Report of the




Monitoring and Evaluation Exchange and Learning Forum for
                 IFAD Projects in Nigeria



                               LAGOS, NIGERIA.




                              18th to 21st July 2011



Programme for support of monitoring and evaluation systems of IFAD funded Projects in
                      Western and Central Africa (PROSUME)

                                         1
Table of Contents


Chapter 1.   Background, Goal and Objectives...................................................................... 4
Chapter 2:   Forum Proceedings ........................................................................................... 6
Chapter 3:   Analysis and Discussion of Results................................................................... 12

Chapter 4:   Needs and Options for Sustainable M&E Capacity Development…………………... 25

Chapter 5:   Recommendations on the Way Forward……………………………………………………….. 29



Annexes

 Annex 1: Sample Framework for Monitoring Implementation of the AWPB………………………30

 Annex 2: List of Forum Participants…………………………………………………………………………………..31




                                                          2
List of Tables
Table 1: Analysis of Participants Expectations…………………………………………………….……..13

Table 2: M&E Experiences across Projects………………………………………………………………….15

Table 3: M&E Good Practices across Projects……………………………………………………………..16

Table 4: M&E Challenges across Projects…………………………………………………………………….16

Table 5: Emerging Issues across Projects……………………………………………………………………..17

Table 6: RIMS Level 2 Scoring………………………………………………………………………………………18

Table 7: Equivalent Scores for RIMS Rating and School grades…………………………………….25

Table 8: Individual technical support needs expressed by participants…………………………26

Table 9: Programme technical support needs expressed by participants………………………27




                                          3
Executive Summary

The learning and exchange forum brought together monitoring and evaluation teams of IFAD
programmes in Nigeria for joint reflection and exchange on the principal issues, challenges and
way forward for good M&E in the programmes. The overall goal of the forum was to enhance
and promote mutual learning and knowledge exchange on experiences, good practices and
challenges facing M&E teams of IFAD funded Projects in Nigeria. The specific objectives were to:
share project experiences and good practices; identify challenges and opportunities for
improving performance; develop a framework and approach for monitoring the
implementation of project Annual Work Plan and Budget (AWPB), develop a harmonized
mechanism for streamlining indicators and evaluating emerging outcomes of project
intervention; and develop a concerted framework for M&E support to concerned programmes.


The forum was structured around an adult exchange and learning module that emphasized the
effective participation of all participants in a series of plenary and group sessions facilitated by
resource persons. Participants shared their challenges and experiences, and developed a
framework for addressing their principal constraints to ensure effective and relevant M&E.


The forum also reviewed and updated a framework for elaborating and monitoring the
implementation of annual workplans and budgets (AWPBs) as a decision tool for management
support. Participants also defined the way forward for sustainable M&E capacity building,
including specific recommendations for a harmonized country approach for M&E support.




                                                 4
Chapter 1: Background, goal and objective of the workshop

1.1    Background

IFAD is supporting M&E capacity development of project teams through a grant for the
implementation of a Program for Support of Monitoring and Evaluation Systems of IFAD funded
projects in West and Central Africa (PROSUME/PASSE). As the grantee and implementing
agency, the West Africa Rural Foundation (WARF) continues to engage IFAD country projects in
identifying and addressing key challenges and issues that are relevant to developing capacities
of M&E teams and consequently enhancing the performance of their M&E systems.

An important element of the programme implementation strategy is a targeted approach,
focusing on country projects to better address specific issues/needs and enhance the overall
country M&E portfolio. The rationale is that common and country specific challenges are better
addressed through a country focus that will promote mutual learning and the sharing of
experiences and good practices in selected countries.

In the framework of its implementation, PROSUME organized a monitoring and evaluation
learning and exchange forum for IFAD projects in Nigeria. The forum, held in Lagos from the
18th to 21st July 2011, brought together 35 M&E and MIS personnel from the Community-
Based Agricultural and Rural Development Programme (CBARDP), Community Based Natural
Resource Management Programme-Niger Delta (CBNRMP-ND) and the Rural Finance Institution
Building Programme (RUFIN).      The forum was designed to promote mutual learning and
exchange between M&E teams of IFAD funded projects in the country, enabling M&E teams of
the three projects to share experiences on important issues and jointly reflect on strategies and
the way forward for addressing project and country-specific M&E challenges.

1.2    Goal and Objectives

The goal of the forum was to enhance and promote mutual learning and knowledge exchange
on experiences, good practices and challenges facing M&E teams of IFAD funded Projects in
Nigeria. The forum specifically permitted M&E teams to share project experiences and good

                                               5
practices; identify challenges and opportunities for improving performance; and develop a
concerted framework for M&E support to concerned programmes. The forum also sought to
develop a framework and approach for monitoring the implementation of project Annual Work
Plan and Budgets (AWPB), and a harmonized mechanism for streamlining indicators and
evaluating emerging outcomes of project intervention.




                                             6
Chapter 2: Forum Programme and Proceedings

The workshop programme was divided into seven sessions, with an average of two sessions per
day. The workshop programme is attached in annex (Annex 1). Details of the proceedings of
the different sessions are discussed in the rest of this chapter.

2.1 Forum Proceedings

SESSION 1: Official opening, introduction of participants, expectations, and objectives

Goal: At the end of session 1, project participants, facilitators and resource persons were to
clarify their expectations and to have a common understanding of the goal and objectives of
the workshop.

   •   Following registration, CBNRMP coordinated the official opening of the workshop.
       Welcome addresses were made by representatives of IFAD programmes in Nigeria and
       PASSE/PROSUME.
   •   Forum participants introduced themselves and outlined their expectations (which were
       placed on SCORE CARDS for grouping).
   •   The objectives and expected outputs of the forum were then presented and discussed.
   •   This presentation was followed by tea break and a group photograph.



SESSION 2: Presentation of M&E experiences, good practices and challenges

Goal: The session was designed to enable participants to have a better understanding of the
status of M&E systems of IFAD funded Programmes in Nigeria. This session focused on
providing participants with the opportunity to share experiences and lessons on M&E, including
current status and M&E support needs for each Programme.

   •   Each Programme was allocated time to share information on its M&E system, focusing
       on the general M&E framework, experiences, good practices and challenges in the
       implementation and management of the system.

                                                 7
•   The following guidelines were used in preparing Programme presentations:


     •    What is the framework of your system/how is M&E organized in your project?
     •    What interesting M&E experiences and good practices do you want to share with
          colleagues?
     •    What are your key challenges/problems/difficulties in M&E implementation and
          management?
     •    How are you addressing these challenges/problems/difficulties?



•   Each presentation was followed by a short exchange for clarifications and burning
    questions.
•   Participants were asked to note key issues emerging from each presentation, which
    were collected and grouped for further discussions and subsequent activities.
•   Workshop facilitators provided a synthesis of the presentations, highlighting key themes
    and synergy between Programmes.




                                           8
Notes

   •        Responsibilities for daily rapporteuring was rotated between Programmes, with each
            Programme providing feedback each morning on daily processes, contents,
            timekeeping, achievements, etc. The final evaluation/feedback was provided on the
            afternoon of the last day.
   •        After day 1, each day started with the feedback on proceedings of the previous day
            and an overview of plans for the day. The feedback was done by the daily rapporteurs
            and the overview undertaken by facilitators.
   •        There was a daily wrap-up session for the first two days, focusing on a recap of key
            issues, actions, observations, comments and announcements
   •        Day 3 ended with group sessions instead of the daily wrap-up
   •        A general wrap-up was undertaken on day 4



  SESSION 3: IFAD’s M&E Framework: Context and Issues in RIMS Reporting

  Goal: At the end of the session, participants were to have common comprehension of IFAD’s
  M&E framework, including the implications of RIMS for project M&E systems

        •     This session started with an overview of IFAD’s M&E framework. The overview drew
              from IFAD’s M&E guide available online.            The discussions highlighted issues of
              monitoring, evaluation and reporting, including the RIMS framework.
        •     Discussions explored issues related to the monitoring and reporting on activities and
              outputs (RIMS Level I) as well as evaluation of outcomes (RIMS Level II) and impact
              (RIMS Level III).
        •     The requirements for progress reports and annual RIMS reporting were also explored in
              this session.




                                                           9
•       The second presentation focused on challenges in streamlining indicators for good M&E.
           This was a brainstorming session where projects and resource persons shared
           experiences on streamlining variables to ensure relevant and realistic M&E.
   •       The subsequent presentation focused on capturing and processing data for outcome
           evaluation. This focused on RIMS level II reporting. Participants and resource persons
           brainstormed on the challenges and options for generating and processing data for level
           II reporting.
   •       The final theme under this session explored project experiences in capturing and sharing
           success stories. The fundamental issue related to the role of M&E in the identification
           and analysis of success stories. What tools were available for this?
   •       The session concluded with a general discussion of key issues emerging from the
           presentations.




  During this session, participants were challenged to reflect on their understanding of the following
  issues:

       •     Working definitions of monitoring, evaluation and reporting

       •     Key actors and their roles in monitoring

       •     Implications of RIMS (Levels I, II and II) for projects/programmes

       •     Organizational requirements for effective monitoring, evaluation and reporting

       •     Challenges and options for capturing and reporting on outcomes

       •     Generating and processing success stories: what role for M&E?




SESSION 4: Monitoring the annual work programme and budget (AWPB)

Goal: At the end of the session, participants were to appreciate the relevance of monitoring the
implementation of the AWPB, and harmonize tools/methods for the process.

                                                        10
•      The plenary presentation focused on assessing key issues and challenges in monitoring
           AWPBs
    •      Tips on ensuring effective and relevant monitoring of AWPBs were highlighted
    •      The discussion included a proposed format for monitoring the AWPB, including the roles
           and responsibilities of different categories of staff in the process
    •      Hands-on group sessions were undertaken to allow participants to develop the
           frameworks for monitoring their programme AWPB
    •      Participants then presented the framework for monitoring their AWPB


Session 5: Presentation of group/individual reports

Goal: At the end of the session, participants were to have an updated framework for
monitoring project implementation during 2011, focusing on 2011 AWPBs, activities, and
results.
    •      During the session, each M&E team developed a framework for monitoring their
           programme AWPB, using the 2011 AWPB as a basis for the task.
    •      One resource person was allocated to each team to provide needed support and
           guidance
    •      Each M&E team presented its framework in a general session, and participants provided
           comments and suggestions on each framework.


SESSION 6: RIMS reporting: Context, issues, procedures

Goal: At the end of the session, participants were to have a better appreciation and
understanding of RIMS reporting requirements and procedures

    •      A plenary overview/introduction of annual RIMS reporting requirements and
           procedures were made by a facilitator/resource person
    •      Discussions on requirements for RIMS levels I, II and III indicators


                                                    11
•   Projects then exchanged their experiences, challenges and problems with RIMS
       reporting. This included a review of 2010 RIMS reports of the projects for tips and
       suggestions on addressing specific issues
   •   Provided tips and suggestions on reporting procedures

Session 7: Support needs and strategy for enhancing M&E performance

Goal: Exchange on options and strategies for M&E support to Programmes

   •   Projects highlighted their major M&E support needs. The project overviews presented
       on day 1 guided those presentations
   •   WARF shared its strategy for M&E support to projects in West and Central Africa
   •   The participants developed options for M&E support to projects. These options were to
       be subsequently presented to the IFAD CPM and project coordinators for a concerted
       M&E support strategy for Nigeria projects

A general wrap-up and evaluation that touched on lessons, conclusions and the way forward
was made by the facilitators on the last day, July 21, 2011. Official closing ceremony was held in
which participants were presented with Certificate of Attendance from WARF.




                                               12
Chapter 3: Analysis and Discussion of Results

3.1 Analysis of participants’ expectations

Participants were asked to write out one or more of their expectations from the forum. The
analysis shows M&E systems/skills and knowledge exchange/sharing were the two dominant of
the six categories of the expectations analyzed (Table 1 below).

Table 1: Analysis of Participants Expectations

SN         CATEGORY OF EXPECTATIONS                                %

1          M&E systems/skills                                   32%

2          Knowledge exchange/sharing                           29%

3          Understanding the RIMS                                  4%

4          Annual Work Plan & Budget (AWPB)                        5%

5          Lessons from other projects                          16%

6          Other expectations                                   14%



3.1.1 M&E Systems/Skills

The various aspects of expression include the following:

     •   More knowledge about M&E methodologies and process

     •   More knowledge about evaluation and M&E in general

     •   More knowledge about MIS

     •   Knowledge on solutions and way forward for M&E challenges

3.1.2 Exchange/Sharing of knowledge

The various aspects of expression for this expectation include the following:

     •   More knowledge from peer projects at the forum

                                                 13
•   Learn from colleagues their knowledge and experiences

   •   Share best practices from the projects

   •   Learn and exchange good practices of M&E

   •   To pick up some good practices found in other projects

3.1.3 Understanding the RIMS reporting format

The different types of expressions for this expectation include the following:

   •   Understanding the RIMS reporting format at the three levels as per the revised version

   •   A comprehensive understanding of the implications of RIMS for the M&E of IFAD
       projects

3.1.4 Annual Workplan and Budget (AWPB)

The different types of expressions for this expectation include the following:

   •   Come up with best framework for monitoring AWPB

   •   Preparation of AWPB using the IFAD indicator based format

   •   Learn the monitoring of AWPB

3.1.5 Lessons from other projects

The different types of expressions for this expectation include the following:

   •   Hope to acquire the best practices of others

   •   Learn from other programmes their experiences in the field as it pertains to M&E

   •   Lessons from each other to build up moral as an M&E officer

   •   Know challenges facing other sister programmes

   •   Learn good practices from other projects to enhance performance in my own project

   •   Learn the successes achieved and the problems faced

   •   Learn the challenges of the projects and way forward

3.1.6 Other Expectations
                                                14
The expressions in this category include the following:

      •   to know the relevance of the forum as a catalyst for enhanced M&E delivery

      •   to know all the participants that attended the forum

      •   to improve on knowledge and experience at the end of the sessions

In summary, the expectations expressed by an overwhelming majority of the participants are
generally in tune with the objectives of the workshop which include:

      •   Enhancing and promoting mutual learning and knowledge exchange on experiences,
          good practices and challenges facing M&E teams of IFAD funded Programmes in Nigeria,

      •   Developing a framework and methodology for monitoring the implementation of
          programme AWPBs, a harmonized mechanism for streamlining indicators and
          evaluating emerging programme outcomes, and a concerted framework for M&E
          support to the concerned projects.

3.2. M&E experiences, good practices, challenges, emerging issues and Lessons

3.2.1. Synthesis of M&E experiences, good practices, and lessons

 Analysis of the presentations revealed a number of experiences, good practices and emerging
issues that are common across the three Programmes. All the Programmes had the following
common issues:

      •   M&E transcends data collection to communication
      •   Participatory approach - Stakeholders are involved in AWPB preparation
      •   Challenge of capacity building
      •   Common challenge in the interface between the M&E and other project components

Detailed evaluation of Programme-specific experiences, good practices and emerging issues are
summarized in the tables below.


Table 2: M&E Experiences across Projects

S/N       Issue                                           CBARDP CBNRMP                RUFIN
1         CDD makes people work together                  X      X                     x
2         Increased level of buy-in and Project Ownership X      X
          Attitude adopted by communities
3         Up scaling of activities in non-project LGs            X
                                                 15
Table 3: M&E Good Practices across Projects

S/N    Issue                                                   CBARDP CBNRMP   RUFIN
1      Participatory approaches                                X      X        X
2      Feedback mechanism by review meetings with all          X      X        X
       stakeholders
3      Result based management                                 X     X         X
4      Timely/Quick analysis of data as available & as soon                    X
       as received + continuous updating
5      Indicator-based AWPB + Indicator-based reporting;       X               X
       approval is not given to undesired activities as they
       are screened out if submitted by beneficiaries
6      Disaggregation of data by gender (male, female,         X     X         X
       disadvantaged groups, etc)
7      Disaggregation of data on state, LG & national levels         X         X


Table 4: M&E Challenges across Projects

S/N    Issue                                                   CBARDP CBNRMP   RUFIN
1      Inadequate logistics including mobility                                 X
2      Uncooperative attitudes and potential role conflicts                    X
3      Undue interference                                      X     X
4      Inadequate staffing/remuneration                        X     X
5      Complexities inherent in participatory M&E using CDD    X     X
       approach
6      LG-level data collection is inadequate                        X
7      IT facilities inadequate                                      X         X
8      Unfamiliarity with some software (such as SPSS,               X
       Access, Excel, etc)
9      Frequent changes in reporting formats by funding &      X     X         X
       supervisory agencies
10     Untimely submission of reports                                X
11     Inadequate funding for activities including review      X     X         X
       meetings & other activities




                                              16
Table 5: Emerging Issues across Projects:

S/N     Issues & Suggested Solution                               CBARDP CBNRMP       RUFIN
1       Capacity of stakeholders in data collection and           X      X            X
        management – project management to build up the
        capacity of staff
2       Implication of project components in M&E – Enhance        X        X          X
        involvement in AWPB preparation and assessment;
        sensitization
3       Elaboration and Updating of M&E manual – WARF to          X        X          X
        provide support to RUFIN; request similar modality
        for other programmes


Way forward
       Re-sensitization and re-orientation of stakeholders at all levels
       Capacity building
       Strengthening of M&E systems
       Setting up of planning based on RIMS indicators and reporting format
       Access to ICT facilities



3.3. M&E in IFAD funded projects: Context and Issues

Based on the forum goal of enhancing and promoting mutual learning and knowledge exchange
on experiences, good practices and challenges facing M&E teams of IFAD funded Programmes
in Nigeria and the expected forum outputs, participants were engaged in a review the
fundamental Monitoring and Evaluation concepts with a view to enhancing their understanding
of the critical role M&E plays in project management. The presentations addressed three basic
themes – M&E framework, RIMS and data capturing.

3.3.1 M&E framework: The framework was explored using graphical illustration of the result
chain to illustrate Input-Activities-Output-Outcome-Impact linkages as shown below:




                                                17
Participants appreciated the difference and linkage between planning for results and managing
for results.

3.3.2 RIMS indicators: Contextualizing the Result and Impact Management System requires the
understanding and interpretation of the three (3) levels of indicators. Extensive discussions
were held to enhance the participants’ understanding of the three levels of indicators – Level 1
(output), Level 2 (outcome) and Level 3 (impact). Since at the project level the critical challenge
is in the interpretation logic of Level 2 (Outcome), more time was spent on demonstrating the
utility of the RIMS Level 2 using table 6 below:

Table 6: RIMS Level 2 Scoring.

  NOTE          EFFECTIVENESS                                SUSTAINABILITY


  1             HIGHLY UNSATISFACTORY                        VERY WEAK



  2             UNSATISFACTORY                               WEAK


  3             MODERATELY UNSATISFACTOR Y                   MODEST


  4             MODERATELY SATISFACTORY                      MODERATE


  5             SATI SFACTORY                                STRONG


  6             HIGHLY SATI SFACTORY                         VERY STRONG




                                                   18
3.3.3 Capturing data for project M&E: Building up from the understanding of the M&E results
chain and concept of Result and Impact Management System (RIMS), discussions were held
with regards to clearly indicating that project M&E must collect the necessary beneficiary and
project data and information that will satisfy different stakeholders: fund providers, supervisory
agencies (Government), beneficiaries as well as project managers. Three critical concepts were
presented:

   a) Understanding the concept of indicator to mean quantitative or qualitative factor or
       variable that provides a simple and reliable means to measure achievement or to reflect
       the changes connected with an intervention.
   b) The general attributes of a good indicator in terms of ‘smart’ - specificity, measurability,
       attainable, relevance and time-bound, as well as in terms of ‘spiced’- subjectivity,
       participatory, easy to interpret, cross-checked, empowering and diverse.
   c) Understanding the different types of indicators based on the results chain: Inputs,
       Activities (process), Outputs, Outcomes and Impact.
   d) Aligning outputs to outcomes to enhance managing for results
   e) Evaluation of emerging and actual outcomes, undertaken by diverse groups of
       stakeholders using a combination of qualitative and quantitative data

3.4. Streamlining indicators for good M&E:

Each project made a short presentation on their experiences in streamlining indicators to
enhance focus and good M&E, using their project logframes as a basis. The presentations also
allowed facilitators to gauge the participants’ understanding of reporting Monitoring and
Evaluation Indicators using the logical framework matrix. It was evident that experiences and
understanding varies both in terms of the process for streamlining indicators, and the formats
and content of the logframe matrix.

The ensuing discussions resulted in a better understanding of the different types of indicators
(Inputs, Activities, Outputs, Outcomes and Impact), and appropriate mechanisms and


                                               19
procedures for streamlining indicators taking into consideration project components and
reporting needs.


Further discussions were held to enhance the understanding of the basic elements of the
logframe which are:
   •   The over-arching goal to which the project will contribute.
   •   The development objective that will be achieved by the end of the project
   •   The outcomes- changes directly attributable to outputs and strengthen the linkage
       between realisation of outputs and achievement of the development objective
   •   The outputs- products, services or results that must be delivered by the project to
       achieve the outcomes and the development objective in the time and with the
       resources available
   •   Activities- actions which the project takes in order to deliver the outputs.




3.5 Capturing and sharing success stories

The programmes shared and exchanged lessons on one success story each to highlight the
important role and interface of M&E min the identification and analysis of experiences and
successes:


3.5.1 RUFIN
RUFIN’s success story focuses on linking community rural microfinance institutions consisting of
the principal targets of the project (women, youths and the physically challenged) to micro-
finance banks and commercial banks in their operational zones in order to enhance their access
to financial services. The testimony from a female poultry farmer who is also a member of a
village savings and credit association (known as informal microfinance institutions) in Bauchi
Local Government Area (LGA) of Bauchi State indicated that the initiative enabled her to obtain
a 1 million naira loan from the Bauchi Investment Corporation, which she used to purchase over

                                               20
20 bags of layers feed in advance for another layers breeding stock, something she could not do
before the intervention. The project has enhanced her access to credit facilities which assisted
her to expand her poultry business and have a buffer stock for her poultry for increased
productivity, thereby contributing to revenue generation from her poultry production activity.
This story demonstrates how the programme will lead to increased incomes of beneficiaries
through enhanced access to financial services.


3.5.2 CBNRMP
The success story of CBNRMP relates to how sustainable agriculture is contributing to raising
the standard of living of rural populations, with emphasis on women and youths. The Oganihu
Women Farmers Association located in one project State started with one hectare of Plantain
plantation through the intervention of the programme. The harvest was so bounteous that the
group realized enough money to rent another farm where Cassava was cultivated. Testimonies
from the women suggest that increased income from plantain and cassava production through
the CBNRMP intervention has improved their livelihoods, and that “they never had it so good
prior to the intervention.” Other groups who did not show interest in farming initially are now
calling the project intervention in their area, providing evidence of a potential spill-over effect
of the project activities.


3.5.3 CBARDP:
The success story of CBARDP focuses on the emergence of ‘Water Melon Millionaires’ in their
intervention zones. Prior to program intervention, majority of the people in the community
relied on the production of millet and sorghum during the raining season and moved to cities
during the dry period as production of these staple crops couldn’t meet their year round food
needs. Project intervention through introduction and support for water melon production
during the dry season is fuelling the emergence of ‘water melon millionaires’ in some project
intervention zones. As a result of this intervention, beneficiaries increased their incomes ten-
fold from less than N 200,000 to more than N 2,000,000 per year. The rural-urban drift during
the dry season has declined by 90%. A landless farmer testified to having recently purchased
                                                 21
farmland worth N 750,000 using revenues generated from the project intervention in water
melon production, providing evidence of the emergence of a new breed of ‘water melon
millionaires’ in the project intervention zones. The beneficiary community has become a model
and learning ground for water melon production in the region.
3.6 Preparing and monitoring the AWPB: Issues, challenges and tools

In an attempt to put the issues on preparation and monitoring of AWPB in proper perspective,
discussions concentrated on: the involvement of beneficiaries and the use of Community Action
Plans (CAP) in the preparation of the AWPB; the formats/tools used in preparing the AWPB; the
formats/tools for monitoring the AWPB and; challenges in preparing, implementing and
monitoring the AWPB.

It was clear that, since all the programmes are intervening through groups-applying the
Community-Driven Development (CDD) approach, CAP is being used to prepare the AWPB after
community needs assessments. In general, the AWPB contains the components’ activities, the
location and the budgeted amount for each activity. However, the formats vary depending on
which stakeholder the AWPB is being prepared for.


Similarly, the formats /tools for monitoring the AWPB also varied depending on the needs of
stakeholders and projects. There seemed to be no uniform standard tools for monitoring the
AWPB and hence the introduction of the new tool was apt and relevant. Discussions on the new
tool focused on explaining the following variables that are contained in the tool (Annex 2:
proposed template for monitoring the AWPB).
   •   Analytical Code
   •   Component and Subcomponent
   •   Activity (Number, Description, Location
   •   Implementation period
   •   Activity type
   •   Quantitative achievement (Target, Actual, % Achievement)
   •   Budget (Target, Actual % Achievement
                                                 22
•   The Gap (% Financial Achievement minus % Physical Achievement)
   •   The Red Flag Gap.


Based on the understanding that the new tool is an excellent decision tool, further discussions
were held to contextualize the following variables that participants needed further clarity
pending further capacity development when the tool is implemented at project level. Training
on the tools for monitoring the AWPB was identified as a capacity development priority for all
projects.
   •   Analytical Code: The derivation of the analytical codes was demonstrated using
       examples from the projects.
   •    Activity type: As a descriptor to illustrate whether a particular activity should be
       classified either as a “process” or “quantity” to allow for objective interpretation of the %
       GAP setting of the Red Flag Gap
   •   The rationale for the computation of the Gap based on the Input-Activities- output logic.


The critical challenges that projects faced in the preparation, implementation and monitoring
AWPB are:

   •   Involvement of stakeholder communities in prioritizing their needs.
   •   Variations in the preparation and monitoring tools.
   •   Fund releases for the implementation of activities
   •   Unavailability of adequate tools for monitoring of the AWPB



3.7 Annual RIMS reporting: experiences and challenges

Presentations were made by the three Projects (CBNRMP, CBARDP and RUFIN) on their 2010
RIMS reports. The actual achievements recorded as compared to the AWPB target for the year
(2010) on the first level (output) and second level (outcome) results were discussed for each of
the three projects.

                                               23
The following common observations were noted:

   •   All three Projects have demonstrated the task of managing for results
   •   The outcome indicators were commonly applicable to CBARDP and CBNRMP, while most
       were not applicable to RUFIN which is in its first year of effective implementation.
   •   Issues emerged on the RIMS level-2 in terms of assessing and rating Effectiveness and
       Sustainability. There was a critical challenge across board in determining the rating to be
       ascribed for the six categories of Effectiveness and sustainability.

Following the Projects’ presentations, the RIMS format was reviewed in respect of the seven
IFAD investment domains (Natural Resources - Land and water, Agricultural Production and
Technologies, Rural Finance Services, Markets, Rural Enterprise and Employment Creation,
Policies and Community Development, and Social Infrastructure).

Exchanges were undertaken on rating Effectiveness and Sustainability in RIMS level 2 reporting.
Tips included the use of simple procedure such as the school grading process in addition to the
guidelines in the RIMS manual on methodological approaches. The table below was used to
illustrate the school grading system which can complement the analytical approach for RIMS
level 2 scoring.




                                                24
Table 7: Equivalent Scores for RIMS Rating and School grades
       RIMS Ranking               Corresponding school grade             Score Range (in %)

       6                                A                                70% and above

       5                                B                                60-69

       4                                C                                50-59

       3                                D                                40-49

       2                                E                                30-39

       1                                F                                <30


Concluding the session, the participants were advised to apply the method most suitable to
their context and circumstances; and there should be flexibility in combining qualitative and
quantitative data from multiple sources for the ranking.




                                               25
Chapter 4 Needs and options for sustainable M&E Capacity Development

Participants were asked to separately express their individual and corporate needs for M&E
support. Analysis of the individual and project needs indicate their classification into four main
categories, namely, information technology (IT); M&E related capacity development, working
conditions/logistics support, and others.

4.1 Individual Technical support needs:       On the perspective of individual needs, more
knowledge/skills on information technology had the first priority, Logistics/Working Conditions
support was second in rank, while capacity building on M&E came third (Table 8). It is to be
noted here that the issue of logistics/working condition does not necessarily reflect a technical
support need. Capacity in ICT and M&E can be combined into one group that addresses issues
of M&E system development and management. With this grouping, it is clear that the priority
concerns revolve around the development, operationalization and management of project M&E
systems.

       Table 8: Individual technical support needs expressed by participants

       SN    Issue                                TOTAL NO.        %                RANK

       1     Information Technology               36               37%              1st

       2     M&E capacity building                25               26%              3rd

       3     Logistics/Working Conditions         29               30%              2nd

       4     Others                               7                7%               4th




                                               26
4.2. Programme level technical support needs: At the project/programme level, more
Logistics/Working Conditions support (again, this does not reflect a technical support need) had
the first priority, capacity building on M&E came second in ranking, while knowledge/skills on
information technology was fourth (Table 9).

       Table 9: Programme technical support needs expressed by participants:
       S/ Issue           CBNRMP CBARDP          RUFIN Project         Total         %       Rank
       No                                                 not          No.
                                                          specified
       1    Information   2           0          6        11           19            17%     4th
            Technology
       2    M&E           5           1          6        11           23            21%     2nd
            capacity
            building
       3    Working       12          3          20       13           48            44%     1st
            Conditions
       4    Others        1           2          11       6            20            18%     3rd




4.3 Analysis of support types by group: The specific options expressed by the participants for
the types of support required are as follows:
Information Technology Options:
   •   Web content management and website management and design
   •   Training on computer software – Access, SPSS, Excel, etc as tools for data analysis
   •   Training on systems management and organization


M&E Capacity Building Options:
   •   Improved knowledge on the use of the Revised RIMS format
   •   M&E contemporary issues
   •   Hands on M&E for result Based Reporting
   •   International Training on Participatory M&E
   •   Computerized Project Budget Monitoring Systems
                                                27
•   Data Management
   •   Report Writing Techniques
   •   Journalistic attitude as it pertains to data capture, management and communication
Logistics/Working Conditions Options:
   •   logistic support for monitoring - vehicles
   •   Equipment (Laptops, Computers, printers, digital camera, internet modem, office
       stationery, flash drives, air-conditioners, photocopiers, etc)
   •   More professional staff to assist on the jobs
   •   GSM recharge cards for monthly subscription
   •   Adequate and timely release of operational funds
   •   Staff allowances reviewed upwards
   •   Regular electricity support


Other Support Options:
   •   Training on Project/Programme Management
   •   Minimizing role conflicts among project components
   •   Gaining cooperation among staff
   •   Inter-State tour to sister projects

4.4 PASSE/PROSUME framework for M&E Support: Participants were briefed on the existing
modes of support to Projects through the Programme for Support of monitoring and evaluation
systems of IFAD projects in West and central Africa, being implemented by the West Africa
West Africa Rural Foundation (WARF).

The goal of the programme is to improve the performance and impact of IFAD financed projects
and programmes in West and Central Africa. Its specific objectives are to: Strengthen the
capacities of project teams and key staff of the implementing Ministries in the field of
monitoring and evaluation; improve the capacities of regional and local institutions in order to
build a regional network of competences in monitoring and evaluation which is capable of

                                                28
supporting IFAD financed programmes and projects; disseminate pertinent information to assist
project and programme directors take informed decisions thanks to an efficient monitoring and
evaluation programme which takes into account gender issues and results targeting and;
promote the learning and sharing of information, knowledge and good practices in matters of
M&E and in so doing ensuring that aid becomes more efficient.

WARF is providing direct and indirect technical support to projects through a number of
initiatives that include coaching and mentoring support to targeted projects considered ‘at-risk’
and new projects (such as RUFIN), targeted national and regional workshops and the
production and dissemination of learning materials and tools for M&E capacity development.

4.5 Suggestions on options for sustainable M&E capacity development: Participants suggested
that making the training plans of WARF and PASSE available to projects would enable them
build these activities into their AWPB. It was also noted that hands-on workshops and learning
forums are much more adequate for capacity development. It was also suggested that based on
its experience in the region, WARF should elaborate and provide to IFAD the principal M&E
support needs and priorities of projects in the sub-region.

For Nigeria projects specifically, participants identified direct M&E support to projects using the
framework of PROSUME/PASSE support to RUFIN as the most appropriate mechanism for
sustainable M&E capacity development. It is recommended that exchanges are initiated
between the CPM/CPO, Project Coordinators and WARF to develop a mechanism for
sustainable M&E support to all three projects using a combination of mechanisms including
coaching/mentoring, peer exchanges and learning/exchange forums.




                                                29
Chapter 5: Recommendations on the way forward

The recommendations that are put forward are based on the discussions that highlighted
projects’ Monitoring and Evaluation capacity development needs and the role of WARF in
meeting those needs.

5.1 M&E Capacity development: In addition to targeting specific country programme for the
M& E capacity development intervention, a general framework should be developed for
country programmes to benefit from M&E capacity building especially in nontraditional areas of
Monitoring and Evaluation such as Outcome Mapping and Most Significant Change Analysis.
The framework of PASSE/PROSUME, which is being used for M&E support to targeted projects
in WCA, could be a basis for elaborating a sustainable M&E capacity development initiative for
Nigeria Programmes.

5.2 Information technology Skills development support: The variations in individual and
programme IT skills development needs make it difficult to have “one-size-fits-all” interventions.
However it was generally recommended that specific IT skills should be developed that should
focus on the working tools for implementing programme interventions (preparation and
monitoring of AWPB), and capturing, analyzing and reporting programme results. IT skill gap
analysis should be undertaken for the M&E staff in order to come up with specific capacity
development interventions.

5.3 Programme Synergy: Country programmes need more synergies in order to learn the
lessons of experiences from one another in capturing and documenting results of programme
interventions. Specifically:

   •   The original concept of forming Monitoring and Evaluation committee spearheaded by
       WARF should be reintroduced for the country programmes

   •   Intra and inter-programmes Monitoring and Evaluation forum should also be
       implemented.




                                               30
ANNEX 1: Sample template for monitoring implementation of AWPB


                                                                                                                                                                                     Gap
Analytical                      Sub          Activity     Activity      Activity    Implementation       Activity                     Achievement                     Achievement            Red Flag
             Component                                                                                              Target   Actual                 Budget   Actual                 (%FA -
  Code                       Component       Number      Description    Location        period            type                             (%)                             (%)               Gap (%)
                                                                                                                                                                                     %PA)

             COMPONENT A:
                     Sub Component 1:
A.1.1        A              1       1
A.1.2        A              1       2
A.1.3        A              1       3
                             Sub Component 2:
A.2.1        A                          2           1
A.2.2        A                          2           2
A.2.3        A                          2           3



Note: The sample template covers 1 project component with 2 subcomponents and 3 activities per subcomponent




                                                                                                          31
Annex 2: List of Forum Participants

S/N             Name            Project/Organization      Designation         E-mail Address

 1    Salisu B. Moh'd Ngulde    CBARDP                 SMEO Borno       ofngulde@yahoo.com


 2    Abbas Hamza Shargalle     CBARDP                 SMEO PSO         abbashamza2006@yahoo.com


 3    Dr. A. L. Ala             CBARDP                 HM&E PSO         alala20002003@yahoo.com


 4    Ya'u Nuhu Katanga         CBARDP                 SMEO Jigawa      yaunuhu@yahoo.com


 5    Amuwa Williams            CBNRMP-ND              M&EO Ondo        amu.williams@yahoo.com


 6    Clifford D. Ogbanga       CBNRMP-ND              M&EO Rivers      cliffordogbanga@yahoo.com


 7    Mohammed Ali              CBARDP                 SMEO Yobe        yobesso@yahoo.com


 8    Jerus Uvieghara           CBNRMP-PSO             PM&E Asst/Data   itisjerus@yahoo.com
                                                       Analyst

 9    Ufaruna Uneku A. (Mrs)    RUFIN                  M&E Specialist   unekuruna@yahoo.com


10    Paulina Iyenagbe (Mrs.)   RUFIN                  MIS Assistant    deinnerita@yahoo.com


11    Esther Bakwo              RUFIN                  M&E Assistant    estbak2007@yahoo.com
                                                       Evaluation

12    Shehu Hamza               RUFIN                  M&E Officer      danshehulle@yahoo.com


13    Okonjo Chris              NPAFS                  HME              cuokonjo@yahoo.com


14    Maiwada Zubairu           NPAFS                  M&E Specialist   maiwadaz@yahoo.com


15    Mohamed Kebbeh            WARF/PROSUME           PSO              mkebbeh@frao.info




                                                 32
16   A. A. Dankyi            A. I. Consult        Consultant          dankyiaa@yahoo.com


17   Faith B. Nwinee         CBNRMP-PSO           Secretary           nwineebfaith@yahoo.com


18   Ojiaka Obinna G.        CBNRMP-ND (Imo)      MISMEO              obinojiaka@yahoo.com


19   Aliyu Abubakar          RUFIN, Bauchi        Data Mgt. Officer   aliyuhabu32@yahoo.com


20   Rosemary Joseph Akpan   RUFIN, Akwa Ibom     Data Mgt. Officer   rosejoe2011@yahoo.com


21   Akpama K. Reuben        RUFIN, Bauchi        M&E Assistant,      kbourg05@yahoo.com
                                                  North

22   Shobande A. Olushina    RUFIN, Lagos         Data Mgt. Officer   justshinnee@yhoo.com


23   Ogieva Godfrey Ikuero   CBNRMP-Edo           M&E Officer         gerolystic@yahoo.com


24   Ewor Myke Edet          CBNRMP-Abia          M&E Officer         endomaedet02@yahoo.com


25   Aloba U. Meeting        CBNRMP-Delta         M&E Officer         pri_ebipade@yahoo.com


26   Ogon Adolphus Robert    CBNRMP-Bayelsa       M&E Officer         a.rogon@yahoo.com


27   Omede A. Odiba          RUFIN, Owerri        M&E Assistant,      omedeson@gmail.com
                                                  South

28   Aloysius D. Edet        CBNRMP -Akwa Ibom    MISMEO              edetaloy@yahoo.com


29   Elder Ikongha, Odey     CBNRMP-Cross River   MISMEO              Ojikongha@yahoo.co.uk
     Joseph

30   Sule John A.            RUFIN, Abuja         M&E Officer         john.sule@aol.com


31   Akangbe Ibraheem        RUFIN, Ibadan        M&E Assistant       ibrotech@live.com
                                                  Middle-Belt

32   Oyebanji Jide           RUFIN, Abuja         Planning Officer    oyeban101@yahoo.com




                                             33
33   Ian Gbinigie        CBNRMP- PSO         M&EO/MIS      ikian65@yahoo.com


34   Sahabi S. Wuya      IFAD-CBARDP         M&E Officer   zmifadsso@yahoo.com


35   Sani Salihu A. M.   IFAD CBARDP,        SMEO          sanisokoto@yahoo.com
                         Sokoto




                                        34

Mais conteúdo relacionado

Mais procurados

Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...FIDAfrique-IFADAfrica
 
Roles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint TemplatesRoles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint TemplatesSlideTeam
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
The Role of Project Manager in Modern Agile Projects
The Role of Project Manager in Modern Agile ProjectsThe Role of Project Manager in Modern Agile Projects
The Role of Project Manager in Modern Agile ProjectsVersionOne
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Palash Mehar
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Deepika Verma
 
Lesson 5 History of environmental management
Lesson 5   History of environmental managementLesson 5   History of environmental management
Lesson 5 History of environmental managementDr. P.B.Dharmasena
 
Project Outcomes and Achievements
Project Outcomes and AchievementsProject Outcomes and Achievements
Project Outcomes and AchievementsICARDA
 
Monitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projectsMonitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projectsInka Pibilova
 
Monitoring, evaluation and accountability staff presentation
Monitoring, evaluation and accountability staff presentationMonitoring, evaluation and accountability staff presentation
Monitoring, evaluation and accountability staff presentationkltpollock
 
Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD)
Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD) Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD)
Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD) Rodney Bodamer
 
Project Management Playbook
Project Management PlaybookProject Management Playbook
Project Management PlaybookDemand Metric
 

Mais procurados (20)

Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
 
Project Management Steps
Project Management StepsProject Management Steps
Project Management Steps
 
Project Portfolio Dashboard
Project Portfolio DashboardProject Portfolio Dashboard
Project Portfolio Dashboard
 
Roles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint TemplatesRoles And Responsibilities Presentation Powerpoint Templates
Roles And Responsibilities Presentation Powerpoint Templates
 
What is agile?
What is agile?What is agile?
What is agile?
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
Engage your stakeholders toolkit
Engage your stakeholders toolkitEngage your stakeholders toolkit
Engage your stakeholders toolkit
 
The Role of Project Manager in Modern Agile Projects
The Role of Project Manager in Modern Agile ProjectsThe Role of Project Manager in Modern Agile Projects
The Role of Project Manager in Modern Agile Projects
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
Lesson 5 History of environmental management
Lesson 5   History of environmental managementLesson 5   History of environmental management
Lesson 5 History of environmental management
 
Project Outcomes and Achievements
Project Outcomes and AchievementsProject Outcomes and Achievements
Project Outcomes and Achievements
 
Monitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projectsMonitoring and evaluation of human rights projects
Monitoring and evaluation of human rights projects
 
Monitoring, evaluation and accountability staff presentation
Monitoring, evaluation and accountability staff presentationMonitoring, evaluation and accountability staff presentation
Monitoring, evaluation and accountability staff presentation
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
Developing a problem tree
Developing a problem treeDeveloping a problem tree
Developing a problem tree
 
Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD)
Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD) Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD)
Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD)
 
Project Management Playbook
Project Management PlaybookProject Management Playbook
Project Management Playbook
 

Destaque (11)

Resume
ResumeResume
Resume
 
AWPB
AWPBAWPB
AWPB
 
Climate change lusip
Climate change lusipClimate change lusip
Climate change lusip
 
Esa recommandations
Esa recommandationsEsa recommandations
Esa recommandations
 
Concept Note - IFAD 6th Regional Forum
Concept Note - IFAD 6th Regional ForumConcept Note - IFAD 6th Regional Forum
Concept Note - IFAD 6th Regional Forum
 
IFAD WCA- Building success together
IFAD WCA- Building success togetherIFAD WCA- Building success together
IFAD WCA- Building success together
 
Esa Km Networks Presentation Final
Esa Km Networks Presentation FinalEsa Km Networks Presentation Final
Esa Km Networks Presentation Final
 
Stage 1a
Stage 1aStage 1a
Stage 1a
 
2010 Portofolio Review Final Report
2010 Portofolio Review Final Report2010 Portofolio Review Final Report
2010 Portofolio Review Final Report
 
Ghana Country programme evaluation
Ghana Country programme evaluationGhana Country programme evaluation
Ghana Country programme evaluation
 
Feed AFRICA N°1 - Rural Entrepreneurship
Feed AFRICA N°1 - Rural EntrepreneurshipFeed AFRICA N°1 - Rural Entrepreneurship
Feed AFRICA N°1 - Rural Entrepreneurship
 

Semelhante a Monitoring & Evaluation learning and exchange forum

Introduction to Participatory Monitoring-Evaluation
Introduction to Participatory Monitoring-EvaluationIntroduction to Participatory Monitoring-Evaluation
Introduction to Participatory Monitoring-EvaluationFIDAfrique-IFADAfrica
 
Experiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaExperiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaYinhongsun
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of ExpertsDr Lendy Spires
 
Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...
Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...
Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...Dr Lendy Spires
 
Kenya – Capacity Assessment
Kenya – Capacity AssessmentKenya – Capacity Assessment
Kenya – Capacity AssessmentFAO
 
NAP-AG Webinar - Kenya Case Study
NAP-AG Webinar - Kenya Case StudyNAP-AG Webinar - Kenya Case Study
NAP-AG Webinar - Kenya Case StudyUNDP Climate
 
Trainer Guide Workshop 1
Trainer Guide Workshop 1Trainer Guide Workshop 1
Trainer Guide Workshop 1E-Mediat
 
Arcadia consulting evaluation report besni
Arcadia consulting evaluation report besniArcadia consulting evaluation report besni
Arcadia consulting evaluation report besniEcuisine
 
ClipFlair Evaluation Report - July 2014
ClipFlair Evaluation Report - July 2014ClipFlair Evaluation Report - July 2014
ClipFlair Evaluation Report - July 2014ClipFlair
 
M&E completion training report oct 142012
M&E completion training report oct 142012M&E completion training report oct 142012
M&E completion training report oct 142012dr-ayub
 
Usaid project presentation
Usaid project presentationUsaid project presentation
Usaid project presentationSaif Qazzaz
 
GF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsGF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsFAO
 
2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_doc
2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_doc2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_doc
2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_docVerne Kemerer
 
Project Design and System Life Cycle Methodologies
Project Design and System Life Cycle MethodologiesProject Design and System Life Cycle Methodologies
Project Design and System Life Cycle MethodologiesShivi Kashyap
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 

Semelhante a Monitoring & Evaluation learning and exchange forum (20)

Introduction to Participatory Monitoring-Evaluation
Introduction to Participatory Monitoring-EvaluationIntroduction to Participatory Monitoring-Evaluation
Introduction to Participatory Monitoring-Evaluation
 
Experiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in IndiaExperiences on PCR of IFAD project in India
Experiences on PCR of IFAD project in India
 
PIDA Terms of Reference Panel of Experts
PIDA   Terms of Reference Panel of ExpertsPIDA   Terms of Reference Panel of Experts
PIDA Terms of Reference Panel of Experts
 
P mat mcorientation
P mat mcorientationP mat mcorientation
P mat mcorientation
 
Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...
Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...
Implementing the Paris Declaration and Accra Agenda for Action in Asia and th...
 
2015 ReSAKSS Conference – Day 1 - Fatmata Lucia SEIWOH
2015 ReSAKSS Conference – Day 1 - Fatmata Lucia SEIWOH�2015 ReSAKSS Conference – Day 1 - Fatmata Lucia SEIWOH�
2015 ReSAKSS Conference – Day 1 - Fatmata Lucia SEIWOH
 
Kenya – Capacity Assessment
Kenya – Capacity AssessmentKenya – Capacity Assessment
Kenya – Capacity Assessment
 
NAP-AG Webinar - Kenya Case Study
NAP-AG Webinar - Kenya Case StudyNAP-AG Webinar - Kenya Case Study
NAP-AG Webinar - Kenya Case Study
 
Trainer Guide Workshop 1
Trainer Guide Workshop 1Trainer Guide Workshop 1
Trainer Guide Workshop 1
 
Mod01
Mod01Mod01
Mod01
 
Arcadia consulting evaluation report besni
Arcadia consulting evaluation report besniArcadia consulting evaluation report besni
Arcadia consulting evaluation report besni
 
ClipFlair Evaluation Report - July 2014
ClipFlair Evaluation Report - July 2014ClipFlair Evaluation Report - July 2014
ClipFlair Evaluation Report - July 2014
 
M&E completion training report oct 142012
M&E completion training report oct 142012M&E completion training report oct 142012
M&E completion training report oct 142012
 
Usaid project presentation
Usaid project presentationUsaid project presentation
Usaid project presentation
 
GF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsGF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project Proposals
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_doc
2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_doc2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_doc
2010 10 22_faciltators guidelines_eng_post nairobi revisions_vk_doc
 
Mafi Work Plan 2013, short version (March 2013)
Mafi Work Plan 2013, short version (March 2013)Mafi Work Plan 2013, short version (March 2013)
Mafi Work Plan 2013, short version (March 2013)
 
Project Design and System Life Cycle Methodologies
Project Design and System Life Cycle MethodologiesProject Design and System Life Cycle Methodologies
Project Design and System Life Cycle Methodologies
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 

Mais de FIDAfrique-IFADAfrica

Introduction au Suivi-Evalutation Participatif
Introduction au Suivi-Evalutation ParticipatifIntroduction au Suivi-Evalutation Participatif
Introduction au Suivi-Evalutation ParticipatifFIDAfrique-IFADAfrica
 
Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...
Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...
Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...FIDAfrique-IFADAfrica
 
Stratégie de communication de waapp sénégal fiara.01pptx
Stratégie de communication de waapp sénégal fiara.01pptxStratégie de communication de waapp sénégal fiara.01pptx
Stratégie de communication de waapp sénégal fiara.01pptxFIDAfrique-IFADAfrica
 
Impact des ta enjeux sur les céréales locales
Impact des ta enjeux sur les céréales localesImpact des ta enjeux sur les céréales locales
Impact des ta enjeux sur les céréales localesFIDAfrique-IFADAfrica
 
ASPRODEB-Senegal: The management of certified groundnut seeds production by c...
ASPRODEB-Senegal: The management of certified groundnut seeds production by c...ASPRODEB-Senegal: The management of certified groundnut seeds production by c...
ASPRODEB-Senegal: The management of certified groundnut seeds production by c...FIDAfrique-IFADAfrica
 
La promotion des micro et petites entreprises rurales : un moyen efficace pou...
La promotion des micro et petites entreprises rurales : un moyen efficace pou...La promotion des micro et petites entreprises rurales : un moyen efficace pou...
La promotion des micro et petites entreprises rurales : un moyen efficace pou...FIDAfrique-IFADAfrica
 
Le FIDA en RDC - Echos dans la presse
Le FIDA en RDC - Echos dans la presseLe FIDA en RDC - Echos dans la presse
Le FIDA en RDC - Echos dans la presseFIDAfrique-IFADAfrica
 
Atelier de partage sur le pratique de suivi évaluation des projets FIDA
Atelier de partage sur le pratique de suivi évaluation des projets FIDAAtelier de partage sur le pratique de suivi évaluation des projets FIDA
Atelier de partage sur le pratique de suivi évaluation des projets FIDAFIDAfrique-IFADAfrica
 
Une expérience rurale novatrice : la production de semences certifiées d’arac...
Une expérience rurale novatrice : la production de semences certifiées d’arac...Une expérience rurale novatrice : la production de semences certifiées d’arac...
Une expérience rurale novatrice : la production de semences certifiées d’arac...FIDAfrique-IFADAfrica
 
Forum PPAAO sur les technologies améliorées et la sécurité alimentaire
Forum PPAAO sur les technologies améliorées et la sécurité alimentaireForum PPAAO sur les technologies améliorées et la sécurité alimentaire
Forum PPAAO sur les technologies améliorées et la sécurité alimentaireFIDAfrique-IFADAfrica
 
Village PPAAO à la FIARA - Seances de demonstration
Village PPAAO à la FIARA - Seances de demonstrationVillage PPAAO à la FIARA - Seances de demonstration
Village PPAAO à la FIARA - Seances de demonstrationFIDAfrique-IFADAfrica
 
Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)
Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)
Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)FIDAfrique-IFADAfrica
 
Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...
Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...
Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...FIDAfrique-IFADAfrica
 
Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...
Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...
Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...FIDAfrique-IFADAfrica
 
An overview of the Ghana national M&E system
An overview of the Ghana national M&E systemAn overview of the Ghana national M&E system
An overview of the Ghana national M&E systemFIDAfrique-IFADAfrica
 
Dossier : Les coopératives de producteurs de semences d'arachides au Sénégal
Dossier : Les coopératives de  producteurs de semences d'arachides au SénégalDossier : Les coopératives de  producteurs de semences d'arachides au Sénégal
Dossier : Les coopératives de producteurs de semences d'arachides au SénégalFIDAfrique-IFADAfrica
 
50. Rapport de la 2è réunion du comité de pilotage du Programme Facilité
50. Rapport de la 2è réunion du comité de pilotage du Programme Facilité50. Rapport de la 2è réunion du comité de pilotage du Programme Facilité
50. Rapport de la 2è réunion du comité de pilotage du Programme FacilitéFIDAfrique-IFADAfrica
 
Feed AFRICA N°1 - Entreprenariat Rural
Feed AFRICA N°1 - Entreprenariat RuralFeed AFRICA N°1 - Entreprenariat Rural
Feed AFRICA N°1 - Entreprenariat RuralFIDAfrique-IFADAfrica
 

Mais de FIDAfrique-IFADAfrica (20)

Introduction au Suivi-Evalutation Participatif
Introduction au Suivi-Evalutation ParticipatifIntroduction au Suivi-Evalutation Participatif
Introduction au Suivi-Evalutation Participatif
 
Agenda Atelier PROPACOM - RCI
Agenda Atelier PROPACOM - RCIAgenda Atelier PROPACOM - RCI
Agenda Atelier PROPACOM - RCI
 
Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...
Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...
Rapport de l'Atelier de Cloture - Programme Facilité Alimentaire (Abuja, Sept...
 
Stratégie de communication de waapp sénégal fiara.01pptx
Stratégie de communication de waapp sénégal fiara.01pptxStratégie de communication de waapp sénégal fiara.01pptx
Stratégie de communication de waapp sénégal fiara.01pptx
 
Impact des ta enjeux sur les céréales locales
Impact des ta enjeux sur les céréales localesImpact des ta enjeux sur les céréales locales
Impact des ta enjeux sur les céréales locales
 
ASPRODEB-Senegal: The management of certified groundnut seeds production by c...
ASPRODEB-Senegal: The management of certified groundnut seeds production by c...ASPRODEB-Senegal: The management of certified groundnut seeds production by c...
ASPRODEB-Senegal: The management of certified groundnut seeds production by c...
 
La promotion des micro et petites entreprises rurales : un moyen efficace pou...
La promotion des micro et petites entreprises rurales : un moyen efficace pou...La promotion des micro et petites entreprises rurales : un moyen efficace pou...
La promotion des micro et petites entreprises rurales : un moyen efficace pou...
 
Le FIDA en RDC - Echos dans la presse
Le FIDA en RDC - Echos dans la presseLe FIDA en RDC - Echos dans la presse
Le FIDA en RDC - Echos dans la presse
 
Atelier de partage sur le pratique de suivi évaluation des projets FIDA
Atelier de partage sur le pratique de suivi évaluation des projets FIDAAtelier de partage sur le pratique de suivi évaluation des projets FIDA
Atelier de partage sur le pratique de suivi évaluation des projets FIDA
 
Une expérience rurale novatrice : la production de semences certifiées d’arac...
Une expérience rurale novatrice : la production de semences certifiées d’arac...Une expérience rurale novatrice : la production de semences certifiées d’arac...
Une expérience rurale novatrice : la production de semences certifiées d’arac...
 
Forum PPAAO sur les technologies améliorées et la sécurité alimentaire
Forum PPAAO sur les technologies améliorées et la sécurité alimentaireForum PPAAO sur les technologies améliorées et la sécurité alimentaire
Forum PPAAO sur les technologies améliorées et la sécurité alimentaire
 
Village PPAAO à la FIARA - Seances de demonstration
Village PPAAO à la FIARA - Seances de demonstrationVillage PPAAO à la FIARA - Seances de demonstration
Village PPAAO à la FIARA - Seances de demonstration
 
Allocution abidjan
Allocution abidjanAllocution abidjan
Allocution abidjan
 
Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)
Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)
Food Facility: Documenting and closing workshop 21-23 march 2012 (Abidjan)
 
Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...
Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...
Facilité Alimentaire : Atelier de capitalisation et de cloture 21-23 mars 201...
 
Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...
Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...
Mauritanie - Programme de Lutte contre la Pauvreté Rurale par l’Appui aux Fil...
 
An overview of the Ghana national M&E system
An overview of the Ghana national M&E systemAn overview of the Ghana national M&E system
An overview of the Ghana national M&E system
 
Dossier : Les coopératives de producteurs de semences d'arachides au Sénégal
Dossier : Les coopératives de  producteurs de semences d'arachides au SénégalDossier : Les coopératives de  producteurs de semences d'arachides au Sénégal
Dossier : Les coopératives de producteurs de semences d'arachides au Sénégal
 
50. Rapport de la 2è réunion du comité de pilotage du Programme Facilité
50. Rapport de la 2è réunion du comité de pilotage du Programme Facilité50. Rapport de la 2è réunion du comité de pilotage du Programme Facilité
50. Rapport de la 2è réunion du comité de pilotage du Programme Facilité
 
Feed AFRICA N°1 - Entreprenariat Rural
Feed AFRICA N°1 - Entreprenariat RuralFeed AFRICA N°1 - Entreprenariat Rural
Feed AFRICA N°1 - Entreprenariat Rural
 

Último

ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 

Último (20)

ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 

Monitoring & Evaluation learning and exchange forum

  • 1. Report of the Monitoring and Evaluation Exchange and Learning Forum for IFAD Projects in Nigeria LAGOS, NIGERIA. 18th to 21st July 2011 Programme for support of monitoring and evaluation systems of IFAD funded Projects in Western and Central Africa (PROSUME) 1
  • 2. Table of Contents Chapter 1. Background, Goal and Objectives...................................................................... 4 Chapter 2: Forum Proceedings ........................................................................................... 6 Chapter 3: Analysis and Discussion of Results................................................................... 12 Chapter 4: Needs and Options for Sustainable M&E Capacity Development…………………... 25 Chapter 5: Recommendations on the Way Forward……………………………………………………….. 29 Annexes Annex 1: Sample Framework for Monitoring Implementation of the AWPB………………………30 Annex 2: List of Forum Participants…………………………………………………………………………………..31 2
  • 3. List of Tables Table 1: Analysis of Participants Expectations…………………………………………………….……..13 Table 2: M&E Experiences across Projects………………………………………………………………….15 Table 3: M&E Good Practices across Projects……………………………………………………………..16 Table 4: M&E Challenges across Projects…………………………………………………………………….16 Table 5: Emerging Issues across Projects……………………………………………………………………..17 Table 6: RIMS Level 2 Scoring………………………………………………………………………………………18 Table 7: Equivalent Scores for RIMS Rating and School grades…………………………………….25 Table 8: Individual technical support needs expressed by participants…………………………26 Table 9: Programme technical support needs expressed by participants………………………27 3
  • 4. Executive Summary The learning and exchange forum brought together monitoring and evaluation teams of IFAD programmes in Nigeria for joint reflection and exchange on the principal issues, challenges and way forward for good M&E in the programmes. The overall goal of the forum was to enhance and promote mutual learning and knowledge exchange on experiences, good practices and challenges facing M&E teams of IFAD funded Projects in Nigeria. The specific objectives were to: share project experiences and good practices; identify challenges and opportunities for improving performance; develop a framework and approach for monitoring the implementation of project Annual Work Plan and Budget (AWPB), develop a harmonized mechanism for streamlining indicators and evaluating emerging outcomes of project intervention; and develop a concerted framework for M&E support to concerned programmes. The forum was structured around an adult exchange and learning module that emphasized the effective participation of all participants in a series of plenary and group sessions facilitated by resource persons. Participants shared their challenges and experiences, and developed a framework for addressing their principal constraints to ensure effective and relevant M&E. The forum also reviewed and updated a framework for elaborating and monitoring the implementation of annual workplans and budgets (AWPBs) as a decision tool for management support. Participants also defined the way forward for sustainable M&E capacity building, including specific recommendations for a harmonized country approach for M&E support. 4
  • 5. Chapter 1: Background, goal and objective of the workshop 1.1 Background IFAD is supporting M&E capacity development of project teams through a grant for the implementation of a Program for Support of Monitoring and Evaluation Systems of IFAD funded projects in West and Central Africa (PROSUME/PASSE). As the grantee and implementing agency, the West Africa Rural Foundation (WARF) continues to engage IFAD country projects in identifying and addressing key challenges and issues that are relevant to developing capacities of M&E teams and consequently enhancing the performance of their M&E systems. An important element of the programme implementation strategy is a targeted approach, focusing on country projects to better address specific issues/needs and enhance the overall country M&E portfolio. The rationale is that common and country specific challenges are better addressed through a country focus that will promote mutual learning and the sharing of experiences and good practices in selected countries. In the framework of its implementation, PROSUME organized a monitoring and evaluation learning and exchange forum for IFAD projects in Nigeria. The forum, held in Lagos from the 18th to 21st July 2011, brought together 35 M&E and MIS personnel from the Community- Based Agricultural and Rural Development Programme (CBARDP), Community Based Natural Resource Management Programme-Niger Delta (CBNRMP-ND) and the Rural Finance Institution Building Programme (RUFIN). The forum was designed to promote mutual learning and exchange between M&E teams of IFAD funded projects in the country, enabling M&E teams of the three projects to share experiences on important issues and jointly reflect on strategies and the way forward for addressing project and country-specific M&E challenges. 1.2 Goal and Objectives The goal of the forum was to enhance and promote mutual learning and knowledge exchange on experiences, good practices and challenges facing M&E teams of IFAD funded Projects in Nigeria. The forum specifically permitted M&E teams to share project experiences and good 5
  • 6. practices; identify challenges and opportunities for improving performance; and develop a concerted framework for M&E support to concerned programmes. The forum also sought to develop a framework and approach for monitoring the implementation of project Annual Work Plan and Budgets (AWPB), and a harmonized mechanism for streamlining indicators and evaluating emerging outcomes of project intervention. 6
  • 7. Chapter 2: Forum Programme and Proceedings The workshop programme was divided into seven sessions, with an average of two sessions per day. The workshop programme is attached in annex (Annex 1). Details of the proceedings of the different sessions are discussed in the rest of this chapter. 2.1 Forum Proceedings SESSION 1: Official opening, introduction of participants, expectations, and objectives Goal: At the end of session 1, project participants, facilitators and resource persons were to clarify their expectations and to have a common understanding of the goal and objectives of the workshop. • Following registration, CBNRMP coordinated the official opening of the workshop. Welcome addresses were made by representatives of IFAD programmes in Nigeria and PASSE/PROSUME. • Forum participants introduced themselves and outlined their expectations (which were placed on SCORE CARDS for grouping). • The objectives and expected outputs of the forum were then presented and discussed. • This presentation was followed by tea break and a group photograph. SESSION 2: Presentation of M&E experiences, good practices and challenges Goal: The session was designed to enable participants to have a better understanding of the status of M&E systems of IFAD funded Programmes in Nigeria. This session focused on providing participants with the opportunity to share experiences and lessons on M&E, including current status and M&E support needs for each Programme. • Each Programme was allocated time to share information on its M&E system, focusing on the general M&E framework, experiences, good practices and challenges in the implementation and management of the system. 7
  • 8. The following guidelines were used in preparing Programme presentations: • What is the framework of your system/how is M&E organized in your project? • What interesting M&E experiences and good practices do you want to share with colleagues? • What are your key challenges/problems/difficulties in M&E implementation and management? • How are you addressing these challenges/problems/difficulties? • Each presentation was followed by a short exchange for clarifications and burning questions. • Participants were asked to note key issues emerging from each presentation, which were collected and grouped for further discussions and subsequent activities. • Workshop facilitators provided a synthesis of the presentations, highlighting key themes and synergy between Programmes. 8
  • 9. Notes • Responsibilities for daily rapporteuring was rotated between Programmes, with each Programme providing feedback each morning on daily processes, contents, timekeeping, achievements, etc. The final evaluation/feedback was provided on the afternoon of the last day. • After day 1, each day started with the feedback on proceedings of the previous day and an overview of plans for the day. The feedback was done by the daily rapporteurs and the overview undertaken by facilitators. • There was a daily wrap-up session for the first two days, focusing on a recap of key issues, actions, observations, comments and announcements • Day 3 ended with group sessions instead of the daily wrap-up • A general wrap-up was undertaken on day 4 SESSION 3: IFAD’s M&E Framework: Context and Issues in RIMS Reporting Goal: At the end of the session, participants were to have common comprehension of IFAD’s M&E framework, including the implications of RIMS for project M&E systems • This session started with an overview of IFAD’s M&E framework. The overview drew from IFAD’s M&E guide available online. The discussions highlighted issues of monitoring, evaluation and reporting, including the RIMS framework. • Discussions explored issues related to the monitoring and reporting on activities and outputs (RIMS Level I) as well as evaluation of outcomes (RIMS Level II) and impact (RIMS Level III). • The requirements for progress reports and annual RIMS reporting were also explored in this session. 9
  • 10. The second presentation focused on challenges in streamlining indicators for good M&E. This was a brainstorming session where projects and resource persons shared experiences on streamlining variables to ensure relevant and realistic M&E. • The subsequent presentation focused on capturing and processing data for outcome evaluation. This focused on RIMS level II reporting. Participants and resource persons brainstormed on the challenges and options for generating and processing data for level II reporting. • The final theme under this session explored project experiences in capturing and sharing success stories. The fundamental issue related to the role of M&E in the identification and analysis of success stories. What tools were available for this? • The session concluded with a general discussion of key issues emerging from the presentations. During this session, participants were challenged to reflect on their understanding of the following issues: • Working definitions of monitoring, evaluation and reporting • Key actors and their roles in monitoring • Implications of RIMS (Levels I, II and II) for projects/programmes • Organizational requirements for effective monitoring, evaluation and reporting • Challenges and options for capturing and reporting on outcomes • Generating and processing success stories: what role for M&E? SESSION 4: Monitoring the annual work programme and budget (AWPB) Goal: At the end of the session, participants were to appreciate the relevance of monitoring the implementation of the AWPB, and harmonize tools/methods for the process. 10
  • 11. The plenary presentation focused on assessing key issues and challenges in monitoring AWPBs • Tips on ensuring effective and relevant monitoring of AWPBs were highlighted • The discussion included a proposed format for monitoring the AWPB, including the roles and responsibilities of different categories of staff in the process • Hands-on group sessions were undertaken to allow participants to develop the frameworks for monitoring their programme AWPB • Participants then presented the framework for monitoring their AWPB Session 5: Presentation of group/individual reports Goal: At the end of the session, participants were to have an updated framework for monitoring project implementation during 2011, focusing on 2011 AWPBs, activities, and results. • During the session, each M&E team developed a framework for monitoring their programme AWPB, using the 2011 AWPB as a basis for the task. • One resource person was allocated to each team to provide needed support and guidance • Each M&E team presented its framework in a general session, and participants provided comments and suggestions on each framework. SESSION 6: RIMS reporting: Context, issues, procedures Goal: At the end of the session, participants were to have a better appreciation and understanding of RIMS reporting requirements and procedures • A plenary overview/introduction of annual RIMS reporting requirements and procedures were made by a facilitator/resource person • Discussions on requirements for RIMS levels I, II and III indicators 11
  • 12. Projects then exchanged their experiences, challenges and problems with RIMS reporting. This included a review of 2010 RIMS reports of the projects for tips and suggestions on addressing specific issues • Provided tips and suggestions on reporting procedures Session 7: Support needs and strategy for enhancing M&E performance Goal: Exchange on options and strategies for M&E support to Programmes • Projects highlighted their major M&E support needs. The project overviews presented on day 1 guided those presentations • WARF shared its strategy for M&E support to projects in West and Central Africa • The participants developed options for M&E support to projects. These options were to be subsequently presented to the IFAD CPM and project coordinators for a concerted M&E support strategy for Nigeria projects A general wrap-up and evaluation that touched on lessons, conclusions and the way forward was made by the facilitators on the last day, July 21, 2011. Official closing ceremony was held in which participants were presented with Certificate of Attendance from WARF. 12
  • 13. Chapter 3: Analysis and Discussion of Results 3.1 Analysis of participants’ expectations Participants were asked to write out one or more of their expectations from the forum. The analysis shows M&E systems/skills and knowledge exchange/sharing were the two dominant of the six categories of the expectations analyzed (Table 1 below). Table 1: Analysis of Participants Expectations SN CATEGORY OF EXPECTATIONS % 1 M&E systems/skills 32% 2 Knowledge exchange/sharing 29% 3 Understanding the RIMS 4% 4 Annual Work Plan & Budget (AWPB) 5% 5 Lessons from other projects 16% 6 Other expectations 14% 3.1.1 M&E Systems/Skills The various aspects of expression include the following: • More knowledge about M&E methodologies and process • More knowledge about evaluation and M&E in general • More knowledge about MIS • Knowledge on solutions and way forward for M&E challenges 3.1.2 Exchange/Sharing of knowledge The various aspects of expression for this expectation include the following: • More knowledge from peer projects at the forum 13
  • 14. Learn from colleagues their knowledge and experiences • Share best practices from the projects • Learn and exchange good practices of M&E • To pick up some good practices found in other projects 3.1.3 Understanding the RIMS reporting format The different types of expressions for this expectation include the following: • Understanding the RIMS reporting format at the three levels as per the revised version • A comprehensive understanding of the implications of RIMS for the M&E of IFAD projects 3.1.4 Annual Workplan and Budget (AWPB) The different types of expressions for this expectation include the following: • Come up with best framework for monitoring AWPB • Preparation of AWPB using the IFAD indicator based format • Learn the monitoring of AWPB 3.1.5 Lessons from other projects The different types of expressions for this expectation include the following: • Hope to acquire the best practices of others • Learn from other programmes their experiences in the field as it pertains to M&E • Lessons from each other to build up moral as an M&E officer • Know challenges facing other sister programmes • Learn good practices from other projects to enhance performance in my own project • Learn the successes achieved and the problems faced • Learn the challenges of the projects and way forward 3.1.6 Other Expectations 14
  • 15. The expressions in this category include the following: • to know the relevance of the forum as a catalyst for enhanced M&E delivery • to know all the participants that attended the forum • to improve on knowledge and experience at the end of the sessions In summary, the expectations expressed by an overwhelming majority of the participants are generally in tune with the objectives of the workshop which include: • Enhancing and promoting mutual learning and knowledge exchange on experiences, good practices and challenges facing M&E teams of IFAD funded Programmes in Nigeria, • Developing a framework and methodology for monitoring the implementation of programme AWPBs, a harmonized mechanism for streamlining indicators and evaluating emerging programme outcomes, and a concerted framework for M&E support to the concerned projects. 3.2. M&E experiences, good practices, challenges, emerging issues and Lessons 3.2.1. Synthesis of M&E experiences, good practices, and lessons Analysis of the presentations revealed a number of experiences, good practices and emerging issues that are common across the three Programmes. All the Programmes had the following common issues: • M&E transcends data collection to communication • Participatory approach - Stakeholders are involved in AWPB preparation • Challenge of capacity building • Common challenge in the interface between the M&E and other project components Detailed evaluation of Programme-specific experiences, good practices and emerging issues are summarized in the tables below. Table 2: M&E Experiences across Projects S/N Issue CBARDP CBNRMP RUFIN 1 CDD makes people work together X X x 2 Increased level of buy-in and Project Ownership X X Attitude adopted by communities 3 Up scaling of activities in non-project LGs X 15
  • 16. Table 3: M&E Good Practices across Projects S/N Issue CBARDP CBNRMP RUFIN 1 Participatory approaches X X X 2 Feedback mechanism by review meetings with all X X X stakeholders 3 Result based management X X X 4 Timely/Quick analysis of data as available & as soon X as received + continuous updating 5 Indicator-based AWPB + Indicator-based reporting; X X approval is not given to undesired activities as they are screened out if submitted by beneficiaries 6 Disaggregation of data by gender (male, female, X X X disadvantaged groups, etc) 7 Disaggregation of data on state, LG & national levels X X Table 4: M&E Challenges across Projects S/N Issue CBARDP CBNRMP RUFIN 1 Inadequate logistics including mobility X 2 Uncooperative attitudes and potential role conflicts X 3 Undue interference X X 4 Inadequate staffing/remuneration X X 5 Complexities inherent in participatory M&E using CDD X X approach 6 LG-level data collection is inadequate X 7 IT facilities inadequate X X 8 Unfamiliarity with some software (such as SPSS, X Access, Excel, etc) 9 Frequent changes in reporting formats by funding & X X X supervisory agencies 10 Untimely submission of reports X 11 Inadequate funding for activities including review X X X meetings & other activities 16
  • 17. Table 5: Emerging Issues across Projects: S/N Issues & Suggested Solution CBARDP CBNRMP RUFIN 1 Capacity of stakeholders in data collection and X X X management – project management to build up the capacity of staff 2 Implication of project components in M&E – Enhance X X X involvement in AWPB preparation and assessment; sensitization 3 Elaboration and Updating of M&E manual – WARF to X X X provide support to RUFIN; request similar modality for other programmes Way forward Re-sensitization and re-orientation of stakeholders at all levels Capacity building Strengthening of M&E systems Setting up of planning based on RIMS indicators and reporting format Access to ICT facilities 3.3. M&E in IFAD funded projects: Context and Issues Based on the forum goal of enhancing and promoting mutual learning and knowledge exchange on experiences, good practices and challenges facing M&E teams of IFAD funded Programmes in Nigeria and the expected forum outputs, participants were engaged in a review the fundamental Monitoring and Evaluation concepts with a view to enhancing their understanding of the critical role M&E plays in project management. The presentations addressed three basic themes – M&E framework, RIMS and data capturing. 3.3.1 M&E framework: The framework was explored using graphical illustration of the result chain to illustrate Input-Activities-Output-Outcome-Impact linkages as shown below: 17
  • 18. Participants appreciated the difference and linkage between planning for results and managing for results. 3.3.2 RIMS indicators: Contextualizing the Result and Impact Management System requires the understanding and interpretation of the three (3) levels of indicators. Extensive discussions were held to enhance the participants’ understanding of the three levels of indicators – Level 1 (output), Level 2 (outcome) and Level 3 (impact). Since at the project level the critical challenge is in the interpretation logic of Level 2 (Outcome), more time was spent on demonstrating the utility of the RIMS Level 2 using table 6 below: Table 6: RIMS Level 2 Scoring. NOTE EFFECTIVENESS SUSTAINABILITY 1 HIGHLY UNSATISFACTORY VERY WEAK 2 UNSATISFACTORY WEAK 3 MODERATELY UNSATISFACTOR Y MODEST 4 MODERATELY SATISFACTORY MODERATE 5 SATI SFACTORY STRONG 6 HIGHLY SATI SFACTORY VERY STRONG 18
  • 19. 3.3.3 Capturing data for project M&E: Building up from the understanding of the M&E results chain and concept of Result and Impact Management System (RIMS), discussions were held with regards to clearly indicating that project M&E must collect the necessary beneficiary and project data and information that will satisfy different stakeholders: fund providers, supervisory agencies (Government), beneficiaries as well as project managers. Three critical concepts were presented: a) Understanding the concept of indicator to mean quantitative or qualitative factor or variable that provides a simple and reliable means to measure achievement or to reflect the changes connected with an intervention. b) The general attributes of a good indicator in terms of ‘smart’ - specificity, measurability, attainable, relevance and time-bound, as well as in terms of ‘spiced’- subjectivity, participatory, easy to interpret, cross-checked, empowering and diverse. c) Understanding the different types of indicators based on the results chain: Inputs, Activities (process), Outputs, Outcomes and Impact. d) Aligning outputs to outcomes to enhance managing for results e) Evaluation of emerging and actual outcomes, undertaken by diverse groups of stakeholders using a combination of qualitative and quantitative data 3.4. Streamlining indicators for good M&E: Each project made a short presentation on their experiences in streamlining indicators to enhance focus and good M&E, using their project logframes as a basis. The presentations also allowed facilitators to gauge the participants’ understanding of reporting Monitoring and Evaluation Indicators using the logical framework matrix. It was evident that experiences and understanding varies both in terms of the process for streamlining indicators, and the formats and content of the logframe matrix. The ensuing discussions resulted in a better understanding of the different types of indicators (Inputs, Activities, Outputs, Outcomes and Impact), and appropriate mechanisms and 19
  • 20. procedures for streamlining indicators taking into consideration project components and reporting needs. Further discussions were held to enhance the understanding of the basic elements of the logframe which are: • The over-arching goal to which the project will contribute. • The development objective that will be achieved by the end of the project • The outcomes- changes directly attributable to outputs and strengthen the linkage between realisation of outputs and achievement of the development objective • The outputs- products, services or results that must be delivered by the project to achieve the outcomes and the development objective in the time and with the resources available • Activities- actions which the project takes in order to deliver the outputs. 3.5 Capturing and sharing success stories The programmes shared and exchanged lessons on one success story each to highlight the important role and interface of M&E min the identification and analysis of experiences and successes: 3.5.1 RUFIN RUFIN’s success story focuses on linking community rural microfinance institutions consisting of the principal targets of the project (women, youths and the physically challenged) to micro- finance banks and commercial banks in their operational zones in order to enhance their access to financial services. The testimony from a female poultry farmer who is also a member of a village savings and credit association (known as informal microfinance institutions) in Bauchi Local Government Area (LGA) of Bauchi State indicated that the initiative enabled her to obtain a 1 million naira loan from the Bauchi Investment Corporation, which she used to purchase over 20
  • 21. 20 bags of layers feed in advance for another layers breeding stock, something she could not do before the intervention. The project has enhanced her access to credit facilities which assisted her to expand her poultry business and have a buffer stock for her poultry for increased productivity, thereby contributing to revenue generation from her poultry production activity. This story demonstrates how the programme will lead to increased incomes of beneficiaries through enhanced access to financial services. 3.5.2 CBNRMP The success story of CBNRMP relates to how sustainable agriculture is contributing to raising the standard of living of rural populations, with emphasis on women and youths. The Oganihu Women Farmers Association located in one project State started with one hectare of Plantain plantation through the intervention of the programme. The harvest was so bounteous that the group realized enough money to rent another farm where Cassava was cultivated. Testimonies from the women suggest that increased income from plantain and cassava production through the CBNRMP intervention has improved their livelihoods, and that “they never had it so good prior to the intervention.” Other groups who did not show interest in farming initially are now calling the project intervention in their area, providing evidence of a potential spill-over effect of the project activities. 3.5.3 CBARDP: The success story of CBARDP focuses on the emergence of ‘Water Melon Millionaires’ in their intervention zones. Prior to program intervention, majority of the people in the community relied on the production of millet and sorghum during the raining season and moved to cities during the dry period as production of these staple crops couldn’t meet their year round food needs. Project intervention through introduction and support for water melon production during the dry season is fuelling the emergence of ‘water melon millionaires’ in some project intervention zones. As a result of this intervention, beneficiaries increased their incomes ten- fold from less than N 200,000 to more than N 2,000,000 per year. The rural-urban drift during the dry season has declined by 90%. A landless farmer testified to having recently purchased 21
  • 22. farmland worth N 750,000 using revenues generated from the project intervention in water melon production, providing evidence of the emergence of a new breed of ‘water melon millionaires’ in the project intervention zones. The beneficiary community has become a model and learning ground for water melon production in the region. 3.6 Preparing and monitoring the AWPB: Issues, challenges and tools In an attempt to put the issues on preparation and monitoring of AWPB in proper perspective, discussions concentrated on: the involvement of beneficiaries and the use of Community Action Plans (CAP) in the preparation of the AWPB; the formats/tools used in preparing the AWPB; the formats/tools for monitoring the AWPB and; challenges in preparing, implementing and monitoring the AWPB. It was clear that, since all the programmes are intervening through groups-applying the Community-Driven Development (CDD) approach, CAP is being used to prepare the AWPB after community needs assessments. In general, the AWPB contains the components’ activities, the location and the budgeted amount for each activity. However, the formats vary depending on which stakeholder the AWPB is being prepared for. Similarly, the formats /tools for monitoring the AWPB also varied depending on the needs of stakeholders and projects. There seemed to be no uniform standard tools for monitoring the AWPB and hence the introduction of the new tool was apt and relevant. Discussions on the new tool focused on explaining the following variables that are contained in the tool (Annex 2: proposed template for monitoring the AWPB). • Analytical Code • Component and Subcomponent • Activity (Number, Description, Location • Implementation period • Activity type • Quantitative achievement (Target, Actual, % Achievement) • Budget (Target, Actual % Achievement 22
  • 23. The Gap (% Financial Achievement minus % Physical Achievement) • The Red Flag Gap. Based on the understanding that the new tool is an excellent decision tool, further discussions were held to contextualize the following variables that participants needed further clarity pending further capacity development when the tool is implemented at project level. Training on the tools for monitoring the AWPB was identified as a capacity development priority for all projects. • Analytical Code: The derivation of the analytical codes was demonstrated using examples from the projects. • Activity type: As a descriptor to illustrate whether a particular activity should be classified either as a “process” or “quantity” to allow for objective interpretation of the % GAP setting of the Red Flag Gap • The rationale for the computation of the Gap based on the Input-Activities- output logic. The critical challenges that projects faced in the preparation, implementation and monitoring AWPB are: • Involvement of stakeholder communities in prioritizing their needs. • Variations in the preparation and monitoring tools. • Fund releases for the implementation of activities • Unavailability of adequate tools for monitoring of the AWPB 3.7 Annual RIMS reporting: experiences and challenges Presentations were made by the three Projects (CBNRMP, CBARDP and RUFIN) on their 2010 RIMS reports. The actual achievements recorded as compared to the AWPB target for the year (2010) on the first level (output) and second level (outcome) results were discussed for each of the three projects. 23
  • 24. The following common observations were noted: • All three Projects have demonstrated the task of managing for results • The outcome indicators were commonly applicable to CBARDP and CBNRMP, while most were not applicable to RUFIN which is in its first year of effective implementation. • Issues emerged on the RIMS level-2 in terms of assessing and rating Effectiveness and Sustainability. There was a critical challenge across board in determining the rating to be ascribed for the six categories of Effectiveness and sustainability. Following the Projects’ presentations, the RIMS format was reviewed in respect of the seven IFAD investment domains (Natural Resources - Land and water, Agricultural Production and Technologies, Rural Finance Services, Markets, Rural Enterprise and Employment Creation, Policies and Community Development, and Social Infrastructure). Exchanges were undertaken on rating Effectiveness and Sustainability in RIMS level 2 reporting. Tips included the use of simple procedure such as the school grading process in addition to the guidelines in the RIMS manual on methodological approaches. The table below was used to illustrate the school grading system which can complement the analytical approach for RIMS level 2 scoring. 24
  • 25. Table 7: Equivalent Scores for RIMS Rating and School grades RIMS Ranking Corresponding school grade Score Range (in %) 6 A 70% and above 5 B 60-69 4 C 50-59 3 D 40-49 2 E 30-39 1 F <30 Concluding the session, the participants were advised to apply the method most suitable to their context and circumstances; and there should be flexibility in combining qualitative and quantitative data from multiple sources for the ranking. 25
  • 26. Chapter 4 Needs and options for sustainable M&E Capacity Development Participants were asked to separately express their individual and corporate needs for M&E support. Analysis of the individual and project needs indicate their classification into four main categories, namely, information technology (IT); M&E related capacity development, working conditions/logistics support, and others. 4.1 Individual Technical support needs: On the perspective of individual needs, more knowledge/skills on information technology had the first priority, Logistics/Working Conditions support was second in rank, while capacity building on M&E came third (Table 8). It is to be noted here that the issue of logistics/working condition does not necessarily reflect a technical support need. Capacity in ICT and M&E can be combined into one group that addresses issues of M&E system development and management. With this grouping, it is clear that the priority concerns revolve around the development, operationalization and management of project M&E systems. Table 8: Individual technical support needs expressed by participants SN Issue TOTAL NO. % RANK 1 Information Technology 36 37% 1st 2 M&E capacity building 25 26% 3rd 3 Logistics/Working Conditions 29 30% 2nd 4 Others 7 7% 4th 26
  • 27. 4.2. Programme level technical support needs: At the project/programme level, more Logistics/Working Conditions support (again, this does not reflect a technical support need) had the first priority, capacity building on M&E came second in ranking, while knowledge/skills on information technology was fourth (Table 9). Table 9: Programme technical support needs expressed by participants: S/ Issue CBNRMP CBARDP RUFIN Project Total % Rank No not No. specified 1 Information 2 0 6 11 19 17% 4th Technology 2 M&E 5 1 6 11 23 21% 2nd capacity building 3 Working 12 3 20 13 48 44% 1st Conditions 4 Others 1 2 11 6 20 18% 3rd 4.3 Analysis of support types by group: The specific options expressed by the participants for the types of support required are as follows: Information Technology Options: • Web content management and website management and design • Training on computer software – Access, SPSS, Excel, etc as tools for data analysis • Training on systems management and organization M&E Capacity Building Options: • Improved knowledge on the use of the Revised RIMS format • M&E contemporary issues • Hands on M&E for result Based Reporting • International Training on Participatory M&E • Computerized Project Budget Monitoring Systems 27
  • 28. Data Management • Report Writing Techniques • Journalistic attitude as it pertains to data capture, management and communication Logistics/Working Conditions Options: • logistic support for monitoring - vehicles • Equipment (Laptops, Computers, printers, digital camera, internet modem, office stationery, flash drives, air-conditioners, photocopiers, etc) • More professional staff to assist on the jobs • GSM recharge cards for monthly subscription • Adequate and timely release of operational funds • Staff allowances reviewed upwards • Regular electricity support Other Support Options: • Training on Project/Programme Management • Minimizing role conflicts among project components • Gaining cooperation among staff • Inter-State tour to sister projects 4.4 PASSE/PROSUME framework for M&E Support: Participants were briefed on the existing modes of support to Projects through the Programme for Support of monitoring and evaluation systems of IFAD projects in West and central Africa, being implemented by the West Africa West Africa Rural Foundation (WARF). The goal of the programme is to improve the performance and impact of IFAD financed projects and programmes in West and Central Africa. Its specific objectives are to: Strengthen the capacities of project teams and key staff of the implementing Ministries in the field of monitoring and evaluation; improve the capacities of regional and local institutions in order to build a regional network of competences in monitoring and evaluation which is capable of 28
  • 29. supporting IFAD financed programmes and projects; disseminate pertinent information to assist project and programme directors take informed decisions thanks to an efficient monitoring and evaluation programme which takes into account gender issues and results targeting and; promote the learning and sharing of information, knowledge and good practices in matters of M&E and in so doing ensuring that aid becomes more efficient. WARF is providing direct and indirect technical support to projects through a number of initiatives that include coaching and mentoring support to targeted projects considered ‘at-risk’ and new projects (such as RUFIN), targeted national and regional workshops and the production and dissemination of learning materials and tools for M&E capacity development. 4.5 Suggestions on options for sustainable M&E capacity development: Participants suggested that making the training plans of WARF and PASSE available to projects would enable them build these activities into their AWPB. It was also noted that hands-on workshops and learning forums are much more adequate for capacity development. It was also suggested that based on its experience in the region, WARF should elaborate and provide to IFAD the principal M&E support needs and priorities of projects in the sub-region. For Nigeria projects specifically, participants identified direct M&E support to projects using the framework of PROSUME/PASSE support to RUFIN as the most appropriate mechanism for sustainable M&E capacity development. It is recommended that exchanges are initiated between the CPM/CPO, Project Coordinators and WARF to develop a mechanism for sustainable M&E support to all three projects using a combination of mechanisms including coaching/mentoring, peer exchanges and learning/exchange forums. 29
  • 30. Chapter 5: Recommendations on the way forward The recommendations that are put forward are based on the discussions that highlighted projects’ Monitoring and Evaluation capacity development needs and the role of WARF in meeting those needs. 5.1 M&E Capacity development: In addition to targeting specific country programme for the M& E capacity development intervention, a general framework should be developed for country programmes to benefit from M&E capacity building especially in nontraditional areas of Monitoring and Evaluation such as Outcome Mapping and Most Significant Change Analysis. The framework of PASSE/PROSUME, which is being used for M&E support to targeted projects in WCA, could be a basis for elaborating a sustainable M&E capacity development initiative for Nigeria Programmes. 5.2 Information technology Skills development support: The variations in individual and programme IT skills development needs make it difficult to have “one-size-fits-all” interventions. However it was generally recommended that specific IT skills should be developed that should focus on the working tools for implementing programme interventions (preparation and monitoring of AWPB), and capturing, analyzing and reporting programme results. IT skill gap analysis should be undertaken for the M&E staff in order to come up with specific capacity development interventions. 5.3 Programme Synergy: Country programmes need more synergies in order to learn the lessons of experiences from one another in capturing and documenting results of programme interventions. Specifically: • The original concept of forming Monitoring and Evaluation committee spearheaded by WARF should be reintroduced for the country programmes • Intra and inter-programmes Monitoring and Evaluation forum should also be implemented. 30
  • 31. ANNEX 1: Sample template for monitoring implementation of AWPB Gap Analytical Sub Activity Activity Activity Implementation Activity Achievement Achievement Red Flag Component Target Actual Budget Actual (%FA - Code Component Number Description Location period type (%) (%) Gap (%) %PA) COMPONENT A: Sub Component 1: A.1.1 A 1 1 A.1.2 A 1 2 A.1.3 A 1 3 Sub Component 2: A.2.1 A 2 1 A.2.2 A 2 2 A.2.3 A 2 3 Note: The sample template covers 1 project component with 2 subcomponents and 3 activities per subcomponent 31
  • 32. Annex 2: List of Forum Participants S/N Name Project/Organization Designation E-mail Address 1 Salisu B. Moh'd Ngulde CBARDP SMEO Borno ofngulde@yahoo.com 2 Abbas Hamza Shargalle CBARDP SMEO PSO abbashamza2006@yahoo.com 3 Dr. A. L. Ala CBARDP HM&E PSO alala20002003@yahoo.com 4 Ya'u Nuhu Katanga CBARDP SMEO Jigawa yaunuhu@yahoo.com 5 Amuwa Williams CBNRMP-ND M&EO Ondo amu.williams@yahoo.com 6 Clifford D. Ogbanga CBNRMP-ND M&EO Rivers cliffordogbanga@yahoo.com 7 Mohammed Ali CBARDP SMEO Yobe yobesso@yahoo.com 8 Jerus Uvieghara CBNRMP-PSO PM&E Asst/Data itisjerus@yahoo.com Analyst 9 Ufaruna Uneku A. (Mrs) RUFIN M&E Specialist unekuruna@yahoo.com 10 Paulina Iyenagbe (Mrs.) RUFIN MIS Assistant deinnerita@yahoo.com 11 Esther Bakwo RUFIN M&E Assistant estbak2007@yahoo.com Evaluation 12 Shehu Hamza RUFIN M&E Officer danshehulle@yahoo.com 13 Okonjo Chris NPAFS HME cuokonjo@yahoo.com 14 Maiwada Zubairu NPAFS M&E Specialist maiwadaz@yahoo.com 15 Mohamed Kebbeh WARF/PROSUME PSO mkebbeh@frao.info 32
  • 33. 16 A. A. Dankyi A. I. Consult Consultant dankyiaa@yahoo.com 17 Faith B. Nwinee CBNRMP-PSO Secretary nwineebfaith@yahoo.com 18 Ojiaka Obinna G. CBNRMP-ND (Imo) MISMEO obinojiaka@yahoo.com 19 Aliyu Abubakar RUFIN, Bauchi Data Mgt. Officer aliyuhabu32@yahoo.com 20 Rosemary Joseph Akpan RUFIN, Akwa Ibom Data Mgt. Officer rosejoe2011@yahoo.com 21 Akpama K. Reuben RUFIN, Bauchi M&E Assistant, kbourg05@yahoo.com North 22 Shobande A. Olushina RUFIN, Lagos Data Mgt. Officer justshinnee@yhoo.com 23 Ogieva Godfrey Ikuero CBNRMP-Edo M&E Officer gerolystic@yahoo.com 24 Ewor Myke Edet CBNRMP-Abia M&E Officer endomaedet02@yahoo.com 25 Aloba U. Meeting CBNRMP-Delta M&E Officer pri_ebipade@yahoo.com 26 Ogon Adolphus Robert CBNRMP-Bayelsa M&E Officer a.rogon@yahoo.com 27 Omede A. Odiba RUFIN, Owerri M&E Assistant, omedeson@gmail.com South 28 Aloysius D. Edet CBNRMP -Akwa Ibom MISMEO edetaloy@yahoo.com 29 Elder Ikongha, Odey CBNRMP-Cross River MISMEO Ojikongha@yahoo.co.uk Joseph 30 Sule John A. RUFIN, Abuja M&E Officer john.sule@aol.com 31 Akangbe Ibraheem RUFIN, Ibadan M&E Assistant ibrotech@live.com Middle-Belt 32 Oyebanji Jide RUFIN, Abuja Planning Officer oyeban101@yahoo.com 33
  • 34. 33 Ian Gbinigie CBNRMP- PSO M&EO/MIS ikian65@yahoo.com 34 Sahabi S. Wuya IFAD-CBARDP M&E Officer zmifadsso@yahoo.com 35 Sani Salihu A. M. IFAD CBARDP, SMEO sanisokoto@yahoo.com Sokoto 34