SlideShare uma empresa Scribd logo
1 de 43
Baixar para ler offline
Lesson Learned
           from
    Cross Constellations
            and
       Multi Models
Process Improvement Initiatives

           Kobi Vider – Picker
            K.V.P Consulting
         Kobi.Vider@hotmail.com
             +972522946676
Agenda
• Process flow
• Background
• First Level Filtering (PA Level)
• Second Level Filtering (Goal Level)
• How We Approach the Combination and
  Integration of the Common PAs
• Suggestions and Open Questions
Process flow
•   Organizational Structure Review and Mapping
•   Organizational Scope Planning
•   Process Improvement Effort Objectives
•   Supporting Quality Standards Scope
•   Correlating the Organizational Mission and
    Responsibilities to the CMMIs Content and
    context
•   Supporting Quality Standards Mapping
•   CMMI Harmonization Process
•   Conducting Detailed Gap Analysis
•   Gap Analysis Result Segmentation
Organizational Structure
       Review and Mapping
• Government Agency
• Structure and Size
   • 6 Senior Managers
   • ~250 Project / Program Managers
   • ~900 In-house Development, Service
      and Maintenance Personal
   • ~2000 External Contractors
   • Internal R&D Team
   • Internal Reliability and Performance Team
Process Improvement
       Effort Objectives
• Group Target is Process Improvement:
  • Increase Processes Efficiency
  • Increase Budget utilization
  • Reduce Cost of Poor Quality
  • Increase Uniformity in Processes
• Leading Standards to Compliance with
  • Internal Quality Standard
  • EFQM
  • CMMI Suite
Supporting Quality Standards Scope

• All Groups
  • Smart Grid
• ACQ PMs / PMO
  • PMBOK
  • DoD 5000.01 & 5000.02
• Maintenance and Service
  • ISO 14000
  • OHAS 18000
Additional Standards Elements
•   ISO 9001-2008 = 216                           • Not Counted
•   OHSAS 18001 = 132
•   ISO 27001 = 126
                                                    • Domain Specific
•   ISO 27002 = 134                                   Regulations
•   ISO 14001 = 139                                 • LEAN
•   PMBOK 3rd = 804       Total of                  • DoD-AF V2
•   OPM3 = 1402
•   DoD-AF V1.5 = 40                                • SOA-MM
•   ISO 20000 = 196
                          5009
•   ITIL V2.0 = 741
                          ‘Additional’ Elements
•   Six Sigma = 148
•   Baldrige = 127
•   EFQM = 804
Supporting Quality
 Standards Mapping



SGMM    Tool    Slides
Some Mapping
  Examples
Six Sigma Correlation Snapshot
                                                        14 out are covered
                    DEFINE


              MEASURE


          ANALYZE


    IMPROVE


CONTROL




                    REQM            SSD         OPP         DAR     RSKM

                  CAM         OT          QPM      M&A            IRP

            SAM         OPD         SST         PPQA        SCON

      PMC         OPF         IPM         OID          SD

 PP         CM      STSM        CAR
ISO 9000:2008 Correlation Snapshot
                                                                 20 are covered
                            Management
                            Responsibility

                      Measurement
                       Analysis &
                      Improvement

               Product
              Realization

        Resource
       Management

  Quality
Management
  System




                            REQM              SSD        OPP         DAR     RSKM

                       CAM             OT          QPM      M&A            IRP

              SAM            OPD             SST         PPQA        SCON

       PMC            OPF            IPM           OID          SD

 PP            CM           STSM             CAR
PMBOK Correlation Snapshot
                                                                      15 PAs are covered

                          Integration    Procurement       Risk    Communications    Human
                                                                                    Resource
                        Scope


                 Time


          Cost


Quality




                          REQM           SSD        OPP         DAR       RSKM

                        CAM       OT          QPM      M&A             IRP

             SAM            OPD         SST         PPQA          SCON

     PMC              OPF         IPM         OID          SD

PP               CM       STSM          CAR
ITIL          – CMMI Correlation Snapshot
                              Service Delivery
                            Financial Management
                                      for
                                 IT Services

                        Capacity
                       Management

                 IT Service
           Continuity Management


       Availability
       Management

Service Level
Management




                                   REQM             SSD        OPP         DAR     RSKM

                              CAM           OT           QPM      M&A            IRP

                      SAM           OPD            SST         PPQA        SCON

                PMC         OPF            IPM           OID          SD

      PP              CM            STSM           CAR
ITIL – CMMI Correlation Snapshot
                                          Service Support

                                        The Service Desk



                                Incident Management



                      Problem Management


                Configuration
                Management


       Change Management



Release Management

                                 REQM                 SSD         OPP         DAR     RSKM

                           CAM               OT             QPM      M&A            IRP

                     SAM            OPD               SST         PPQA        SCON

          PMC              OPF             IPM              OID          SD

   PP                CM            STSM          CAR
ISO 20000 – CMMI
                                              Correlation Snapshot
                                        Control processes Planning and       Resolution processes Release process
                                                          implementing
                                                          service management
                          new or changed
                             services

                     Service delivery
                         process


        Requirements for a
        management system


Relationship processes




                                  REQM                   SSD           OPP            DAR            RSKM

                             CAM                 OT            QPM            M&A                IRP

                    SAM             OPD                SST           PPQA              SCON

            PMC              OPF               IPM            OID                SD

    PP               CM            STSM              CAR
CMMI Harmonization
     Process
CMMI Harmonization
  Process Tool
DEV                                           ACQ                                        SVC
Project Planning                          Project Planning                                  Project Planning
Project Monitoring and Control            Project Monitoring and Control                    Project Monitoring and Control
Process and Product Quality Assurance     Process and Product Quality Assurance             Process and Product Quality Assurance
Requirements Management                   Requirements Management                           Requirements Management
Configuration Management                  Configuration Management                          Configuration Management
Measurement and Analysis                  Measurement and Analysis                          Measurement and Analysis

Organizational Process Definition +IPPD   Organizational Process Definition                 Organizational Process Definition
Organizational Process Focus              Organizational Process Focus                      Organizational Process Focus
Organizational Training                   Organizational Training                           Organizational Training
Decision Analysis and Resolution          Decision Analysis and Resolution                  Decision Analysis and Resolution
Integrated Project Management +IPPD       Integrated Project Management                     Integrated Project Management
Risk Management                           Risk Management                                   Risk Management

Quantitative Project Management           Quantitative Project Management                   Quantitative Project Management
Organizational Process Performance        Organizational Process Performance                Organizational Process Performance

Causal Analysis and Resolution           Causal Analysis and Resolution                     Causal Analysis and Resolution
Organizational Innovation and Deployment Organizational Innovation and Deployment           Organizational Innovation and Deployment

Supplier Agreement Management                                                               Supplier Agreement Management

Requirements Development                  Acquisition Requirements Development
Validation                                Acquisition Validation
Verification                              Acquisition Verification

Technical Solution                        Solicitation and Supplier Agreement Development   Capacity and Availability Management
Product Integration                       Agreement Management                              Incident Resolution and Prevention
                                          Acquisition Technical Management                  Service Continuity
                                                                                            Service Delivery
                                                                                            Service System Development
                                                                                            Service System Transition
                                                                                            Strategic Service Management
First Level Filtering (PA Level)
                      DEV                                           ACQ                                        SVC
Project Planning                          Project Planning                                  Project Planning
Project Monitoring and Control            Project Monitoring and Control                    Project Monitoring and Control
Process and Product Quality Assurance     Process and Product Quality Assurance             Process and Product Quality Assurance
Requirements Management                   Requirements Management                           Requirements Management
Configuration Management                  Configuration Management                          Configuration Management
Measurement and Analysis                  Measurement and Analysis                          Measurement and Analysis

Organizational Process Definition +IPPD   Organizational Process Definition                 Organizational Process Definition
Organizational Process Focus              Organizational Process Focus                      Organizational Process Focus
Organizational Training                   Organizational Training                           Organizational Training
Decision Analysis and Resolution          Decision Analysis and Resolution                  Decision Analysis and Resolution
Integrated Project Management +IPPD       Integrated Project Management                     Integrated Project Management
Risk Management                           Risk Management                                   Risk Management

Quantitative Project Management           Quantitative Project Management                   Quantitative Project Management
Organizational Process Performance        Organizational Process Performance                Organizational Process Performance

Causal Analysis and Resolution           Causal Analysis and Resolution                     Causal Analysis and Resolution
Organizational Innovation and Deployment Organizational Innovation and Deployment           Organizational Innovation and Deployment

Supplier Agreement Management                                                               Supplier Agreement Management

Requirements Development                  Acquisition Requirements Development
Validation                                Acquisition Validation
Verification                              Acquisition Verification

Technical Solution                        Solicitation and Supplier Agreement Development   Capacity and Availability Management
Product Integration                       Agreement Management                              Incident Resolution and Prevention
                                          Acquisition Technical Management                  Service Continuity
                                                                                            Service Delivery
                                                                                            Service System Development
                                                                                            Service System Transition
                                                                                            Strategic Service Management
Second Level Filtering (Goal Level)

• Service System Development (SSD),
  SG 1 – Develop and Analyze Stakeholder Requirements
  can be found in Requirements Development
• Acquisition Technical Management (ATM),
  SG 1 – Evaluate Technical Solutions
  can be found in Technical Solution
• Acquisition Technical Management (ATM),
  SG 2 – Perform Interface Management
  can be found in Technical Solution and Product Integration
Second Level Filtering (Goal Level)

• Service Continuity (SCON),
  SG 3 - Verify and Validate the Service Continuity Plan
  can be found in Verification and Validation

• Service System Development (SSD),
  SG 3 - Verify and Validate Service Systems
  can be found in Verification and Validation
Conducting Detailed
   Gap Analysis
Gap Analysis Model Scope
• 32 CMMI Process Areas
  • 75 CMMI Specific Goals
     • 249 CMMI Specific Practices
        • 1169 CMMI Specific Subpractices
  • 5 ‘Classic’ CMMI Generic Goals (Extended)
     • 17 ‘Classic’ CMMI Generic Practices (Extended)
        • 34 ‘Classic’ CMMI Generic Subpractices (Extended)

• Cross-referenced with the following
  additional standards elements
Rating Profile




                 Page 31
Processing the Results
Improvement vs. Implementation
  Process Improvements
                         ROI
Organizational Benefit
                         Improvement vs. Benefit          Add Value




                                                               Page 34
                                   Achieved Improvement
Standards Compliance to ORG Mission
Organizational Benefit




                                                          Page 35
                                   Achieved Improvement
Additional Standards Contribution
Organizational Benefit




                                    Achieved Improvement   Page 36
Some of Our Suggestions
Survival Quick guidelines
• A method to support multi appraisals in line with
  CMMI must be compatible with the Reference Model
  and discipline
• Requirements for Compatibility are expressed in terms
  of:
   • Purpose
      • Of combined models
      • Of going there
   • Scope
      • Of selected models
      • Of organization
   • Model elements and indicators
   • Mapping
      • Knowledge on....
   • Translation
• These requirements span various levels and model
  features
Some of Our Suggestions
Integration approach
• Capacity and Availability Management (CAM)
  place as unique PA?
•   In CMU/SEI-93-TR-025 (SW-CMM V1.1) SPP KPA Activity 11: Estimates
    for the project's critical computer resources are derived according to a
    documented procedure

• Integrate SG 3 of Service Continuity (SCON), and
  Service System Development (SSD) to be part of
  Verification and Validation
• Integrate Acquisition Technical Management
  (ATM) to Technical Solution
• Integrate VER and AVER; VAL and AVAL
• Consider Security
Some of Our Suggestions
Our Suggestions to the integration approach
• Add more elaborations
• Create more objective wording in PAs, e.g.
  • Project Planning to Delivery / Assignment /
    Product Planning
  • Technical Solution to Solution Development
• Add more examples
Some of Our Future Discussions
• Additional Generic Practice for Security as defined process
   • Our suggestion: GP 3.3 Information Management and Security
     Control
       • Place designated information entities and work products of the process and
         product under appropriate levels of classification and control

       • Including five subpractices
            •   Identify
            •   Analysis
            •   Evaluate
            •   Prepare plan
            •   Execute and recover
• Approach to P-CMM
• Approach to Resiliency Engineering Framework (REF)
  and Operationally Critical Threat, Asset, and Vulnerability
  Evaluation (OCTAVE)
• Approach Smart Grid at three levels
Some of Our Future Discussions
• Cross constellation support team
   • Prerequisite knowledge
   • Team qualification / certifications
• Cross constellations Appraisal team
   •   Team training
   •   Team qualification / certifications
   •   PIIDs
   •   Structure of mini teams
   •   Consensus process
Applying CMMI SCAMPI method for Multi standards and cross CMMIs joint assessment

Mais conteúdo relacionado

Semelhante a Applying CMMI SCAMPI method for Multi standards and cross CMMIs joint assessment

Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)Franck Paduch
 
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013Sammy Saba
 
Advertisement-ISOQualitas
Advertisement-ISOQualitasAdvertisement-ISOQualitas
Advertisement-ISOQualitasRenato Pisani
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resumeMarty Howard
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resumeMarty Howard
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resumeMarty Howard
 
Cmmi constellations.pptx
Cmmi constellations.pptxCmmi constellations.pptx
Cmmi constellations.pptxAndré Heijstek
 
21 Business Processes and Counting - Enhancing Customer Experience with Proce...
21 Business Processes and Counting - Enhancing Customer Experience with Proce...21 Business Processes and Counting - Enhancing Customer Experience with Proce...
21 Business Processes and Counting - Enhancing Customer Experience with Proce...Capgemini
 
PPM STUDIO for CMMI
PPM STUDIO for CMMIPPM STUDIO for CMMI
PPM STUDIO for CMMIPPM Studio
 
Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8Kaushik S. Gandhi
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC Advisory Group
 
IAPsolutions' corporate presentation
IAPsolutions' corporate presentationIAPsolutions' corporate presentation
IAPsolutions' corporate presentationIAPsolutions
 
ITIL involvement in itil processes
ITIL involvement in itil processesITIL involvement in itil processes
ITIL involvement in itil processesbrunodeepak
 
Transport change control_3
Transport change control_3Transport change control_3
Transport change control_3dugant
 

Semelhante a Applying CMMI SCAMPI method for Multi standards and cross CMMIs joint assessment (20)

Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)Cilt Singapore (Scpd Flyer)
Cilt Singapore (Scpd Flyer)
 
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013ABB Consulting and Full Service-The road to efficiency and reliability-april2013
ABB Consulting and Full Service-The road to efficiency and reliability-april2013
 
Advertisement-ISOQualitas
Advertisement-ISOQualitasAdvertisement-ISOQualitas
Advertisement-ISOQualitas
 
Bsm master
Bsm   masterBsm   master
Bsm master
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume
 
Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume
 
Cmmi constellations.pptx
Cmmi constellations.pptxCmmi constellations.pptx
Cmmi constellations.pptx
 
Operations Careers
Operations CareersOperations Careers
Operations Careers
 
21 Business Processes and Counting - Enhancing Customer Experience with Proce...
21 Business Processes and Counting - Enhancing Customer Experience with Proce...21 Business Processes and Counting - Enhancing Customer Experience with Proce...
21 Business Processes and Counting - Enhancing Customer Experience with Proce...
 
PPM STUDIO for CMMI
PPM STUDIO for CMMIPPM STUDIO for CMMI
PPM STUDIO for CMMI
 
Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8Opteamates Corporate Presentation V8
Opteamates Corporate Presentation V8
 
Presentation
PresentationPresentation
Presentation
 
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
ARC's Sid Snitkin Asset Lifecycle Management @ ARC Industry Forum 2010
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
IAPsolutions' corporate presentation
IAPsolutions' corporate presentationIAPsolutions' corporate presentation
IAPsolutions' corporate presentation
 
TTM extended managed services framework - High Level Overview
TTM extended managed services framework - High Level OverviewTTM extended managed services framework - High Level Overview
TTM extended managed services framework - High Level Overview
 
ITIL involvement in itil processes
ITIL involvement in itil processesITIL involvement in itil processes
ITIL involvement in itil processes
 
Transport change control_3
Transport change control_3Transport change control_3
Transport change control_3
 

Mais de Kobi Vider

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniquesKobi Vider
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagramKobi Vider
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceKobi Vider
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guideKobi Vider
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolKobi Vider
 
Kaizen – road map to world class processes
Kaizen – road map to world class processesKaizen – road map to world class processes
Kaizen – road map to world class processesKobi Vider
 
Customer value management
Customer value managementCustomer value management
Customer value managementKobi Vider
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product qualityKobi Vider
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmiKobi Vider
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian networkKobi Vider
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcKobi Vider
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfdKobi Vider
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people Kobi Vider
 
Cross constellations v1
Cross constellations v1Cross constellations v1
Cross constellations v1Kobi Vider
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carKobi Vider
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kitKobi Vider
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk managementKobi Vider
 
Configuration management
Configuration managementConfiguration management
Configuration managementKobi Vider
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total costKobi Vider
 

Mais de Kobi Vider (20)

Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniques
 
Risk management process diagram
Risk management process diagramRisk management process diagram
Risk management process diagram
 
Customer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importanceCustomer service quality perception the mutual commitments importance
Customer service quality perception the mutual commitments importance
 
Kaizen team leader guide
Kaizen team leader guideKaizen team leader guide
Kaizen team leader guide
 
Process asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing toolProcess asset library as process improvement and knowledge sharing tool
Process asset library as process improvement and knowledge sharing tool
 
Kaizen – road map to world class processes
Kaizen – road map to world class processesKaizen – road map to world class processes
Kaizen – road map to world class processes
 
Customer value management
Customer value managementCustomer value management
Customer value management
 
Customer perception of product quality
Customer perception of product qualityCustomer perception of product quality
Customer perception of product quality
 
Six sigma as foundation to cmmi
Six sigma as foundation to cmmiSix sigma as foundation to cmmi
Six sigma as foundation to cmmi
 
Understanding the impact of certain uncertain event using bayesian network
Understanding the impact of  certain uncertain event using bayesian networkUnderstanding the impact of  certain uncertain event using bayesian network
Understanding the impact of certain uncertain event using bayesian network
 
Interpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svcInterpretation and lesson learned from high maturity implementation of cmmi svc
Interpretation and lesson learned from high maturity implementation of cmmi svc
 
Game theory bbn and qfd
Game theory bbn and qfdGame theory bbn and qfd
Game theory bbn and qfd
 
Design your business processes to embrace people
Design your business processes to embrace people Design your business processes to embrace people
Design your business processes to embrace people
 
Cross constellations v1
Cross constellations v1Cross constellations v1
Cross constellations v1
 
Base your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, carBase your initial m&a to ppm, qpm, car
Base your initial m&a to ppm, qpm, car
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
Cmmi configuration management interpretation kit
Cmmi configuration management interpretation kitCmmi configuration management interpretation kit
Cmmi configuration management interpretation kit
 
Software testing by risk management
Software testing by risk managementSoftware testing by risk management
Software testing by risk management
 
Configuration management
Configuration managementConfiguration management
Configuration management
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total cost
 

Último

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 

Último (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

Applying CMMI SCAMPI method for Multi standards and cross CMMIs joint assessment

  • 1. Lesson Learned from Cross Constellations and Multi Models Process Improvement Initiatives Kobi Vider – Picker K.V.P Consulting Kobi.Vider@hotmail.com +972522946676
  • 2.
  • 3. Agenda • Process flow • Background • First Level Filtering (PA Level) • Second Level Filtering (Goal Level) • How We Approach the Combination and Integration of the Common PAs • Suggestions and Open Questions
  • 4. Process flow • Organizational Structure Review and Mapping • Organizational Scope Planning • Process Improvement Effort Objectives • Supporting Quality Standards Scope • Correlating the Organizational Mission and Responsibilities to the CMMIs Content and context • Supporting Quality Standards Mapping • CMMI Harmonization Process • Conducting Detailed Gap Analysis • Gap Analysis Result Segmentation
  • 5. Organizational Structure Review and Mapping • Government Agency • Structure and Size • 6 Senior Managers • ~250 Project / Program Managers • ~900 In-house Development, Service and Maintenance Personal • ~2000 External Contractors • Internal R&D Team • Internal Reliability and Performance Team
  • 6. Process Improvement Effort Objectives • Group Target is Process Improvement: • Increase Processes Efficiency • Increase Budget utilization • Reduce Cost of Poor Quality • Increase Uniformity in Processes • Leading Standards to Compliance with • Internal Quality Standard • EFQM • CMMI Suite
  • 7. Supporting Quality Standards Scope • All Groups • Smart Grid • ACQ PMs / PMO • PMBOK • DoD 5000.01 & 5000.02 • Maintenance and Service • ISO 14000 • OHAS 18000
  • 8. Additional Standards Elements • ISO 9001-2008 = 216 • Not Counted • OHSAS 18001 = 132 • ISO 27001 = 126 • Domain Specific • ISO 27002 = 134 Regulations • ISO 14001 = 139 • LEAN • PMBOK 3rd = 804 Total of • DoD-AF V2 • OPM3 = 1402 • DoD-AF V1.5 = 40 • SOA-MM • ISO 20000 = 196 5009 • ITIL V2.0 = 741 ‘Additional’ Elements • Six Sigma = 148 • Baldrige = 127 • EFQM = 804
  • 9. Supporting Quality Standards Mapping SGMM Tool Slides
  • 10.
  • 11. Some Mapping Examples
  • 12. Six Sigma Correlation Snapshot 14 out are covered DEFINE MEASURE ANALYZE IMPROVE CONTROL REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 13. ISO 9000:2008 Correlation Snapshot 20 are covered Management Responsibility Measurement Analysis & Improvement Product Realization Resource Management Quality Management System REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 14. PMBOK Correlation Snapshot 15 PAs are covered Integration Procurement Risk Communications Human Resource Scope Time Cost Quality REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 15. ITIL – CMMI Correlation Snapshot Service Delivery Financial Management for IT Services Capacity Management IT Service Continuity Management Availability Management Service Level Management REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 16. ITIL – CMMI Correlation Snapshot Service Support The Service Desk Incident Management Problem Management Configuration Management Change Management Release Management REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 17. ISO 20000 – CMMI Correlation Snapshot Control processes Planning and Resolution processes Release process implementing service management new or changed services Service delivery process Requirements for a management system Relationship processes REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 18.
  • 19.
  • 20.
  • 21.
  • 23.
  • 24. CMMI Harmonization Process Tool
  • 25. DEV ACQ SVC Project Planning Project Planning Project Planning Project Monitoring and Control Project Monitoring and Control Project Monitoring and Control Process and Product Quality Assurance Process and Product Quality Assurance Process and Product Quality Assurance Requirements Management Requirements Management Requirements Management Configuration Management Configuration Management Configuration Management Measurement and Analysis Measurement and Analysis Measurement and Analysis Organizational Process Definition +IPPD Organizational Process Definition Organizational Process Definition Organizational Process Focus Organizational Process Focus Organizational Process Focus Organizational Training Organizational Training Organizational Training Decision Analysis and Resolution Decision Analysis and Resolution Decision Analysis and Resolution Integrated Project Management +IPPD Integrated Project Management Integrated Project Management Risk Management Risk Management Risk Management Quantitative Project Management Quantitative Project Management Quantitative Project Management Organizational Process Performance Organizational Process Performance Organizational Process Performance Causal Analysis and Resolution Causal Analysis and Resolution Causal Analysis and Resolution Organizational Innovation and Deployment Organizational Innovation and Deployment Organizational Innovation and Deployment Supplier Agreement Management Supplier Agreement Management Requirements Development Acquisition Requirements Development Validation Acquisition Validation Verification Acquisition Verification Technical Solution Solicitation and Supplier Agreement Development Capacity and Availability Management Product Integration Agreement Management Incident Resolution and Prevention Acquisition Technical Management Service Continuity Service Delivery Service System Development Service System Transition Strategic Service Management
  • 26. First Level Filtering (PA Level) DEV ACQ SVC Project Planning Project Planning Project Planning Project Monitoring and Control Project Monitoring and Control Project Monitoring and Control Process and Product Quality Assurance Process and Product Quality Assurance Process and Product Quality Assurance Requirements Management Requirements Management Requirements Management Configuration Management Configuration Management Configuration Management Measurement and Analysis Measurement and Analysis Measurement and Analysis Organizational Process Definition +IPPD Organizational Process Definition Organizational Process Definition Organizational Process Focus Organizational Process Focus Organizational Process Focus Organizational Training Organizational Training Organizational Training Decision Analysis and Resolution Decision Analysis and Resolution Decision Analysis and Resolution Integrated Project Management +IPPD Integrated Project Management Integrated Project Management Risk Management Risk Management Risk Management Quantitative Project Management Quantitative Project Management Quantitative Project Management Organizational Process Performance Organizational Process Performance Organizational Process Performance Causal Analysis and Resolution Causal Analysis and Resolution Causal Analysis and Resolution Organizational Innovation and Deployment Organizational Innovation and Deployment Organizational Innovation and Deployment Supplier Agreement Management Supplier Agreement Management Requirements Development Acquisition Requirements Development Validation Acquisition Validation Verification Acquisition Verification Technical Solution Solicitation and Supplier Agreement Development Capacity and Availability Management Product Integration Agreement Management Incident Resolution and Prevention Acquisition Technical Management Service Continuity Service Delivery Service System Development Service System Transition Strategic Service Management
  • 27. Second Level Filtering (Goal Level) • Service System Development (SSD), SG 1 – Develop and Analyze Stakeholder Requirements can be found in Requirements Development • Acquisition Technical Management (ATM), SG 1 – Evaluate Technical Solutions can be found in Technical Solution • Acquisition Technical Management (ATM), SG 2 – Perform Interface Management can be found in Technical Solution and Product Integration
  • 28. Second Level Filtering (Goal Level) • Service Continuity (SCON), SG 3 - Verify and Validate the Service Continuity Plan can be found in Verification and Validation • Service System Development (SSD), SG 3 - Verify and Validate Service Systems can be found in Verification and Validation
  • 29. Conducting Detailed Gap Analysis
  • 30. Gap Analysis Model Scope • 32 CMMI Process Areas • 75 CMMI Specific Goals • 249 CMMI Specific Practices • 1169 CMMI Specific Subpractices • 5 ‘Classic’ CMMI Generic Goals (Extended) • 17 ‘Classic’ CMMI Generic Practices (Extended) • 34 ‘Classic’ CMMI Generic Subpractices (Extended) • Cross-referenced with the following additional standards elements
  • 31. Rating Profile Page 31
  • 33. Improvement vs. Implementation Process Improvements ROI
  • 34. Organizational Benefit Improvement vs. Benefit Add Value Page 34 Achieved Improvement
  • 35. Standards Compliance to ORG Mission Organizational Benefit Page 35 Achieved Improvement
  • 36. Additional Standards Contribution Organizational Benefit Achieved Improvement Page 36
  • 37. Some of Our Suggestions
  • 38. Survival Quick guidelines • A method to support multi appraisals in line with CMMI must be compatible with the Reference Model and discipline • Requirements for Compatibility are expressed in terms of: • Purpose • Of combined models • Of going there • Scope • Of selected models • Of organization • Model elements and indicators • Mapping • Knowledge on.... • Translation • These requirements span various levels and model features
  • 39. Some of Our Suggestions Integration approach • Capacity and Availability Management (CAM) place as unique PA? • In CMU/SEI-93-TR-025 (SW-CMM V1.1) SPP KPA Activity 11: Estimates for the project's critical computer resources are derived according to a documented procedure • Integrate SG 3 of Service Continuity (SCON), and Service System Development (SSD) to be part of Verification and Validation • Integrate Acquisition Technical Management (ATM) to Technical Solution • Integrate VER and AVER; VAL and AVAL • Consider Security
  • 40. Some of Our Suggestions Our Suggestions to the integration approach • Add more elaborations • Create more objective wording in PAs, e.g. • Project Planning to Delivery / Assignment / Product Planning • Technical Solution to Solution Development • Add more examples
  • 41. Some of Our Future Discussions • Additional Generic Practice for Security as defined process • Our suggestion: GP 3.3 Information Management and Security Control • Place designated information entities and work products of the process and product under appropriate levels of classification and control • Including five subpractices • Identify • Analysis • Evaluate • Prepare plan • Execute and recover • Approach to P-CMM • Approach to Resiliency Engineering Framework (REF) and Operationally Critical Threat, Asset, and Vulnerability Evaluation (OCTAVE) • Approach Smart Grid at three levels
  • 42. Some of Our Future Discussions • Cross constellation support team • Prerequisite knowledge • Team qualification / certifications • Cross constellations Appraisal team • Team training • Team qualification / certifications • PIIDs • Structure of mini teams • Consensus process