Lean Six Sigma Improving FTX/STX2 Tank Draw Quality SFC Henry, Don H. II Project Initiation Date: 31/03/08 Control Tollgate Date: 25/09/08
Agenda ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Control – Executive Summary ,[object Object],[object Object],[object Object],[object Object]
Project Charter Review ,[object Object],[object Object],Problem/Goal Statement Tollgate Review Schedule Business Impact Core Team ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Tollgate Scheduled Revised   Complete Define: 04/30/08 -  04/29/08 Measure: 05/14/08 04/06/08   06/04/08 Analyze: 06/13/08 07/13/08  08/05/08 Improve:   07/18/08 08/13/08  09/05/08 Control: 08/23/08 09/13/08  09/29/08 ,[object Object],[object Object],[object Object],Problem Statement  Soldiers of 1/16 express dissatisfaction with the Unit Maintenance Activities M1 series tank quality prior to mission support. Currently, 90% of the tanks drawn require maintenance for mission readiness.  Approximately 10% of faults listed on the 5988-E ‘s completed by soldiers are tracked by UMA.  Lastly, tank bumper number accuracy during T-2 is currently at 10% which causes excess work in the last days of the mission support draw.
Measure Review Baseline Data Tools Used Process Capability Recommended Quick Wins/RIEs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Baseline   Quality #1:  To-date, 33% of tanks presented for draw are not ready for issue. Baseline Quality #2 : To-date, 10% of 5988-E faults annotated by soldiers during tank draw is updated by UMA clerks. Baseline Quality #3 : To-date, 67% of tank bumper numbers presented to 1/16 at T-2 by UMA is actually drawn for mission support. The current tank draw process is capable of issuing 2 tanks per hour with a 33% critical maintenance defect rate.
Analyze Review Impact of Root Causes:  Hypothesis Tests Tools Used Reducing List of Root Causes Prioritized Root Causes / Effects ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Improve Review “ To-Be” Process Map Implementation Plan Solution Selection Pilot Results Solution A = a 75 %  improvement in accuracy of bumper #’s (75% of 40%=30%) Solution B = a 50 %  improvement of maintenance quality (50% of 30%=15%) Solution C = a 50 %  improvement of vehicle tracking (50% of 30%=15%)  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],QAQC Maintenance Manager Dispatch Soldier Issues prescreened bumper number list to soldier Hand receipt Vehicle signed over to soldier Avg. Delay 30 min Soldier conducts PMCS and  updates  5988-E, turns it in to maintenance supervisor  Passes QAQC Receives signed QAQC sheet Vehicle dispatched to soldier YES NO NVA time is in dark blue,  Total delay time is reduced to .5 hours Retrieves info from RATSS system Notify UMA of the # of tanks needed Mechanics Maintenance manager checks bumper number list and 5988-E,  verifies faults and makes repairs if needed  Solutions Trackable Causes Accurate Bumper #’s 40% Increased quality  maintenance 30% Improved vehicle  tracking 30% Step Action/Task Responsible Accountable Consulted Informed 1 Updating the UMA EXSOP to reflect the new process 1/16 Maintenance Officer 1/16 Maintenance Officer UMA, 1/16 1/16 leadership, 1/16 soldiers, UMA personnel 2 Maintenance personnel PMCS training UMA Training manager UMA Program manager Human resources UMA leadership 3 Tracking board updates Maintenance leader Maintenance leader mechanics soldiers 4 5988-E updates UMA ULLS clerk Mechanics, Soldiers, ULLS clerks Mechanics, Soldiers, ULLS clerks 1/16 leadership, 1/16 soldiers, UMA personnel 5 Issue of bumper number list to Soldiers Maintenance leader Maintenance leader Mechanics/QAQC 1/16 leadership, 1/16 soldiers, UMA personnel 6
Process Control/Response Plan
Measurement System Analysis  ,[object Object],Type of Measurement Error Description Considerations to this Project Discrimination (resolution) The ability of the measurement system to divide measurements into “data categories” Work hours can be measured to .25 hours.  Tank draw times are measured to +- .25 hours.  Bias The difference between an observed average measurement result and a reference value No bias - Work hours and draw start-stop times consistent through the population.  Stability The change in bias over time No bias of work hours and draw data. Repeatability The extent variability is consistent Not an issue.  Labor and tank usage is based on course requirements, so it is historical and felt to be accurate enough for insight and analysis. Reproducibility Different appraisers produce consistent results Usage data deemed not reproducible, therefore was not considered in determining which were used during the tank draw Variation The difference between tanks Tanks are either Fully Mission Capable or Non Fully Mission Capable.
Standard Operating Procedures (SOPs) and Training Plans SOPs Requiring Revision Required Training SOPs Requiring Revision Responsible Status EXSOP Joe Massouda and MAJ Douglas Aydelott In process Required Training Responsible Status UMA employees (PMCS Training) Reed Lyons In Process 16 th  Cavalry Soldiers (PMCS Training) Various Troop Commanders In Process
Process Monitoring and Stabilization:  Visual Control Measures Takt time sheet to be used in vehicle issue times and monitor throughput
Process Monitoring and Stabilization:  Visual Control Measures Map board to be used in vehicle tracking and aid in bumper number accuracy
Transition to Process Owner:  RACI Chart R = Responsible  –   The person who performs the action/task. A = Accountable  – The person who is held accountable that the action/task is completed. C = Consulted  – The person(s) who is consulted before performing the action/task. I = Informed  – The person(s) who is informed after performing the action/task. Step Action/Task Responsible Accountable Consulted Informed 1 Map board updates Maintenance supervisor (UMA) Maintenance supervisor (UMA) Mechanics and soldiers 16 th  Cav Leadership and UMA program manager 2 Takt Time Sheet annotation Maintenance supervisor (UMA) Mechanics Maintenance supervisor (UMA) 16 th  Cav Leadership and UMA program manager 3 Bumper number list updates Maintenance supervisor (UMA) Mechanics and Maintenance supervisor (UMA) UMA program manager 16 th  Cav Leadership and UMA program manager 4 Maintenance training (UMA) UMA program manager UMA program manager UMA program manager 16 th  Cav Leadership 5 Maintenance training (soldiers) 16 th  Cav Leadership 16 th  Cav Leadership Unit Motor Officer Unit Motor Officer 16 th  Cav Leadership
[object Object],[object Object],[object Object],Transition to Process Owner:  Other Steps
Transition to Process Owner: Lessons Learned ,[object Object],[object Object],[object Object],[object Object],[object Object]
Project Replication Opportunities and Benefits ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Barriers/Issues/Project Action Log ,[object Object],[object Object],[object Object],[object Object],[object Object],Lean Six Sigma Project Action Log         Last Revised: 09/09/2008   No Description/ Recommendation Status  Open/Closed/Hold Due Date Revised Due Date Resp. Comments / Resolution 1 Leave of critical team member     14 May   4 May     2 Larger multi-colored Push Pins Closed  9 Sep.  n/a   SFC Henry Identified on 3 Sep.  3 Investigate possible IT tracker   Open   TBD     UMA program Manager   4           5          
Next Steps ,[object Object],[object Object],[object Object]
Project Contributors Team Member Project Contribution Andre Mackey, MAJ Champion Douglas Aydelott, MAJ Assistant Champion   Joe Massouda, Program Manager Process Owner Reed Lyons, Supervisor Subject Matter Expert (SME) Richard Pryor, Basic Issue Items  SME Don Henry, SFC Black Belt  (Project Leader) Nathan Sprague Master Black Belt These team members contributed to the success of this project!
Analyze Storyboard Define Project Charter T-6  IPR T2T RATSS T-5 T2T T-4 T2T T-3 T2T T-2 IPR  vehicle Bumper #s Given to unit T-1 Tank draw, HETT, 5988-E update Measure BII draw measured Tank draw measured 5988-E updates measured RIE Baselines  collected Critical X’s Identified Potential Root Causes Identified Root Causes Prioritized Analyze Improve Potential solutions identified Pilot test/results Implementation Plan developed Control Update SOP’s Train, train, train Process owner takes over! Problem: Poor tank quality at issue Goal: Improve tank quality at issue,  Reduce rework, improve fault tracking Non-quantifiable Benefits Morale, tank maintenance, fault tracking Step Action/Task Responsible Accountable Consulted Informed 1 Updating the UMA EXSOP to reflect the new process 1/16 Maintenance Officer 1/16 Maintenance Officer UMA, 1/16 1/16 leadership, 1/16 soldiers, UMA personnel 2 Hiring of more maintenance personnel UMA Hiring manager UMA Program manager Human resources UMA leadership 3 Tracking board updates Maintenance leader Maintenance leader mechanics soldiers 4 5988-E updates UMA ULLS clerk Mechanics, Soldiers, ULLS clerks Mechanics, Soldiers, ULLS clerks 1/16 leadership, 1/16 soldiers, UMA personnel 5 Issue of bumper number list to Soldiers Maintenance leader Maintenance leader Mechanics/QAQC 1/16 leadership, 1/16 soldiers, UMA personnel 6
Sign Off ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CW4 David Lucy Resource Manager/Finance COL Leopoldo Quintas  Deployment Director  SFC Don H. Henry II  Black Belt Nathan Sprague Master Black Belt MAJ Andre L. Mackey  Sponsor / Process Owner
Control  Tollgate Checklist ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Has the team implemented the solution, and a control plan to insure the process is robust to change? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Tollgate Review Stop
 

Mais conteúdo relacionado

Mais procurados

Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakharMohammad IFTAKHAR
 
Developing Metrics and KPI (Key Performance Indicators
Developing Metrics and KPI (Key Performance IndicatorsDeveloping Metrics and KPI (Key Performance Indicators
Developing Metrics and KPI (Key Performance IndicatorsVictor Holman
 
Measurement System Analysis - Module 1
Measurement System Analysis - Module 1Measurement System Analysis - Module 1
Measurement System Analysis - Module 1Subhodeep Deb
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Simon Misiewicz
 
KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)
KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)
KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)André Lima
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)Md.Muzahid Khan
 
Gr&r studies
Gr&r studiesGr&r studies
Gr&r studiesshilpi020
 
Applying PDCA, A3 Thinking & Problem Solving
Applying PDCA, A3 Thinking & Problem SolvingApplying PDCA, A3 Thinking & Problem Solving
Applying PDCA, A3 Thinking & Problem SolvingLean Enterprise Academy
 

Mais procurados (20)

6 sigma
6 sigma6 sigma
6 sigma
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Developing Metrics and KPI (Key Performance Indicators
Developing Metrics and KPI (Key Performance IndicatorsDeveloping Metrics and KPI (Key Performance Indicators
Developing Metrics and KPI (Key Performance Indicators
 
Dmaic
DmaicDmaic
Dmaic
 
Measurement System Analysis - Module 1
Measurement System Analysis - Module 1Measurement System Analysis - Module 1
Measurement System Analysis - Module 1
 
FMEA Analysis Cycle
FMEA Analysis CycleFMEA Analysis Cycle
FMEA Analysis Cycle
 
Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase Lean, Six Sigma, ToC using DMAIC - Measure phase
Lean, Six Sigma, ToC using DMAIC - Measure phase
 
A3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John KiffA3 Thinking Masterclass by John Kiff
A3 Thinking Masterclass by John Kiff
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)
KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)
KMM - Modelo de Maturidade Kanban - v.1.1 (Pt-br)
 
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh AroraThe Basics 7 QC Tools - ADDVALUE - Nilesh Arora
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Tollgate Presentation
Tollgate PresentationTollgate Presentation
Tollgate Presentation
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
PFMEA
PFMEAPFMEA
PFMEA
 
Gr&r studies
Gr&r studiesGr&r studies
Gr&r studies
 
Applying PDCA, A3 Thinking & Problem Solving
Applying PDCA, A3 Thinking & Problem SolvingApplying PDCA, A3 Thinking & Problem Solving
Applying PDCA, A3 Thinking & Problem Solving
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 

Semelhante a Control Tollgate

Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgatedonhhenry
 
Define Tollgate
Define TollgateDefine Tollgate
Define Tollgatedonhhenry
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgatedonhhenry
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxIsmailJulaihi
 
planning maintenance system for engineers
planning maintenance system for engineersplanning maintenance system for engineers
planning maintenance system for engineersZiad Salem
 
Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Stephen Crowell
 
Aircraft maintenance programme
Aircraft maintenance programmeAircraft maintenance programme
Aircraft maintenance programmeS P Singh
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sampleantonioharenas
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyWaseem Akram
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTRIrfan Rasheed Rana
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)Timothy Wooi
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics ReportingTSSParatransit
 
Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10United States Marine Corps
 
Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10United States Marine Corps
 
Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)Rakesh Raja
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementsmumbahelp
 

Semelhante a Control Tollgate (20)

Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgate
 
Define Tollgate
Define TollgateDefine Tollgate
Define Tollgate
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgate
 
TYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptxTYPE OF WORLD CLASS MAINTENANCE.pptx
TYPE OF WORLD CLASS MAINTENANCE.pptx
 
planning maintenance system for engineers
planning maintenance system for engineersplanning maintenance system for engineers
planning maintenance system for engineers
 
Crowell's Resume NOV 2014
Crowell's Resume NOV 2014Crowell's Resume NOV 2014
Crowell's Resume NOV 2014
 
Aircraft maintenance programme
Aircraft maintenance programmeAircraft maintenance programme
Aircraft maintenance programme
 
Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case Study
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
 
Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10Manpower and training ipt lvsr presentation 21 july 10
Manpower and training ipt lvsr presentation 21 july 10
 
Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10Manpower and Training IPT LVSR presentation 21 July 10
Manpower and Training IPT LVSR presentation 21 July 10
 
Reliability Engineer
Reliability EngineerReliability Engineer
Reliability Engineer
 
Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)Capa ppt. ( for jan '17)
Capa ppt. ( for jan '17)
 
Cmp presentation 3 21-16
Cmp presentation 3 21-16Cmp presentation 3 21-16
Cmp presentation 3 21-16
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 

Último

Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 

Último (20)

Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 

Control Tollgate

  • 1. Lean Six Sigma Improving FTX/STX2 Tank Draw Quality SFC Henry, Don H. II Project Initiation Date: 31/03/08 Control Tollgate Date: 25/09/08
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 9.
  • 10. Standard Operating Procedures (SOPs) and Training Plans SOPs Requiring Revision Required Training SOPs Requiring Revision Responsible Status EXSOP Joe Massouda and MAJ Douglas Aydelott In process Required Training Responsible Status UMA employees (PMCS Training) Reed Lyons In Process 16 th Cavalry Soldiers (PMCS Training) Various Troop Commanders In Process
  • 11. Process Monitoring and Stabilization: Visual Control Measures Takt time sheet to be used in vehicle issue times and monitor throughput
  • 12. Process Monitoring and Stabilization: Visual Control Measures Map board to be used in vehicle tracking and aid in bumper number accuracy
  • 13. Transition to Process Owner: RACI Chart R = Responsible – The person who performs the action/task. A = Accountable – The person who is held accountable that the action/task is completed. C = Consulted – The person(s) who is consulted before performing the action/task. I = Informed – The person(s) who is informed after performing the action/task. Step Action/Task Responsible Accountable Consulted Informed 1 Map board updates Maintenance supervisor (UMA) Maintenance supervisor (UMA) Mechanics and soldiers 16 th Cav Leadership and UMA program manager 2 Takt Time Sheet annotation Maintenance supervisor (UMA) Mechanics Maintenance supervisor (UMA) 16 th Cav Leadership and UMA program manager 3 Bumper number list updates Maintenance supervisor (UMA) Mechanics and Maintenance supervisor (UMA) UMA program manager 16 th Cav Leadership and UMA program manager 4 Maintenance training (UMA) UMA program manager UMA program manager UMA program manager 16 th Cav Leadership 5 Maintenance training (soldiers) 16 th Cav Leadership 16 th Cav Leadership Unit Motor Officer Unit Motor Officer 16 th Cav Leadership
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19. Project Contributors Team Member Project Contribution Andre Mackey, MAJ Champion Douglas Aydelott, MAJ Assistant Champion Joe Massouda, Program Manager Process Owner Reed Lyons, Supervisor Subject Matter Expert (SME) Richard Pryor, Basic Issue Items SME Don Henry, SFC Black Belt (Project Leader) Nathan Sprague Master Black Belt These team members contributed to the success of this project!
  • 20. Analyze Storyboard Define Project Charter T-6 IPR T2T RATSS T-5 T2T T-4 T2T T-3 T2T T-2 IPR vehicle Bumper #s Given to unit T-1 Tank draw, HETT, 5988-E update Measure BII draw measured Tank draw measured 5988-E updates measured RIE Baselines collected Critical X’s Identified Potential Root Causes Identified Root Causes Prioritized Analyze Improve Potential solutions identified Pilot test/results Implementation Plan developed Control Update SOP’s Train, train, train Process owner takes over! Problem: Poor tank quality at issue Goal: Improve tank quality at issue, Reduce rework, improve fault tracking Non-quantifiable Benefits Morale, tank maintenance, fault tracking Step Action/Task Responsible Accountable Consulted Informed 1 Updating the UMA EXSOP to reflect the new process 1/16 Maintenance Officer 1/16 Maintenance Officer UMA, 1/16 1/16 leadership, 1/16 soldiers, UMA personnel 2 Hiring of more maintenance personnel UMA Hiring manager UMA Program manager Human resources UMA leadership 3 Tracking board updates Maintenance leader Maintenance leader mechanics soldiers 4 5988-E updates UMA ULLS clerk Mechanics, Soldiers, ULLS clerks Mechanics, Soldiers, ULLS clerks 1/16 leadership, 1/16 soldiers, UMA personnel 5 Issue of bumper number list to Soldiers Maintenance leader Maintenance leader Mechanics/QAQC 1/16 leadership, 1/16 soldiers, UMA personnel 6
  • 21.
  • 22.
  • 23.  

Notas do Editor

  1. Expectations from the Measure Phase A detailed process map has been developed by the team and reflects key customer requirements and process variables. Key input, process and output metrics have been identified for data collection (potential Critical X’s) The relationship between process inputs and customer requirements has been investigated to provide a direction for the Analysis Phase. Special cause variation is reduced/removed providing an accurate picture of the process. A measurement system is in place and it’s error is understood. Baseline capability has been established and a path forward has been identified. A detailed project plan for the next phase exists, is realistic and reflects a more accurate financial impact statement. Who Should Attend Green Belt or Black Belt Required Project Leader Required Project Sponsor Required Process Owner Required (if not = Project Sponsor) Project Team Nice to have; Required for M, A, I, and C Stakeholders Required/Strongly Recommended Deployment Director Recommended Senior Management As possible or at DD request Master Black Belt Strongly Recommended (if available to attend)