Delivering the Strategy 2014-2019
Work Programme Planning
Overview and Timeline
GWP Regional Days
26-30 August 2013
Stockholm
Sessions Overview
1. Planning
– Finalisation of 2014-2016 Work Programme
– Preparation of 2014 Workplan
2. Financing
– Looking ahead to 2014
3. Monitoring and Reporting
– Preparation of 2013 Progress Review
– Monitoring and reporting tools in 2014
3
Work Programme Management Cycle:
Intentional Design:
Planning
Vision and Mission
Boundary Actors
Desired Outcomes
Progress Markers
Implementation
Activities
Outputs
Monitoring
1) Progress Markers - through
outcome journals
2) Implementation of activities
Evaluation
Learning
Reporting
GWP programme management documents
GWPStrategy2014-2019
Work programme 2014-2016
Outcome challenges, progress
markers, projects/activities,
logframe targets, resources for the
3-year period
Work programme 2017-2019
Outcome challenges, progress
markers, projects/activities,
logframe targets, resources for the
3-year period
Work plan 2014
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2015
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2016
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2017
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2018
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2019
OC, PM, activities, LF targets, budget for the 12-month period
Annual reporting 2014
Annual reporting 2015
Annual reporting 2016
Annual reporting 2017
Annual reporting 2018
Annual reporting 2019
201420152016201720182019
GWP
Work
Program
1
2
3
Timeline
By 25 October:
1. Final Work Programme 2014-2016;
2. contributions to the Annual Programme Review 2013;
3. Workplan & Budget 2014:
• Implications: Projects to be included in 2014 Workplan
should be approved before 25 October.
• Templates:
– For workprogramme: already available
– For workplan/budget and progress review sent by GWPO
on 9 September.
Finalisation of 2014-2016 Work Programme
Work programme 2014-2016
GWPStrategy2014-2019
Work programme 2014-2016
Outcome challenges, progress
markers, projects/activities,
logframe targets, resources for the
3-year period
Work programme 2017-2019
Outcome challenges, progress
markers, projects/activities,
logframe targets, resources for the
3-year period
Work plan 2014
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2015
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2016
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2017
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2018
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2019
OC, PM, activities, LF targets, budget for the 12-month period
Annual reporting 2014
Annual reporting 2015
Annual reporting 2016
Annual reporting 2017
Annual reporting 2018
Annual reporting 2019
201420152016201720182019
Contents Work Programme
1. Background and introduction
1.1 The regional context
1.2 GWP organization in the region
1.3 GWP regional role and value added
1.4 Taking stock of the 2009-2013 Strategy period
2. Strategic Result Framework at Regional level (6 years)
2.1 Vision & Mission
2.2 Regional Outcome Challenges & Progress Markers
2.2.1 Strategic goal 1
2.2.2 Strategic goal 2
2.2.3 Strategic goal 3
3. Implementation Map at Regional level (3 years)
3.1 Implementation Path for Goal 1
3.2 Implementation Path for Goal 2
3.3 Implementation Path for Goal 3
4. Resources needed (3 years)
5. Summary Results Framework (targets)
5.1 GWP Impact
5.2 GWP Key Water Governance Outcomes
5.3 GWP Outputs
TABLE A: Strategic Results Framework (1)
Vision “A water-secure
world”
GWP Impact Statement:
A higher level of water
security and climate
resilience achieved in
developing countries,
transboundary basins and
economic regions
Regional level Impact
Statement:
(beneficiaries; investments
leveraged)
Mission “To advance
integrated water
resources
management for
sustainable
growth and
prosperity at all
levels”
GWP Work Programme
Overall Outcome:
Sustainable development
and management of water
resources at all levels
Regional level Work
Programme Overall
Outcome:
(major governance changes
fostered)
Vision & Mission
TABLE B: Strategic Results Framework (2)
OC Outcome Challenges Boundary
actors
Progress markers
1.1 
1.2 
1.3 

Regional Outcome Challenges
& Progress Markers for 2020
For the 3 Goals
• G1: Catalyse Change
• G2: Generate & Share Knowledge
• G3: Strengthen Partnerships
TABLE C: Implementation Map
OC OC OC INDICATIVE PROJECTS AND
ACTIVITIES
IMPLEMENTATION
MECHANISMS
Implementation Map at Regional level (3 years 2014-16)
For the 3 Goals
• Overall Output G1: Facilitation packages for countries and regions
implemented and innovative, sustainable IWRM solutions demonstrated
• Overall Output G2: Knowledge and capacity developed, disseminated and
used
• Overall Output G3: An effective Global Action Network of partners sustained
TABLE D: Summary Results Framework
LFA level Description Indicators 2014 2015 2016 Total
Outcome Sustainable
development and
management of water
resources at all levels
Series of indicators recording changes in Water
Governance influenced by GWP, following
ToolBox structure
# Number of Enabling Environment elements
influenced
# Number of Institutional Arrangements
influenced
# Number of Management Instruments
influenced
More specifically: 6 Indicators followed closely,
including Targets
O1 Number of policies, plans and strategies which
integrate water security for climate resilience
O2 Number of approved investment plans associated
with policies, plans and strategies which integrate
water security for climate resilience
O3 Number of agreements/commitments on
enhanced water security at
transboundary/regional level influenced.
O4 Number. of investment strategies supporting
policies and plans which integrate water security
for climate resilience
O5 Number of enhanced legal frameworks / policies
/ strategies integrating water security and climate
change facilitated by GWP/WPP.
O6 Gender: Percentage of women and girls
benefiting from interventions to improve water
security (min %). Nb requires robust M&E
methodology to ensure disaggregated data
collected.
GWP
Gender
strategy
in place
50% 50%
3-year work programme
• The detailed description of projects is provided in the
respective project documents.
• The full list of project activities / tasks do therefore not
need to be repeated
• A project can simply be included as a single action line,
3 action lines (3 components under the 3 strategic
goals), or according to work packages (e.g. 8 action lines
for the WCP programme) in the GWP entity work
programme document.
How to deal with projects?
Preparation of 2014 Workplan & Budget
Work plan 2014
GWPStrategy2014-2019
Work programme 2014-2016
Outcome challenges, progress
markers, projects/activities,
logframe targets, resources for the
3-year period
Work programme 2017-2019
Outcome challenges, progress
markers, projects/activities,
logframe targets, resources for the
3-year period
Work plan 2014
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2015
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2016
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2017
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2018
OC, PM, activities, LF targets, budget for the 12-month period
Work plan 2019
OC, PM, activities, LF targets, budget for the 12-month period
Annual reporting 2014
Annual reporting 2015
Annual reporting 2016
Annual reporting 2017
Annual reporting 2018
Annual reporting 2019
201420152016201720182019
Annual work plans
• Project activities are listed individually by relevant
progress marker and outcome challenge
• Consistency maintained with annual budget breakdown
Locally funded projects: Can be included in summary
form as in the work programme document
How to deal with projects?
New: Setting targets on a
limited set of indicators
Preparation of 2013 Progress Review
New: Follow up on a
limited set of indicators with
targets
Other Monitoring tools 2014
New: Include a Narrative
to the Q project report;
Progress, Obstacles lessons
• In addition to financial reports we need quarterly
narrative from projects
• Starting with the Water and Climate Programme
• Necessary to manage the portfolio of projects,
including budget reallocation
• Template still being developed – will be sent out
shortly
• To be required from Q3 2013 onwards from all
regions that have ongoing WCP projects
WCP quarterly narrative reports

Mais conteúdo relacionado

Mais procurados

August 2013 strategic projects monthly review
August 2013   strategic projects monthly reviewAugust 2013   strategic projects monthly review
August 2013 strategic projects monthly review
647435
 
11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...
NAP Events
 
740582main nasa fy14_m&p-4-9-13
740582main nasa fy14_m&p-4-9-13740582main nasa fy14_m&p-4-9-13
740582main nasa fy14_m&p-4-9-13
Sérgio Sacani
 
General guidelines for developing country strategy papers 11042013
General guidelines for developing country strategy papers 11042013General guidelines for developing country strategy papers 11042013
General guidelines for developing country strategy papers 11042013
Sri Lmb
 

Mais procurados (16)

Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)
 
Climate Change Screening and Programme Appraisal in MOAC - Building Institut...
Climate Change Screening and Programme Appraisal in MOAC -  Building Institut...Climate Change Screening and Programme Appraisal in MOAC -  Building Institut...
Climate Change Screening and Programme Appraisal in MOAC - Building Institut...
 
August 2013 strategic projects monthly review
August 2013   strategic projects monthly reviewAugust 2013   strategic projects monthly review
August 2013 strategic projects monthly review
 
Measuring the Success of Your Strategic Plan
Measuring the Success of Your Strategic Plan Measuring the Success of Your Strategic Plan
Measuring the Success of Your Strategic Plan
 
Overview of the process to formulate and implement NAPs
Overview of the process to formulate and implement NAPsOverview of the process to formulate and implement NAPs
Overview of the process to formulate and implement NAPs
 
Programme cycle management overview v3
Programme cycle management overview v3Programme cycle management overview v3
Programme cycle management overview v3
 
Highland Park IL Strategic Plan Documentation
Highland Park IL Strategic Plan DocumentationHighland Park IL Strategic Plan Documentation
Highland Park IL Strategic Plan Documentation
 
Strategic direction of cambodia budget system reform 2013-2020 - Ratanak Hav,...
Strategic direction of cambodia budget system reform 2013-2020 - Ratanak Hav,...Strategic direction of cambodia budget system reform 2013-2020 - Ratanak Hav,...
Strategic direction of cambodia budget system reform 2013-2020 - Ratanak Hav,...
 
Monitoring Committee Meeting, Q1, 2017
Monitoring Committee Meeting, Q1, 2017Monitoring Committee Meeting, Q1, 2017
Monitoring Committee Meeting, Q1, 2017
 
11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...11.3.3 Experiencing on enhancing institutional arrangements and support for t...
11.3.3 Experiencing on enhancing institutional arrangements and support for t...
 
Recent budgeting developments - Sokkheang Lay, Cambodia
Recent budgeting developments - Sokkheang Lay, CambodiaRecent budgeting developments - Sokkheang Lay, Cambodia
Recent budgeting developments - Sokkheang Lay, Cambodia
 
Cambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
Cambodia's perspective on program/performance budgeting - Ratanak Hav - CambodiaCambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
Cambodia's perspective on program/performance budgeting - Ratanak Hav - Cambodia
 
740582main nasa fy14_m&p-4-9-13
740582main nasa fy14_m&p-4-9-13740582main nasa fy14_m&p-4-9-13
740582main nasa fy14_m&p-4-9-13
 
5.0 Overview of the NAP Process
5.0 Overview of the NAP Process5.0 Overview of the NAP Process
5.0 Overview of the NAP Process
 
General guidelines for developing country strategy papers 11042013
General guidelines for developing country strategy papers 11042013General guidelines for developing country strategy papers 11042013
General guidelines for developing country strategy papers 11042013
 
Fara progress and performance monitoring report (jan sept 2016) 19-bod
Fara progress and performance monitoring report (jan sept 2016) 19-bodFara progress and performance monitoring report (jan sept 2016) 19-bod
Fara progress and performance monitoring report (jan sept 2016) 19-bod
 

Semelhante a Work programme planning_john metzger_30 aug

BP&A Deliverable Summary_SRG
BP&A Deliverable Summary_SRGBP&A Deliverable Summary_SRG
BP&A Deliverable Summary_SRG
scarlettgamble
 
(BR) JK Monitoring and Evaluation 02 August 2016
(BR) JK Monitoring and Evaluation 02 August 2016(BR) JK Monitoring and Evaluation 02 August 2016
(BR) JK Monitoring and Evaluation 02 August 2016
Joyce Khunou
 
August 2013 functional projects monthly review
August 2013   functional projects monthly reviewAugust 2013   functional projects monthly review
August 2013 functional projects monthly review
647435
 
Yemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action planYemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action plan
Jean-Marc Lepain
 
July 2013 functional plans review
July 2013   functional plans reviewJuly 2013   functional plans review
July 2013 functional plans review
647435
 
PIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_ReportPIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_Report
Tatjana Muhic
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
647435
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
647435
 

Semelhante a Work programme planning_john metzger_30 aug (20)

Draft proposed programme budget 2016–2017: the European regional perspective
Draft proposed programme budget 2016–2017:the European regional perspectiveDraft proposed programme budget 2016–2017:the European regional perspective
Draft proposed programme budget 2016–2017: the European regional perspective
 
NHS Eastern Cheshire CCG Strategic Planning Process
NHS Eastern Cheshire CCG Strategic Planning ProcessNHS Eastern Cheshire CCG Strategic Planning Process
NHS Eastern Cheshire CCG Strategic Planning Process
 
Annual Work Plan and Budget (AWPB)
Annual Work Plan and Budget (AWPB)Annual Work Plan and Budget (AWPB)
Annual Work Plan and Budget (AWPB)
 
Integrating 2030 Agenda into Planning and Budgeting – Overview of Key Steps
Integrating 2030 Agenda into Planning and Budgeting – Overview of Key StepsIntegrating 2030 Agenda into Planning and Budgeting – Overview of Key Steps
Integrating 2030 Agenda into Planning and Budgeting – Overview of Key Steps
 
Integrated Approaches: Integration of SDGs into national development policies...
Integrated Approaches: Integration of SDGs into national development policies...Integrated Approaches: Integration of SDGs into national development policies...
Integrated Approaches: Integration of SDGs into national development policies...
 
MAIZE Planning Workshop
MAIZE Planning WorkshopMAIZE Planning Workshop
MAIZE Planning Workshop
 
ROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management SystemROPMS - Results-Oriented Project Management System
ROPMS - Results-Oriented Project Management System
 
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
 
BP&A Deliverable Summary_SRG
BP&A Deliverable Summary_SRGBP&A Deliverable Summary_SRG
BP&A Deliverable Summary_SRG
 
(BR) JK Monitoring and Evaluation 02 August 2016
(BR) JK Monitoring and Evaluation 02 August 2016(BR) JK Monitoring and Evaluation 02 August 2016
(BR) JK Monitoring and Evaluation 02 August 2016
 
August 2013 functional projects monthly review
August 2013   functional projects monthly reviewAugust 2013   functional projects monthly review
August 2013 functional projects monthly review
 
Pipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptxPipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptx
 
Yemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action planYemen: Methodology for preparing the new public financial management action plan
Yemen: Methodology for preparing the new public financial management action plan
 
AWPB
AWPBAWPB
AWPB
 
July 2013 functional plans review
July 2013   functional plans reviewJuly 2013   functional plans review
July 2013 functional plans review
 
Improving the quality and impact of annual performance reporting - Andy Heath...
Improving the quality and impact of annual performance reporting - Andy Heath...Improving the quality and impact of annual performance reporting - Andy Heath...
Improving the quality and impact of annual performance reporting - Andy Heath...
 
Measuring performance: UK experience -- Simon Madden & Johannes Wolff, Unite...
Measuring performance:  UK experience -- Simon Madden & Johannes Wolff, Unite...Measuring performance:  UK experience -- Simon Madden & Johannes Wolff, Unite...
Measuring performance: UK experience -- Simon Madden & Johannes Wolff, Unite...
 
PIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_ReportPIP-DIP_Evaluation_Report
PIP-DIP_Evaluation_Report
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
 
Monthly functional report january
Monthly functional report   januaryMonthly functional report   january
Monthly functional report january
 

Mais de Global Water Partnership

Womens empowerment and increased food security through increased access to la...
Womens empowerment and increased food security through increased access to la...Womens empowerment and increased food security through increased access to la...
Womens empowerment and increased food security through increased access to la...
Global Water Partnership
 
Just in time chances for a holistic approach for land and water governance
Just in time chances for a holistic approach for land and water governanceJust in time chances for a holistic approach for land and water governance
Just in time chances for a holistic approach for land and water governance
Global Water Partnership
 
Ecosystem services mapping as a framework for integrated natural resource man...
Ecosystem services mapping as a framework for integrated natural resource man...Ecosystem services mapping as a framework for integrated natural resource man...
Ecosystem services mapping as a framework for integrated natural resource man...
Global Water Partnership
 
Coordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food securityCoordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food security
Global Water Partnership
 

Mais de Global Water Partnership (20)

Benefits of Transboundary Cooperation in Neman and Pregolya River Basins
Benefits of Transboundary Cooperation in Neman and Pregolya River BasinsBenefits of Transboundary Cooperation in Neman and Pregolya River Basins
Benefits of Transboundary Cooperation in Neman and Pregolya River Basins
 
High Level Panel on Water and Climate Change in the context of the #SDGs - Ru...
High Level Panel on Water and Climate Change in the context of the #SDGs - Ru...High Level Panel on Water and Climate Change in the context of the #SDGs - Ru...
High Level Panel on Water and Climate Change in the context of the #SDGs - Ru...
 
Frederik Piscke: #Drought solutions and #IWRM – Experiences from the IDMP @fr...
Frederik Piscke: #Drought solutions and #IWRM – Experiences from the IDMP @fr...Frederik Piscke: #Drought solutions and #IWRM – Experiences from the IDMP @fr...
Frederik Piscke: #Drought solutions and #IWRM – Experiences from the IDMP @fr...
 
Water for Development and Development for Water - Realizing the New SDG's Vision
Water for Development and Development for Water - Realizing the New SDG's VisionWater for Development and Development for Water - Realizing the New SDG's Vision
Water for Development and Development for Water - Realizing the New SDG's Vision
 
Water in the post-2015 development agenda
Water in the post-2015 development agendaWater in the post-2015 development agenda
Water in the post-2015 development agenda
 
Land acquisitions: How will they impact on transboundary waters?
Land acquisitions: How will they impact on transboundary waters?Land acquisitions: How will they impact on transboundary waters?
Land acquisitions: How will they impact on transboundary waters?
 
Womens empowerment and increased food security through increased access to la...
Womens empowerment and increased food security through increased access to la...Womens empowerment and increased food security through increased access to la...
Womens empowerment and increased food security through increased access to la...
 
Towards voluntary guidelines for GWP
Towards voluntary guidelines for  GWPTowards voluntary guidelines for  GWP
Towards voluntary guidelines for GWP
 
Responding to the global food security challenge through coordinated land and...
Responding to the global food security challenge through coordinated land and...Responding to the global food security challenge through coordinated land and...
Responding to the global food security challenge through coordinated land and...
 
OXFAM land and water work in Africa
OXFAM land and water work in AfricaOXFAM land and water work in Africa
OXFAM land and water work in Africa
 
Links between land use and groundwater - governance provisions and management...
Links between land use and groundwater - governance provisions and management...Links between land use and groundwater - governance provisions and management...
Links between land use and groundwater - governance provisions and management...
 
Just in time chances for a holistic approach for land and water governance
Just in time chances for a holistic approach for land and water governanceJust in time chances for a holistic approach for land and water governance
Just in time chances for a holistic approach for land and water governance
 
Food Security Definition
Food Security DefinitionFood Security Definition
Food Security Definition
 
Implementation of AU Assembly Declaration Decl.1 (xiii) Rev.1
Implementation of AU Assembly Declaration Decl.1 (xiii) Rev.1Implementation of AU Assembly Declaration Decl.1 (xiii) Rev.1
Implementation of AU Assembly Declaration Decl.1 (xiii) Rev.1
 
Are current land and water governance systems fit for purpose in promoting su...
Are current land and water governance systems fit for purpose in promoting su...Are current land and water governance systems fit for purpose in promoting su...
Are current land and water governance systems fit for purpose in promoting su...
 
Ecosystem services mapping as a framework for integrated natural resource man...
Ecosystem services mapping as a framework for integrated natural resource man...Ecosystem services mapping as a framework for integrated natural resource man...
Ecosystem services mapping as a framework for integrated natural resource man...
 
Development of agricultural irrigated lands in burkina faso
Development of agricultural irrigated lands in burkina fasoDevelopment of agricultural irrigated lands in burkina faso
Development of agricultural irrigated lands in burkina faso
 
Coordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food securityCoordinating land and water governance in the context of food security
Coordinating land and water governance in the context of food security
 
Community/farmers-led land and water governance - An experience from Nepal
Community/farmers-led land and water governance - An experience from NepalCommunity/farmers-led land and water governance - An experience from Nepal
Community/farmers-led land and water governance - An experience from Nepal
 
Bioenergy large scale agriculture investments in africa - food security pers...
Bioenergy  large scale agriculture investments in africa - food security pers...Bioenergy  large scale agriculture investments in africa - food security pers...
Bioenergy large scale agriculture investments in africa - food security pers...
 

Último

Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Último (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 

Work programme planning_john metzger_30 aug

  • 1. Delivering the Strategy 2014-2019 Work Programme Planning Overview and Timeline GWP Regional Days 26-30 August 2013 Stockholm
  • 2. Sessions Overview 1. Planning – Finalisation of 2014-2016 Work Programme – Preparation of 2014 Workplan 2. Financing – Looking ahead to 2014 3. Monitoring and Reporting – Preparation of 2013 Progress Review – Monitoring and reporting tools in 2014
  • 3. 3 Work Programme Management Cycle: Intentional Design: Planning Vision and Mission Boundary Actors Desired Outcomes Progress Markers Implementation Activities Outputs Monitoring 1) Progress Markers - through outcome journals 2) Implementation of activities Evaluation Learning Reporting
  • 4. GWP programme management documents GWPStrategy2014-2019 Work programme 2014-2016 Outcome challenges, progress markers, projects/activities, logframe targets, resources for the 3-year period Work programme 2017-2019 Outcome challenges, progress markers, projects/activities, logframe targets, resources for the 3-year period Work plan 2014 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2015 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2016 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2017 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2018 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2019 OC, PM, activities, LF targets, budget for the 12-month period Annual reporting 2014 Annual reporting 2015 Annual reporting 2016 Annual reporting 2017 Annual reporting 2018 Annual reporting 2019 201420152016201720182019
  • 6. Timeline By 25 October: 1. Final Work Programme 2014-2016; 2. contributions to the Annual Programme Review 2013; 3. Workplan & Budget 2014: • Implications: Projects to be included in 2014 Workplan should be approved before 25 October. • Templates: – For workprogramme: already available – For workplan/budget and progress review sent by GWPO on 9 September.
  • 7. Finalisation of 2014-2016 Work Programme
  • 8. Work programme 2014-2016 GWPStrategy2014-2019 Work programme 2014-2016 Outcome challenges, progress markers, projects/activities, logframe targets, resources for the 3-year period Work programme 2017-2019 Outcome challenges, progress markers, projects/activities, logframe targets, resources for the 3-year period Work plan 2014 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2015 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2016 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2017 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2018 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2019 OC, PM, activities, LF targets, budget for the 12-month period Annual reporting 2014 Annual reporting 2015 Annual reporting 2016 Annual reporting 2017 Annual reporting 2018 Annual reporting 2019 201420152016201720182019
  • 9. Contents Work Programme 1. Background and introduction 1.1 The regional context 1.2 GWP organization in the region 1.3 GWP regional role and value added 1.4 Taking stock of the 2009-2013 Strategy period 2. Strategic Result Framework at Regional level (6 years) 2.1 Vision & Mission 2.2 Regional Outcome Challenges & Progress Markers 2.2.1 Strategic goal 1 2.2.2 Strategic goal 2 2.2.3 Strategic goal 3 3. Implementation Map at Regional level (3 years) 3.1 Implementation Path for Goal 1 3.2 Implementation Path for Goal 2 3.3 Implementation Path for Goal 3 4. Resources needed (3 years) 5. Summary Results Framework (targets) 5.1 GWP Impact 5.2 GWP Key Water Governance Outcomes 5.3 GWP Outputs
  • 10. TABLE A: Strategic Results Framework (1) Vision “A water-secure world” GWP Impact Statement: A higher level of water security and climate resilience achieved in developing countries, transboundary basins and economic regions Regional level Impact Statement: (beneficiaries; investments leveraged) Mission “To advance integrated water resources management for sustainable growth and prosperity at all levels” GWP Work Programme Overall Outcome: Sustainable development and management of water resources at all levels Regional level Work Programme Overall Outcome: (major governance changes fostered) Vision & Mission
  • 11. TABLE B: Strategic Results Framework (2) OC Outcome Challenges Boundary actors Progress markers 1.1  1.2  1.3   Regional Outcome Challenges & Progress Markers for 2020 For the 3 Goals • G1: Catalyse Change • G2: Generate & Share Knowledge • G3: Strengthen Partnerships
  • 12. TABLE C: Implementation Map OC OC OC INDICATIVE PROJECTS AND ACTIVITIES IMPLEMENTATION MECHANISMS Implementation Map at Regional level (3 years 2014-16) For the 3 Goals • Overall Output G1: Facilitation packages for countries and regions implemented and innovative, sustainable IWRM solutions demonstrated • Overall Output G2: Knowledge and capacity developed, disseminated and used • Overall Output G3: An effective Global Action Network of partners sustained
  • 13. TABLE D: Summary Results Framework LFA level Description Indicators 2014 2015 2016 Total Outcome Sustainable development and management of water resources at all levels Series of indicators recording changes in Water Governance influenced by GWP, following ToolBox structure # Number of Enabling Environment elements influenced # Number of Institutional Arrangements influenced # Number of Management Instruments influenced More specifically: 6 Indicators followed closely, including Targets O1 Number of policies, plans and strategies which integrate water security for climate resilience O2 Number of approved investment plans associated with policies, plans and strategies which integrate water security for climate resilience O3 Number of agreements/commitments on enhanced water security at transboundary/regional level influenced. O4 Number. of investment strategies supporting policies and plans which integrate water security for climate resilience O5 Number of enhanced legal frameworks / policies / strategies integrating water security and climate change facilitated by GWP/WPP. O6 Gender: Percentage of women and girls benefiting from interventions to improve water security (min %). Nb requires robust M&E methodology to ensure disaggregated data collected. GWP Gender strategy in place 50% 50%
  • 14. 3-year work programme • The detailed description of projects is provided in the respective project documents. • The full list of project activities / tasks do therefore not need to be repeated • A project can simply be included as a single action line, 3 action lines (3 components under the 3 strategic goals), or according to work packages (e.g. 8 action lines for the WCP programme) in the GWP entity work programme document. How to deal with projects?
  • 15. Preparation of 2014 Workplan & Budget
  • 16. Work plan 2014 GWPStrategy2014-2019 Work programme 2014-2016 Outcome challenges, progress markers, projects/activities, logframe targets, resources for the 3-year period Work programme 2017-2019 Outcome challenges, progress markers, projects/activities, logframe targets, resources for the 3-year period Work plan 2014 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2015 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2016 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2017 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2018 OC, PM, activities, LF targets, budget for the 12-month period Work plan 2019 OC, PM, activities, LF targets, budget for the 12-month period Annual reporting 2014 Annual reporting 2015 Annual reporting 2016 Annual reporting 2017 Annual reporting 2018 Annual reporting 2019 201420152016201720182019
  • 17.
  • 18.
  • 19.
  • 20. Annual work plans • Project activities are listed individually by relevant progress marker and outcome challenge • Consistency maintained with annual budget breakdown Locally funded projects: Can be included in summary form as in the work programme document How to deal with projects?
  • 21. New: Setting targets on a limited set of indicators
  • 22.
  • 23. Preparation of 2013 Progress Review
  • 24.
  • 25.
  • 26. New: Follow up on a limited set of indicators with targets
  • 27.
  • 28.
  • 30. New: Include a Narrative to the Q project report; Progress, Obstacles lessons
  • 31. • In addition to financial reports we need quarterly narrative from projects • Starting with the Water and Climate Programme • Necessary to manage the portfolio of projects, including budget reallocation • Template still being developed – will be sent out shortly • To be required from Q3 2013 onwards from all regions that have ongoing WCP projects WCP quarterly narrative reports