                            Demystifying Outsourcing and Global Services Delivery


Ramesh Adavi
Sr. Consultant
Prabhas Sinha
Product Marketing Manager
Digité Inc.
82 Pioneer Way
Mountain View, CA 94041




                            Optimizing the SERVICES VALUE CHAIN has emerged as the most powerful lever, for improving
                            business performance.

                            This white-paper, takes a look at the important issues and drivers, of the global services industry,
                            and suggests a few best practices. Six Sigma, LEAN and Critical Chain project Management
                            concepts have proven themselves in manufacturing. They can and should be applied to services
                            delivery as well.

                            THE OUTSOURCING PARADIGM

                            Outsourcing is now the universally accepted solution for enhancing service delivery and
                            improving bottom-line performance. After accounting for transition costs and associated risks, net
                            cost savings of 30%-35% are achievable.

                            The top three business benefits of outsourcing are (source www.ventoro.com):
                            l  46% of the benefit value due to re-engineering business processes (a case for BUSINESS
                              PROCESS MANAGEMENT).
                            l 45% due to improvement in delivery execution (improved quality, reduced delays, shorter
                              time-to-market).
                            l Only 9% due to labor cost differences.


                            Surprisingly, low cost labor is not the only reason why outsourcing is here to stay

                            BUSINESS PROCESS MANAGEMENT (BPM)

                            BPM is clearly the “hottest” area in service delivery.
                            Points to consider are:

                            PROCESS VALUE-ENGINEERING

                            Not all processes (and activities) are “valuable”. The customer must decide the value.
                            v Processes must be categorized as
                                             l VALUABLE / BILLABLE, if a customer will pay (say at an hourly rate)
                                             l MANDATORY, those processes which are not “billable”, but considered




        www.digite.com                                     1                             Copyright 2005 Digité, Inc. All rights reserved.
diginotes


                                       essential for administrative control or regulatory compliance
                                   l    WASTE, none of the above.
                  Processes such as approvals, hand-offs, inspections, are a WASTE. Unless the customer has
                  explicitly agreed to pay for them (wishful thinking!), or there is a MANDATORY requirement to
                  retain them.

                  Clearly, there is very little room for bureaucracy in services organizations. Overdoing the quality
                  bit, over-reporting, and the such-like, are symptomatic of waste, which could ironically be
                  rewarded!

                  v Co-relate SERVICE LEVELS with VALUE

                                   l BASIC SERVICE LEVEL as per contracted terms with customer
                                   l INCREMENTAL SERVICE LEVEL there is a perceived benefit in providing
                                     beyond BASIC level. For e.g. incentives for delivery schedule improvement.
                                   l DELIGHT by design, incorporate processes, which beget superlatives from
                                     the customer. The benefits are not necessarily evident in the short term.
                                     Nevertheless, the long term value of such processes must be qualified.

                  v Processes must be close to the customer.

                                   l Value is co-created with the customer, by the “foot soldiers”. Not by
                                     supervisors. Empowerment of customer facing teams is of paramount
                                      importance.
                                   l Opportunities for SELF-SERVICE processes, with an enhanced USER
                                      EXPERIENCE, must be aggressively considered. Internet banking is case
                                      in point. e-LEARNING is fast proving a point.


                  PROCESS PERFORMANCE MEASURES

                  For the (valuable) processes which are retained, measures must be established.
                  Useful process performance measures are:

                  v   CYCLE TIME
                                Elapsed time, from start to finish of the process / activity / task / project.

                  v   PROCESS CYCLE EFFICIENCY (PCE)
                               PCE = (VALUE ADDED Time) / (Total CYCLE TIME)
                               VALUE ADDED time represents, the time spent by a person on the activity for
                               which a customer will pay (Billable activity). Many BPOs operate at PCEs as low
                               as 10%. A PCE of 50% , though considered top-of-the-line, is achievable.
                               Substantial productivity benefits are waiting to be picked up here.

                                   Common reasons for low PCE are:
                                   l Waiting for work to be assigned
                                   l Seeking clarification
                                   l Transportation e.g. papers for signature
                                   l Human nature
                                         o Parkinson's Law work expands to fill the time
                                         o Students Syndrome leave it till the last day (of the exam)

                                            Tasks must not be allocated too much in advance, or with very big
                                            safety margins.


                  v   WORK-IN-PROCESS (WIP).
                                WIP is the number of pending tasks / activities with a person. Multi-tasking has
                                detrimental effect on overall throughput. Add to it the costs of frequent
                                changeovers between tasks. Even work quality suffers, when a person tries to
                                do too many things at a time.
                                In particular, WIP on STRATEGIC RESOURCES must be continuously tracked.
                                Strategic resources are those that yield high value (billable rate), and are critical
                                to the success of a project. Chances are that STRATEGIC RESOURCES are
                                heavily loaded, and are on one or more CRITICAL CHAINS.


 www.digite.com                                 2                              Copyright 2005 Digité, Inc. All rights reserved.
diginotes


                  v SET-UP TIME.
                                   Set-up procedures, such as PROJECT INITIATION, ACTIVITY TYPE / TASK
                                   TYPE CHANGE OVER; have inherent penalty costs. Typically, 15-30% of
                                   overall process costs are attributed to set-up costs. For which customers don't
                                   pay.

                  v PROCESS COST

                                   PROCESS COST = (CYCLE TIME) X (RESOURCE COST RATE*)
                  *Note: Only direct cost has been considered, in which, the cost of the most significant resource is
                  considered, typically person-time.

                                   Ways to reduce PROCESS COSTS are:
                                   l Reduce resource cost by outsourcing to cheaper destinations. But this is
                                      only one of the ways

                                   l CYCLE TIME reduction
                                        o WASTE (and DELAY) reduction
                                        o SET-UP time reduction
                                   l PCE improvement


                  PROCESS MATURITY

                  Indicators of PROCESS MATURITY are:

                  v VARIABILTY on key PROCESS PERFORMANCE MEASURES

                          Immature processes have large variability on key measures such as CYCLE TIME and
                          PROCESS COSTS. And they in turn reflect an unstable operation!
                          l Deming has declared that a process is statistically stable, on a performance
                             measure, if its variability is within 5% of the mean. (2 ó maturity).
                          l Commercial / business commitments can be made, within manageable risk, only
                            when processes are stable. Services, compared to manufacturing processes, are
                            considerably more difficult to stabilize.
                          l FIXED BID agreements (SLAs, Projects,…), are on the rise. However, as per
                            Standish variability on project estimates are extremely high (69% over-run on
                            schedule, is the average).
                          l The luxury of multiplying “estimates” liberally (say by an arbitrary 2.2 times), will not
                            be available. Customers will not pay for “immaturity”.

                  v PROCESS QUALITY

                  The quality of a process is measured by number of DEFECTS counted in the PROCESS. A
                  defect is anything that does not meet pre-agreed specifications. Which points to an important, but
                  the often overlooked requirement, of documenting pre-agreed specifications and acceptance
                  criteria.

                  Specifications (and acceptance criteria) should be defined for different SERVICE LEVELS, with
                  VALUE defined for each service level. A pragmatic approach to quality is to take an end-to-end
                  view of quality. And not create “silos of excellence”. Also, a smart balance between cost-of-quality
                  and service-level is required.

                  The achievement of an end-to-end quality objective requires, that all stages included in the
                  process, perform within acceptable limits (LCL / UCL). Clear ENTRY / EXIT criteria must be set
                  for all key stages, and for hand-over between stages. Much like a relay race!

                  An estimated 25% of costs (in IT projects), are wasted as unpaid re-work, due to defects.
                  Damned customers! They are the guys who get to decide what a defect is! A very large
                  proportion of these defects are traced back to lack of clarity (and documentation) of
                  REQUIREMENTS.

                  Causal analysis techniques, are commonly applied for defect reduction:
                          l Pareto Principle 20% causes for 80% defects.
                          l Examine the correlations between defects, and factors such as process type,
                             location, customer, person assigned, value stream type (practice group / SBU,), etc.


 www.digite.com                                 3                              Copyright 2005 Digité, Inc. All rights reserved.
diginotes


                  v COMPLEXITY REDUCTION
                  Complexity is measured in terms of number of activities, interdependencies between activities
                  and variety of activities (TASK / ACTIVITY TYPES), in a process.
                  Complex processes are also likely to be costly, because:
                          l Cycle-time variability increases proportionately to the number of activities
                          l Number of dependencies (on predecessors) increases WAIT times
                          l Learning-curve costs are proportional to variety.
                          l Set-up costs increase proportionately to variety.



                  ORGANIZATION MODELING

                  Creating the right type of “outsourcing” capacity is extremely critical. This calls for
                  ORGANIZATION MODELING.

                  The following are the prevalent outsourced organization types:

                  v   Off-shore, staff augmentation
                          l Re-deploy / increase the headcount in an out-location.
                  v   Project outsourcing
                          l Projects with at least 3 months duration.
                          l Leverage vendor's specialist skills, which are critical to the success of the project.
                          l In-house projects do not receive the required priority.
                  v   Off-shore development centre (ODC)
                          l Vendor head-count exclusively earmarked to the corporation
                          l Commonly (in the IT domain), the processes outsourced to ODCs are Maintenance /
                            support on legacy / existing applications and Product Life Cycle Management for
                            product companies.
                          l The ODC model is expected to deliver all benefits of outsourcing process
                             improvement and lower cost.
                          l A KEY CONCERN: PROTECTION OF INTELLECTUAL PROPERTY & DATA
                  v   Functional outsourcing
                          l Complexity reduction is a significant benefit of functional out-sourcing.
                          l Very significant process improvement benefits are possible on account of

                                    o Specialized functional skills (e.g. qualified design engineers)
                                    o High process maturity (given the vendor's domain specialization).
                           l The functional outsourcing model is likely to see the highest BPM benefits, though less
                             cost arbitrage benefits.
                           l SECURITY THE KEY CONCERN.



                  SECURITY & IP PROTECTION

                           l All publicly traded corporations in the US, will be governed by the Sarbanes-Oxley Act.
                            The act mandates implementation of the CobIT security framework. Which in turn
                            requires:
                           l Authentication
                                    o Access Control
                                    o User account management
                                    o Credential life-cycle management
                                    o Non-repudiation
                                    o Audit controls
                           l A documented SECURITY POLICY must be in place. And enforced.
                           l Corporations must consider Auto-ID technologies (RFID being the fore-runner). RFID
                             solutions, integrated with the enterprise Identity and Role-based Access Management
                             applications, successfully enable corporations to meet CobIT requirements, cost
                             effectively.




 www.digite.com                                  4                               Copyright 2005 Digité, Inc. All rights reserved.
diginotes


                  THE VENDOR SIDE PERSPECTIVE

                  The discussion so far looks at the needs of the outsourcing corporations (the PRINCIPALS). Cl
                  early, VENDORS (the outsourcee), must be capable of delivering to these needs.

                  However, in addition, the vendors must manage their own business interests. Important vendor
                  -side issues are:
                           A. Project Portfolio Management (PPM)
                           B. Risk Management
                           C. Delivery Workflow Design
                           D. Resource Management
                           E. Process Improvement

                  A. PROJECT PORTFOLIO MANAGEMENT

                  A well defined PPM system, will lead to better financial performance and strategic alignment for
                  the vendor.Selection criteria for projects should be based on:
                           · NET PRESENT VALUE INDICATOR based on project cash flows.
                          · FEASIBILITY INDICATOR       can the project be accepted given available capacity,
                           resources,skills and knowledge?
                          · STATEGIC INDICATOR what is the projects potential to create a sustainable longer
                           term competitive advantage on attributes such as market attractiveness, competitive
                           activity, organizational capability, risk assessment - internal and external.

                  By appropriately assigning values and weightings to each of the above, a PRIORITIZATION
                  INDEX can be arrived at. The factors that drive the PRIORITIZATION INDEX must be reviewed
                  and re-baselined periodically. For e.g. the project cash flows will change, capacities increased,
                  and so on.

                  The feasibility checks and project scheduling should particularly focus on loading of STRATEGIC
                  RESOURCES.

                  The PRIORITIZATION INDEX will then provide the rationale for inducting projects, closure of
                  “bleeding” projects, and resource conflicts.

                  B. RISK MANAGEMENT

                  As per Standish, only 26 % of all projects are considered successful. For IT projects, it is only
                  16%!

                  The top three reasons for unsuccessful IT projects are:
                         · Inadequately defined requirements
                          · Delays in change request management
                          · Constraints on critical chain resources.
                  With fixed-bid projects on the rise, vendors must de-risk themselves. In particular, they must pay
                  special attention to mitigate risks on the top three factors.

                  C. DELIVERY WORKFLOW DESIGN

                  The delivery workflow must be designed with the following considerations:

                  · THROUGHPUT MAXIMIZATION
                   Maximum value (EARNED VALUE) in the shortest elapsed time (CYCLE TIME).
                   There is a strong case for project managers to apply “CRITICAL CHAIN” concepts, espoused
                   by Eliyahu Goldratt. Proponents of the Critical Chain concept, claim 25 to 300% reduction in
                   total project cycle-times. Certainly there are improvement opportunities, even if they are not as
                   dramatic as the evangelists claim. Tough times require that no improvement opportunity be
                   squandered.




 www.digite.com                                 5                             Copyright 2005 Digité, Inc. All rights reserved.
diginotes


                  · FOCUS Management must focus on a few GLOBALLY critical issues, rather than “policing”
                    every activity. Critical Chain project management makes a compelling argument for focusing
                    exclusively on the PROJECT BUFFER and the STRATEGIC RESOURCES.

                  · WORK-IN-PROGRESS MANAGEMENT’
                           o The list pending items in a persons INBOX, must as small as possible. At the same
                             time, no one should be idle.
                           o There should be, if possible zero latency, between actual start of work, and it's
                             assignment.
                           o Like in a “relay race”, succeeding task members must be primed up to receive the
                            baton from predecessors.

                  D. RESOURCE MANAGEMENT
                  · Golden rule: Strengthen the weakest link (on the critical chain) on the highest value chain (the
                    project with the highest prioritization index).
                  · The resource pool, particularly STRATEGIC RESOURCES must be accessible as GLOBAL
                    RESOURCE POOL. STRATEGIC RESOURCES are those that typically
                           · yield the highest value (billable rate high, assignable to projects of high prioritization
                             index)
                           · Are key to success of a project / activity. For a project activity type, attributes of a
                             strategic resource must be defined.
                  · Loading of strategic resources must be considered before acceptance of new projects
                    (on that type).
                  · The resourcing team must therefore focus on the strategic resource pool:
                           o To de-risk. Ensure sufficient back-ups and alternatives available.
                           o Training and resource development efforts are oriented towards converting non-
                             strategic resources to strategic.

                  E. PROCESS IMPROVEMENT

                  Process Centric IT Lifecycle is not new. It has been long since ISO 9000 certified companies
                  graduated to SW-CMM and to P-CMM and CMMi. All these have provided roadmap to an
                  organization for the long-term process improvement. Despite this, customer satisfaction and
                  eliminating defects remain a continuous challenge. Process maturity and quality will continue to
                  be the key selection criteria of “the vendor” by an outsourcing company. In addition, vendor will
                  have their own set of internal challenges to make best use of their resources/assets and comply
                  to strict financial compliances.

                  CMMi helped the organizations to identify processes and subsequently their capabilities matured
                  over the years however processes implemented with CMMi also has variability and most critically
                  it is important to understand which of these processes are not bringing any VALUE to the
                  organization or have become obsolete. In light of this, it is about time that IT organizations must
                  look into icing their CMMi processes with Six Sigma that will provide the data to understand the
                  variability of the processes and further improvement. Not only this, there has to be an end-to-end
                  integration between various standalone process frameworks like ITIL, CoBIT, SOX etc.




 www.digite.com                                   6                              Copyright 2005 Digité, Inc. All rights reserved.

Mais conteúdo relacionado

Mais procurados

2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality management2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality management
Amber Joan Wood
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
Leanleaders.org
 
Implementing Lean Six Sigma for IT
Implementing Lean Six Sigma for ITImplementing Lean Six Sigma for IT
Implementing Lean Six Sigma for IT
prashanthi_ks
 
Testing times q2 2009
Testing times   q2 2009Testing times   q2 2009
Testing times q2 2009
scrumpyjo
 
Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...
Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...
Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...
Clinci Lucian
 

Mais procurados (17)

2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality management2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality management
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Implementing Lean Six Sigma for IT
Implementing Lean Six Sigma for ITImplementing Lean Six Sigma for IT
Implementing Lean Six Sigma for IT
 
Testing times q2 2009
Testing times   q2 2009Testing times   q2 2009
Testing times q2 2009
 
SpendMatters / Achilles White Paper: Is Your Supplier Qualification Process a...
SpendMatters / Achilles White Paper: Is Your Supplier Qualification Process a...SpendMatters / Achilles White Paper: Is Your Supplier Qualification Process a...
SpendMatters / Achilles White Paper: Is Your Supplier Qualification Process a...
 
Ch0 1
Ch0 1Ch0 1
Ch0 1
 
Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...
Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...
Integrating Lean Manufacturingand Six Sigma The Challengesand Benefits Garcia...
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementation
 
Qfd dfss
Qfd dfssQfd dfss
Qfd dfss
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
Cmmi Overview And Nihilent Show Case In Cmmir Consulting.1
 
The Rules of Lean Project Management
The Rules of Lean Project ManagementThe Rules of Lean Project Management
The Rules of Lean Project Management
 
Managing A Successful Team Offline Version
Managing A Successful Team Offline VersionManaging A Successful Team Offline Version
Managing A Successful Team Offline Version
 
UAE Advanced BPM Workshop
UAE Advanced BPM WorkshopUAE Advanced BPM Workshop
UAE Advanced BPM Workshop
 
Value Stream Mapping in the Office
Value Stream Mapping in the Office Value Stream Mapping in the Office
Value Stream Mapping in the Office
 
Creatively Applying CMMI for Services in a Very Small Consulting Firm
Creatively Applying CMMI for Services in a Very Small Consulting FirmCreatively Applying CMMI for Services in a Very Small Consulting Firm
Creatively Applying CMMI for Services in a Very Small Consulting Firm
 
Saudi Arabia Advanced BPM Workshop
Saudi Arabia Advanced BPM WorkshopSaudi Arabia Advanced BPM Workshop
Saudi Arabia Advanced BPM Workshop
 

Destaque

Portfolio, Project and Programme Management
Portfolio, Project and Programme ManagementPortfolio, Project and Programme Management
Portfolio, Project and Programme Management
Bruce Levitan
 

Destaque (7)

Is PPM Enough?
Is PPM Enough?Is PPM Enough?
Is PPM Enough?
 
IT Governance with Digité Enterprise
IT Governance with Digité EnterpriseIT Governance with Digité Enterprise
IT Governance with Digité Enterprise
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 
CMMI with Digité Universal Process Framework
CMMI with Digité Universal Process FrameworkCMMI with Digité Universal Process Framework
CMMI with Digité Universal Process Framework
 
Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?
 
Proteans goes Agile with Digite
Proteans goes Agile with DigiteProteans goes Agile with Digite
Proteans goes Agile with Digite
 
Portfolio, Project and Programme Management
Portfolio, Project and Programme ManagementPortfolio, Project and Programme Management
Portfolio, Project and Programme Management
 

Semelhante a Demystifying Outsourcing and Global Services Delivery

Introduction to Lean Software Development
Introduction to Lean Software DevelopmentIntroduction to Lean Software Development
Introduction to Lean Software Development
Michael Vax
 
Lean advisory services from cdg
Lean advisory services from cdgLean advisory services from cdg
Lean advisory services from cdg
Shekar N.
 
MGD Onshoring
MGD OnshoringMGD Onshoring
MGD Onshoring
Maggie
 
Ops Man Intro
Ops Man IntroOps Man Intro
Ops Man Intro
theopsman
 
Case StudyAugust 2010Case Study Using ITIL® and PRIN
Case StudyAugust 2010Case Study Using ITIL® and  PRINCase StudyAugust 2010Case Study Using ITIL® and  PRIN
Case StudyAugust 2010Case Study Using ITIL® and PRIN
MaximaSheffield592
 

Semelhante a Demystifying Outsourcing and Global Services Delivery (20)

Integrated Business Process Management System
Integrated Business Process Management SystemIntegrated Business Process Management System
Integrated Business Process Management System
 
Project Management Essentials
Project Management EssentialsProject Management Essentials
Project Management Essentials
 
Dynamic Process Transformation Platform on Cloud
Dynamic Process Transformation Platform on CloudDynamic Process Transformation Platform on Cloud
Dynamic Process Transformation Platform on Cloud
 
Managing The Less Visible Processes
Managing The Less Visible ProcessesManaging The Less Visible Processes
Managing The Less Visible Processes
 
Soft Cost Savings in a VMS/MSP Implementation
Soft Cost Savings in a VMS/MSP ImplementationSoft Cost Savings in a VMS/MSP Implementation
Soft Cost Savings in a VMS/MSP Implementation
 
Business process improvement (special report) presentation
Business process improvement (special report) presentationBusiness process improvement (special report) presentation
Business process improvement (special report) presentation
 
Workflow Hpn 11 05
Workflow Hpn 11 05Workflow Hpn 11 05
Workflow Hpn 11 05
 
Business Process Services: Redefining Business Process Outsourcing
Business Process Services: Redefining Business Process OutsourcingBusiness Process Services: Redefining Business Process Outsourcing
Business Process Services: Redefining Business Process Outsourcing
 
Quality In Outsourcing
Quality In OutsourcingQuality In Outsourcing
Quality In Outsourcing
 
Introduction to Lean Software Development
Introduction to Lean Software DevelopmentIntroduction to Lean Software Development
Introduction to Lean Software Development
 
Higher education IAM-seminar Turku 10.12.2009
Higher education IAM-seminar Turku 10.12.2009Higher education IAM-seminar Turku 10.12.2009
Higher education IAM-seminar Turku 10.12.2009
 
Lean advisory services from cdg
Lean advisory services from cdgLean advisory services from cdg
Lean advisory services from cdg
 
MGD Onshoring
MGD OnshoringMGD Onshoring
MGD Onshoring
 
Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case StudyProcess Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
 
Ops Man Intro
Ops Man IntroOps Man Intro
Ops Man Intro
 
Dennis stevens response
Dennis stevens responseDennis stevens response
Dennis stevens response
 
Case StudyAugust 2010Case Study Using ITIL® and PRIN
Case StudyAugust 2010Case Study Using ITIL® and  PRINCase StudyAugust 2010Case Study Using ITIL® and  PRIN
Case StudyAugust 2010Case Study Using ITIL® and PRIN
 
Automation of Shared Services Center processes
Automation of Shared Services Center processesAutomation of Shared Services Center processes
Automation of Shared Services Center processes
 
Think proces context-1
Think proces  context-1Think proces  context-1
Think proces context-1
 
SOFTWARE PRODUCT DEVELOPMENT GOVERNANCE FRAMEWORK
SOFTWARE PRODUCT DEVELOPMENT GOVERNANCE FRAMEWORKSOFTWARE PRODUCT DEVELOPMENT GOVERNANCE FRAMEWORK
SOFTWARE PRODUCT DEVELOPMENT GOVERNANCE FRAMEWORK
 

Último

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Último (20)

Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 

Demystifying Outsourcing and Global Services Delivery

  • 1. diginotes Demystifying Outsourcing and Global Services Delivery Ramesh Adavi Sr. Consultant Prabhas Sinha Product Marketing Manager Digité Inc. 82 Pioneer Way Mountain View, CA 94041 Optimizing the SERVICES VALUE CHAIN has emerged as the most powerful lever, for improving business performance. This white-paper, takes a look at the important issues and drivers, of the global services industry, and suggests a few best practices. Six Sigma, LEAN and Critical Chain project Management concepts have proven themselves in manufacturing. They can and should be applied to services delivery as well. THE OUTSOURCING PARADIGM Outsourcing is now the universally accepted solution for enhancing service delivery and improving bottom-line performance. After accounting for transition costs and associated risks, net cost savings of 30%-35% are achievable. The top three business benefits of outsourcing are (source www.ventoro.com): l 46% of the benefit value due to re-engineering business processes (a case for BUSINESS PROCESS MANAGEMENT). l 45% due to improvement in delivery execution (improved quality, reduced delays, shorter time-to-market). l Only 9% due to labor cost differences. Surprisingly, low cost labor is not the only reason why outsourcing is here to stay BUSINESS PROCESS MANAGEMENT (BPM) BPM is clearly the “hottest” area in service delivery. Points to consider are: PROCESS VALUE-ENGINEERING Not all processes (and activities) are “valuable”. The customer must decide the value. v Processes must be categorized as l VALUABLE / BILLABLE, if a customer will pay (say at an hourly rate) l MANDATORY, those processes which are not “billable”, but considered www.digite.com 1 Copyright 2005 Digité, Inc. All rights reserved.
  • 2. diginotes essential for administrative control or regulatory compliance l WASTE, none of the above. Processes such as approvals, hand-offs, inspections, are a WASTE. Unless the customer has explicitly agreed to pay for them (wishful thinking!), or there is a MANDATORY requirement to retain them. Clearly, there is very little room for bureaucracy in services organizations. Overdoing the quality bit, over-reporting, and the such-like, are symptomatic of waste, which could ironically be rewarded! v Co-relate SERVICE LEVELS with VALUE l BASIC SERVICE LEVEL as per contracted terms with customer l INCREMENTAL SERVICE LEVEL there is a perceived benefit in providing beyond BASIC level. For e.g. incentives for delivery schedule improvement. l DELIGHT by design, incorporate processes, which beget superlatives from the customer. The benefits are not necessarily evident in the short term. Nevertheless, the long term value of such processes must be qualified. v Processes must be close to the customer. l Value is co-created with the customer, by the “foot soldiers”. Not by supervisors. Empowerment of customer facing teams is of paramount importance. l Opportunities for SELF-SERVICE processes, with an enhanced USER EXPERIENCE, must be aggressively considered. Internet banking is case in point. e-LEARNING is fast proving a point. PROCESS PERFORMANCE MEASURES For the (valuable) processes which are retained, measures must be established. Useful process performance measures are: v CYCLE TIME Elapsed time, from start to finish of the process / activity / task / project. v PROCESS CYCLE EFFICIENCY (PCE) PCE = (VALUE ADDED Time) / (Total CYCLE TIME) VALUE ADDED time represents, the time spent by a person on the activity for which a customer will pay (Billable activity). Many BPOs operate at PCEs as low as 10%. A PCE of 50% , though considered top-of-the-line, is achievable. Substantial productivity benefits are waiting to be picked up here. Common reasons for low PCE are: l Waiting for work to be assigned l Seeking clarification l Transportation e.g. papers for signature l Human nature o Parkinson's Law work expands to fill the time o Students Syndrome leave it till the last day (of the exam) Tasks must not be allocated too much in advance, or with very big safety margins. v WORK-IN-PROCESS (WIP). WIP is the number of pending tasks / activities with a person. Multi-tasking has detrimental effect on overall throughput. Add to it the costs of frequent changeovers between tasks. Even work quality suffers, when a person tries to do too many things at a time. In particular, WIP on STRATEGIC RESOURCES must be continuously tracked. Strategic resources are those that yield high value (billable rate), and are critical to the success of a project. Chances are that STRATEGIC RESOURCES are heavily loaded, and are on one or more CRITICAL CHAINS. www.digite.com 2 Copyright 2005 Digité, Inc. All rights reserved.
  • 3. diginotes v SET-UP TIME. Set-up procedures, such as PROJECT INITIATION, ACTIVITY TYPE / TASK TYPE CHANGE OVER; have inherent penalty costs. Typically, 15-30% of overall process costs are attributed to set-up costs. For which customers don't pay. v PROCESS COST PROCESS COST = (CYCLE TIME) X (RESOURCE COST RATE*) *Note: Only direct cost has been considered, in which, the cost of the most significant resource is considered, typically person-time. Ways to reduce PROCESS COSTS are: l Reduce resource cost by outsourcing to cheaper destinations. But this is only one of the ways l CYCLE TIME reduction o WASTE (and DELAY) reduction o SET-UP time reduction l PCE improvement PROCESS MATURITY Indicators of PROCESS MATURITY are: v VARIABILTY on key PROCESS PERFORMANCE MEASURES Immature processes have large variability on key measures such as CYCLE TIME and PROCESS COSTS. And they in turn reflect an unstable operation! l Deming has declared that a process is statistically stable, on a performance measure, if its variability is within 5% of the mean. (2 ó maturity). l Commercial / business commitments can be made, within manageable risk, only when processes are stable. Services, compared to manufacturing processes, are considerably more difficult to stabilize. l FIXED BID agreements (SLAs, Projects,…), are on the rise. However, as per Standish variability on project estimates are extremely high (69% over-run on schedule, is the average). l The luxury of multiplying “estimates” liberally (say by an arbitrary 2.2 times), will not be available. Customers will not pay for “immaturity”. v PROCESS QUALITY The quality of a process is measured by number of DEFECTS counted in the PROCESS. A defect is anything that does not meet pre-agreed specifications. Which points to an important, but the often overlooked requirement, of documenting pre-agreed specifications and acceptance criteria. Specifications (and acceptance criteria) should be defined for different SERVICE LEVELS, with VALUE defined for each service level. A pragmatic approach to quality is to take an end-to-end view of quality. And not create “silos of excellence”. Also, a smart balance between cost-of-quality and service-level is required. The achievement of an end-to-end quality objective requires, that all stages included in the process, perform within acceptable limits (LCL / UCL). Clear ENTRY / EXIT criteria must be set for all key stages, and for hand-over between stages. Much like a relay race! An estimated 25% of costs (in IT projects), are wasted as unpaid re-work, due to defects. Damned customers! They are the guys who get to decide what a defect is! A very large proportion of these defects are traced back to lack of clarity (and documentation) of REQUIREMENTS. Causal analysis techniques, are commonly applied for defect reduction: l Pareto Principle 20% causes for 80% defects. l Examine the correlations between defects, and factors such as process type, location, customer, person assigned, value stream type (practice group / SBU,), etc. www.digite.com 3 Copyright 2005 Digité, Inc. All rights reserved.
  • 4. diginotes v COMPLEXITY REDUCTION Complexity is measured in terms of number of activities, interdependencies between activities and variety of activities (TASK / ACTIVITY TYPES), in a process. Complex processes are also likely to be costly, because: l Cycle-time variability increases proportionately to the number of activities l Number of dependencies (on predecessors) increases WAIT times l Learning-curve costs are proportional to variety. l Set-up costs increase proportionately to variety. ORGANIZATION MODELING Creating the right type of “outsourcing” capacity is extremely critical. This calls for ORGANIZATION MODELING. The following are the prevalent outsourced organization types: v Off-shore, staff augmentation l Re-deploy / increase the headcount in an out-location. v Project outsourcing l Projects with at least 3 months duration. l Leverage vendor's specialist skills, which are critical to the success of the project. l In-house projects do not receive the required priority. v Off-shore development centre (ODC) l Vendor head-count exclusively earmarked to the corporation l Commonly (in the IT domain), the processes outsourced to ODCs are Maintenance / support on legacy / existing applications and Product Life Cycle Management for product companies. l The ODC model is expected to deliver all benefits of outsourcing process improvement and lower cost. l A KEY CONCERN: PROTECTION OF INTELLECTUAL PROPERTY & DATA v Functional outsourcing l Complexity reduction is a significant benefit of functional out-sourcing. l Very significant process improvement benefits are possible on account of o Specialized functional skills (e.g. qualified design engineers) o High process maturity (given the vendor's domain specialization). l The functional outsourcing model is likely to see the highest BPM benefits, though less cost arbitrage benefits. l SECURITY THE KEY CONCERN. SECURITY & IP PROTECTION l All publicly traded corporations in the US, will be governed by the Sarbanes-Oxley Act. The act mandates implementation of the CobIT security framework. Which in turn requires: l Authentication o Access Control o User account management o Credential life-cycle management o Non-repudiation o Audit controls l A documented SECURITY POLICY must be in place. And enforced. l Corporations must consider Auto-ID technologies (RFID being the fore-runner). RFID solutions, integrated with the enterprise Identity and Role-based Access Management applications, successfully enable corporations to meet CobIT requirements, cost effectively. www.digite.com 4 Copyright 2005 Digité, Inc. All rights reserved.
  • 5. diginotes THE VENDOR SIDE PERSPECTIVE The discussion so far looks at the needs of the outsourcing corporations (the PRINCIPALS). Cl early, VENDORS (the outsourcee), must be capable of delivering to these needs. However, in addition, the vendors must manage their own business interests. Important vendor -side issues are: A. Project Portfolio Management (PPM) B. Risk Management C. Delivery Workflow Design D. Resource Management E. Process Improvement A. PROJECT PORTFOLIO MANAGEMENT A well defined PPM system, will lead to better financial performance and strategic alignment for the vendor.Selection criteria for projects should be based on: · NET PRESENT VALUE INDICATOR based on project cash flows. · FEASIBILITY INDICATOR can the project be accepted given available capacity, resources,skills and knowledge? · STATEGIC INDICATOR what is the projects potential to create a sustainable longer term competitive advantage on attributes such as market attractiveness, competitive activity, organizational capability, risk assessment - internal and external. By appropriately assigning values and weightings to each of the above, a PRIORITIZATION INDEX can be arrived at. The factors that drive the PRIORITIZATION INDEX must be reviewed and re-baselined periodically. For e.g. the project cash flows will change, capacities increased, and so on. The feasibility checks and project scheduling should particularly focus on loading of STRATEGIC RESOURCES. The PRIORITIZATION INDEX will then provide the rationale for inducting projects, closure of “bleeding” projects, and resource conflicts. B. RISK MANAGEMENT As per Standish, only 26 % of all projects are considered successful. For IT projects, it is only 16%! The top three reasons for unsuccessful IT projects are: · Inadequately defined requirements · Delays in change request management · Constraints on critical chain resources. With fixed-bid projects on the rise, vendors must de-risk themselves. In particular, they must pay special attention to mitigate risks on the top three factors. C. DELIVERY WORKFLOW DESIGN The delivery workflow must be designed with the following considerations: · THROUGHPUT MAXIMIZATION Maximum value (EARNED VALUE) in the shortest elapsed time (CYCLE TIME). There is a strong case for project managers to apply “CRITICAL CHAIN” concepts, espoused by Eliyahu Goldratt. Proponents of the Critical Chain concept, claim 25 to 300% reduction in total project cycle-times. Certainly there are improvement opportunities, even if they are not as dramatic as the evangelists claim. Tough times require that no improvement opportunity be squandered. www.digite.com 5 Copyright 2005 Digité, Inc. All rights reserved.
  • 6. diginotes · FOCUS Management must focus on a few GLOBALLY critical issues, rather than “policing” every activity. Critical Chain project management makes a compelling argument for focusing exclusively on the PROJECT BUFFER and the STRATEGIC RESOURCES. · WORK-IN-PROGRESS MANAGEMENT’ o The list pending items in a persons INBOX, must as small as possible. At the same time, no one should be idle. o There should be, if possible zero latency, between actual start of work, and it's assignment. o Like in a “relay race”, succeeding task members must be primed up to receive the baton from predecessors. D. RESOURCE MANAGEMENT · Golden rule: Strengthen the weakest link (on the critical chain) on the highest value chain (the project with the highest prioritization index). · The resource pool, particularly STRATEGIC RESOURCES must be accessible as GLOBAL RESOURCE POOL. STRATEGIC RESOURCES are those that typically · yield the highest value (billable rate high, assignable to projects of high prioritization index) · Are key to success of a project / activity. For a project activity type, attributes of a strategic resource must be defined. · Loading of strategic resources must be considered before acceptance of new projects (on that type). · The resourcing team must therefore focus on the strategic resource pool: o To de-risk. Ensure sufficient back-ups and alternatives available. o Training and resource development efforts are oriented towards converting non- strategic resources to strategic. E. PROCESS IMPROVEMENT Process Centric IT Lifecycle is not new. It has been long since ISO 9000 certified companies graduated to SW-CMM and to P-CMM and CMMi. All these have provided roadmap to an organization for the long-term process improvement. Despite this, customer satisfaction and eliminating defects remain a continuous challenge. Process maturity and quality will continue to be the key selection criteria of “the vendor” by an outsourcing company. In addition, vendor will have their own set of internal challenges to make best use of their resources/assets and comply to strict financial compliances. CMMi helped the organizations to identify processes and subsequently their capabilities matured over the years however processes implemented with CMMi also has variability and most critically it is important to understand which of these processes are not bringing any VALUE to the organization or have become obsolete. In light of this, it is about time that IT organizations must look into icing their CMMi processes with Six Sigma that will provide the data to understand the variability of the processes and further improvement. Not only this, there has to be an end-to-end integration between various standalone process frameworks like ITIL, CoBIT, SOX etc. www.digite.com 6 Copyright 2005 Digité, Inc. All rights reserved.