How to Plan, Implement and
        Manage a
    World-Class PMO
PMO Starter Toolkit




• Understand PMO Starter Kit White Paper

2. Share How to… Presentation

 3. Manage PMO Action Plan
So, you’ve decided to form a PMO…



Because you need to be able to answer questions like:

               Are we doing the right projects?
               Do we know the current status of the projects?
               Are we managing, escalating, and resolving project
               Issues?
               Do PMs have the right training?
               What is our overall resource utilization?

                                                  Now what?
PMO Roadmap




      1. Plan               2. Implement                3. Manage


1. Purpose & Goals       1. Job Descriptions &      1. Project Reviews
2. Scope & Maturity         Hiring                  2. Project Management
3. Service Offering      2. Project Portfolio          and Monitoring
                            Inventory & Analysis    3. Working with
4. Service Metrics
                         3. Methodology and            Governance
5. Business Processes
                            Standards Definition    4. Re-Validation with
6. Governance,
                         4. Skills Assessment and      Senior Leadership
   Stakeholders &
                            Development             5. Maturity Assessment
   Team Structure
                         5. PPM System Plan            and Development
7. Timeline/Milestones
8. Charter Document
   (summary of above)
Plan Phase Components


                                           2.
                     1. Plan                                  3. Manage
                                       Implement


         Key Plan Components          Key Questions Answered
Why?     1. Statement of purpose/     • What is the PMO's fundamental purpose and goals?
            goals
What?    2. Scope & target maturity   • What is the scope of the PMO based on organization
         3. Core services offerings     needs and target organizational maturity?
         4. Service metrics           • What core services will the PMO provide and how will
                                        success/value be measured?
How?     5. Business processes        • How will services be managed and delivered?
Who?     6. Governance                • Who does the PMO report to?
            Customers/Stakeholders    • Who are the PMO’s customers and stakeholders?
            PMO team structure        • Who comprises the PMO team (key roles, org chart)?
When?    7. Timeline/milestones       • When will the PMO be in business and when will the
                                        core services come online?
Summary 8. Charter                    • A simple one page summary document answering
                                        most/all of the above
1. Why: Create statement of purpose/goals


                                       2.
             1. Plan                                        3. Manage
                                   Implement


A simple statement of purpose and goals should serve as a guide
for the PMO team and as a core communications platform to
stakeholders. Potential goals include:

             Better alignment of project activity and business strategy and investments

             Implement a more consistent project management process and
             methodology

             Facilitate better collaboration and knowledge and best-practice sharing

             Ensure resource pool is trained and competent to meet evolving IT and
             business needs

             Better manage resource utilization and capacity

             Provide executive visibility to project, program and portfolio-level status,
             issues, risks, costs, etc.
2. What: Define Scope & Target Maturity


                                                  2.
                1. Plan                                                        3. Manage
                                              Implement

PMO Scope
                                                 * Example starting point and goal
                              GOAL*
    Portfolio
      Mgmt

    Program
       Mgmt

                NOW*
     Project
     Mgmt
                 1 Reactive




                               2 Repeatable




                                                   3 Pro-active




                                                                  4 Measured




                                                                                      Continuously
                                                                                      5
                                                                                        Improved
                              Organization Maturity Level
2. What: Define Scope & Target Maturity (cont.)
                      Assess current and target maturity level

                                                         2.
                            1. Plan                                              3. Manage
                                                     Implement

CMMI Maturity Level Definitions…
Methods                     Processes not         Commitment to          KPIs specified and     Extend processes to
undocumented;               consistently used,    documented             monitored regularly,   external entities,
Delivery, budgets,          projects regularly    standardized PM and    predictable and        state-of-the art
schedules                   exceed budgets,       delivery process       controlled delivery.   collaboration.
uncontrolled                schedule              company-wide

Next Level When

Methodology defined        Automated project      Automation of other    An Innovative          N/A
for project tracking       budgeting; risk,       functions such as      process improvement
scheduling, time,          issue, requirements    financial              culture is evident
tracking, resource         tracking; resource     management,
assignments, project       management             business process
oversight, support                                modeling
         1 Reactive




                                   2 Repeatable




                                                          3 Pro-active




                                                                                  4 Measured




                                                                                                                 5 Continuously
                                                                                                      Improved
2. What: Define Scope & Target Maturity (cont.)
        Define PMO Scope

                                                  2.
               1. Plan                                                        3. Manage
                                              Implement


PMO Scope
   Portfolio Benefits realization mgmt; knowledge mgmt,risks,
             definition, overall investments, benefits and
                                                           portfolio scope
     Mgmt performance monitoring
   Program Coordination of business and IT projects, program planning,
      Mgmt change/risk mgmt, coordination of project delivery and
               results measurement

    Project PM training, mentoring, coaching; budgets, scheduling,
    Mgmt resources deliverables, scope, risks and metrics.
                  1 Reactive




                               2 Repeatable




                                                  3 Pro-active




                                                                 4 Measured




                                                                                  5 Continuously
                                                                                    Improved
3. What: Identify Core Services Needed to
           Achieve Goal

                                         2.
                 1. Plan                                 3. Manage
                                     Implement

Potential core service
offerings:

                           Business Strategy Alignment

                   Methodology & Process Consistency

   Collaboration &         Professional/Organizational          Resource
  Knowledge Mgmt                  Development                  Management

          Project/Program/Portfolio Visibility and Coordination:
               Issues, Risks, Schedule, Costs, Quality…
3. What: Identify Core Services Needed to
    Achieve Goal (cont.)


             * Example core services identified to achieve goal

                                •   Basic strategy alignment/oversight
                                •   KM & Best Practice Repository
Portfolio                       •   Benefits realization tracking process
  Mgmt                          •   Portfolio-level metrics and
                                    dashboard



Program                         • Program planning services
   Mgmt                         • Program change and risk mgmt
                                  process


                                • Methodology & process consistency
 Project                        • PM training, mentoring coaching
 Mgmt                           • Time tracking and resource
                                  allocation process


             1. Reactive                     2. Repeatable
4. What: Define core service metrics


                                           2.
                    1. Plan                                 3. Manage
                                       Implement

    Potential Service                   Example Metrics/Success Criteria
Business Strategy        • # of projects aligned with key business strategies
Alignment                • Project health by strategy (# or %)
Methodology and process  • % projects following approved methodologies
consistency              • # or % of milestones or phases completed as planned
                         • % projects completed on time
Collaboration and        • # of best practice documents submitted to knowledge base
knowledge management • # or % of issues resolved leveraging lessons learned
Professional development • # of “certified” PMs or PMs trained in company process
                         • Training courses delivered
                         • % decrease in expenditures on contractor/outside help
Resource management      • % improvement in resource utilization
                         • % improvement in employee satisfaction
Issue & Risk management • # of issues reported; % reported issues resolved
                         • # of high-impact issues
                         • % of aged issues
5. How: Define business processes
                   (how services will be managed/delivered)

                                               2.
                      1. Plan                                        3. Manage
                                           Implement


Potential Service     Example Scope, Focus                      Target Delivery Mechanism
Business Strategy • Alignments to corporate            •   PPM system delivers strategy
Alignment           strategies                             alignment functionality using listings,
                                                           reports, and dashboards
Methodology and • Focus is on standards and            •   Methodology expertise and knowledge
process             methodologies for project              transfer delivered via training services
consistency         execution, risk identification,    •   Consistent delivery enforced by PPM
                    issue resolution                       system
Collaboration and • Best practice projects, tools      •   Globally accessible web-based
knowledge           and templates                          knowledge base leveraging PPM
management        • PPM community                          system document repository
Professional      • Methodology training and           • Delivered via blended learning
development         certification                        software platform (ILT + eLearning)
Resource          • Resource management will           • Core function of PPM software solution
management          initially focus on resource
                    assignment visibility and
                    basic resource utilization
6. Who: Define Governance, Stakeholders, and
         PMO Team Structure

                                     2.
               1. Plan                             3. Manage
                                 Implement



                                Example PMO Reporting Structure

                                             Leadership
Identify direct reporting                      Team
relationship and dotted-line
sponsors/champions (i.e.                       PMO               Business
                                              Director            Units
PMO customers)
Define organizational               PMO        PMO
                                                           Manager
structure and                      Trainer    Analyst

responsibilities                                               Program
                                                               Managers
Solicit and track stakeholder
agreement                                                       Project
                                                               Managers
7. When: Create Timeline and Identify Key
 Milestones

                                         2.
         1. Plan                                            3. Manage
                                     Implement


             Charter



Plan
       Initial Staff   Project        Methodology,
        On-board       Inventory &    PPM Solution,
                       Analysis       Skills Assessment



                               Implement

                                          Project Reviews          Revalidation with
                                           and Reporting           senior leadership


                                                            Manage
8. Publish Charter


                                               2.
                      1. Plan                                   3. Manage
                                           Implement



1. PMO Purpose & Goals                            4. PMO Processes
  • Concise statement of purpose and goals             • Description of how the PMO processes
2. PMO Scope and Focus                                   will be managed and delivered
  • Definition of the scope and focus of the      5. PMO Organization Structure
    PMO and target maturity level if                   • Description of organization structure and
    applicable                                           communications flow
3. Service Offering & Metrics                          • List of key personnel including PMO
  • Definition of service offerings (aligned             Sponsor(s) and stakeholders
    with PMO scope and target maturity)           6. PMO Authority
  • Service success criteria and metrics               • Statement of PMO authority
  • High-level timeline of key service delivery        • List of sponsor and key stakeholder
    milestones                                           signatories and/or charter
                                                         approvers
1. Plan   2. Implement   3. Manage
1. Define Key Roles/Job Descriptions


                                               2.
                        1. Plan                               3. Manage
                                           Implement


PMO Director                                      PM Manager/Support
Job Description: Sets strategic direction.        Job Description: Manages the PM resources
Defines, manages to and reports KPIs. Creates     and provides PM coaching and mentoring. May
and maintains tool, templates, best-practice      serve as PM resource for strategic projects.
and methodology documentation.                    Tracks organization-wide resource capacity
                                                  and utilization recommending optimal
                                                  allocation.


Training/Professional                             PMO Analyst
Development Manager                               Job Description: Maintains PMO dashboard
                                                  and reports. Assists project teams with
Job Description: Assesses organizational and
                                                  reporting and tracking. Provides systems
individual competency levels and skills to
                                                  support and administration (project inventory
determine needs. Designs and delivers
                                                  database, knowledge repository, collaboration
curriculum/service offering and certification
                                                  platform, etc.).
program.
2. Gather project Inventory and Analyze


                              2.
            1. Plan                      3. Manage
                          Implement



For every active and proposed project, the PMO should
gather:
              Project Name, Description and Scope
              Alignment (BU, program, portfolio, strategy, etc.)
              Project Type
              Project Personnel (PM, project sponsor, project team)
              Requestor and Internal Priority
              Dates
              Financials (budget, costs, ROI, approved changes)
              Outstanding Issues
2. Gather project Inventory and Analyze (cont.)


                                    2.
                1. Plan                        3. Manage
                                Implement




Analyze project
inventory to:                          Example Findings:
 1. Understand potential               • “Projects are not generally
    issues and opportunities             aligned with business
    that exist right now                 objectives”
 2. Generate baseline metrics          • “There are some common
    for future trend &                   project issues such as…”
    comparative analytics
                                       • “Projects with certain attributes
                                         such as [fill in the blank], are
                                         generally not on-time”
3. Define Key Methodologies and Standards


                                          2.
                    1. Plan                               3. Manage
                                      Implement


 Key Areas                    Description/Components                        Owner
Project          •Proprietary, off-the shelf/industry standard or blend
Methodology      •Deliverable templates [list both required and optional]
Risks            •Definition
                 •Trigger Event
                 •Management approach
Issues           •Definition
                 •Qualification (Exposure = $ Impact x %Probability)
                 •Assignment (one individual)
                 •Report Updates, Escalation, and Resolution
Change Control   •Definition
(optional)       •Planned and Actual Impact
                 •Approvals
4. Build skills assessment & development plan


                                      2.
                1. Plan                         3. Manage
                                  Implement


Potential PM skills assessment and development action plan
characteristics:
                     • Assessment of current project delivery skills
                          • Training and development plan implemented
                            in coordination with functional/resource
                            managers
                          • Training tracked in PPM solution
                          • Company PM certification program Implement
                            (optional)
                          • Development of feedback system to assess
                            training effectiveness
                          • All or some of above may be outsourced
5. Build a PPM System Plan


                                    2.
                 1. Plan                         3. Manage
                                Implement




                                       Example requirements:
Actions:                               ► Portfolio Dashboard with Project
  Evaluate and select a PPM              Health/Status
  system in consultation with          ► Portfolio Alignment
  stakeholders                         ► Rollups and Variances
  Offer Solution training to           ► Easy integration with installed
  everyone including the project         systems
  management process                   ► Integrated knowledge base for best
                                         practices, tools and training docs
                                       ► Training
1. Plan   2. Implement   3. Manage
1. Conduct Project Reviews


                                           2.
                   1. Plan                                    3. Manage
                                       Implement


Conduct periodic project and program
reviews that focus on:
    For Projects
      ► Consistent project planning, delivery and reporting
      ► Ensuring the project is focused on scope and objectives
      ► Task assignment and reporting process and results
      ► Issues and changes
      ► Project communication effectiveness
    For programs
      ► Master schedule and rollup of issues/costs
      ► Project dependencies being met and reported
    For both:
      ► Assess team skills and offer training as needed
2. Establish a Project Monitoring and
Management Model

                              2.
       1. Plan                             3. Manage
                          Implement




                          Monitor/
                           Detect


                       Reporting
                 •   Issues    • Quality
 Resolve/                                       Qualify/
 Mitigate        •   Risks     • Time
                                                Quantify
                 •   Costs     • Change
                 •   Resources


                        Communicate/
                          Escalate
3. Work with Governance


                                   2.
                1. Plan                         3. Manage
                               Implement



The PMO should stand ready to make project
recommendations in the following areas:
► Retaining
► Consolidating
► Reprioritizing and shifting project resources
► Killing projects based on metrics, duplications,
  alignment with corporate initiatives, revenue, and
  project resource availability
4. Re-validate with Senior Leadership


                                            2.
                    1. Plan                            3. Manage
                                        Implement


Questions the PMO should be able to
periodically answer:
  Are we providing value?
  Are any changes needed?
  Have we driven our organizations maturity to the next level?
  Can we answer the critical questions?
   ► Are we doing the right projects?
   ► Do we know the current status of all projects?
   ► Are we managing, escalating, and resolving project Issues?
   ► Do PMs have the right training?
   ► What is our overall resource utilization?
5. Mature your PMO


                                                               2.
                                  1. Plan                                                3. Manage
                                                           Implement


 Maturity                                                         Strategic       Effective
  Level             Key Process Area Concentrations                Focus             Span                   Next Phase when…

     5       • Value, Procurement, Outsourcing, and            Integration with Enterprise /    A whole new paradigm for Enterprise
Integrated     Contract Management                             Business         Industry –      PPM and governance is invented.
             • Business Continuity Planning                                     Strategy
             • PM Center of Excellence                                          Execution
   4         • Program Process, Vendor, Project Integration,   Dynamic          Multiple SBUs   Project success is the norm and little
Managed        and Staff Performance Management                Micro-Level      – Strategic     PMO resource goes to crisis
             • PM Career Path                                  Change,          Alignment       management. PMO established as focal
             • Best practices dissemination                    Continuous                       point for optimizing project execution
             • Enterprise-wide resource planning/mgmt          improvement                      performance enterprise-wide
    3        • PM Methodology                                  Static Macro-    Multiple        PMO viewed as an important link
 Defined     • Skills, Risk, Staff/Environment Resource,       Level Change     Programs or     between IT project/program delivery and
               Change, Conflict/Issue Management                                Portfolios      the business. PMO takes lead in
             • PM Training and Consulting                                                       objective setting and performance
             • Knowledge Management                                                             monitoring.
   2         • Planning, Tracking, Estimating, Risk            Stabilize        Multiple        PMO now viewed as Program or
 Stable        Identification, Schedule, Scope, Budget/Cost,   Performance,     Projects        Portfolio Management Office
               and Progress Reporting Skills                   Standardize      (Portfolio or
                                                               processes        Program)
    1        • Basic tools/techniques, methodologies,        Success            Individual      Start to see initial “pull” for PMO
  Initial      services, roles, standards established        Stories, Low-      Projects        services and info.
               (underlying disciplines may not be understood hanging fruit
               or consistently followed)
Get Started!
Questions?

Mais conteúdo relacionado

Mais procurados

Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Hussain Bandukwala
 
How to set up a project management office (PMO)
How to set up a project management office (PMO)How to set up a project management office (PMO)
How to set up a project management office (PMO)PM Majik
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmocrmackenzie
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardJavid Hamdard
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMOTURKI , PMP
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)Ricardo Viana Vargas
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off PresentationEbru Seiwert
 
ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiAli Kaabi
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
PPM and PMO In The Current Market
PPM and PMO In The Current MarketPPM and PMO In The Current Market
PPM and PMO In The Current Marketerwin_dunnink
 

Mais procurados (20)

The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
How to set up a project management office (PMO)
How to set up a project management office (PMO)How to set up a project management office (PMO)
How to set up a project management office (PMO)
 
Pmo Why?
Pmo Why?Pmo Why?
Pmo Why?
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmo
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid Hamdard
 
PMO services
PMO servicesPMO services
PMO services
 
Pmipmo
PmipmoPmipmo
Pmipmo
 
PMO Challenges and Opportunities; DIPMF Presentation
PMO Challenges and Opportunities; DIPMF PresentationPMO Challenges and Opportunities; DIPMF Presentation
PMO Challenges and Opportunities; DIPMF Presentation
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
 
041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
 
PMO Kick-Off Presentation
PMO Kick-Off PresentationPMO Kick-Off Presentation
PMO Kick-Off Presentation
 
ePMO Workshop - Ali Kaabi
ePMO Workshop - Ali KaabiePMO Workshop - Ali Kaabi
ePMO Workshop - Ali Kaabi
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
PPM and PMO In The Current Market
PPM and PMO In The Current MarketPPM and PMO In The Current Market
PPM and PMO In The Current Market
 

Destaque

How To Build A PMO
How To Build A PMOHow To Build A PMO
How To Build A PMOTURKI , PMP
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMOJack Brown
 
Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)Ricardo Viana Vargas
 
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017Association for Project Management
 
Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...
Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...
Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...Click Earn Grow
 
Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2Ravi M
 
[Ebook] implementing a ppm solution
[Ebook] implementing a ppm solution[Ebook] implementing a ppm solution
[Ebook] implementing a ppm solutionPlanningForce
 
IS3 FBR Division Overview
IS3 FBR Division OverviewIS3 FBR Division Overview
IS3 FBR Division Overviewmrsjennbrown
 
Strategic Benefits Mapping in the Public Service - Tanner James Webinar
Strategic Benefits Mapping in the Public Service - Tanner James WebinarStrategic Benefits Mapping in the Public Service - Tanner James Webinar
Strategic Benefits Mapping in the Public Service - Tanner James WebinarCarley McHugh
 
eCIO PPT What is a PMO
eCIO PPT What is a PMOeCIO PPT What is a PMO
eCIO PPT What is a PMODavid Niles
 
Project Benefits Realisation G Byatt
Project Benefits Realisation G ByattProject Benefits Realisation G Byatt
Project Benefits Realisation G ByattGareth Byatt
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service IntroductionKeith Rackley
 

Destaque (17)

How To Build A PMO
How To Build A PMOHow To Build A PMO
How To Build A PMO
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO
 
PMO 101
PMO 101PMO 101
PMO 101
 
Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)Types of Project Management Offices (PMO)
Types of Project Management Offices (PMO)
 
The Next Generation PMO - VIC
The Next Generation PMO - VICThe Next Generation PMO - VIC
The Next Generation PMO - VIC
 
Gartner pmo best in class
Gartner pmo best in classGartner pmo best in class
Gartner pmo best in class
 
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
 
Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...
Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...
Click Earn Grow 2009 Original Concept Next Generation Online Betting Technolo...
 
Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2Ravi Manickam_CV_Sep 2015 Ver 2
Ravi Manickam_CV_Sep 2015 Ver 2
 
[Ebook] implementing a ppm solution
[Ebook] implementing a ppm solution[Ebook] implementing a ppm solution
[Ebook] implementing a ppm solution
 
IS3 FBR Division Overview
IS3 FBR Division OverviewIS3 FBR Division Overview
IS3 FBR Division Overview
 
Strategic Benefits Mapping in the Public Service - Tanner James Webinar
Strategic Benefits Mapping in the Public Service - Tanner James WebinarStrategic Benefits Mapping in the Public Service - Tanner James Webinar
Strategic Benefits Mapping in the Public Service - Tanner James Webinar
 
eCIO PPT What is a PMO
eCIO PPT What is a PMOeCIO PPT What is a PMO
eCIO PPT What is a PMO
 
Project Benefits Realisation G Byatt
Project Benefits Realisation G ByattProject Benefits Realisation G Byatt
Project Benefits Realisation G Byatt
 
PMO Managed Service Introduction
PMO Managed Service IntroductionPMO Managed Service Introduction
PMO Managed Service Introduction
 
PMO as a service
PMO as a servicePMO as a service
PMO as a service
 
The Virtual PMO
The Virtual PMOThe Virtual PMO
The Virtual PMO
 

Semelhante a PC 2012 PMO plan

Death Of the PMO
Death Of the PMODeath Of the PMO
Death Of the PMOLarry Dukes
 
Mo v overview presentation 1.0
Mo v overview presentation 1.0Mo v overview presentation 1.0
Mo v overview presentation 1.0Robert Peopall
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability frameworkRobert Greca, PMP, SA
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOAnthony Natoli
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6Amit Gupta
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
PA-210-G1-Participatory Project Development Management.pptx
PA-210-G1-Participatory Project Development Management.pptxPA-210-G1-Participatory Project Development Management.pptx
PA-210-G1-Participatory Project Development Management.pptxMarivicPenarubia1
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution TrainingAminuddin Seth
 
PA-210-G1-Participatory Project Development Management.pdf
 PA-210-G1-Participatory Project Development Management.pdf PA-210-G1-Participatory Project Development Management.pdf
PA-210-G1-Participatory Project Development Management.pdfMarivicPenarubia1
 
Project Management Skills
Project Management SkillsProject Management Skills
Project Management SkillsRinie Altena
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410Saqib Imran
 
Project Management Process
Project Management ProcessProject Management Process
Project Management ProcessSaqib Raza
 

Semelhante a PC 2012 PMO plan (20)

Death Of the PMO
Death Of the PMODeath Of the PMO
Death Of the PMO
 
IT projects
IT projectsIT projects
IT projects
 
Mo v overview presentation 1.0
Mo v overview presentation 1.0Mo v overview presentation 1.0
Mo v overview presentation 1.0
 
Project management office value
Project management office valueProject management office value
Project management office value
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 
A project portfolio management capability framework
A project portfolio management capability frameworkA project portfolio management capability framework
A project portfolio management capability framework
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMO
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
PA-210-G1-Participatory Project Development Management.pptx
PA-210-G1-Participatory Project Development Management.pptxPA-210-G1-Participatory Project Development Management.pptx
PA-210-G1-Participatory Project Development Management.pptx
 
Entra lecture6 PM1.pdf
Entra lecture6 PM1.pdfEntra lecture6 PM1.pdf
Entra lecture6 PM1.pdf
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution Training
 
PA-210-G1-Participatory Project Development Management.pdf
 PA-210-G1-Participatory Project Development Management.pdf PA-210-G1-Participatory Project Development Management.pdf
PA-210-G1-Participatory Project Development Management.pdf
 
Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 
Project Management Skills
Project Management SkillsProject Management Skills
Project Management Skills
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
Pm training 1 18
Pm training 1 18Pm training 1 18
Pm training 1 18
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 

Último

"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 

Último (20)

"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 

PC 2012 PMO plan

  • 1. How to Plan, Implement and Manage a World-Class PMO
  • 2. PMO Starter Toolkit • Understand PMO Starter Kit White Paper 2. Share How to… Presentation 3. Manage PMO Action Plan
  • 3. So, you’ve decided to form a PMO… Because you need to be able to answer questions like: Are we doing the right projects? Do we know the current status of the projects? Are we managing, escalating, and resolving project Issues? Do PMs have the right training? What is our overall resource utilization? Now what?
  • 4. PMO Roadmap 1. Plan 2. Implement 3. Manage 1. Purpose & Goals 1. Job Descriptions & 1. Project Reviews 2. Scope & Maturity Hiring 2. Project Management 3. Service Offering 2. Project Portfolio and Monitoring Inventory & Analysis 3. Working with 4. Service Metrics 3. Methodology and Governance 5. Business Processes Standards Definition 4. Re-Validation with 6. Governance, 4. Skills Assessment and Senior Leadership Stakeholders & Development 5. Maturity Assessment Team Structure 5. PPM System Plan and Development 7. Timeline/Milestones 8. Charter Document (summary of above)
  • 5. Plan Phase Components 2. 1. Plan 3. Manage Implement Key Plan Components Key Questions Answered Why? 1. Statement of purpose/ • What is the PMO's fundamental purpose and goals? goals What? 2. Scope & target maturity • What is the scope of the PMO based on organization 3. Core services offerings needs and target organizational maturity? 4. Service metrics • What core services will the PMO provide and how will success/value be measured? How? 5. Business processes • How will services be managed and delivered? Who? 6. Governance • Who does the PMO report to? Customers/Stakeholders • Who are the PMO’s customers and stakeholders? PMO team structure • Who comprises the PMO team (key roles, org chart)? When? 7. Timeline/milestones • When will the PMO be in business and when will the core services come online? Summary 8. Charter • A simple one page summary document answering most/all of the above
  • 6. 1. Why: Create statement of purpose/goals 2. 1. Plan 3. Manage Implement A simple statement of purpose and goals should serve as a guide for the PMO team and as a core communications platform to stakeholders. Potential goals include: Better alignment of project activity and business strategy and investments Implement a more consistent project management process and methodology Facilitate better collaboration and knowledge and best-practice sharing Ensure resource pool is trained and competent to meet evolving IT and business needs Better manage resource utilization and capacity Provide executive visibility to project, program and portfolio-level status, issues, risks, costs, etc.
  • 7. 2. What: Define Scope & Target Maturity 2. 1. Plan 3. Manage Implement PMO Scope * Example starting point and goal GOAL* Portfolio Mgmt Program Mgmt NOW* Project Mgmt 1 Reactive 2 Repeatable 3 Pro-active 4 Measured Continuously 5 Improved Organization Maturity Level
  • 8. 2. What: Define Scope & Target Maturity (cont.) Assess current and target maturity level 2. 1. Plan 3. Manage Implement CMMI Maturity Level Definitions… Methods Processes not Commitment to KPIs specified and Extend processes to undocumented; consistently used, documented monitored regularly, external entities, Delivery, budgets, projects regularly standardized PM and predictable and state-of-the art schedules exceed budgets, delivery process controlled delivery. collaboration. uncontrolled schedule company-wide Next Level When Methodology defined Automated project Automation of other An Innovative N/A for project tracking budgeting; risk, functions such as process improvement scheduling, time, issue, requirements financial culture is evident tracking, resource tracking; resource management, assignments, project management business process oversight, support modeling 1 Reactive 2 Repeatable 3 Pro-active 4 Measured 5 Continuously Improved
  • 9. 2. What: Define Scope & Target Maturity (cont.) Define PMO Scope 2. 1. Plan 3. Manage Implement PMO Scope Portfolio Benefits realization mgmt; knowledge mgmt,risks, definition, overall investments, benefits and portfolio scope Mgmt performance monitoring Program Coordination of business and IT projects, program planning, Mgmt change/risk mgmt, coordination of project delivery and results measurement Project PM training, mentoring, coaching; budgets, scheduling, Mgmt resources deliverables, scope, risks and metrics. 1 Reactive 2 Repeatable 3 Pro-active 4 Measured 5 Continuously Improved
  • 10. 3. What: Identify Core Services Needed to Achieve Goal 2. 1. Plan 3. Manage Implement Potential core service offerings: Business Strategy Alignment Methodology & Process Consistency Collaboration & Professional/Organizational Resource Knowledge Mgmt Development Management Project/Program/Portfolio Visibility and Coordination: Issues, Risks, Schedule, Costs, Quality…
  • 11. 3. What: Identify Core Services Needed to Achieve Goal (cont.) * Example core services identified to achieve goal • Basic strategy alignment/oversight • KM & Best Practice Repository Portfolio • Benefits realization tracking process Mgmt • Portfolio-level metrics and dashboard Program • Program planning services Mgmt • Program change and risk mgmt process • Methodology & process consistency Project • PM training, mentoring coaching Mgmt • Time tracking and resource allocation process 1. Reactive 2. Repeatable
  • 12. 4. What: Define core service metrics 2. 1. Plan 3. Manage Implement Potential Service Example Metrics/Success Criteria Business Strategy • # of projects aligned with key business strategies Alignment • Project health by strategy (# or %) Methodology and process • % projects following approved methodologies consistency • # or % of milestones or phases completed as planned • % projects completed on time Collaboration and • # of best practice documents submitted to knowledge base knowledge management • # or % of issues resolved leveraging lessons learned Professional development • # of “certified” PMs or PMs trained in company process • Training courses delivered • % decrease in expenditures on contractor/outside help Resource management • % improvement in resource utilization • % improvement in employee satisfaction Issue & Risk management • # of issues reported; % reported issues resolved • # of high-impact issues • % of aged issues
  • 13. 5. How: Define business processes (how services will be managed/delivered) 2. 1. Plan 3. Manage Implement Potential Service Example Scope, Focus Target Delivery Mechanism Business Strategy • Alignments to corporate • PPM system delivers strategy Alignment strategies alignment functionality using listings, reports, and dashboards Methodology and • Focus is on standards and • Methodology expertise and knowledge process methodologies for project transfer delivered via training services consistency execution, risk identification, • Consistent delivery enforced by PPM issue resolution system Collaboration and • Best practice projects, tools • Globally accessible web-based knowledge and templates knowledge base leveraging PPM management • PPM community system document repository Professional • Methodology training and • Delivered via blended learning development certification software platform (ILT + eLearning) Resource • Resource management will • Core function of PPM software solution management initially focus on resource assignment visibility and basic resource utilization
  • 14. 6. Who: Define Governance, Stakeholders, and PMO Team Structure 2. 1. Plan 3. Manage Implement Example PMO Reporting Structure Leadership Identify direct reporting Team relationship and dotted-line sponsors/champions (i.e. PMO Business Director Units PMO customers) Define organizational PMO PMO Manager structure and Trainer Analyst responsibilities Program Managers Solicit and track stakeholder agreement Project Managers
  • 15. 7. When: Create Timeline and Identify Key Milestones 2. 1. Plan 3. Manage Implement Charter Plan Initial Staff Project Methodology, On-board Inventory & PPM Solution, Analysis Skills Assessment Implement Project Reviews Revalidation with and Reporting senior leadership Manage
  • 16. 8. Publish Charter 2. 1. Plan 3. Manage Implement 1. PMO Purpose & Goals 4. PMO Processes • Concise statement of purpose and goals • Description of how the PMO processes 2. PMO Scope and Focus will be managed and delivered • Definition of the scope and focus of the 5. PMO Organization Structure PMO and target maturity level if • Description of organization structure and applicable communications flow 3. Service Offering & Metrics • List of key personnel including PMO • Definition of service offerings (aligned Sponsor(s) and stakeholders with PMO scope and target maturity) 6. PMO Authority • Service success criteria and metrics • Statement of PMO authority • High-level timeline of key service delivery • List of sponsor and key stakeholder milestones signatories and/or charter approvers
  • 17. 1. Plan 2. Implement 3. Manage
  • 18. 1. Define Key Roles/Job Descriptions 2. 1. Plan 3. Manage Implement PMO Director PM Manager/Support Job Description: Sets strategic direction. Job Description: Manages the PM resources Defines, manages to and reports KPIs. Creates and provides PM coaching and mentoring. May and maintains tool, templates, best-practice serve as PM resource for strategic projects. and methodology documentation. Tracks organization-wide resource capacity and utilization recommending optimal allocation. Training/Professional PMO Analyst Development Manager Job Description: Maintains PMO dashboard and reports. Assists project teams with Job Description: Assesses organizational and reporting and tracking. Provides systems individual competency levels and skills to support and administration (project inventory determine needs. Designs and delivers database, knowledge repository, collaboration curriculum/service offering and certification platform, etc.). program.
  • 19. 2. Gather project Inventory and Analyze 2. 1. Plan 3. Manage Implement For every active and proposed project, the PMO should gather: Project Name, Description and Scope Alignment (BU, program, portfolio, strategy, etc.) Project Type Project Personnel (PM, project sponsor, project team) Requestor and Internal Priority Dates Financials (budget, costs, ROI, approved changes) Outstanding Issues
  • 20. 2. Gather project Inventory and Analyze (cont.) 2. 1. Plan 3. Manage Implement Analyze project inventory to: Example Findings: 1. Understand potential • “Projects are not generally issues and opportunities aligned with business that exist right now objectives” 2. Generate baseline metrics • “There are some common for future trend & project issues such as…” comparative analytics • “Projects with certain attributes such as [fill in the blank], are generally not on-time”
  • 21. 3. Define Key Methodologies and Standards 2. 1. Plan 3. Manage Implement Key Areas Description/Components Owner Project •Proprietary, off-the shelf/industry standard or blend Methodology •Deliverable templates [list both required and optional] Risks •Definition •Trigger Event •Management approach Issues •Definition •Qualification (Exposure = $ Impact x %Probability) •Assignment (one individual) •Report Updates, Escalation, and Resolution Change Control •Definition (optional) •Planned and Actual Impact •Approvals
  • 22. 4. Build skills assessment & development plan 2. 1. Plan 3. Manage Implement Potential PM skills assessment and development action plan characteristics: • Assessment of current project delivery skills • Training and development plan implemented in coordination with functional/resource managers • Training tracked in PPM solution • Company PM certification program Implement (optional) • Development of feedback system to assess training effectiveness • All or some of above may be outsourced
  • 23. 5. Build a PPM System Plan 2. 1. Plan 3. Manage Implement Example requirements: Actions: ► Portfolio Dashboard with Project Evaluate and select a PPM Health/Status system in consultation with ► Portfolio Alignment stakeholders ► Rollups and Variances Offer Solution training to ► Easy integration with installed everyone including the project systems management process ► Integrated knowledge base for best practices, tools and training docs ► Training
  • 24. 1. Plan 2. Implement 3. Manage
  • 25. 1. Conduct Project Reviews 2. 1. Plan 3. Manage Implement Conduct periodic project and program reviews that focus on: For Projects ► Consistent project planning, delivery and reporting ► Ensuring the project is focused on scope and objectives ► Task assignment and reporting process and results ► Issues and changes ► Project communication effectiveness For programs ► Master schedule and rollup of issues/costs ► Project dependencies being met and reported For both: ► Assess team skills and offer training as needed
  • 26. 2. Establish a Project Monitoring and Management Model 2. 1. Plan 3. Manage Implement Monitor/ Detect Reporting • Issues • Quality Resolve/ Qualify/ Mitigate • Risks • Time Quantify • Costs • Change • Resources Communicate/ Escalate
  • 27. 3. Work with Governance 2. 1. Plan 3. Manage Implement The PMO should stand ready to make project recommendations in the following areas: ► Retaining ► Consolidating ► Reprioritizing and shifting project resources ► Killing projects based on metrics, duplications, alignment with corporate initiatives, revenue, and project resource availability
  • 28. 4. Re-validate with Senior Leadership 2. 1. Plan 3. Manage Implement Questions the PMO should be able to periodically answer: Are we providing value? Are any changes needed? Have we driven our organizations maturity to the next level? Can we answer the critical questions? ► Are we doing the right projects? ► Do we know the current status of all projects? ► Are we managing, escalating, and resolving project Issues? ► Do PMs have the right training? ► What is our overall resource utilization?
  • 29. 5. Mature your PMO 2. 1. Plan 3. Manage Implement Maturity Strategic Effective Level Key Process Area Concentrations Focus Span Next Phase when… 5 • Value, Procurement, Outsourcing, and Integration with Enterprise / A whole new paradigm for Enterprise Integrated Contract Management Business Industry – PPM and governance is invented. • Business Continuity Planning Strategy • PM Center of Excellence Execution 4 • Program Process, Vendor, Project Integration, Dynamic Multiple SBUs Project success is the norm and little Managed and Staff Performance Management Micro-Level – Strategic PMO resource goes to crisis • PM Career Path Change, Alignment management. PMO established as focal • Best practices dissemination Continuous point for optimizing project execution • Enterprise-wide resource planning/mgmt improvement performance enterprise-wide 3 • PM Methodology Static Macro- Multiple PMO viewed as an important link Defined • Skills, Risk, Staff/Environment Resource, Level Change Programs or between IT project/program delivery and Change, Conflict/Issue Management Portfolios the business. PMO takes lead in • PM Training and Consulting objective setting and performance • Knowledge Management monitoring. 2 • Planning, Tracking, Estimating, Risk Stabilize Multiple PMO now viewed as Program or Stable Identification, Schedule, Scope, Budget/Cost, Performance, Projects Portfolio Management Office and Progress Reporting Skills Standardize (Portfolio or processes Program) 1 • Basic tools/techniques, methodologies, Success Individual Start to see initial “pull” for PMO Initial services, roles, standards established Stories, Low- Projects services and info. (underlying disciplines may not be understood hanging fruit or consistently followed)

Notas do Editor

  1. Pre-amble – assumptions about where org is wrt PMO: decision has been made, now what?
  2. This is your chance to engage/hook your audience. Ask the burning questions that you will be able to answer when your new PMO is up and running.
  3. These are the suggest 12 steps. You may want to modify by adding or deleting steps as appropriate for your organizational and cultural context. Implement
  4. Slides lists action items to be completed. If any of these items are complete, they may take a full slide to describe. PMO communications and leadership principles must be defined How will changes be communicated How will the decisions related to change be executed? Who keeps the PMO vision in everyone’s mind? 
  5. These are typical PMO benefits. You may need to build your own house. Business Alignment Manage project priorities matching business goals with appropriate solutions Methodology and Process Consistency : methodology and process for all project management engagements across the company Professional Development Train, certify if possible, coach, and mentor project managers in project management and delivery to ensure skill mastery and consistency in planning and execution  Resource Mgmt Provide increased resource utilization across the organization matching skills to project needs Reduce time to market by coordinating the right resources with the right skills for the projects Collaboration and Knowledge Mgmt Increase project collaboration Provide increased satisfaction with project-related work through increased communications, collaboration, training, and awareness Better manage and report on poject issues centrally Project/Program Collaboration & Coordination Provide centralized control, coordination, and reporting of scope, change, cost, risk, issues, and quality across all projects Reduce project costs because common tasks and redundant projects could be eliminated or managed at the central level Reduce corporate project risk
  6. These are typical PMO benefits. You may need to build your own house. Business Alignment Manage project priorities matching business goals with appropriate solutions Methodology and Process Consistency : methodology and process for all project management engagements across the company Professional Development Train, certify if possible, coach, and mentor project managers in project management and delivery to ensure skill mastery and consistency in planning and execution  Resource Mgmt Provide increased resource utilization across the organization matching skills to project needs Reduce time to market by coordinating the right resources with the right skills for the projects Collaboration and Knowledge Mgmt Increase project collaboration Provide increased satisfaction with project-related work through increased communications, collaboration, training, and awareness Better manage and report on poject issues centrally Project/Program Collaboration & Coordination Provide centralized control, coordination, and reporting of scope, change, cost, risk, issues, and quality across all projects Reduce project costs because common tasks and redundant projects could be eliminated or managed at the central level Reduce corporate project risk
  7. Slides lists action items to be completed. If any of these items are complete, they may take a full slide to describe. PMO communications and leadership principles must be defined How will changes be communicated How will the decisions related to change be executed? Who keeps the PMO vision in everyone’s mind? 
  8. Slides lists action items to be completed. If any of these items are complete, they may take a full slide to describe. PMO communications and leadership principles must be defined How will changes be communicated How will the decisions related to change be executed? Who keeps the PMO vision in everyone’s mind? 
  9. Slides lists action items to be completed. If any of these items are complete, they may take a full slide to describe. PMO communications and leadership principles must be defined How will changes be communicated How will the decisions related to change be executed? Who keeps the PMO vision in everyone’s mind? 
  10. If this is the plan for the plan than edit to show just action items planned (first bullet is draft example). If these Charter definitions are known, delete first bullet and report known data.
  11. Notes about Methodologies, Risk and Issues Methodologies are defined by the PMO. The PMO also gathers deliverable templates into Knowledge Base. Templates should be made available to all project teams. The best-practices should be used to update the knowledge base. Risks are things that MAY occur during a project. You should define what qualifies as a risk by type (e.g. schedule risk, financial risk, quality risk, etc.); define trigger events and management approach (e.g avoidance, transference, mitigation, acceptance). Monitor risks and if trigger Event occurs, manage as an issue. Issues are happening NOW and need to be assigned, managed, escalated and resolved. Assing one owner, manage, escalate and resolve, track all updates and aged issues.