Pull System Definition: A method of  controlling  the flow  of resources by  replacing  only what has  been  consumed . Pull Signals Pull Process Material At Operator Manpower WASTE
Push System Definition: Resources are provided to  the consumer based on  forecasts or schedules.
The Material Dilemma Looking for Parts High  Inventory Counting Parts Moving Parts Long Distances PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS
The Toilet Paper Analogy TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP
Customer Pull •  Requirements - Fresh - Available - Brand - Price - Size Capacity Demand Supply •  Requirements - Communications - Specifications - Expectations - Timing GROCERIES J.I.T On Time Delivery FIFO Rotate Stock Quality Cost
Synchronous / Lean Manufacturing Pull System 75¢ m m m m m m&m m&m m&m m&m m&m m&m m&m m E M P T Y mmmn mmmn mmmn mmmn mmmn mmmn mmmn mmmn Provider Consumer Replaces Used Products Uses Products m&m
Replace Consumption 1/4 1/2 3/4 F E Fuel Tank Point of Replenishment
Push vs. Pull Make all we can just in case. Make what’s needed when we need it ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS
A Pull System Is Flexible and Simple ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange NUMBER QUANTITY WIDGET ADDRESS 1 2 3 4 5 6 7 8 9 EMPTY
Example of an “Internal” Pull Signal Visual Control Board Information
Pull Signal - Card Point of Manufacturing Point of Use Standard Pack Container Standard Pack Quantity Description Part Number Designated Storage Area STORE MN 10/12/98
Reverse side of Pull Signal Card 10/12/98 If found, return to MA, or ship. area Thank You
Pull - Loop Flow Diagram 10/12/98 Pull Signal Material with Pull Signal Visual Control Board Weld Test Assembly Pipe Shop 4 3 1 2,5 6
De-Coupled Pull Process 8:00 Card / delivery person walks by,  picking up  cards while delivering material 8:05 Operator  puts out  card “A” 9:00 Card delivery person walks by,  gets Card “A” 10:00 Card “A” material is  filled  by supermarket Person 11:00 Card “A” material is  delivered  to the  Operator Need Minimum 3 Hours of Material At the Operator 10/12/98
Is This Familiar? 10/12/98 My parts are hot!! My parts are hot!! ? ? ? ? Customer A Customer B Supplier
Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange 10/12/98 NUMBER QUANTITY WIDGET ADDRESS EMPTY 1 2 3 4 5 6 7 8 9
Pull Signals CONTAINER OR DOLLY EXCHANGE 10/12/98 Uses the empty container as a physical signal that authorizes The replenishment of the consumed material. ,[object Object],[object Object],[object Object],[object Object],EMPTY
Why a Standard Pack? = Pull Signals CONTAINER OR DOLLY EXCHANGE 10/12/98 Specific number of parts = 1 Container of parts 1 Standard pack = 1 Pull signal 1 Container of parts = 1 Standard pack Supplier Toy Co.. Part Number Toy Strut Customer K2 Dock Lot Size Seq.. No.
Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange 10/12/98 NUMBER QUANTITY WIDGET ADDRESS EMPTY 1 2 3 4 5 6 7 8 9
Pull Signals MATERIAL LIGHT BOARD Uses lights to signal the need for bulk material replenishment At a pre-determined re-order point. ,[object Object],[object Object],[object Object],[object Object],[object Object],10/12/98 PART # 1234567 PART # 1234567 PART # 1234567 PART # 1234567 PART # 1234567 PART # 1234567
Material Order Indicator Material Staging Container Removal Material Order Point Pull Sign Pull Signals MATERIAL LIGHT BOARD 10/12/98
Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange 10/12/98 NUMBER QUANTITY WIDGET ADDRESS EMPTY 1 2 3 4 5 6 7 8 9
Guidelines for Types of Pull Signals 10/12/98
Loop 1 Loop 2 Loop 3 Loop 4 10/12/98 Assembly Operation 20 Operation 10 Raw Material Finished Goods
Internal Loop Planning 10/12/98 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
How Many Pull Signals? What should be considered in establishing maximum inventory levels? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],10/12/98
Pull Signal Monitoring — Case 1 10/12/98 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Max Signals in Loop Red Zone Yellow Zone Green Zone # Signals On Board 1  2  3  4  5  6  7  8  9  10  11  12  13  14 Days
Pull Signal Monitoring — Case 2 10/12/98 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Max Signals in Loop Red Zone Yellow Zone Green Zone # Signals On Board 1  2  3  4  5  6  7  8  9  10  11  12  13  14 Days
Pull Signal Monitoring — Case 3 10/12/98 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Max Signals in Loop Red Zone Yellow Zone Green Zone # Signals On Board 1  2  3  4  5  6  7  8  9  10  11  12  13  14 Days
Pull Signal Monitoring — Case 4 10/12/98 ,[object Object],[object Object],[object Object],[object Object],[object Object],Max Signals in Loop Red Zone Yellow Zone Green Zone # Signals On Board 1  2  3  4  5  6  7  8  9  10  11  12  13  14 Days
How Will Pull System Change Your Job? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Pull system provides more time for constructive activities  that will make your job and working conditions better tomorrow because with pull you run only the parts that are needed.  Shut down time can be spent on: 10/12/98
Implementation of a Pull System Is Affected by Many Factors ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],These are the reasons why there are only guidelines and not concrete rules governing the implementation of pull systems.  Real data and common sense must be applied . 10/12/98
Benefits of Pull Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],10/12/98
Benefits of Pull Systems Continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],10/12/98
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Pull Signal Calculations 10/12/98
Observation Worksheet:  Pull System Key Point Observations Pull Systems (Replenishment based on consumption) Pull Signals (Type used & why) Inventory Levels (Stock, WIP, banks) Stock Dates (FIFO vs. FISH) Distance Traveled (Part, WIP,conveyor lengths) Small Lot Production (Minimum material quantity and flow) Containerization (Quality part presented to operator) Supplier Involvement (External of process or obvious boundary) Leveling (Smooth flow vs. too much / little work, equipment, facilities, people)

Mais conteúdo relacionado

Mais procurados

Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )industrialengg
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven WastesJorge Ros
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean managementPramod A
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive MaintenanceRAHMAT EIE
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance Ashik Takvir
 

Mais procurados (20)

5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Kanban system (presentation for blog )
Kanban system (presentation for blog )Kanban system (presentation for blog )
Kanban system (presentation for blog )
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
Kanban pull flow_intro
Kanban pull flow_introKanban pull flow_intro
Kanban pull flow_intro
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Kanban (1)
Kanban (1)Kanban (1)
Kanban (1)
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Lean basics
Lean basicsLean basics
Lean basics
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Total Productive Maintenance
Total Productive Maintenance Total Productive Maintenance
Total Productive Maintenance
 

Destaque

Kanban in 4 easy steps
Kanban in 4 easy steps Kanban in 4 easy steps
Kanban in 4 easy steps Shore Labs
 
Damned case studt ppt @ bec doms mba bagalkot
Damned case studt ppt @ bec doms mba bagalkotDamned case studt ppt @ bec doms mba bagalkot
Damned case studt ppt @ bec doms mba bagalkotBabasab Patil
 
Implementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsImplementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsTKMG, Inc.
 
Total quality management in education
Total quality management  in educationTotal quality management  in education
Total quality management in educationSam Luke
 
Tools and techniques used in tqm ppt
Tools and techniques used in tqm pptTools and techniques used in tqm ppt
Tools and techniques used in tqm pptabhandary
 
total quality management (tqm)
total quality management (tqm)total quality management (tqm)
total quality management (tqm)Dr. Sunil Kumar
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)Mudassar Salman
 

Destaque (12)

Kanban in 4 easy steps
Kanban in 4 easy steps Kanban in 4 easy steps
Kanban in 4 easy steps
 
Damned case studt ppt @ bec doms mba bagalkot
Damned case studt ppt @ bec doms mba bagalkotDamned case studt ppt @ bec doms mba bagalkot
Damned case studt ppt @ bec doms mba bagalkot
 
Kanban Systems
Kanban SystemsKanban Systems
Kanban Systems
 
Implementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service EnvironmentsImplementing Kanban Pull Systems in Office & Service Environments
Implementing Kanban Pull Systems in Office & Service Environments
 
Total quality management in education
Total quality management  in educationTotal quality management  in education
Total quality management in education
 
Tools and techniques used in tqm ppt
Tools and techniques used in tqm pptTools and techniques used in tqm ppt
Tools and techniques used in tqm ppt
 
TQM in service sector
TQM in service sectorTQM in service sector
TQM in service sector
 
CASE STUDY- TQM
CASE STUDY- TQM CASE STUDY- TQM
CASE STUDY- TQM
 
total quality management (tqm)
total quality management (tqm)total quality management (tqm)
total quality management (tqm)
 
Logistic management
Logistic managementLogistic management
Logistic management
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Logistics Management
Logistics ManagementLogistics Management
Logistics Management
 

Semelhante a Kanban Pull System

Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223Carl Briggs
 
Chapter10-Inventorymanagement.ppt
Chapter10-Inventorymanagement.pptChapter10-Inventorymanagement.ppt
Chapter10-Inventorymanagement.pptMichael Celis
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...NazrulIslam657555
 
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsIn the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsVantage Data Centers
 
2010.Ship.Office.Floor
2010.Ship.Office.Floor2010.Ship.Office.Floor
2010.Ship.Office.Floortbreeves
 
Final Presentation Gap Reduction
Final Presentation   Gap ReductionFinal Presentation   Gap Reduction
Final Presentation Gap ReductionAnthony Scarchilli
 
Presentation On Warehousing
Presentation On WarehousingPresentation On Warehousing
Presentation On WarehousingRRChandran
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
Material Management at Projects Site and Manufacturing plant
Material Management  at Projects  Site and Manufacturing plantMaterial Management  at Projects  Site and Manufacturing plant
Material Management at Projects Site and Manufacturing plantLT COLONEL VIKRAM BAKSHI ( RETD)
 
Demand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturingDemand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturingbisal6
 
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...Amazon Web Services
 
Advances In Digital Automation Within Refining
Advances In Digital Automation Within RefiningAdvances In Digital Automation Within Refining
Advances In Digital Automation Within RefiningJim Cahill
 

Semelhante a Kanban Pull System (20)

Kanban pull.pptx
Kanban pull.pptxKanban pull.pptx
Kanban pull.pptx
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Are your sensors oil field tough?
Are your sensors oil field tough?Are your sensors oil field tough?
Are your sensors oil field tough?
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
Project Presentation
Project PresentationProject Presentation
Project Presentation
 
PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223PSCG Kaizen Presentation CBR6223
PSCG Kaizen Presentation CBR6223
 
Chapter10-Inventorymanagement.ppt
Chapter10-Inventorymanagement.pptChapter10-Inventorymanagement.ppt
Chapter10-Inventorymanagement.ppt
 
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
5 Steps to Achieve More CostEffective Aminebased Carbon Capture Processes at ...
 
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEsIn the Data Center: Five Keys to Achieving Ultra-Low PUEs
In the Data Center: Five Keys to Achieving Ultra-Low PUEs
 
2010.Ship.Office.Floor
2010.Ship.Office.Floor2010.Ship.Office.Floor
2010.Ship.Office.Floor
 
Final Presentation Gap Reduction
Final Presentation   Gap ReductionFinal Presentation   Gap Reduction
Final Presentation Gap Reduction
 
Presentation On Warehousing
Presentation On WarehousingPresentation On Warehousing
Presentation On Warehousing
 
JIT
JITJIT
JIT
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Material Management at Projects Site and Manufacturing plant
Material Management  at Projects  Site and Manufacturing plantMaterial Management  at Projects  Site and Manufacturing plant
Material Management at Projects Site and Manufacturing plant
 
Demand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturingDemand Flow Technology workshop - Lean manufacturing
Demand Flow Technology workshop - Lean manufacturing
 
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
 
Advances In Digital Automation Within Refining
Advances In Digital Automation Within RefiningAdvances In Digital Automation Within Refining
Advances In Digital Automation Within Refining
 
Waste water solid application
Waste water solid application Waste water solid application
Waste water solid application
 

Último

Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryPooja Nehwal
 
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...Hot Call Girls In Sector 58 (Noida)
 
John Deere Tractors 6130M 6140M Diagnostic Manual
John Deere Tractors  6130M 6140M Diagnostic ManualJohn Deere Tractors  6130M 6140M Diagnostic Manual
John Deere Tractors 6130M 6140M Diagnostic ManualExcavator
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingBruce Cox Imports
 
audience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxxaudience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxxMollyBrown86
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfExcavator
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfAggregage
 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorAndres Auto Service
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai Motor Group
 
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...Hot Call Girls In Sector 58 (Noida)
 
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一meq5nzfnk
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubaikojalkojal131
 
How To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation IssueHow To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation IssueTerry Sayther Automotive
 

Último (20)

Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
 
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
Alina 7042364481 Call Girls Service Pochanpur Colony - independent Pochanpur ...
 
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝Call Girls in  Shri Niwas Puri  Delhi 💯Call Us 🔝9953056974🔝
Call Girls in Shri Niwas Puri Delhi 💯Call Us 🔝9953056974🔝
 
John Deere Tractors 6130M 6140M Diagnostic Manual
John Deere Tractors  6130M 6140M Diagnostic ManualJohn Deere Tractors  6130M 6140M Diagnostic Manual
John Deere Tractors 6130M 6140M Diagnostic Manual
 
Call Girls In Greater Noida 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Greater Noida 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Greater Noida 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Greater Noida 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
What Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop WorkingWhat Could Cause Your Subaru's Touch Screen To Stop Working
What Could Cause Your Subaru's Touch Screen To Stop Working
 
audience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxxaudience feedback draft 3.pptxxxxxxxxxxx
audience feedback draft 3.pptxxxxxxxxxxx
 
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 DelhiCall Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
Call Girls In Kirti Nagar 7042364481 Escort Service 24x7 Delhi
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdfSales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
Sales & Marketing Alignment_ How to Synergize for Success.pptx.pdf
 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
Stay Cool and Compliant: Know Your Window Tint Laws Before You Tint
Stay Cool and Compliant: Know Your Window Tint Laws Before You TintStay Cool and Compliant: Know Your Window Tint Laws Before You Tint
Stay Cool and Compliant: Know Your Window Tint Laws Before You Tint
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRC
 
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
꧁ ୨ Call Girls In Radisson Blu Plaza Delhi Airport, New Delhi ❀7042364481❀ Es...
 
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
 
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls  Size E6 (O525547819) Call Girls In DubaiDubai Call Girls  Size E6 (O525547819) Call Girls In Dubai
Dubai Call Girls Size E6 (O525547819) Call Girls In Dubai
 
How To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation IssueHow To Fix Mercedes Benz Anti-Theft Protection Activation Issue
How To Fix Mercedes Benz Anti-Theft Protection Activation Issue
 

Kanban Pull System

  • 2. Pull System Definition: A method of controlling the flow of resources by replacing only what has been consumed . Pull Signals Pull Process Material At Operator Manpower WASTE
  • 3. Push System Definition: Resources are provided to the consumer based on forecasts or schedules.
  • 4. The Material Dilemma Looking for Parts High Inventory Counting Parts Moving Parts Long Distances PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS PARTS
  • 5. The Toilet Paper Analogy TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP
  • 6. Customer Pull • Requirements - Fresh - Available - Brand - Price - Size Capacity Demand Supply • Requirements - Communications - Specifications - Expectations - Timing GROCERIES J.I.T On Time Delivery FIFO Rotate Stock Quality Cost
  • 7. Synchronous / Lean Manufacturing Pull System 75¢ m m m m m m&m m&m m&m m&m m&m m&m m&m m E M P T Y mmmn mmmn mmmn mmmn mmmn mmmn mmmn mmmn Provider Consumer Replaces Used Products Uses Products m&m
  • 8. Replace Consumption 1/4 1/2 3/4 F E Fuel Tank Point of Replenishment
  • 9.
  • 10.
  • 11. Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange NUMBER QUANTITY WIDGET ADDRESS 1 2 3 4 5 6 7 8 9 EMPTY
  • 12. Example of an “Internal” Pull Signal Visual Control Board Information
  • 13. Pull Signal - Card Point of Manufacturing Point of Use Standard Pack Container Standard Pack Quantity Description Part Number Designated Storage Area STORE MN 10/12/98
  • 14. Reverse side of Pull Signal Card 10/12/98 If found, return to MA, or ship. area Thank You
  • 15. Pull - Loop Flow Diagram 10/12/98 Pull Signal Material with Pull Signal Visual Control Board Weld Test Assembly Pipe Shop 4 3 1 2,5 6
  • 16. De-Coupled Pull Process 8:00 Card / delivery person walks by, picking up cards while delivering material 8:05 Operator puts out card “A” 9:00 Card delivery person walks by, gets Card “A” 10:00 Card “A” material is filled by supermarket Person 11:00 Card “A” material is delivered to the Operator Need Minimum 3 Hours of Material At the Operator 10/12/98
  • 17. Is This Familiar? 10/12/98 My parts are hot!! My parts are hot!! ? ? ? ? Customer A Customer B Supplier
  • 18. Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange 10/12/98 NUMBER QUANTITY WIDGET ADDRESS EMPTY 1 2 3 4 5 6 7 8 9
  • 19.
  • 20. Why a Standard Pack? = Pull Signals CONTAINER OR DOLLY EXCHANGE 10/12/98 Specific number of parts = 1 Container of parts 1 Standard pack = 1 Pull signal 1 Container of parts = 1 Standard pack Supplier Toy Co.. Part Number Toy Strut Customer K2 Dock Lot Size Seq.. No.
  • 21. Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange 10/12/98 NUMBER QUANTITY WIDGET ADDRESS EMPTY 1 2 3 4 5 6 7 8 9
  • 22.
  • 23. Material Order Indicator Material Staging Container Removal Material Order Point Pull Sign Pull Signals MATERIAL LIGHT BOARD 10/12/98
  • 24. Pull Signals Electronic Signals Instruction Sent From the Consumer to the Provider to Replace Resources that have been Used Computer Signals Cards Container Exchange 10/12/98 NUMBER QUANTITY WIDGET ADDRESS EMPTY 1 2 3 4 5 6 7 8 9
  • 25. Guidelines for Types of Pull Signals 10/12/98
  • 26. Loop 1 Loop 2 Loop 3 Loop 4 10/12/98 Assembly Operation 20 Operation 10 Raw Material Finished Goods
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. Observation Worksheet: Pull System Key Point Observations Pull Systems (Replenishment based on consumption) Pull Signals (Type used & why) Inventory Levels (Stock, WIP, banks) Stock Dates (FIFO vs. FISH) Distance Traveled (Part, WIP,conveyor lengths) Small Lot Production (Minimum material quantity and flow) Containerization (Quality part presented to operator) Supplier Involvement (External of process or obvious boundary) Leveling (Smooth flow vs. too much / little work, equipment, facilities, people)

Notas do Editor

  1. We’re going to talk about the pull system; we’re going to define it, discuss the objectives and give some examples of pull systems in use. Then we’re going to discuss traditional systems and how they contrast with a pull system. Next we’re going to investigate how a pull system is managed, what types of pull signals could be used and why you would want to use a particular kind. We’ll close the discussion by looking at the benefits that can be achieved by implementing a pull system. Note: this group of slides contains some that may not be appropriate for the workshop discussions. Use the material as you see find it fits the situation. Key points of Pull Module: Possibilities in all areas: administrative, indirect, direct Simplicity of various types Sends a visual message Operator control, does not require management involvement or sophisticated systems. Must have discipline. Exists in our lives everywhere but work.