire Protection Association
NFPA 85 Boiler and Combustion Systems Hazards Code
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 6 of 24
4 Definitions
4.1 Definitions presented in this Standard and other JER documents have precedence
over other definitions. Conflicts between various definitions shall be brought to the
attention of Company Representative by the Contractor for resolution.
Company: Jubail Export Refinery.
Company Representative: A designated person from the Company or an assigned
third party representative.
Company Inspector: A designated person or an agency responsible for conducting
inspection activities on behalf of the Company.
4.2 List of Definitions
Automatic BMS Operation: The Saudi Aramco mandatory method of BMS
operation in which pushbutton actuations initiate furnace start-up, and where all
purging, positioning, timing, and fuel/air valve manipulations are supervised and
occur automatically. In Automatic BMS logic, operators are not required to
manipulate burner front controls (e.g., manually open gas cocks) to light burners or
pilots. Instead, burner and pilot starts are actuated from pushbuttons and monitored
locally and remotely. Saudi Aramco requires the operator to manually initiate (via
pushbutton) each of the following sequences:
- Furnace Master Fuel Trip (MFT) reset
- Purge
- Initial pilot/burner start (local operator function)
- Subsequent pilot/burner starts and stops
- Normal shutdown
Burner Valve (BV): A burner valve (BV) can be either an automated block valve or
an automated bleed valve as defined below. BVs shall be selected as ZV valves per
JERES-J-601; however, BVs shall not be provided with manual operators, local
pushbutton operators, bypass valves, or partial stroke testing features. BVs are under
complete control and supervision of the BMS system.
Automated Bleed Valve - BV: This is an automatic valve used to vent fuel gas
from between block BVs in both the pilot and burner fuel headers. Bleed valves
shall be tagged as 'BV', and are not to be tagged as ZV.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 7 of 24
Automated Block Valve - BV: Sometimes called block valve, fuel shutdown valve,
or SSV valve. The block valve is an automatic, fast closing, tight shutoff valve that
completely shuts off fuel or air supply. These valves are located in the pilot and
burner fuel headers and in the individual pilot and burner piping. Block valves can
be used in conjunction with Bleed valves for gas service. Block valves shall be
tagged as 'BV' and are not to be tagged as ZV.
Burner Management System (BMS): The BMS is the control system dedicated to
furnace safety and provides operator assistance in the starting and stopping of fuel
preparation and burning equipment. Use of a BMS prevents misoperation of and
damage to fuel preparation and burning equipment. The BMS includes the following
subsystems:
- Logic System
- Field Sensors
- Pilot System
- Flame Monitoring System
- Automated Block and Bleed Valves
- Local Flame Safety Shutdown Panel
- Control Room Indication and Control Equipment
Master Fuel Trip: Sometimes called main fuel trip or MFT; an event that results in
the rapid shutoff of all fuel to a furnace.
Sulfur Recovery Unit (SRU) Fired Equipment: SRUs may have the following
fired equipment:
• Air Preheater – A natural draft, fuel gas fired furnace that preheats combustion
air to be used in the SRU Reaction Furnace. This furnace typically uses up to
10 burners and incorporates continuous pilots. Pilots and burners are
individually supervised, each with its own flame monitor. Pilots are lit via
integrated spark ignitors. Firebox purging is via steam injection.
• Acid Gas Preheater – A natural draft, fuel gas fired furnace that preheats H2S
acid gas before it is combusted in the SRU Reaction Furnace. This furnace
typically uses up to 14 burners with continuous pilots. Pilots and burners are
individually supervised, each with its own flame monitor. Pilots are lit via
integrated spark ignitors. Firebox purging is via steam injection.
• Reaction Furnace - A forced draft reaction furnace with one burner (typically
no pilot) where acid gas is the fuel and is burned with air to form SO2 and
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 8 of 24
sulfur. This furnace will also be equipped with a forced draft fuel gas fired
burner that starts and supplements the H2S burning. The fuel gas burner flame
is lit by an automatically retracting spark ignitor. The burner flame is
supervised with dual optical flame monitors. Purging on cold start is by
combustion air flow, but on hot re-start, purge is via nitrogen to prevent reactor
cool-down and free oxygen ingress to the downstream catalyst beds.
• Catalytic Reheat-Auxiliary Combustion Chamber/Burner – When used, the
auxiliary combustion chamber uses a single forced draft, fuel gas or fuel
gas/acid gas fired burner to reheat the process stream above the liquid sulfur
dewpoint prior to entering the next catalytic conversion stage. This burner is
supervised with dual flame monitors and is lit by an automatically retracting
spark ignitor (typically no pilot). There are up to 3 independent Catalytic
Reheat Auxiliary Combustion Chamber/Burners per Reaction Furnace. Purge
is via forced draft combustion airflow.
• Tail Gas Thermal Oxidizer – A natural or forced draft, fuel gas fired furnace
that combusts the SRU tail gas to form SO2 and release to atmosphere. The
Thermal Oxidizer uses multiple burners with continuous pilots. Pilots and
burners are individually supervised, each with their own flame monitor. Pilots
are lit via integrated spark ignitors. Firebox purging is via steam injection or
air in the forced draft configuration.
5 General Requirements
5.1 Each SRU furnace shall have automatic BMS logic. Each BMS system shall
incorporate a complete automatic BMS sequence including:
- Pre-Purge Permissives
- Purge
- Light off First and Subsequent Pilots and Burners
- Normal Operation
- Individual Pilot Fuel and/or Burner Fuel Trips
- Total Furnace Master Fuel Trips
5.2 Instrument Selection
Instruments shall be selected from JERES-J-002.
5.3 Environmental Conditions
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 9 of 24
All equipment shall be specified, built and installed for operation in environmental
conditions per JERES-J-003.
6 Burner Management System – Hardware Requirements
6.1 BMS Electrical Requirements
6.1.1 The electrical installation shall be designed and installed per requirements specified
in JERES-J-902.
6.1.2 All BMS logic hardware and subsystems shall be powered from uninterruptible
power supplies (UPS), as specified in JERES-J-902 and JERES-J-601.
6.2 BMS System
6.2.1 Logic Solver Hardware Types
Programmable logic controllers (PLCs) which are approved for use in ESD systems,
as specified in JERMS-J-4623, shall be used for BMS logic hardware.
6.2.2 Logic Software Modification Limitation
BMS logic software shall not be changed while its associated fired equipment is in
operation.
6.2.3 Logic Hardware Segregation
6.2.3.1 All BMS and ESD logic from a single SRU train shall be integrated into a dedicated
PLC logic hardware package.
6.2.3.2 No other BMS, ESD, or non-ESD logic shall be included in the SRU train's
dedicated BMS PLC hardware.
6.3 BMS Field Instruments
6.3.1 Input Sensors
6.3.1.1 Process measurement input signals to the BMS shall be from process connected
transmitters, as defined in JERES-J-601. Discrete BMS inputs may be from
hardwired manual push/pull buttons or dry contact inputs from valve position
switches and flame scanner/amplifier relays.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 10 of 24
6.3.1.2 All input sensors and associated signal wiring shall meet the requirements specified
in JERES-J-902.
6.3.2 Output Solenoids
Solenoid valves shall have high temperature, class H insulated coils, internal valve trim
appropriate for the service, and be suitable for continuous duty. They shall meet
requirements specified in JERES-J-902.
6.3.3 Input/Output Bypasses
6.3.3.1 Input bypasses shall be provided for each Master Fuel Trip (MFT) input to the BMS.
The input bypasses shall meet the requirements of JERES-J-601. Note that the use
of input bypasses is limited to online testing and maintenance only. Startup bypasses
are not permitted.
6.3.3.2 Output bypasses shall not be used.
7 Burner Management System – Logic Requirements
7.1 BMS Startup Logic Sequence
7.1.1 An automatic BMS sequence, as defined in section 4 above, shall be used for each
fired furnace in the SRU train.
7.1.2 The BMS shall supervise each step in the light-off sequence, including pre-purge
permissives, purge and fuel gas tightness testing, pilot and burner light-off, normal
operation, and shutdown.
7.1.3 The purge process shall be manually initiated via pushbutton in the field, with the
intent that the field operator will verify purge operation.
7.1.4 Purge shall accomplish 5 furnace volume air changes with a purge time of least 5
minutes. Forced draft furnaces shall incorporate airflow meters to verify purge rate.
Natural draft furnaces shall incorporate an active method to generate airflow (e.g.,
steam purge). The furnace designer shall verify by calculation that the design purge
airflow rate and time meet the required 5 furnace volume changes. Natural draft
furnace purge airflow rate shall be confimed by a one-time test conducted during
furnace commissioning. Natural draft heaters shall incorporate a manual
combustible gas test as part of the purge sequence.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 11 of 24
7.1.5. A pilot and burner fuel gas piping leak test shall be included in the purge sequence
for all multiburner furnaces. Fuel gas at a normal pressure shall be introduced to the
both pilot and burner headers up to the individual pilot and burner BVs. Header
block BVs shall then be closed and the bleed BV opened, and the individual pilot
and burner BVs shall be closed. The trapped fuel pressure shall be monitored for 3
minutes and any significant pressure loss shall invalidate the purge, shall require
shutoff valve leak investigation and repair, and shall take the sequence back to the
purge required state. The manual isolation valve and blind on the individual burners
and pilots shall be open during the leak test. See Figure 1 and 2 for diagrams of the
fuel gas systems. The furnace designer shall calculate the acceptable leak test
pressure drop based on the BV valve leakage rates required generate explosive LEL
fuel concentrations in the firebox.
7.1.6 The light-off of the first pilot/burner shall be manually initiated via pushbutton in the
field, with the intent that the field operator will verify safe operation on initial
furnace firing.
7.2 SRU Furnace BMS Mandatory Trips
7.2.1 SRU train furnaces shall apply the following mandatory BMS burner, pilot, and
master fuel trips.
7.2.2 Air and Acid Gas Preheater Furnaces
7.2.2.1 The following conditions shall cause a trip of the individual burner and pilot BVs:
a) Loss of both burner and pilot (2oo2) flame detector signals.
b) Individual burner or pilot BVs out of position.
7.2.2.2 The following conditions shall cause a complete Preheater master fuel trip,
extinguishing all fire in the furnace.
a) Burner header or pilot header BVs out of position.
b) Loss of both burner and pilot (2oo2) flame detector signals on a predetermined
number of burners.
c) Burner header fuel gas pressure low-low or high-high.
d) Pilot header fuel gas pressure low-low or high-high.
e) Acid gas pass flow low-low (Acid Gas Preheater only).
f) Air pass flow low-low (Air Preheater only).
g) Stack damper closed position.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 12 of 24
h) Preheater manual shutdown button.
i) SRU Train shutdown signal.
7.2.3 Reaction Furnace
The following conditions shall cause a complete Reaction Furnace master fuel trip,
which shuts off fuel gas, acid gas and combustion air and extinguishes all fire in the
furnace:
a) Fuel gas burner header BV out of position (when on fuel gas firing).
b) Loss of both (2oo2) burner flame detector signals.
c) Fuel gas pressure low-low or high-high (when on fuel gas firing).
d) Acid gas knock-out drum level high-high (acid gas trip only – fuel gas and
combustion air continues).
e) Reaction Furnace combustion air pressure low-low.
f) Waste Heat Recovery boiler steam drum level low-low.
g) Thermal Oxidizer Trip (with 30 minute delay).
h) Reaction Furnace manual shutdown button.
i) SRU Train shutdown signal.
7.2.4 Reheat Auxiliary Burners
The following conditions will cause an individual Reheat Auxiliary Burner air and
fuel gas trip:
a) Fuel gas header BV out of position.
b) Loss of both (2oo2) auxiliary burner flame detector signals.
c) Auxiliary burner fuel gas pressure low-low or high-high.
d) Air/Fuel Ratio high-high or low-low.
e) Reheat temperature high-high.
f) Reheat Burner manual shutdown button.
g) SRU Train shutdown signal.
7.2.5 Tail Gas Thermal Oxidizer
7.2.5.1 The following conditions shall cause a trip of the individual burner and pilot BV:
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 13 of 24
a) Loss of both burner and pilot (2oo2) flame detector signals.
b) Individual burner or pilot BVs out of position.
7.2.5.2 The following conditions shall cause a Tail Gas Thermal Oxidizer master fuel trip,
extinguishing all fire in the furnace:
a) Burner header or pilot header fuel BV out of position.
b) Loss of both burner and pilot (2oo2) flame detector signals on a predetermined
number of burners.
c) Loss of all flame detector signals.
d) Burner header fuel gas pressure low-low or high-high.
e) Pilot header fuel gas pressure low-low or high-high.
f) Thermal Oxidizer outlet temperature high-high.
g) Thermal Oxidizer manual shutdown button.
h) SRU Train shutdown signal.
8 Pilot System
8.1 Pilots
8.1.1 Pilot Requirements
8.1.1.1 Pilots shall operate continuously and shall incorporate spark ignitors and flame
monitoring.
8.1.1.2 Pilot shall be permanently mounted and located in accordance with burner
manufacturer's recommendations. Pilots shall provide sufficient energy to ignite the
specified burner combustible fuel-air mixture reliably under all conditions.
8.1.1.3 The pilot flame shall be stable with the burner extinguished and with maximum
draft.
8.2 Pilot Flame Monitor and Spark Ignition system
8.2.1 Each pilot shall be provided with a dedicated flame monitor. Rectified ionization
type (flame rod) or optical flame scanners shall be used. Flame scanners shall meet
requirements specified the Flame Monitoring section below.
8.2.2 Each pilot shall be provided with individual spark ignition.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 14 of 24
8.2.3 The power supply to the flame monitoring system shall be from the BMS
uninterruptible power source.
8.3 Pilot Gas Header
8.3.1 The pilot gas supply shall be supplied from the burner header, upstream of the first
header BV valve. Refer to Figure 1, "Pilot Gas System Diagram."
8.3.2 Each furnace with pilots shall have a separate pilot gas header. Pilot gas to each
pilot shall be supplied from the pilot gas header. A quick-closing, manual isolating
valve shall be provided in the pilot gas supply, upstream of all controls and at least
50 feet from the furnace. This valve shall be used for emergency isolation or for
maintenance purposes.
8.3.3 The pilot gas header shall incorporate automated dual BV block valves with an
automated BV bleed valve between. Refer to Figure 1, "Pilot Gas System Diagram."
8.3.4 Filters shall be located upstream of the shutoff and control valves to prevent entry of
foreign material into the pilot gas system.
8.3.5 The pilot gas header pressure shall be regulated to the designed operating pressure
prior to distribution to the individual pilot subsystem.
8.4 Individual Pilots
8.4.1 Individual pilot gas lines shall be provided with a manual isolating valve, an
isolating blind, and a single automated BV valve – in series. Refer to Figure 1, "Pilot
Gas System Diagram." It is intended that all pilots will remain lit while the furnace
is operational. Any pilots that are removed from service must be isolated via the
manual isolation valve and blind.
8.4.2 On furnaces with only a single pilot which is supplied directly from the pilot header
– no individual pilot automated BV is required. In this case, the pilot header
automated block and bleed valves provide pilot isolation.
8.5 Pilot Combustion Air System
8.5.1 The pilot combustion air system shall incorporate the following components,
installed in this sequence:
a) Manual isolating (ball) valve
b) Dual-type filter
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 15 of 24
c) Pressure regulating valve
d) Pressure gauge
e) Two-way direct-acting solenoid valve or air actuated valve. This valve shall be
considered a BV valve and be supervised by the BMS.
8.5.2 Pilot combustion air shall be clean and dry. Pilots shall not require an external air
supply for cooling.
8.6 Pilot Automated Block and Bleed BV Valves
8.6.1 Solenoid valves or air actuated quarter-turn ball valves may be used for gas pilot
header and individual pilot automated block and bleed BV valves.
8.6.2 Pilot solenoid BVs shall be two-way, direct-acting valves suitable for safety shutoff
service in gas fired equipment. On loss of electrical power, solenoid block BVs shall
fail closed and bleed BVs shall fail open. Solenoid BVs shall be fitted with limit
switches detecting the "fully open" and "fully closed" positions for input to the BMS
logic system. Solenoids shall have class H, high-temperature insulated coils, and
internal trim suitable to the service. Solenoids shall be suitable for continuous duty
and shall meet the requirements specified in JERES-J-902.
8.6.3 Ball valves used as pilot BVs shall be fire-safe, tight shutoff, quarter-turn ball valves
with 316 ss trim. Block BV actuators shall be air open/spring close. Bleed BV
actuators shall be air close/spring open. Valves shall be fitted with limit switches
detecting the "fully open" and "fully closed" positions for input to the BMS logic
system. Actuators shall conform to JERMS-J-4716, "Pneumatic Actuators, On-Off
Service", and valves 2 inches and larger shall conform to Saudi Aramco
Specification JERMS-L-4051.
9 Burner System
9.1 Burner Flame Monitor
Each burner shall be provided with a dedicated UV optical flame monitor. Flame
scanners shall meet requirements specified in the Flame Monitoring section below.
9.2 Burner Fuel Gas Header
9.2.1 Each furnace shall have a separate burner fuel gas header supplied from the plant gas
header, configured per Figure 2, "Burner Gas System Diagram." A quick-closing,
manual isolating valve shall be provided in the burner header gas supply, upstream
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 16 of 24
of all controls and at least 50 feet from the furnace. This valve shall be used for
emergency isolation or for maintenance purposes.
9.2.2 The burner gas header shall incorporate dual automated BV block valves with an
automated BV bleed valve between.
9.3 Individual Burners
9.3.1 Individual burner gas supply lines shall be provided with a manual isolating valve,
an isolating blind, and a single automated BV – in series. Refer to Figure 2, "Burner
Gas System Diagram". It is intended that all burners will remain lit while the
furnace is operational. Any burners that are removed from service must be isolated
via the manual isolation valve and blind.
9.3.2 On furnaces with only a single burner which is supplied directly from the burner
header – no individual burner BV is required. In this case, the burner header
automated block and bleed BVs provide burner isolation.
9.4 Burner Combustion Air System
The burner forced draft combustion air system shall incorporate a single automated
BV under the supervision of the BMS system.
9.5 Burner Automated Block and Bleed Valves:
9.5.1 The Burner header and individual burner Block and Bleed BVs shall be fire-safe,
tight shutoff, quarter-turn ball valves with 316 SS trim. BVs 2 inches and larger
shall conform to Saudi Aramco specification JERMS-L-4051.
9.5.2 Block BV actuators shall be air open/spring close. Bleed BV actuators shall be air
close/spring open. Actuators shall conform to JERMS-J-4716, "Pneumatic
Actuators, On-Off Service." Block and bleed valves shall be tagged BV and shall
not be provided with manual operators, local pushbuttons, bypass valves, or partial
stroke testing features.
9.5.3 Burner and pilot header Block BVs shall close within 10 seconds. Header bleed BVs
shall open in less than 2 seconds. Individual burner block BVs with a nominal size
of 4 inch and smaller shall close within 2 seconds - BVs larger than 4 inch shall close
within 3 seconds. The opening time of individual burner BVs shall be compatible
with the burner ignition requirements.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 17 of 24
9.5.4 All block and bleed BVs shall be fitted with limit switches detecting the "fully open"
and "fully closed" positions for input to the BMS logic system. Limit switches shall
conform to requirements in JERMS-J-4716.
9.6 Acid Gas Automated Block Valves:
At least one automated block BV shall be provided in the acid gas supply line to
SRU train. This BV shall be under the control and supervision of the BMS system
and shall be fitted with limit switches detecting the "fully open" and "fully closed"
positions for input to the BMS logic system. Limit switches shall conform to
requirements in JERMS-J-4716.
10 Flame Monitoring System
10.1 General
10.1.1 Flame monitoring equipment shall be specified in accordance with
JERMS-J-4617.
10.1.2 The furnace flame scanner specification shall identify the type of fuel gas to be fired
in the burner and pilot.
10.1.3 The Vendor of the flame monitoring equipment shall submit in writing, for Saudi
Aramco Proponent Organization approval, the proposed detection principle for the
specified fuel(s).
10.2 Pilot Flame Supervision
10.2.1 The pilot flame detector shall:
a) Be either a rectified ionization type (flame rod) or optical UV flame detector.
b) Detect the smallest pilot flame which can provide smooth and reliable ignition
of the burner.
10.2.2 The pilot flame detector amplifier shall provide analog output signals to indicate the
flame intensity and assist in calibration.
10.3 Number of Detectors
Two flame detectors shall be used per burner - one to detect the pilot flame and other
to sight the burner flame. On direct ignited burners that do not use pilots; two flame
detectors – both sighting the burner flame - shall be used.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 18 of 24
10.4 Flame Monitoring System Design
10.4.1 The flame monitoring equipment shall be fail-safe in accordance with JERMS-J-
4617.
10.4.2 The flame monitoring equipment shall have self-checking features. The cycle time
of the self-check function shall be two seconds or less.
10.4.3 The equipment and system design shall permit the operator to distinguish between a
flame-out signal and self-check fault.
10.4.4 Two flame detectors shall indicate flame-on during normal operation. Flame-out
signals from both the burner and pilot flame detectors shall trip the associated burner
and pilot. A flame-out signal from only one of the two flame detectors shall activate
an alarm in the control room; the fault shall also be indicated on the local flame
safety shutdown (FSS) panel.
10.4.5 An analog indicator of the flame intensity of each detector, or signal connections for
this purpose, shall be provided near the flame detector to facilitate detector sighting.
A flame status indicating light shall be located on each flame amplifier.
10.4.6 The flame-on and flame-off response times for each particular fuel shall be specified
in accordance with JERMS-J-4617.
10.4.7 The flame detector shall be suitable for continuous operation in an ambient
temperature of 100°C when cooling air is not available. With cooling air, the
scanner shall be suitable for continuous operation at 65°C.
10.5 Flame Monitoring Air and Nitrogen Purge
For the Reaction Furnace and Auxiliary Combustion Chamber - where air input must
be isolated during a furnace trip - flame detectors and peep sights shall be purged
with a system that can supply both purge air and nitrogen. The air source shall be
the normal purge medium and shall include a BMS supervised block BV to isolate
purge air on furnace trip. An additional BMS supervised block BV shall be provided
in the nitrogen purge supply to immediately introduce nitrogen in the event of a
furnace trip.
11 Control Room and Local BMS Interface
11.1 General
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 19 of 24
Operational monitoring of the BMS shall be via the Distributed Control System
(DCS) in the control room and via a local control panel. The local control panel
shall be termed the flame safety shutdown (FSS) panel.
11.2 Local Flame Safety Shutdown (FSS) Panel
11.2.1 Each furnace in the SRU train shall be provided with a dedicated local FSS panel.
The FSS panel shall be located near the furnace where the operator may generally
observe the furnace burner equipment.
11.2.2 The FSS panel shall provide – as a minimum - the following pushbuttons and
indicating lights:
a) MFT Reset Pushbutton
b) Purge Start Pushbutton
c) First Pilot Light-Off Pushbutton
d) Furnace Online Indicator Lamp
e) Furnace Shutdown Pullbutton
f) SRU Train Shutdown Pullbutton
g) Lamp Test Pushbutton
11.2.3 FSS-mounted BMS indicators and controls shall be discrete push buttons and lights,
lamps, or LED's hardwired to the BMS logic system.
11.3 Control Room BMS Operator Interface
11.3.1 General
11.3.1.1 A control room operator interface for the BMS shall be integrated into the
Distributed Control System (DCS) using DCS graphic displays.
11.3.1.2 Digital communication between the BMS logic system and DCS shall meet all
requirements of JERES-J-601.
11.3.2 BMS – DCS Operator Interface Requirements
The BMS operator interface on the DCS system shall provide all inputs indications
and outputs necessary to startup, operate, and shutdown the SRU train. These shall
include operator displays for:
a) Purge permissive status and troubleshooting
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 20 of 24
b) Purge status including fuel gas leak test
c) Pilot and burner light-off and shutdown operation and status
d) Block or bleed BV position status
11.3.3 Control Room Manual Master Fuel Trip Button
Dedicated manual shutdown buttons for each SRU furnace, as well as for the overall
SRU train, shall be provided at the control room operator interface location.
11.3.4 Control Room Alarms
The burner management system shall be configured to communicate each BMS
alarm or fault condition to the DCS. The alarm communication shall be designed in
accordance with JERES-J-601.
11.3.5 BMS Sequence of Events Functionality
Each SRU furnace BMS shall be provided with sequence of events functionality and
a first out log compliant with JERES-J-601.
12 Installation
12.1 General
12.1.1 Instruments shall be installed in a vibration-free location as close as possible to the
point of measurement. Instrument process piping shall be adequately supported to
minimize transmission of vibration to the instruments. Access shall be allowed to
facilitate testing, calibration and maintenance.
12.1.2 The position of local indicating instruments shall enable them to be observed from
grade, platform or walkway while related equipment is operated or when primary
instruments are being tested or calibrated.
12.1.3 Instruments and components shall be located so that they are protected against direct
drainage or blowdown of condensate, water or process fluids from adjacent
equipment.
12.1.4 All locally mounted instrumentation and associated control equipment shall be
accessible from grade, platform, fixed walkway or fixed ladder to facilitate testing
and maintenance. Where necessary, provide standoff shielding around
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 21 of 24
instrumentation to prevent operator contact with high temperature surfaces, as per
requirements in JERES-F-001.
12.2 Flame Monitoring Equipment
12.2.1 The flame monitoring equipment shall be purchased and installed in accordance with
JERMS-J-4617 and the flame equipment and burner manufacturer's instructions.
12.2.2 Vendor approved cable shall be provided for interconnecting scanners to their
respective amplifier/relay units. The layout and wiring techniques shall eliminate or
minimize the effects of electrical noise on the flame monitoring equipment.
12.2.3 The location and installation of the scanner shall permit reasonable access for
operations and maintenance personnel.
12.2.4 Each scanner shall be installed to permit an unobstructed view of the flame it is
supervising under all firing conditions. Scanners should be located or fixed so aim is
not disturbed during routine maintenance or burner changes during furnace
operation.
12.2.5 To assist in optimum sighting, flame scanners shall be installed on a sight-pipe
having a swivel-ball mounting.
13 Documentation
Documentation shall be provided as per requirements in JERES-J-601. In addition,
the project shall provide:
a) Calculation documents for each natural draft furnace verifying purge airflow
rate.
b) Calculation documents for each natural draft furnace verifying that the design
purge airflow rate and purge time are acceptable to meet the purge requirement
of 5 furnace air volume changes.
14 Testing and Inspection
14.1 BMS Testing
BMS inputs and outputs shall be periodically tested as defined in JERES-J-601.
14.2 Block and Bleed BV Testing
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 22 of 24
The furnace safety system design shall permit the periodic leak testing of all fuel
block and bleed BVs.
14.3 Purge Airflow Verification Test
During commissioning, natural draft heaters shall have their purge airflow rate
verified against design by field test using portable airflow meters.
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 23 of 24
Appendix I: Figure 1 Pilot Gas System Diagram
Jubail Export Refinery
Engineering Standards
JERES-J-607
Rev. 0
Burner Management Systems for SRU Trains 29 April 2008
This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by
any means without prior approval by the Company.
Page 24 of 24

Mais conteúdo relacionado

Mais procurados

Corporate Brochure v0.2 lower res
Corporate Brochure v0.2 lower resCorporate Brochure v0.2 lower res
Corporate Brochure v0.2 lower res
Mark Boshoff
 
Euler Engineering Overview
Euler Engineering OverviewEuler Engineering Overview
Euler Engineering Overview
Garrett Connally
 
Moore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineMoore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - online
Gabriel van der Merwe
 
Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...
Emerson Exchange
 
Tải Catalog biến tần Siemens Sinamic G120X
Tải Catalog biến tần Siemens Sinamic G120XTải Catalog biến tần Siemens Sinamic G120X
Tải Catalog biến tần Siemens Sinamic G120X
Công ty công nghệ tự động hóa Hoàng Gia
 
PLC Based Annunciation System Report
PLC Based Annunciation System ReportPLC Based Annunciation System Report
PLC Based Annunciation System Report
Fasih Ahmed
 
Murraycontrolsoverview 12614657032483 Phpapp01
Murraycontrolsoverview 12614657032483 Phpapp01Murraycontrolsoverview 12614657032483 Phpapp01
Murraycontrolsoverview 12614657032483 Phpapp01
guest79820da
 

Mais procurados (19)

Corporate Brochure v0.2 lower res
Corporate Brochure v0.2 lower resCorporate Brochure v0.2 lower res
Corporate Brochure v0.2 lower res
 
Moore Corporate Brochure
Moore Corporate BrochureMoore Corporate Brochure
Moore Corporate Brochure
 
Euler Engineering Overview
Euler Engineering OverviewEuler Engineering Overview
Euler Engineering Overview
 
Dcs course
Dcs courseDcs course
Dcs course
 
Moore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - onlineMoore FPSO and Subsea Brochure - online
Moore FPSO and Subsea Brochure - online
 
Ch1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_enCh1 2 kb_pcs7_v70_en
Ch1 2 kb_pcs7_v70_en
 
G120 cu250 s2_kba1_0414_eng_en-us
G120 cu250 s2_kba1_0414_eng_en-usG120 cu250 s2_kba1_0414_eng_en-us
G120 cu250 s2_kba1_0414_eng_en-us
 
Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...Maximizing the return on your control investment meet the experts sessions pa...
Maximizing the return on your control investment meet the experts sessions pa...
 
Copywriter Collective - Denzil - Honeywell experion lx brochure
Copywriter Collective - Denzil - Honeywell experion lx brochureCopywriter Collective - Denzil - Honeywell experion lx brochure
Copywriter Collective - Denzil - Honeywell experion lx brochure
 
Tải Catalog biến tần Siemens Sinamic G120X
Tải Catalog biến tần Siemens Sinamic G120XTải Catalog biến tần Siemens Sinamic G120X
Tải Catalog biến tần Siemens Sinamic G120X
 
Functional safety standards_for_machinery
Functional safety standards_for_machineryFunctional safety standards_for_machinery
Functional safety standards_for_machinery
 
Commissioning highly interactive process an approach for tuning control loops
Commissioning highly interactive process an approach for tuning control loopsCommissioning highly interactive process an approach for tuning control loops
Commissioning highly interactive process an approach for tuning control loops
 
PLC Based Annunciation System Report
PLC Based Annunciation System ReportPLC Based Annunciation System Report
PLC Based Annunciation System Report
 
Murraycontrolsoverview 12614657032483 Phpapp01
Murraycontrolsoverview 12614657032483 Phpapp01Murraycontrolsoverview 12614657032483 Phpapp01
Murraycontrolsoverview 12614657032483 Phpapp01
 
Practical Alarm Management for Engineers and Technicians
Practical Alarm Management for Engineers and TechniciansPractical Alarm Management for Engineers and Technicians
Practical Alarm Management for Engineers and Technicians
 
Control loop_foundation_overview
 Control  loop_foundation_overview Control  loop_foundation_overview
Control loop_foundation_overview
 
TCL Gas Turbine Control Systems
TCL Gas Turbine Control SystemsTCL Gas Turbine Control Systems
TCL Gas Turbine Control Systems
 
PID Advances in Industrial Control
PID Advances in Industrial ControlPID Advances in Industrial Control
PID Advances in Industrial Control
 
Deployment of the Festo PA Workstation for Undergraduate Training on Industri...
Deployment of the Festo PA Workstation for Undergraduate Training on Industri...Deployment of the Festo PA Workstation for Undergraduate Training on Industri...
Deployment of the Festo PA Workstation for Undergraduate Training on Industri...
 

Destaque

94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008
Mowaten Masry
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
Mowaten Masry
 

Destaque (7)

Combustion Engineering Solutions - Boiler Applications
Combustion Engineering Solutions - Boiler ApplicationsCombustion Engineering Solutions - Boiler Applications
Combustion Engineering Solutions - Boiler Applications
 
Bms system basic
Bms system  basicBms system  basic
Bms system basic
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequence
 
94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008
 
jayakumarcv
jayakumarcvjayakumarcv
jayakumarcv
 
Elements of a Successful Burner Management Project
Elements of a Successful Burner Management ProjectElements of a Successful Burner Management Project
Elements of a Successful Burner Management Project
 
49539990 burner-management-system
49539990 burner-management-system49539990 burner-management-system
49539990 burner-management-system
 

Semelhante a 114632948 jeres-j-607-burner-management-systems-for-sru-trains

143673805 1-burner-management-system
143673805 1-burner-management-system143673805 1-burner-management-system
143673805 1-burner-management-system
Mowaten Masry
 
Belt heater-2009-catalog
Belt heater-2009-catalogBelt heater-2009-catalog
Belt heater-2009-catalog
George Hebb
 
4 jh1+gestión+electrónica
4 jh1+gestión+electrónica4 jh1+gestión+electrónica
4 jh1+gestión+electrónica
carlos malvacia
 
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
fjskeawsekdmme
 
Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
fjskekmmem
 
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
fjskekqaswdmmem
 
Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
kfdjkskdmm
 
Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
fjskekqazdmmem
 

Semelhante a 114632948 jeres-j-607-burner-management-systems-for-sru-trains (19)

Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance
 
MOTOR DEUTZ 914
MOTOR DEUTZ 914MOTOR DEUTZ 914
MOTOR DEUTZ 914
 
Protection Systems for Machines: an Engineering Guide
Protection Systems for Machines: an Engineering GuideProtection Systems for Machines: an Engineering Guide
Protection Systems for Machines: an Engineering Guide
 
143673805 1-burner-management-system
143673805 1-burner-management-system143673805 1-burner-management-system
143673805 1-burner-management-system
 
13 ta application - flypartsguy.com - mar 2019
13 ta   application - flypartsguy.com - mar 201913 ta   application - flypartsguy.com - mar 2019
13 ta application - flypartsguy.com - mar 2019
 
Belt heater-2009-catalog
Belt heater-2009-catalogBelt heater-2009-catalog
Belt heater-2009-catalog
 
4 jh1+gestión+electrónica
4 jh1+gestión+electrónica4 jh1+gestión+electrónica
4 jh1+gestión+electrónica
 
GE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdfGE LM2500 bearing damage case study.pdf
GE LM2500 bearing damage case study.pdf
 
testing formats
testing formatstesting formats
testing formats
 
10 na application - flypartsguy.com - 3.2017
10 na   application - flypartsguy.com - 3.201710 na   application - flypartsguy.com - 3.2017
10 na application - flypartsguy.com - 3.2017
 
10 ta application - flypartsguy.com - 4.2017
10 ta   application - flypartsguy.com - 4.201710 ta   application - flypartsguy.com - 4.2017
10 ta application - flypartsguy.com - 4.2017
 
Importance of the NERC PRC-005 Standard - Challenges and Audit Tips
Importance of the NERC PRC-005 Standard - Challenges and Audit TipsImportance of the NERC PRC-005 Standard - Challenges and Audit Tips
Importance of the NERC PRC-005 Standard - Challenges and Audit Tips
 
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
 
Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh601 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
 
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh721 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
 
Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh641 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
 
Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
Kawasaki fh680 d 4 stroke air-cooled v-twin gasoline engine service repair ma...
 
Pflex um003 -en-p
Pflex um003 -en-pPflex um003 -en-p
Pflex um003 -en-p
 
7-srm_compress.pdf
7-srm_compress.pdf7-srm_compress.pdf
7-srm_compress.pdf
 

Mais de Mowaten Masry

117697637 burner-mgmt-system
117697637 burner-mgmt-system117697637 burner-mgmt-system
117697637 burner-mgmt-system
Mowaten Masry
 
49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selection49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selection
Mowaten Masry
 
89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system
Mowaten Masry
 
Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)
Mowaten Masry
 
Methods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMethods of determining_safety_integrity_level
Methods of determining_safety_integrity_level
Mowaten Masry
 
71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculation71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculation
Mowaten Masry
 
96000707 gas-turbine-control
96000707 gas-turbine-control96000707 gas-turbine-control
96000707 gas-turbine-control
Mowaten Masry
 
78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstrucciones78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstrucciones
Mowaten Masry
 
Item06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programmeItem06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programme
Mowaten Masry
 
75340982 standards-issued
75340982 standards-issued75340982 standards-issued
75340982 standards-issued
Mowaten Masry
 
Safety instrumented systems
Safety instrumented systemsSafety instrumented systems
Safety instrumented systems
Mowaten Masry
 
35958867 safety-instrumented-systems
35958867 safety-instrumented-systems35958867 safety-instrumented-systems
35958867 safety-instrumented-systems
Mowaten Masry
 

Mais de Mowaten Masry (17)

An9030
An9030An9030
An9030
 
117697637 burner-mgmt-system
117697637 burner-mgmt-system117697637 burner-mgmt-system
117697637 burner-mgmt-system
 
49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selection49574055 burner-management-system-safety-integrity-level-selection
49574055 burner-management-system-safety-integrity-level-selection
 
89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system89912310 boiler-purge-burner-management-system
89912310 boiler-purge-burner-management-system
 
Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)Manual reset 8327 direct mount push button (m)
Manual reset 8327 direct mount push button (m)
 
Methods of determining_safety_integrity_level
Methods of determining_safety_integrity_levelMethods of determining_safety_integrity_level
Methods of determining_safety_integrity_level
 
44636808 bms
44636808 bms44636808 bms
44636808 bms
 
9fcfd50a69d9647585
9fcfd50a69d96475859fcfd50a69d9647585
9fcfd50a69d9647585
 
71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculation71364263 voting-logic-sil-calculation
71364263 voting-logic-sil-calculation
 
96000707 gas-turbine-control
96000707 gas-turbine-control96000707 gas-turbine-control
96000707 gas-turbine-control
 
78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstrucciones78679939 dvc6000manualinstrucciones
78679939 dvc6000manualinstrucciones
 
Item06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programmeItem06 reliability-availability-maintainability-and-safety-programme
Item06 reliability-availability-maintainability-and-safety-programme
 
75340982 standards-issued
75340982 standards-issued75340982 standards-issued
75340982 standards-issued
 
Safety instrumented systems
Safety instrumented systemsSafety instrumented systems
Safety instrumented systems
 
35958867 safety-instrumented-systems
35958867 safety-instrumented-systems35958867 safety-instrumented-systems
35958867 safety-instrumented-systems
 
E04
E04E04
E04
 
Ram s
Ram sRam s
Ram s
 

Último

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 

114632948 jeres-j-607-burner-management-systems-for-sru-trains

  • 1. JERES-J-607 Burner Management Systems for SRU Trains Revision 0 Responsibility JER Engineering 29 April 2008 Jubail Export Refinery Engineering Standards
  • 2. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 2 of 24 Revision Tracking Revision Revision Date Scope of Revision 0 29 April 2008 Issued for a bid package. 01 31 March 2008 Issued for Bid package only for review. 00 03 February 2007 First draft issued is based on Saudi Aramco SAES-J-607 “Burner Management Systems for SRU Trains” issue date 14 November, 2005. Document was modified to incorporate amendments and modifications.
  • 3. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 3 of 24 Table of Contents Section Contents Page 1 Scope 4 2 Conflicts, Deviations and Clarifications 4 3 References 4 4 Definitions 6 5 General Requirements 8 6 Burner Management System- Hardware Requirements 9 7 Burner Management System – Logic Requirements 9 8 Pilot System 12 9 Burner System 15 10 Flame Monitoring System 16 11 Control Room and Local BMS Interface 18 12 Installation 19 13 Documentation 20 14 Testing and Inspection 21 Appendix I Figures 22
  • 4. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 4 of 24 1 Scope 1.1 This engineering standard establishes minimum requirements for the design, construction and installation of burner management systems (BMS) for the gas fired equipment in sulfur recovery unit (SRU) trains. SRU trains have typically 5 independently fired furnaces. The BMS system for each fired furnace is defined herein. 1.2 Emphasis is placed on the use of a reliable Burner Management System (BMS), incorporating flame monitoring, safety interlocks, light-off and purge permissives, and alarms and trip functions as defined in NFPA 85. Requirements of NFPA 85 shall be applied to the BMS systems used on SRU trains. However, conflicting requirements specified in this standard shall take precedence over NFPA 85. 1.3 A BMS is considered a specific type of Emergency Shutdown System (ESD). As such, all requirements of JERES-J-601 apply to this standard, except as noted herein. 1.4 The BMS requirements specified in this standard are considered prescriptive and the application of ANSI/ISA-84.00.01-2004 (IEC 61511 Mod), including establishment and validation of SIL levels, is not required. 1.5 This standard specifies the minimum BMS requirements for new SRU projects. BMS upgrade projects to existing SRU trains may reduce the minimum requirements of this standard to maintain consistency with other SRU units, when approved by the Saudi Aramco Proponent Organization. 2 Conflicts, Deviations and Clarifications 2.1 Any conflicts between this standard and other applicable Company Engineering Standards (JERES), Material Specifications (JERMS), Standard Drawings (JERSD), Engineering Procedures (JEREP), Company Forms or Industry standards, specifications, Codes and forms shall be brought to the attention of Company Representative by the Contractor for resolution. Until the resolution is officially made by the Company Representative, the most stringent requirement shall govern. 2.2 Where a licensor specification is more stringent than those of this standard, the Licensor’s specific requirement shall apply.
  • 5. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 5 of 24 2.3 Where applicable Codes or Standards are not called by this standard or its requirements are not clear, it shall be brought to attention of Company Representative by Contractor for resolution. 2.4 Direct all requests for deviations or clarifications in writing to the Company or its Representative who shall follow internal Company procedure and provide final resolution. 3 References The selection of material and equipment, and the design, construction, maintenance, and repair of equipment and facilities covered by this standard shall comply with the latest edition of the references listed below as of the CUT-OFF DATE as specified in the Contract unless otherwise noted. 3.1 Jubail Export Refinery References Jubail Export Refinery Engineering Procedure Jubail Export Refinery Engineering Standards JERES-F-001 Process Fired Heaters JERES-J-002 Technically Acceptable Instruments JERES-J-003 Basic Design Criteria JERES-J-601 Emergency Shutdown and Isolation Systems JERES-J-902 Electrical Systems for Instrumentation Jubail Export Refinery Materials System Specifications JERMS-L-4051 Ball Valves, (API SPEC 6D) JERMS-J-4617 Flame Monitoring Systems JERMS-J-4623 Programmable Controller Based ESD Systems JERMS-J-4716 Pneumatic Actuators On-Off Service 3.2 National and Industry Standards National Fire Protection Association NFPA 85 Boiler and Combustion Systems Hazards Code
  • 6. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 6 of 24 4 Definitions 4.1 Definitions presented in this Standard and other JER documents have precedence over other definitions. Conflicts between various definitions shall be brought to the attention of Company Representative by the Contractor for resolution. Company: Jubail Export Refinery. Company Representative: A designated person from the Company or an assigned third party representative. Company Inspector: A designated person or an agency responsible for conducting inspection activities on behalf of the Company. 4.2 List of Definitions Automatic BMS Operation: The Saudi Aramco mandatory method of BMS operation in which pushbutton actuations initiate furnace start-up, and where all purging, positioning, timing, and fuel/air valve manipulations are supervised and occur automatically. In Automatic BMS logic, operators are not required to manipulate burner front controls (e.g., manually open gas cocks) to light burners or pilots. Instead, burner and pilot starts are actuated from pushbuttons and monitored locally and remotely. Saudi Aramco requires the operator to manually initiate (via pushbutton) each of the following sequences: - Furnace Master Fuel Trip (MFT) reset - Purge - Initial pilot/burner start (local operator function) - Subsequent pilot/burner starts and stops - Normal shutdown Burner Valve (BV): A burner valve (BV) can be either an automated block valve or an automated bleed valve as defined below. BVs shall be selected as ZV valves per JERES-J-601; however, BVs shall not be provided with manual operators, local pushbutton operators, bypass valves, or partial stroke testing features. BVs are under complete control and supervision of the BMS system. Automated Bleed Valve - BV: This is an automatic valve used to vent fuel gas from between block BVs in both the pilot and burner fuel headers. Bleed valves shall be tagged as 'BV', and are not to be tagged as ZV.
  • 7. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 7 of 24 Automated Block Valve - BV: Sometimes called block valve, fuel shutdown valve, or SSV valve. The block valve is an automatic, fast closing, tight shutoff valve that completely shuts off fuel or air supply. These valves are located in the pilot and burner fuel headers and in the individual pilot and burner piping. Block valves can be used in conjunction with Bleed valves for gas service. Block valves shall be tagged as 'BV' and are not to be tagged as ZV. Burner Management System (BMS): The BMS is the control system dedicated to furnace safety and provides operator assistance in the starting and stopping of fuel preparation and burning equipment. Use of a BMS prevents misoperation of and damage to fuel preparation and burning equipment. The BMS includes the following subsystems: - Logic System - Field Sensors - Pilot System - Flame Monitoring System - Automated Block and Bleed Valves - Local Flame Safety Shutdown Panel - Control Room Indication and Control Equipment Master Fuel Trip: Sometimes called main fuel trip or MFT; an event that results in the rapid shutoff of all fuel to a furnace. Sulfur Recovery Unit (SRU) Fired Equipment: SRUs may have the following fired equipment: • Air Preheater – A natural draft, fuel gas fired furnace that preheats combustion air to be used in the SRU Reaction Furnace. This furnace typically uses up to 10 burners and incorporates continuous pilots. Pilots and burners are individually supervised, each with its own flame monitor. Pilots are lit via integrated spark ignitors. Firebox purging is via steam injection. • Acid Gas Preheater – A natural draft, fuel gas fired furnace that preheats H2S acid gas before it is combusted in the SRU Reaction Furnace. This furnace typically uses up to 14 burners with continuous pilots. Pilots and burners are individually supervised, each with its own flame monitor. Pilots are lit via integrated spark ignitors. Firebox purging is via steam injection. • Reaction Furnace - A forced draft reaction furnace with one burner (typically no pilot) where acid gas is the fuel and is burned with air to form SO2 and
  • 8. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 8 of 24 sulfur. This furnace will also be equipped with a forced draft fuel gas fired burner that starts and supplements the H2S burning. The fuel gas burner flame is lit by an automatically retracting spark ignitor. The burner flame is supervised with dual optical flame monitors. Purging on cold start is by combustion air flow, but on hot re-start, purge is via nitrogen to prevent reactor cool-down and free oxygen ingress to the downstream catalyst beds. • Catalytic Reheat-Auxiliary Combustion Chamber/Burner – When used, the auxiliary combustion chamber uses a single forced draft, fuel gas or fuel gas/acid gas fired burner to reheat the process stream above the liquid sulfur dewpoint prior to entering the next catalytic conversion stage. This burner is supervised with dual flame monitors and is lit by an automatically retracting spark ignitor (typically no pilot). There are up to 3 independent Catalytic Reheat Auxiliary Combustion Chamber/Burners per Reaction Furnace. Purge is via forced draft combustion airflow. • Tail Gas Thermal Oxidizer – A natural or forced draft, fuel gas fired furnace that combusts the SRU tail gas to form SO2 and release to atmosphere. The Thermal Oxidizer uses multiple burners with continuous pilots. Pilots and burners are individually supervised, each with their own flame monitor. Pilots are lit via integrated spark ignitors. Firebox purging is via steam injection or air in the forced draft configuration. 5 General Requirements 5.1 Each SRU furnace shall have automatic BMS logic. Each BMS system shall incorporate a complete automatic BMS sequence including: - Pre-Purge Permissives - Purge - Light off First and Subsequent Pilots and Burners - Normal Operation - Individual Pilot Fuel and/or Burner Fuel Trips - Total Furnace Master Fuel Trips 5.2 Instrument Selection Instruments shall be selected from JERES-J-002. 5.3 Environmental Conditions
  • 9. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 9 of 24 All equipment shall be specified, built and installed for operation in environmental conditions per JERES-J-003. 6 Burner Management System – Hardware Requirements 6.1 BMS Electrical Requirements 6.1.1 The electrical installation shall be designed and installed per requirements specified in JERES-J-902. 6.1.2 All BMS logic hardware and subsystems shall be powered from uninterruptible power supplies (UPS), as specified in JERES-J-902 and JERES-J-601. 6.2 BMS System 6.2.1 Logic Solver Hardware Types Programmable logic controllers (PLCs) which are approved for use in ESD systems, as specified in JERMS-J-4623, shall be used for BMS logic hardware. 6.2.2 Logic Software Modification Limitation BMS logic software shall not be changed while its associated fired equipment is in operation. 6.2.3 Logic Hardware Segregation 6.2.3.1 All BMS and ESD logic from a single SRU train shall be integrated into a dedicated PLC logic hardware package. 6.2.3.2 No other BMS, ESD, or non-ESD logic shall be included in the SRU train's dedicated BMS PLC hardware. 6.3 BMS Field Instruments 6.3.1 Input Sensors 6.3.1.1 Process measurement input signals to the BMS shall be from process connected transmitters, as defined in JERES-J-601. Discrete BMS inputs may be from hardwired manual push/pull buttons or dry contact inputs from valve position switches and flame scanner/amplifier relays.
  • 10. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 10 of 24 6.3.1.2 All input sensors and associated signal wiring shall meet the requirements specified in JERES-J-902. 6.3.2 Output Solenoids Solenoid valves shall have high temperature, class H insulated coils, internal valve trim appropriate for the service, and be suitable for continuous duty. They shall meet requirements specified in JERES-J-902. 6.3.3 Input/Output Bypasses 6.3.3.1 Input bypasses shall be provided for each Master Fuel Trip (MFT) input to the BMS. The input bypasses shall meet the requirements of JERES-J-601. Note that the use of input bypasses is limited to online testing and maintenance only. Startup bypasses are not permitted. 6.3.3.2 Output bypasses shall not be used. 7 Burner Management System – Logic Requirements 7.1 BMS Startup Logic Sequence 7.1.1 An automatic BMS sequence, as defined in section 4 above, shall be used for each fired furnace in the SRU train. 7.1.2 The BMS shall supervise each step in the light-off sequence, including pre-purge permissives, purge and fuel gas tightness testing, pilot and burner light-off, normal operation, and shutdown. 7.1.3 The purge process shall be manually initiated via pushbutton in the field, with the intent that the field operator will verify purge operation. 7.1.4 Purge shall accomplish 5 furnace volume air changes with a purge time of least 5 minutes. Forced draft furnaces shall incorporate airflow meters to verify purge rate. Natural draft furnaces shall incorporate an active method to generate airflow (e.g., steam purge). The furnace designer shall verify by calculation that the design purge airflow rate and time meet the required 5 furnace volume changes. Natural draft furnace purge airflow rate shall be confimed by a one-time test conducted during furnace commissioning. Natural draft heaters shall incorporate a manual combustible gas test as part of the purge sequence.
  • 11. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 11 of 24 7.1.5. A pilot and burner fuel gas piping leak test shall be included in the purge sequence for all multiburner furnaces. Fuel gas at a normal pressure shall be introduced to the both pilot and burner headers up to the individual pilot and burner BVs. Header block BVs shall then be closed and the bleed BV opened, and the individual pilot and burner BVs shall be closed. The trapped fuel pressure shall be monitored for 3 minutes and any significant pressure loss shall invalidate the purge, shall require shutoff valve leak investigation and repair, and shall take the sequence back to the purge required state. The manual isolation valve and blind on the individual burners and pilots shall be open during the leak test. See Figure 1 and 2 for diagrams of the fuel gas systems. The furnace designer shall calculate the acceptable leak test pressure drop based on the BV valve leakage rates required generate explosive LEL fuel concentrations in the firebox. 7.1.6 The light-off of the first pilot/burner shall be manually initiated via pushbutton in the field, with the intent that the field operator will verify safe operation on initial furnace firing. 7.2 SRU Furnace BMS Mandatory Trips 7.2.1 SRU train furnaces shall apply the following mandatory BMS burner, pilot, and master fuel trips. 7.2.2 Air and Acid Gas Preheater Furnaces 7.2.2.1 The following conditions shall cause a trip of the individual burner and pilot BVs: a) Loss of both burner and pilot (2oo2) flame detector signals. b) Individual burner or pilot BVs out of position. 7.2.2.2 The following conditions shall cause a complete Preheater master fuel trip, extinguishing all fire in the furnace. a) Burner header or pilot header BVs out of position. b) Loss of both burner and pilot (2oo2) flame detector signals on a predetermined number of burners. c) Burner header fuel gas pressure low-low or high-high. d) Pilot header fuel gas pressure low-low or high-high. e) Acid gas pass flow low-low (Acid Gas Preheater only). f) Air pass flow low-low (Air Preheater only). g) Stack damper closed position.
  • 12. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 12 of 24 h) Preheater manual shutdown button. i) SRU Train shutdown signal. 7.2.3 Reaction Furnace The following conditions shall cause a complete Reaction Furnace master fuel trip, which shuts off fuel gas, acid gas and combustion air and extinguishes all fire in the furnace: a) Fuel gas burner header BV out of position (when on fuel gas firing). b) Loss of both (2oo2) burner flame detector signals. c) Fuel gas pressure low-low or high-high (when on fuel gas firing). d) Acid gas knock-out drum level high-high (acid gas trip only – fuel gas and combustion air continues). e) Reaction Furnace combustion air pressure low-low. f) Waste Heat Recovery boiler steam drum level low-low. g) Thermal Oxidizer Trip (with 30 minute delay). h) Reaction Furnace manual shutdown button. i) SRU Train shutdown signal. 7.2.4 Reheat Auxiliary Burners The following conditions will cause an individual Reheat Auxiliary Burner air and fuel gas trip: a) Fuel gas header BV out of position. b) Loss of both (2oo2) auxiliary burner flame detector signals. c) Auxiliary burner fuel gas pressure low-low or high-high. d) Air/Fuel Ratio high-high or low-low. e) Reheat temperature high-high. f) Reheat Burner manual shutdown button. g) SRU Train shutdown signal. 7.2.5 Tail Gas Thermal Oxidizer 7.2.5.1 The following conditions shall cause a trip of the individual burner and pilot BV:
  • 13. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 13 of 24 a) Loss of both burner and pilot (2oo2) flame detector signals. b) Individual burner or pilot BVs out of position. 7.2.5.2 The following conditions shall cause a Tail Gas Thermal Oxidizer master fuel trip, extinguishing all fire in the furnace: a) Burner header or pilot header fuel BV out of position. b) Loss of both burner and pilot (2oo2) flame detector signals on a predetermined number of burners. c) Loss of all flame detector signals. d) Burner header fuel gas pressure low-low or high-high. e) Pilot header fuel gas pressure low-low or high-high. f) Thermal Oxidizer outlet temperature high-high. g) Thermal Oxidizer manual shutdown button. h) SRU Train shutdown signal. 8 Pilot System 8.1 Pilots 8.1.1 Pilot Requirements 8.1.1.1 Pilots shall operate continuously and shall incorporate spark ignitors and flame monitoring. 8.1.1.2 Pilot shall be permanently mounted and located in accordance with burner manufacturer's recommendations. Pilots shall provide sufficient energy to ignite the specified burner combustible fuel-air mixture reliably under all conditions. 8.1.1.3 The pilot flame shall be stable with the burner extinguished and with maximum draft. 8.2 Pilot Flame Monitor and Spark Ignition system 8.2.1 Each pilot shall be provided with a dedicated flame monitor. Rectified ionization type (flame rod) or optical flame scanners shall be used. Flame scanners shall meet requirements specified the Flame Monitoring section below. 8.2.2 Each pilot shall be provided with individual spark ignition.
  • 14. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 14 of 24 8.2.3 The power supply to the flame monitoring system shall be from the BMS uninterruptible power source. 8.3 Pilot Gas Header 8.3.1 The pilot gas supply shall be supplied from the burner header, upstream of the first header BV valve. Refer to Figure 1, "Pilot Gas System Diagram." 8.3.2 Each furnace with pilots shall have a separate pilot gas header. Pilot gas to each pilot shall be supplied from the pilot gas header. A quick-closing, manual isolating valve shall be provided in the pilot gas supply, upstream of all controls and at least 50 feet from the furnace. This valve shall be used for emergency isolation or for maintenance purposes. 8.3.3 The pilot gas header shall incorporate automated dual BV block valves with an automated BV bleed valve between. Refer to Figure 1, "Pilot Gas System Diagram." 8.3.4 Filters shall be located upstream of the shutoff and control valves to prevent entry of foreign material into the pilot gas system. 8.3.5 The pilot gas header pressure shall be regulated to the designed operating pressure prior to distribution to the individual pilot subsystem. 8.4 Individual Pilots 8.4.1 Individual pilot gas lines shall be provided with a manual isolating valve, an isolating blind, and a single automated BV valve – in series. Refer to Figure 1, "Pilot Gas System Diagram." It is intended that all pilots will remain lit while the furnace is operational. Any pilots that are removed from service must be isolated via the manual isolation valve and blind. 8.4.2 On furnaces with only a single pilot which is supplied directly from the pilot header – no individual pilot automated BV is required. In this case, the pilot header automated block and bleed valves provide pilot isolation. 8.5 Pilot Combustion Air System 8.5.1 The pilot combustion air system shall incorporate the following components, installed in this sequence: a) Manual isolating (ball) valve b) Dual-type filter
  • 15. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 15 of 24 c) Pressure regulating valve d) Pressure gauge e) Two-way direct-acting solenoid valve or air actuated valve. This valve shall be considered a BV valve and be supervised by the BMS. 8.5.2 Pilot combustion air shall be clean and dry. Pilots shall not require an external air supply for cooling. 8.6 Pilot Automated Block and Bleed BV Valves 8.6.1 Solenoid valves or air actuated quarter-turn ball valves may be used for gas pilot header and individual pilot automated block and bleed BV valves. 8.6.2 Pilot solenoid BVs shall be two-way, direct-acting valves suitable for safety shutoff service in gas fired equipment. On loss of electrical power, solenoid block BVs shall fail closed and bleed BVs shall fail open. Solenoid BVs shall be fitted with limit switches detecting the "fully open" and "fully closed" positions for input to the BMS logic system. Solenoids shall have class H, high-temperature insulated coils, and internal trim suitable to the service. Solenoids shall be suitable for continuous duty and shall meet the requirements specified in JERES-J-902. 8.6.3 Ball valves used as pilot BVs shall be fire-safe, tight shutoff, quarter-turn ball valves with 316 ss trim. Block BV actuators shall be air open/spring close. Bleed BV actuators shall be air close/spring open. Valves shall be fitted with limit switches detecting the "fully open" and "fully closed" positions for input to the BMS logic system. Actuators shall conform to JERMS-J-4716, "Pneumatic Actuators, On-Off Service", and valves 2 inches and larger shall conform to Saudi Aramco Specification JERMS-L-4051. 9 Burner System 9.1 Burner Flame Monitor Each burner shall be provided with a dedicated UV optical flame monitor. Flame scanners shall meet requirements specified in the Flame Monitoring section below. 9.2 Burner Fuel Gas Header 9.2.1 Each furnace shall have a separate burner fuel gas header supplied from the plant gas header, configured per Figure 2, "Burner Gas System Diagram." A quick-closing, manual isolating valve shall be provided in the burner header gas supply, upstream
  • 16. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 16 of 24 of all controls and at least 50 feet from the furnace. This valve shall be used for emergency isolation or for maintenance purposes. 9.2.2 The burner gas header shall incorporate dual automated BV block valves with an automated BV bleed valve between. 9.3 Individual Burners 9.3.1 Individual burner gas supply lines shall be provided with a manual isolating valve, an isolating blind, and a single automated BV – in series. Refer to Figure 2, "Burner Gas System Diagram". It is intended that all burners will remain lit while the furnace is operational. Any burners that are removed from service must be isolated via the manual isolation valve and blind. 9.3.2 On furnaces with only a single burner which is supplied directly from the burner header – no individual burner BV is required. In this case, the burner header automated block and bleed BVs provide burner isolation. 9.4 Burner Combustion Air System The burner forced draft combustion air system shall incorporate a single automated BV under the supervision of the BMS system. 9.5 Burner Automated Block and Bleed Valves: 9.5.1 The Burner header and individual burner Block and Bleed BVs shall be fire-safe, tight shutoff, quarter-turn ball valves with 316 SS trim. BVs 2 inches and larger shall conform to Saudi Aramco specification JERMS-L-4051. 9.5.2 Block BV actuators shall be air open/spring close. Bleed BV actuators shall be air close/spring open. Actuators shall conform to JERMS-J-4716, "Pneumatic Actuators, On-Off Service." Block and bleed valves shall be tagged BV and shall not be provided with manual operators, local pushbuttons, bypass valves, or partial stroke testing features. 9.5.3 Burner and pilot header Block BVs shall close within 10 seconds. Header bleed BVs shall open in less than 2 seconds. Individual burner block BVs with a nominal size of 4 inch and smaller shall close within 2 seconds - BVs larger than 4 inch shall close within 3 seconds. The opening time of individual burner BVs shall be compatible with the burner ignition requirements.
  • 17. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 17 of 24 9.5.4 All block and bleed BVs shall be fitted with limit switches detecting the "fully open" and "fully closed" positions for input to the BMS logic system. Limit switches shall conform to requirements in JERMS-J-4716. 9.6 Acid Gas Automated Block Valves: At least one automated block BV shall be provided in the acid gas supply line to SRU train. This BV shall be under the control and supervision of the BMS system and shall be fitted with limit switches detecting the "fully open" and "fully closed" positions for input to the BMS logic system. Limit switches shall conform to requirements in JERMS-J-4716. 10 Flame Monitoring System 10.1 General 10.1.1 Flame monitoring equipment shall be specified in accordance with JERMS-J-4617. 10.1.2 The furnace flame scanner specification shall identify the type of fuel gas to be fired in the burner and pilot. 10.1.3 The Vendor of the flame monitoring equipment shall submit in writing, for Saudi Aramco Proponent Organization approval, the proposed detection principle for the specified fuel(s). 10.2 Pilot Flame Supervision 10.2.1 The pilot flame detector shall: a) Be either a rectified ionization type (flame rod) or optical UV flame detector. b) Detect the smallest pilot flame which can provide smooth and reliable ignition of the burner. 10.2.2 The pilot flame detector amplifier shall provide analog output signals to indicate the flame intensity and assist in calibration. 10.3 Number of Detectors Two flame detectors shall be used per burner - one to detect the pilot flame and other to sight the burner flame. On direct ignited burners that do not use pilots; two flame detectors – both sighting the burner flame - shall be used.
  • 18. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 18 of 24 10.4 Flame Monitoring System Design 10.4.1 The flame monitoring equipment shall be fail-safe in accordance with JERMS-J- 4617. 10.4.2 The flame monitoring equipment shall have self-checking features. The cycle time of the self-check function shall be two seconds or less. 10.4.3 The equipment and system design shall permit the operator to distinguish between a flame-out signal and self-check fault. 10.4.4 Two flame detectors shall indicate flame-on during normal operation. Flame-out signals from both the burner and pilot flame detectors shall trip the associated burner and pilot. A flame-out signal from only one of the two flame detectors shall activate an alarm in the control room; the fault shall also be indicated on the local flame safety shutdown (FSS) panel. 10.4.5 An analog indicator of the flame intensity of each detector, or signal connections for this purpose, shall be provided near the flame detector to facilitate detector sighting. A flame status indicating light shall be located on each flame amplifier. 10.4.6 The flame-on and flame-off response times for each particular fuel shall be specified in accordance with JERMS-J-4617. 10.4.7 The flame detector shall be suitable for continuous operation in an ambient temperature of 100°C when cooling air is not available. With cooling air, the scanner shall be suitable for continuous operation at 65°C. 10.5 Flame Monitoring Air and Nitrogen Purge For the Reaction Furnace and Auxiliary Combustion Chamber - where air input must be isolated during a furnace trip - flame detectors and peep sights shall be purged with a system that can supply both purge air and nitrogen. The air source shall be the normal purge medium and shall include a BMS supervised block BV to isolate purge air on furnace trip. An additional BMS supervised block BV shall be provided in the nitrogen purge supply to immediately introduce nitrogen in the event of a furnace trip. 11 Control Room and Local BMS Interface 11.1 General
  • 19. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 19 of 24 Operational monitoring of the BMS shall be via the Distributed Control System (DCS) in the control room and via a local control panel. The local control panel shall be termed the flame safety shutdown (FSS) panel. 11.2 Local Flame Safety Shutdown (FSS) Panel 11.2.1 Each furnace in the SRU train shall be provided with a dedicated local FSS panel. The FSS panel shall be located near the furnace where the operator may generally observe the furnace burner equipment. 11.2.2 The FSS panel shall provide – as a minimum - the following pushbuttons and indicating lights: a) MFT Reset Pushbutton b) Purge Start Pushbutton c) First Pilot Light-Off Pushbutton d) Furnace Online Indicator Lamp e) Furnace Shutdown Pullbutton f) SRU Train Shutdown Pullbutton g) Lamp Test Pushbutton 11.2.3 FSS-mounted BMS indicators and controls shall be discrete push buttons and lights, lamps, or LED's hardwired to the BMS logic system. 11.3 Control Room BMS Operator Interface 11.3.1 General 11.3.1.1 A control room operator interface for the BMS shall be integrated into the Distributed Control System (DCS) using DCS graphic displays. 11.3.1.2 Digital communication between the BMS logic system and DCS shall meet all requirements of JERES-J-601. 11.3.2 BMS – DCS Operator Interface Requirements The BMS operator interface on the DCS system shall provide all inputs indications and outputs necessary to startup, operate, and shutdown the SRU train. These shall include operator displays for: a) Purge permissive status and troubleshooting
  • 20. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 20 of 24 b) Purge status including fuel gas leak test c) Pilot and burner light-off and shutdown operation and status d) Block or bleed BV position status 11.3.3 Control Room Manual Master Fuel Trip Button Dedicated manual shutdown buttons for each SRU furnace, as well as for the overall SRU train, shall be provided at the control room operator interface location. 11.3.4 Control Room Alarms The burner management system shall be configured to communicate each BMS alarm or fault condition to the DCS. The alarm communication shall be designed in accordance with JERES-J-601. 11.3.5 BMS Sequence of Events Functionality Each SRU furnace BMS shall be provided with sequence of events functionality and a first out log compliant with JERES-J-601. 12 Installation 12.1 General 12.1.1 Instruments shall be installed in a vibration-free location as close as possible to the point of measurement. Instrument process piping shall be adequately supported to minimize transmission of vibration to the instruments. Access shall be allowed to facilitate testing, calibration and maintenance. 12.1.2 The position of local indicating instruments shall enable them to be observed from grade, platform or walkway while related equipment is operated or when primary instruments are being tested or calibrated. 12.1.3 Instruments and components shall be located so that they are protected against direct drainage or blowdown of condensate, water or process fluids from adjacent equipment. 12.1.4 All locally mounted instrumentation and associated control equipment shall be accessible from grade, platform, fixed walkway or fixed ladder to facilitate testing and maintenance. Where necessary, provide standoff shielding around
  • 21. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 21 of 24 instrumentation to prevent operator contact with high temperature surfaces, as per requirements in JERES-F-001. 12.2 Flame Monitoring Equipment 12.2.1 The flame monitoring equipment shall be purchased and installed in accordance with JERMS-J-4617 and the flame equipment and burner manufacturer's instructions. 12.2.2 Vendor approved cable shall be provided for interconnecting scanners to their respective amplifier/relay units. The layout and wiring techniques shall eliminate or minimize the effects of electrical noise on the flame monitoring equipment. 12.2.3 The location and installation of the scanner shall permit reasonable access for operations and maintenance personnel. 12.2.4 Each scanner shall be installed to permit an unobstructed view of the flame it is supervising under all firing conditions. Scanners should be located or fixed so aim is not disturbed during routine maintenance or burner changes during furnace operation. 12.2.5 To assist in optimum sighting, flame scanners shall be installed on a sight-pipe having a swivel-ball mounting. 13 Documentation Documentation shall be provided as per requirements in JERES-J-601. In addition, the project shall provide: a) Calculation documents for each natural draft furnace verifying purge airflow rate. b) Calculation documents for each natural draft furnace verifying that the design purge airflow rate and purge time are acceptable to meet the purge requirement of 5 furnace air volume changes. 14 Testing and Inspection 14.1 BMS Testing BMS inputs and outputs shall be periodically tested as defined in JERES-J-601. 14.2 Block and Bleed BV Testing
  • 22. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 22 of 24 The furnace safety system design shall permit the periodic leak testing of all fuel block and bleed BVs. 14.3 Purge Airflow Verification Test During commissioning, natural draft heaters shall have their purge airflow rate verified against design by field test using portable airflow meters.
  • 23. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 23 of 24 Appendix I: Figure 1 Pilot Gas System Diagram
  • 24. Jubail Export Refinery Engineering Standards JERES-J-607 Rev. 0 Burner Management Systems for SRU Trains 29 April 2008 This document is the property of Jubail Export Refinery and no parts of this document shall be reproduced by any means without prior approval by the Company. Page 24 of 24