A Sample filled in CSSBB affidavit
1. Six Sigma Project completed by John Q Public, 01000010
(applicant’s name, please print) (member number)
2. Six Sigma project title Reduction of XXX process Quality defects
3. Provide a brief description of the purpose of the project, and how it related to the business
objective:
The process XXX has been our bottle neck for over 6 months producing defects over 20 % of the
manufacturing volume. This excess defectives have resulted in customer complaints (Inspection
escape), inconsistent delivery, and increasing in manufacturing costs. This goal for this process
step is to keep the defectives under 5000 ppm (0.5%) The on-time delivery of correct quantity is
expected to be 99% or higher. By improving the process quality to less than 5000 ppm, and
building adequate controls in place, the number escape defects are expected to reduce to less
than 500 ppm.
4. Six Sigma project’s start and completion dates by month/year: Jan 2006- March 2006
5. Provide a brief description of applicant’s hands-on performance in completing Six Sigma
project. Please include specific examples of tools used, i.e., process maps, metrics (DPU, DPMO,
RTY), procedures, charts, etc. Do not send documentation.
As a Black belt, I was responsible for creating a project charter to define the project, NPV
financial sheet to calculate project financial gains, develop a comprehensive Project plan (Gantt).
I lead the team with a brainstorming session, consolidated the inputs to a cause and effect
diagram. The process map and initial data of process defect Pareto analysis were used during
the discussion. Prioritized causes were further investigated to identify the root causes.
Measurement system analysis was conducted to identify the measurement system error; a
factorial DOE was conducted to identify significant factors. A Response surface design was
further used to optimize the process settings. The process capability study was conducted and
the indices Cp, Cpk were meeting the process objectives. The team developed on the existing
PFMEA and updated the control plan for sustainability.
6. Provide a brief statement on the benefits achieved by the successful completion of the project,
including but not limited to financial savings, labor, material costs, cycle-time reduction, etc.
The process step with the initial process defectives at 20% was costing the organization $5000 /
Week (over $250,000 / year). This includes material costs and labor only. The lost machine
capacity in producing scrap is now effectively used for meeting tighter delivery deadlines. The
reduced escape defects and on-time delivery have improved our customer satisfaction from 3.5 to
4.0 in a 5 point scale.
The NPV, ROI, payback financial sheet were verified by MBB.
7. Verification of completion by project champion:
Verification form completed by:
Bruce Almighty 11th
April 2006
(project champion’s signature) (date signed)
Champion’s name: Bruce Almighty Job title Operations Director
Company name Never Fail Inc.
Address 1, Zero defect Lane, Road to success, Achievement Valley, California
Project champion’s e-mail address bruce.almighty@neverfail.com
Project champion’s telephone 408 1234567 Fax number 408 1234568.
Page 1 of 1
Author: Govind Ramu

Mais conteúdo relacionado

Mais procurados

Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupTKMG, Inc.
 
Value Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing EnvironmentsValue Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing EnvironmentsTKMG, Inc.
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakharMohammad IFTAKHAR
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1vedzen1234
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortGoLeanSixSigma.com
 
DMAIC Methodolgy
DMAIC MethodolgyDMAIC Methodolgy
DMAIC MethodolgyBharath M
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentationPRASHANT KSHIRSAGAR
 
211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)Saieesha Chitoori
 
Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015CSoltero
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3TKMG, Inc.
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.TKMG, Inc.
 
How to Run a Value Stream Mapping (VSM) Workshop
How to Run a Value Stream Mapping (VSM) WorkshopHow to Run a Value Stream Mapping (VSM) Workshop
How to Run a Value Stream Mapping (VSM) WorkshopAbraic, Inc.
 

Mais procurados (20)

Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User Group
 
Value Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing EnvironmentsValue Stream Mapping in Non-Manufacturing Environments
Value Stream Mapping in Non-Manufacturing Environments
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
DMAIC Methodolgy
DMAIC MethodolgyDMAIC Methodolgy
DMAIC Methodolgy
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentation
 
Six Sigma Project- GB
Six Sigma Project- GBSix Sigma Project- GB
Six Sigma Project- GB
 
211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)
 
Dmaic
DmaicDmaic
Dmaic
 
Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015
 
Msa training
Msa trainingMsa training
Msa training
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3Metrics-Based Process Mapping: Part 1 of 3
Metrics-Based Process Mapping: Part 1 of 3
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.
 
How to Run a Value Stream Mapping (VSM) Workshop
How to Run a Value Stream Mapping (VSM) WorkshopHow to Run a Value Stream Mapping (VSM) Workshop
How to Run a Value Stream Mapping (VSM) Workshop
 

Destaque

Tips For Passing Asq Certification Exam Asq
Tips For Passing Asq Certification Exam AsqTips For Passing Asq Certification Exam Asq
Tips For Passing Asq Certification Exam AsqGovind Ramu
 
Certified Six Sigma Black Belt
Certified Six Sigma Black BeltCertified Six Sigma Black Belt
Certified Six Sigma Black Beltwinlsm520
 
Affidavit format
Affidavit formatAffidavit format
Affidavit formatUma Krishna
 
DMAIC implementation
DMAIC implementationDMAIC implementation
DMAIC implementationriyankadaga
 
6 Sigma Catapult Project
6 Sigma Catapult Project6 Sigma Catapult Project
6 Sigma Catapult Projecttrojanbrewer
 
Six sigma full report
Six sigma full reportSix sigma full report
Six sigma full reporttapan27591
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS ProjectsJohn Smith
 
Affidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgmentAffidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgmentCocoselul Inaripat
 
ASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black BeltASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black BeltLendell Hawley
 
PressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspxPressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspxJohnny Pittman
 
Certified Quality Engineer Exam Overview
Certified Quality Engineer Exam OverviewCertified Quality Engineer Exam Overview
Certified Quality Engineer Exam OverviewStephen Deas
 

Destaque (18)

Tips For Passing Asq Certification Exam Asq
Tips For Passing Asq Certification Exam AsqTips For Passing Asq Certification Exam Asq
Tips For Passing Asq Certification Exam Asq
 
Six Sigma Sample Project
Six Sigma Sample ProjectSix Sigma Sample Project
Six Sigma Sample Project
 
Certified Six Sigma Black Belt
Certified Six Sigma Black BeltCertified Six Sigma Black Belt
Certified Six Sigma Black Belt
 
Affidavit format
Affidavit formatAffidavit format
Affidavit format
 
DMAIC implementation
DMAIC implementationDMAIC implementation
DMAIC implementation
 
Catapult DOE Case Study
Catapult DOE Case StudyCatapult DOE Case Study
Catapult DOE Case Study
 
6 Sigma Catapult Project
6 Sigma Catapult Project6 Sigma Catapult Project
6 Sigma Catapult Project
 
Six sigma full report
Six sigma full reportSix sigma full report
Six sigma full report
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS Projects
 
Rutgers Green Belt
Rutgers Green BeltRutgers Green Belt
Rutgers Green Belt
 
My Projects Portfolio
My Projects PortfolioMy Projects Portfolio
My Projects Portfolio
 
Law audit
Law auditLaw audit
Law audit
 
Affidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgmentAffidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgment
 
ASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black BeltASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black Belt
 
PressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspxPressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspx
 
Certified Quality Engineer Exam Overview
Certified Quality Engineer Exam OverviewCertified Quality Engineer Exam Overview
Certified Quality Engineer Exam Overview
 
5 C Template
5 C Template5 C Template
5 C Template
 

Semelhante a ASQ CSSBB Affidavit Example

Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docxhallettfaustina
 
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...Karen Gomez
 
KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808Gregory King II
 
Growing your business with BPM
Growing your business with BPMGrowing your business with BPM
Growing your business with BPMinnovelocity
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxPhngPhmTrung
 
Department Structure
Department StructureDepartment Structure
Department StructureG.J. dePillis
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxtodd771
 
IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8Parag Kapile
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajalAJAL A J
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxvrickens
 
Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainCognizant
 

Semelhante a ASQ CSSBB Affidavit Example (20)

S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
 
TS02
TS02TS02
TS02
 
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
 
150110746014
150110746014150110746014
150110746014
 
KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808
 
Oscar Padilla, PMP
Oscar Padilla, PMPOscar Padilla, PMP
Oscar Padilla, PMP
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Growing your business with BPM
Growing your business with BPMGrowing your business with BPM
Growing your business with BPM
 
DMAIC Report_v1(full)
DMAIC Report_v1(full)DMAIC Report_v1(full)
DMAIC Report_v1(full)
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
 
olivier_a.pdf
olivier_a.pdfolivier_a.pdf
olivier_a.pdf
 
PM
PMPM
PM
 
Department Structure
Department StructureDepartment Structure
Department Structure
 
Projects summary
Projects summaryProjects summary
Projects summary
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
 
IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docx
 
Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value Chain
 

Mais de Govind Ramu

Demystifying Cost of Quality.pdf
Demystifying Cost of Quality.pdfDemystifying Cost of Quality.pdf
Demystifying Cost of Quality.pdfGovind Ramu
 
Quality Management - Guidelines for realizing financial and economic benefits
Quality Management - Guidelines for realizing financial and economic benefitsQuality Management - Guidelines for realizing financial and economic benefits
Quality Management - Guidelines for realizing financial and economic benefitsGovind Ramu
 
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...Govind Ramu
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation Govind Ramu
 
ISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and ImplementationISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and Implementation Govind Ramu
 
Overview of the proposed Photovoltaic Solar Quality Management System standard
Overview of the proposed Photovoltaic Solar Quality Management System standardOverview of the proposed Photovoltaic Solar Quality Management System standard
Overview of the proposed Photovoltaic Solar Quality Management System standardGovind Ramu
 
Future of-quality asq 042011-govind
Future of-quality asq 042011-govindFuture of-quality asq 042011-govind
Future of-quality asq 042011-govindGovind Ramu
 
Prioritizing Process Improvements
Prioritizing Process ImprovementsPrioritizing Process Improvements
Prioritizing Process ImprovementsGovind Ramu
 
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA FacilitationInnovative Approach to FMEA Facilitation
Innovative Approach to FMEA FacilitationGovind Ramu
 
Quality In Outsourcing
Quality In OutsourcingQuality In Outsourcing
Quality In OutsourcingGovind Ramu
 
Iso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis GovindIso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis GovindGovind Ramu
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindGovind Ramu
 

Mais de Govind Ramu (12)

Demystifying Cost of Quality.pdf
Demystifying Cost of Quality.pdfDemystifying Cost of Quality.pdf
Demystifying Cost of Quality.pdf
 
Quality Management - Guidelines for realizing financial and economic benefits
Quality Management - Guidelines for realizing financial and economic benefitsQuality Management - Guidelines for realizing financial and economic benefits
Quality Management - Guidelines for realizing financial and economic benefits
 
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
ISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and ImplementationISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and Implementation
 
Overview of the proposed Photovoltaic Solar Quality Management System standard
Overview of the proposed Photovoltaic Solar Quality Management System standardOverview of the proposed Photovoltaic Solar Quality Management System standard
Overview of the proposed Photovoltaic Solar Quality Management System standard
 
Future of-quality asq 042011-govind
Future of-quality asq 042011-govindFuture of-quality asq 042011-govind
Future of-quality asq 042011-govind
 
Prioritizing Process Improvements
Prioritizing Process ImprovementsPrioritizing Process Improvements
Prioritizing Process Improvements
 
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA FacilitationInnovative Approach to FMEA Facilitation
Innovative Approach to FMEA Facilitation
 
Quality In Outsourcing
Quality In OutsourcingQuality In Outsourcing
Quality In Outsourcing
 
Iso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis GovindIso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis Govind
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq Govind
 

Último

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 

Último (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 

ASQ CSSBB Affidavit Example

  • 1. A Sample filled in CSSBB affidavit 1. Six Sigma Project completed by John Q Public, 01000010 (applicant’s name, please print) (member number) 2. Six Sigma project title Reduction of XXX process Quality defects 3. Provide a brief description of the purpose of the project, and how it related to the business objective: The process XXX has been our bottle neck for over 6 months producing defects over 20 % of the manufacturing volume. This excess defectives have resulted in customer complaints (Inspection escape), inconsistent delivery, and increasing in manufacturing costs. This goal for this process step is to keep the defectives under 5000 ppm (0.5%) The on-time delivery of correct quantity is expected to be 99% or higher. By improving the process quality to less than 5000 ppm, and building adequate controls in place, the number escape defects are expected to reduce to less than 500 ppm. 4. Six Sigma project’s start and completion dates by month/year: Jan 2006- March 2006 5. Provide a brief description of applicant’s hands-on performance in completing Six Sigma project. Please include specific examples of tools used, i.e., process maps, metrics (DPU, DPMO, RTY), procedures, charts, etc. Do not send documentation. As a Black belt, I was responsible for creating a project charter to define the project, NPV financial sheet to calculate project financial gains, develop a comprehensive Project plan (Gantt). I lead the team with a brainstorming session, consolidated the inputs to a cause and effect diagram. The process map and initial data of process defect Pareto analysis were used during the discussion. Prioritized causes were further investigated to identify the root causes. Measurement system analysis was conducted to identify the measurement system error; a factorial DOE was conducted to identify significant factors. A Response surface design was further used to optimize the process settings. The process capability study was conducted and the indices Cp, Cpk were meeting the process objectives. The team developed on the existing PFMEA and updated the control plan for sustainability. 6. Provide a brief statement on the benefits achieved by the successful completion of the project, including but not limited to financial savings, labor, material costs, cycle-time reduction, etc. The process step with the initial process defectives at 20% was costing the organization $5000 / Week (over $250,000 / year). This includes material costs and labor only. The lost machine capacity in producing scrap is now effectively used for meeting tighter delivery deadlines. The reduced escape defects and on-time delivery have improved our customer satisfaction from 3.5 to 4.0 in a 5 point scale. The NPV, ROI, payback financial sheet were verified by MBB. 7. Verification of completion by project champion: Verification form completed by: Bruce Almighty 11th April 2006 (project champion’s signature) (date signed) Champion’s name: Bruce Almighty Job title Operations Director Company name Never Fail Inc. Address 1, Zero defect Lane, Road to success, Achievement Valley, California Project champion’s e-mail address bruce.almighty@neverfail.com Project champion’s telephone 408 1234567 Fax number 408 1234568. Page 1 of 1 Author: Govind Ramu