EMTP-RV
              USER GROUP MEETING




EMTP_RV MODELLING FOR THE TRANSMISSION LINE
   LIGHNTING PERFORMANCE COMPUTATION
               T. Sadovic, S. Sadovic




               Dubrovnik 30.04.2009
LINE LIGHTNING PERFORMANCE

THE ANNUAL NUMBER OF LIGHTNING
OUTAGES PER 100 KM OF LINE LENGTH
                                                  I0, tf



                                                           BACK FLASHOVERS
           I0, tf                 I 0, t f




 INDUCED



                             SHIELDING FAILURES
LINE BACK FLASHOVER RATE


THE ANNUAL OUTAGE RATE CAUSED BY A   I0, tf
    FLASHOVER OF LINE INSULATION
 RESULTING FROM THE STROKES TO THE
  TOWERS AND TO THE GROUND WIRES




                                                 Back
                                              flashover
LINE SHIELDING FAILURES

THE ANNUAL NUMBER OF LIGHTNING EVENTS      THE ANNUAL NUMBER OF
THAT BYPASS THE OVERHEAD GROUND WIRES      FLASHOVERS CAUSED BY
AND TERMINATE ON THE PHASE CONDUCTORS        SHIELDING FAILURES


                            I0, tf




                                             Shielding failure
                                                flashover


                       Shielding failure
HOW TO IMPROVE LINE LIGHTNING PERFORMANCE?




                                Additional Shield Wires


                                             Underbuilt Ground Wire
   Increasing Insulation




                                  Line Surge Arrester

      Guy Wires




                           Foot_resistance
                            improvement
LINE SURGE ARRESTER APPLICATION
      123 kV Line Dubrovnik - Ston




                      2 LSA
                     per tower




          1 LSA
         per tower
ELECTROMAGNETIC TRANSIENTS SIMULATION
        MODEL OF THE LINE INSULATION FLASHOVER


            (s2)
                                                                             Flashover models:
U(t)                   (s1)
                              (U - t) Insulation characteristic              Constant voltage
 U2                                                                          Equal area
 U1
                                                                             Leader propagation

 U0

                                                                  Leader propagation model:


       t2     t1                                   t                                                        u (t )
                                                                             u (t )              0 , 0015
                                                                                                              d
                                                                  vl   170 d              E0 e
                                                                             d ll

       d           l                                               vl - Leader speed (m/s)
                                  u(t)

                                                                   d - Arcing distance (m)
                                                                   ll - Leader length (m)
                                                                   u(t) - Applied voltage (kV)
                                                                       E0 = 520 (kV/m)
EQUAL AREA FLASHOVER MODEL                                                                 d                      Ugap(t)



    U(t)
                          t                                                            710
                               ( U gap (t ) U 0 )   k
                                                        D            U        (400             ) d      (kV) [IEEE]
     U2    s              t0
                                                                                       t 0, 75
                          k 1
     U50%      D                                                                                     710
     U0                                                              U8   s    U 50%      (400              ) d   550 d
                                                                                                     80, 75

                   2                        8               t ( s)   U0       0,9 U 50%          495 d

EMTP_RV Model data:
                                                                                          710
                                                                     U2   s     (400              ) d    822 d
[d - arcing distance in meters]                                                           2 0, 75

     U0        495 d
                                                                     D        0,2045 d
     k 1
     D 0,2045 d
ELECTROMAGNETIC TRANSIENTS SIMULATION
SOIL IONIZATION TOWER FOOTING RESISTANCE MODEL
    I



                                       Rlc
                             Ri                   U (kA)            Linear Resistance
                                             I
                                   1
                                             Ig
                                                                Non-Linear Resistance
                                       Eg
                              Ig        2                                     I (kA)
                                    2 Rlc
                                                           Ig

Rlc – low current tower footing resistance ( )
Ri – tower footing impulse resistance ( )
I – impulse current (kA)
Ig – soil ionisation limit current (kA)
Eg – soil ionisation critical electric field (kV/m) – [Eg = 400 (kV/m)]
QUICK BACK FLASHOVER RATE COMPUTATIONS

Stroke current is changed until
flashover [IC obtained]
                                     W - Line shadow width
                                     A - Line attraction area
                   IC
                                     hav - Tower average height
                                     IC - Back flashover critical current
                                                100 km




                                       A = 100 x W (km2)                    W


                           Back
hav                      Flashover
                                           Ra    14 hav, 6
                                                     0


                                           W     2 Ra        b
                                           A 100 W
                                           N L NG A
              W
QUICK BACK FLASHOVER RATE COMPUTATIONS

                                                          100 km
             IC



                                                 A = 100 x W (km2)                   W



                                             1               Ra      14 hav, 6
                                                                         0
                                   PI C
                                             I
                    Back                  1 ( C ) 2,6        W       2 Ra        b
hav               Flashover                  31
                                                             A 100 W
                                  BFR      0,6 N L PI C
                                                             N L NG A
                              W - Line shadow width
                              b - Ground wire separation distance
         W
                              NL - Number of strokes collected [str/100km/year]
                              NG – Ground flash density [str/km2/year]
                              BFR - Back flashover rate
                              0,6 > Takes into account strokes hitting shield wire
IEEE DISTRIBUTION



                             1                     i0 (t)        S (kA/ s)
CURRENT PEAK
                    PI
                              I
                          1 ( ) 2,6              I0
                             31
                                                 I0/2
                             1                                                t ( s)
STEEPNESS           PS
                              S 4                           tf           tt
                          1 ( )
                             24

Equal Probability        PS    PI



                               I0
                         S
                               tf
                                        Equivalent Front Time
123 kV TRANSMISSION LINE DUBROVNIK STON


    No       DC Resistance   Outside diameter    x [m]         y [m]           y [m]
              [Ohm/km]             [cm]                                     at midspan
        1       0.1444            1.708           2.5           22.7           14.1
        2       0.1444            1.708           -3            20.5           11.9
        3       0.1444            1.708           3.5           18.3            9.7
        4       0.4555              0.9            0            28.9           21.3
    4

                                                                       L1 = 2,8 H

                                                                       L2 = 1,37 H
                         Un=       123 kV
                         Length = 46 km                                L3 = 1,37 H
             1           Span = 200 m
                         L = ZT/v
2                        v - velocity of light           hT = 28,9 m                          Propagation
             3                                                                                  element
                                                                                         lprop = 20 m

                                                                                         ZT = 184
LINE SURGE ARRESTER



    Rated voltage: 123 kV
    IEC Class II
    Polymer housed


Current (A)         Voltage (V)
   1000              239000
   2500              252000
   5000              275000
  10000              291000
  20000              324000
  40000              357000
123 kV TRANSMISSION LINE DUBROVNIK STON


                Ground flash density: 5 strokes/km2/year
                Length = 46 km


    Ra   14 hav, 6
             0
                         14 28,90, 6      105 (m)
    W    2 Ra        b    2 105 0         210 (m)
    A 100 W 100 0,210 21                         (km2)
    N L N G A 5 21 105                           (strokes/100km/year)
                Using EMTP_RV find IC (Critical current)

                                          1
                              PI C
                                          I
                                       1 ( C ) 2,6
                                          31
                              BFR       0,6 105 PI C
AUTOMATIC BACKFLASHOVER COMPUTATIONS


EMTP_RV Line section model created
Netlist file obtained
AUTOMATIC BACKFLASHOVER SIMULATIONS

                           Tower Model> Sub circuits




Air gap model
Signal = 0: No flashover
Signal =1: Flashover
AUTOMATIC BACKFLASHOVER SIMULATIONS

     Tool developed to run EMTP_RV in a loop




 Initial stroke current   Current step
AUTOMATIC BACKFLASHOVER SIMULATIONS

  EMTP_RV is running in the loop until gap signal > 0




                                Stroke Sub circuit


Flashover Tower 2
Phase conductor C
AUTOMATIC BACKFLASHOVER SIMULATIONS

EMTP_RV is running in the loop until gap signal > 0

                     Critical current




                      Back flashover rate
FUTURE WORK > 3D EGM

                I0, tf
                                                         WS - SIMULATED WIDTH

                                                          STRIKING DISTANCES
                              DOWNWARD
                               LEADER                          1. TO PHC & GW:

     rT1                                                          rS = A I B
                                  rT2
                                                                [A=10, B=0,65]

                                         span                  2. TO TOWERS:
                                                                   rTT = k rS
                         rE
                                                                  [k= 1 – 1,1]

                                                                3. TO EARTH:
x0                                         WS


           y0                                   IEEE :    rE     3,6 1,7 ln(43 yv ) I0,65
FUTURE WORK > 3D EGM


                                          DOWNWARD
         I0, tf
                                      LEADER APPROACHES
                                         UNDER ANGLE

                                                           2
                                                      f        cos2

                              rGW                         rGW = rPHC = rNO = rS

                               rPHC    GW
         rNO

NEARBY                        PHC
OBJECT
     hl
                              dl
                  x0

                       WS/2                   WS/2
FUTURE WORK > sigma slp like interface
EMTP_RV modeling and transients computation
  Monte Carlo Statistical Study and 3D EGM

Mais conteúdo relacionado

Mais procurados

Load test on single phase indution motor
Load test on single phase indution motorLoad test on single phase indution motor
Load test on single phase indution motorAmit Debnath
 
Chapter 2 Uncontrolled Rectifiers.pdf
Chapter 2 Uncontrolled Rectifiers.pdfChapter 2 Uncontrolled Rectifiers.pdf
Chapter 2 Uncontrolled Rectifiers.pdfLiewChiaPing
 
Single phase ac voltage controller
Single phase ac voltage controllerSingle phase ac voltage controller
Single phase ac voltage controllerSwati Tiwari
 
ETAP - coordinación de protecciones (star)
ETAP -   coordinación de protecciones (star)ETAP -   coordinación de protecciones (star)
ETAP - coordinación de protecciones (star)Himmelstern
 
Difference of CT & PT
Difference of CT & PT Difference of CT & PT
Difference of CT & PT Jay Ranvir
 
Electrical drive unit 1 as per IP university_EEE
Electrical drive unit 1 as per IP university_EEEElectrical drive unit 1 as per IP university_EEE
Electrical drive unit 1 as per IP university_EEEamrutapattnaik2
 
Classification of transmission lines
Classification of transmission linesClassification of transmission lines
Classification of transmission linesHamzaAbbas43
 
Electrical Machines - II
Electrical Machines - IIElectrical Machines - II
Electrical Machines - IIkarthi1017
 
Impulse voltage
Impulse voltageImpulse voltage
Impulse voltagesarunkutti
 
Three level inverter
Three level inverterThree level inverter
Three level inverterVinay Singh
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCRBurdwan University
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)Ameh Messiah Edache
 
GENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGEGENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGEJamil Abdullah
 
تحسين معامل القدرة وكيفيه حساب المكثفات
تحسين معامل القدرة وكيفيه حساب المكثفاتتحسين معامل القدرة وكيفيه حساب المكثفات
تحسين معامل القدرة وكيفيه حساب المكثفاتIslam Hesham
 
AUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATIONAUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATIONPower System Operation
 
3.1 Overhead Line Insulators,Underground Cables (1).pptx
3.1 Overhead Line Insulators,Underground Cables (1).pptx3.1 Overhead Line Insulators,Underground Cables (1).pptx
3.1 Overhead Line Insulators,Underground Cables (1).pptxBalaMurugan992669
 
Open circuit and Short circuit test on transformer
Open circuit and Short circuit test on transformerOpen circuit and Short circuit test on transformer
Open circuit and Short circuit test on transformerHarshit Khandelwal
 
Voltage Source Inverter VSI - Six Step Switching
Voltage Source Inverter VSI - Six Step Switching Voltage Source Inverter VSI - Six Step Switching
Voltage Source Inverter VSI - Six Step Switching Citharthan Durairaj
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformersZiyaulhaq
 
Line to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power SystemLine to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power SystemSmit Shah
 

Mais procurados (20)

Load test on single phase indution motor
Load test on single phase indution motorLoad test on single phase indution motor
Load test on single phase indution motor
 
Chapter 2 Uncontrolled Rectifiers.pdf
Chapter 2 Uncontrolled Rectifiers.pdfChapter 2 Uncontrolled Rectifiers.pdf
Chapter 2 Uncontrolled Rectifiers.pdf
 
Single phase ac voltage controller
Single phase ac voltage controllerSingle phase ac voltage controller
Single phase ac voltage controller
 
ETAP - coordinación de protecciones (star)
ETAP -   coordinación de protecciones (star)ETAP -   coordinación de protecciones (star)
ETAP - coordinación de protecciones (star)
 
Difference of CT & PT
Difference of CT & PT Difference of CT & PT
Difference of CT & PT
 
Electrical drive unit 1 as per IP university_EEE
Electrical drive unit 1 as per IP university_EEEElectrical drive unit 1 as per IP university_EEE
Electrical drive unit 1 as per IP university_EEE
 
Classification of transmission lines
Classification of transmission linesClassification of transmission lines
Classification of transmission lines
 
Electrical Machines - II
Electrical Machines - IIElectrical Machines - II
Electrical Machines - II
 
Impulse voltage
Impulse voltageImpulse voltage
Impulse voltage
 
Three level inverter
Three level inverterThree level inverter
Three level inverter
 
Power electronics Phase Controlled Rectifiers - SCR
Power electronics   Phase Controlled Rectifiers - SCRPower electronics   Phase Controlled Rectifiers - SCR
Power electronics Phase Controlled Rectifiers - SCR
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
 
GENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGEGENERATING OF HIGH ALTERNATING VOLTAGE
GENERATING OF HIGH ALTERNATING VOLTAGE
 
تحسين معامل القدرة وكيفيه حساب المكثفات
تحسين معامل القدرة وكيفيه حساب المكثفاتتحسين معامل القدرة وكيفيه حساب المكثفات
تحسين معامل القدرة وكيفيه حساب المكثفات
 
AUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATIONAUTO-RECLOSING & LOCAL SYSTEM RESTORATION
AUTO-RECLOSING & LOCAL SYSTEM RESTORATION
 
3.1 Overhead Line Insulators,Underground Cables (1).pptx
3.1 Overhead Line Insulators,Underground Cables (1).pptx3.1 Overhead Line Insulators,Underground Cables (1).pptx
3.1 Overhead Line Insulators,Underground Cables (1).pptx
 
Open circuit and Short circuit test on transformer
Open circuit and Short circuit test on transformerOpen circuit and Short circuit test on transformer
Open circuit and Short circuit test on transformer
 
Voltage Source Inverter VSI - Six Step Switching
Voltage Source Inverter VSI - Six Step Switching Voltage Source Inverter VSI - Six Step Switching
Voltage Source Inverter VSI - Six Step Switching
 
Three phase transformers
Three phase transformersThree phase transformers
Three phase transformers
 
Line to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power SystemLine to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power System
 

Semelhante a Sadovic Lighting Performance Computation

SPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARKSPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARKSPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARKSPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARK
SPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARKSPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARK
SPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARKSPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARK
SPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARKSPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARK
SPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of PC851 in SPICE PARK
SPICE MODEL of PC851 in SPICE PARKSPICE MODEL of PC851 in SPICE PARK
SPICE MODEL of PC851 in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of U71 in SPICE PARK
SPICE MODEL of U71 in SPICE PARKSPICE MODEL of U71 in SPICE PARK
SPICE MODEL of U71 in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARKSPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARKSPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARKTsuyoshi Horigome
 
N13T1のスパイスモデル
N13T1のスパイスモデルN13T1のスパイスモデル
N13T1のスパイスモデルTsuyoshi Horigome
 
SPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARK
SPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARKSPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARK
SPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARKSPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARKSPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of LM7924 SIMetrix in SPICE PARK
SPICE MODEL of LM7924 SIMetrix in SPICE PARKSPICE MODEL of LM7924 SIMetrix in SPICE PARK
SPICE MODEL of LM7924 SIMetrix in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of uPC78L15T in SPICE PARK
SPICE MODEL of uPC78L15T in SPICE PARKSPICE MODEL of uPC78L15T in SPICE PARK
SPICE MODEL of uPC78L15T in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARKSPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of uPC7805A in SPICE PARK
SPICE MODEL of uPC7805A in SPICE PARKSPICE MODEL of uPC7805A in SPICE PARK
SPICE MODEL of uPC7805A in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARKSPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of LM7824 SIMetrix in SPICE PARK
SPICE MODEL of LM7824 SIMetrix in SPICE PARKSPICE MODEL of LM7824 SIMetrix in SPICE PARK
SPICE MODEL of LM7824 SIMetrix in SPICE PARKTsuyoshi Horigome
 

Semelhante a Sadovic Lighting Performance Computation (20)

SPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARKSPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SJ438 (Standard+BDS Model) in SPICE PARK
 
SPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARKSPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDP Model) in SPICE PARK
 
SPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARKSPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARK
SPICE MODEL of 2SK2563 (Professional+BDS Model) in SPICE PARK
 
SPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARK
SPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARKSPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARK
SPICE MODEL of TLWH1100 , White ,TA=40degree (Professional Model) in SPICE PARK
 
SPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARKSPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MB15D-060 (Professional+FWDS Model) in SPICE PARK
 
SPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARK
SPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARKSPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARK
SPICE MODEL of SSM3J314T (Standard+BDS Model) in SPICE PARK
 
SPICE MODEL of PC851 in SPICE PARK
SPICE MODEL of PC851 in SPICE PARKSPICE MODEL of PC851 in SPICE PARK
SPICE MODEL of PC851 in SPICE PARK
 
SPICE MODEL of U71 in SPICE PARK
SPICE MODEL of U71 in SPICE PARKSPICE MODEL of U71 in SPICE PARK
SPICE MODEL of U71 in SPICE PARK
 
SPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARKSPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARK
 
SPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARKSPICE MODEL of N13T1 in SPICE PARK
SPICE MODEL of N13T1 in SPICE PARK
 
N13T1のスパイスモデル
N13T1のスパイスモデルN13T1のスパイスモデル
N13T1のスパイスモデル
 
SPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARK
SPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARKSPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARK
SPICE MODEL of IDD04SG60C (Professional Model) in SPICE PARK
 
SPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARKSPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARK
SPICE MODEL of 1MBC10D-060 (Professional+FWDS Model) in SPICE PARK
 
SPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARKSPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARK
SPICE MODEL of TPC8111 (Professional+BDP Model) in SPICE PARK
 
SPICE MODEL of LM7924 SIMetrix in SPICE PARK
SPICE MODEL of LM7924 SIMetrix in SPICE PARKSPICE MODEL of LM7924 SIMetrix in SPICE PARK
SPICE MODEL of LM7924 SIMetrix in SPICE PARK
 
SPICE MODEL of uPC78L15T in SPICE PARK
SPICE MODEL of uPC78L15T in SPICE PARKSPICE MODEL of uPC78L15T in SPICE PARK
SPICE MODEL of uPC78L15T in SPICE PARK
 
SPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARKSPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK3611-01MR (Standard+BDS Model) in SPICE PARK
 
SPICE MODEL of uPC7805A in SPICE PARK
SPICE MODEL of uPC7805A in SPICE PARKSPICE MODEL of uPC7805A in SPICE PARK
SPICE MODEL of uPC7805A in SPICE PARK
 
SPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARKSPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARK
SPICE MODEL of 2SK4075 (Standard+BDS Model) in SPICE PARK
 
SPICE MODEL of LM7824 SIMetrix in SPICE PARK
SPICE MODEL of LM7824 SIMetrix in SPICE PARKSPICE MODEL of LM7824 SIMetrix in SPICE PARK
SPICE MODEL of LM7824 SIMetrix in SPICE PARK
 

Mais de corinne rocherieux

Rte Parisot Overview Of Emtp Studiesandmodel Devpt At Rte
Rte Parisot Overview Of Emtp Studiesandmodel Devpt At RteRte Parisot Overview Of Emtp Studiesandmodel Devpt At Rte
Rte Parisot Overview Of Emtp Studiesandmodel Devpt At Rtecorinne rocherieux
 
Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv OverheadlineRte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadlinecorinne rocherieux
 
Rte Dufour Protection Systemforactives Substation
Rte Dufour Protection Systemforactives SubstationRte Dufour Protection Systemforactives Substation
Rte Dufour Protection Systemforactives Substationcorinne rocherieux
 
Univ Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of FlashoverUniv Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of Flashovercorinne rocherieux
 
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And PipelinesEdf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelinescorinne rocherieux
 
Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++
Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++
Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++corinne rocherieux
 
Opal Rt Giroux Scrpting In Emtp Works
Opal Rt Giroux Scrpting In Emtp WorksOpal Rt Giroux Scrpting In Emtp Works
Opal Rt Giroux Scrpting In Emtp Workscorinne rocherieux
 
Emtp User Group092008 Supelec Stab Transitoire Web
Emtp User Group092008 Supelec Stab Transitoire WebEmtp User Group092008 Supelec Stab Transitoire Web
Emtp User Group092008 Supelec Stab Transitoire Webcorinne rocherieux
 
Emtp User Group092008 Sicae Raccordement Resau Web
Emtp User Group092008 Sicae Raccordement Resau WebEmtp User Group092008 Sicae Raccordement Resau Web
Emtp User Group092008 Sicae Raccordement Resau Webcorinne rocherieux
 
Emtp User Group092008 Sadovic Etudes Web
Emtp User Group092008 Sadovic Etudes WebEmtp User Group092008 Sadovic Etudes Web
Emtp User Group092008 Sadovic Etudes Webcorinne rocherieux
 
Emtp User Group092008 Rte Etudes Ttr Web
Emtp User Group092008 Rte Etudes Ttr WebEmtp User Group092008 Rte Etudes Ttr Web
Emtp User Group092008 Rte Etudes Ttr Webcorinne rocherieux
 
Emtp User Group092008 Polytechnique Montreal Nouveaux Dvpts Web
Emtp User Group092008 Polytechnique Montreal Nouveaux Dvpts WebEmtp User Group092008 Polytechnique Montreal Nouveaux Dvpts Web
Emtp User Group092008 Polytechnique Montreal Nouveaux Dvpts Webcorinne rocherieux
 
Emtp User Group092008 Idea P Vprotection Web
Emtp User Group092008 Idea P Vprotection WebEmtp User Group092008 Idea P Vprotection Web
Emtp User Group092008 Idea P Vprotection Webcorinne rocherieux
 
Emtp User Group092008 Idea P Vgeneration Web
Emtp User Group092008 Idea P Vgeneration WebEmtp User Group092008 Idea P Vgeneration Web
Emtp User Group092008 Idea P Vgeneration Webcorinne rocherieux
 
Emtp User Group092008 Edf Ttr Discordance Phase Web
Emtp User Group092008 Edf Ttr Discordance Phase WebEmtp User Group092008 Edf Ttr Discordance Phase Web
Emtp User Group092008 Edf Ttr Discordance Phase Webcorinne rocherieux
 
Emtp User Group092008 Edf Sectionneurs Web
Emtp User Group092008 Edf Sectionneurs WebEmtp User Group092008 Edf Sectionneurs Web
Emtp User Group092008 Edf Sectionneurs Webcorinne rocherieux
 
Emtp User Group092008 Edf Programme Web
Emtp User Group092008 Edf Programme WebEmtp User Group092008 Edf Programme Web
Emtp User Group092008 Edf Programme Webcorinne rocherieux
 

Mais de corinne rocherieux (20)

Rte Parisot Overview Of Emtp Studiesandmodel Devpt At Rte
Rte Parisot Overview Of Emtp Studiesandmodel Devpt At RteRte Parisot Overview Of Emtp Studiesandmodel Devpt At Rte
Rte Parisot Overview Of Emtp Studiesandmodel Devpt At Rte
 
Rte Guerrier Lips Toolbox
Rte Guerrier Lips ToolboxRte Guerrier Lips Toolbox
Rte Guerrier Lips Toolbox
 
Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv OverheadlineRte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
Rte Lebranchu Compensation And Transient Studies Onalong Ehv Overheadline
 
Rte Dufour Protection Systemforactives Substation
Rte Dufour Protection Systemforactives SubstationRte Dufour Protection Systemforactives Substation
Rte Dufour Protection Systemforactives Substation
 
Univ Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of FlashoverUniv Of Zagreb Uglesic Prevention Of Flashover
Univ Of Zagreb Uglesic Prevention Of Flashover
 
Emtp Mahseredjian R&D
Emtp Mahseredjian R&DEmtp Mahseredjian R&D
Emtp Mahseredjian R&D
 
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And PipelinesEdf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
Edf R&D Xemard Coupling Between Transmission Underground Cables And Pipelines
 
Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++
Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++
Hydro Quebec Roumy Interfacing Emtp Rv Withothersoftware Using C++
 
Opal Rt Giroux Scrpting In Emtp Works
Opal Rt Giroux Scrpting In Emtp WorksOpal Rt Giroux Scrpting In Emtp Works
Opal Rt Giroux Scrpting In Emtp Works
 
Edf R&D Dennetiere Hvdc Emtp
Edf R&D Dennetiere Hvdc EmtpEdf R&D Dennetiere Hvdc Emtp
Edf R&D Dennetiere Hvdc Emtp
 
Emtp User Group092008 Supelec Stab Transitoire Web
Emtp User Group092008 Supelec Stab Transitoire WebEmtp User Group092008 Supelec Stab Transitoire Web
Emtp User Group092008 Supelec Stab Transitoire Web
 
Emtp User Group092008 Sicae Raccordement Resau Web
Emtp User Group092008 Sicae Raccordement Resau WebEmtp User Group092008 Sicae Raccordement Resau Web
Emtp User Group092008 Sicae Raccordement Resau Web
 
Emtp User Group092008 Sadovic Etudes Web
Emtp User Group092008 Sadovic Etudes WebEmtp User Group092008 Sadovic Etudes Web
Emtp User Group092008 Sadovic Etudes Web
 
Emtp User Group092008 Rte Etudes Ttr Web
Emtp User Group092008 Rte Etudes Ttr WebEmtp User Group092008 Rte Etudes Ttr Web
Emtp User Group092008 Rte Etudes Ttr Web
 
Emtp User Group092008 Polytechnique Montreal Nouveaux Dvpts Web
Emtp User Group092008 Polytechnique Montreal Nouveaux Dvpts WebEmtp User Group092008 Polytechnique Montreal Nouveaux Dvpts Web
Emtp User Group092008 Polytechnique Montreal Nouveaux Dvpts Web
 
Emtp User Group092008 Idea P Vprotection Web
Emtp User Group092008 Idea P Vprotection WebEmtp User Group092008 Idea P Vprotection Web
Emtp User Group092008 Idea P Vprotection Web
 
Emtp User Group092008 Idea P Vgeneration Web
Emtp User Group092008 Idea P Vgeneration WebEmtp User Group092008 Idea P Vgeneration Web
Emtp User Group092008 Idea P Vgeneration Web
 
Emtp User Group092008 Edf Ttr Discordance Phase Web
Emtp User Group092008 Edf Ttr Discordance Phase WebEmtp User Group092008 Edf Ttr Discordance Phase Web
Emtp User Group092008 Edf Ttr Discordance Phase Web
 
Emtp User Group092008 Edf Sectionneurs Web
Emtp User Group092008 Edf Sectionneurs WebEmtp User Group092008 Edf Sectionneurs Web
Emtp User Group092008 Edf Sectionneurs Web
 
Emtp User Group092008 Edf Programme Web
Emtp User Group092008 Edf Programme WebEmtp User Group092008 Edf Programme Web
Emtp User Group092008 Edf Programme Web
 

Último

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 

Último (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 

Sadovic Lighting Performance Computation

  • 1. EMTP-RV USER GROUP MEETING EMTP_RV MODELLING FOR THE TRANSMISSION LINE LIGHNTING PERFORMANCE COMPUTATION T. Sadovic, S. Sadovic Dubrovnik 30.04.2009
  • 2. LINE LIGHTNING PERFORMANCE THE ANNUAL NUMBER OF LIGHTNING OUTAGES PER 100 KM OF LINE LENGTH I0, tf BACK FLASHOVERS I0, tf I 0, t f INDUCED SHIELDING FAILURES
  • 3. LINE BACK FLASHOVER RATE THE ANNUAL OUTAGE RATE CAUSED BY A I0, tf FLASHOVER OF LINE INSULATION RESULTING FROM THE STROKES TO THE TOWERS AND TO THE GROUND WIRES Back flashover
  • 4. LINE SHIELDING FAILURES THE ANNUAL NUMBER OF LIGHTNING EVENTS THE ANNUAL NUMBER OF THAT BYPASS THE OVERHEAD GROUND WIRES FLASHOVERS CAUSED BY AND TERMINATE ON THE PHASE CONDUCTORS SHIELDING FAILURES I0, tf Shielding failure flashover Shielding failure
  • 5. HOW TO IMPROVE LINE LIGHTNING PERFORMANCE? Additional Shield Wires Underbuilt Ground Wire Increasing Insulation Line Surge Arrester Guy Wires Foot_resistance improvement
  • 6. LINE SURGE ARRESTER APPLICATION 123 kV Line Dubrovnik - Ston 2 LSA per tower 1 LSA per tower
  • 7. ELECTROMAGNETIC TRANSIENTS SIMULATION MODEL OF THE LINE INSULATION FLASHOVER (s2) Flashover models: U(t) (s1) (U - t) Insulation characteristic Constant voltage U2 Equal area U1 Leader propagation U0 Leader propagation model: t2 t1 t u (t ) u (t ) 0 , 0015 d vl 170 d E0 e d ll d l vl - Leader speed (m/s) u(t) d - Arcing distance (m) ll - Leader length (m) u(t) - Applied voltage (kV) E0 = 520 (kV/m)
  • 8. EQUAL AREA FLASHOVER MODEL d Ugap(t) U(t) t 710 ( U gap (t ) U 0 ) k D U (400 ) d (kV) [IEEE] U2 s t0 t 0, 75 k 1 U50% D 710 U0 U8 s U 50% (400 ) d 550 d 80, 75 2 8 t ( s) U0 0,9 U 50% 495 d EMTP_RV Model data: 710 U2 s (400 ) d 822 d [d - arcing distance in meters] 2 0, 75 U0 495 d D 0,2045 d k 1 D 0,2045 d
  • 9. ELECTROMAGNETIC TRANSIENTS SIMULATION SOIL IONIZATION TOWER FOOTING RESISTANCE MODEL I Rlc Ri U (kA) Linear Resistance I 1 Ig Non-Linear Resistance Eg Ig 2 I (kA) 2 Rlc Ig Rlc – low current tower footing resistance ( ) Ri – tower footing impulse resistance ( ) I – impulse current (kA) Ig – soil ionisation limit current (kA) Eg – soil ionisation critical electric field (kV/m) – [Eg = 400 (kV/m)]
  • 10. QUICK BACK FLASHOVER RATE COMPUTATIONS Stroke current is changed until flashover [IC obtained] W - Line shadow width A - Line attraction area IC hav - Tower average height IC - Back flashover critical current 100 km A = 100 x W (km2) W Back hav Flashover Ra 14 hav, 6 0 W 2 Ra b A 100 W N L NG A W
  • 11. QUICK BACK FLASHOVER RATE COMPUTATIONS 100 km IC A = 100 x W (km2) W 1 Ra 14 hav, 6 0 PI C I Back 1 ( C ) 2,6 W 2 Ra b hav Flashover 31 A 100 W BFR 0,6 N L PI C N L NG A W - Line shadow width b - Ground wire separation distance W NL - Number of strokes collected [str/100km/year] NG – Ground flash density [str/km2/year] BFR - Back flashover rate 0,6 > Takes into account strokes hitting shield wire
  • 12. IEEE DISTRIBUTION 1 i0 (t) S (kA/ s) CURRENT PEAK PI I 1 ( ) 2,6 I0 31 I0/2 1 t ( s) STEEPNESS PS S 4 tf tt 1 ( ) 24 Equal Probability PS PI I0 S tf Equivalent Front Time
  • 13. 123 kV TRANSMISSION LINE DUBROVNIK STON No DC Resistance Outside diameter x [m] y [m] y [m] [Ohm/km] [cm] at midspan 1 0.1444 1.708 2.5 22.7 14.1 2 0.1444 1.708 -3 20.5 11.9 3 0.1444 1.708 3.5 18.3 9.7 4 0.4555 0.9 0 28.9 21.3 4 L1 = 2,8 H L2 = 1,37 H Un= 123 kV Length = 46 km L3 = 1,37 H 1 Span = 200 m L = ZT/v 2 v - velocity of light hT = 28,9 m Propagation 3 element lprop = 20 m ZT = 184
  • 14. LINE SURGE ARRESTER Rated voltage: 123 kV IEC Class II Polymer housed Current (A) Voltage (V) 1000 239000 2500 252000 5000 275000 10000 291000 20000 324000 40000 357000
  • 15. 123 kV TRANSMISSION LINE DUBROVNIK STON Ground flash density: 5 strokes/km2/year Length = 46 km Ra 14 hav, 6 0 14 28,90, 6 105 (m) W 2 Ra b 2 105 0 210 (m) A 100 W 100 0,210 21 (km2) N L N G A 5 21 105 (strokes/100km/year) Using EMTP_RV find IC (Critical current) 1 PI C I 1 ( C ) 2,6 31 BFR 0,6 105 PI C
  • 16. AUTOMATIC BACKFLASHOVER COMPUTATIONS EMTP_RV Line section model created Netlist file obtained
  • 17. AUTOMATIC BACKFLASHOVER SIMULATIONS Tower Model> Sub circuits Air gap model Signal = 0: No flashover Signal =1: Flashover
  • 18. AUTOMATIC BACKFLASHOVER SIMULATIONS Tool developed to run EMTP_RV in a loop Initial stroke current Current step
  • 19. AUTOMATIC BACKFLASHOVER SIMULATIONS EMTP_RV is running in the loop until gap signal > 0 Stroke Sub circuit Flashover Tower 2 Phase conductor C
  • 20. AUTOMATIC BACKFLASHOVER SIMULATIONS EMTP_RV is running in the loop until gap signal > 0 Critical current Back flashover rate
  • 21. FUTURE WORK > 3D EGM I0, tf WS - SIMULATED WIDTH STRIKING DISTANCES DOWNWARD LEADER 1. TO PHC & GW: rT1 rS = A I B rT2 [A=10, B=0,65] span 2. TO TOWERS: rTT = k rS rE [k= 1 – 1,1] 3. TO EARTH: x0 WS y0 IEEE : rE 3,6 1,7 ln(43 yv ) I0,65
  • 22. FUTURE WORK > 3D EGM DOWNWARD I0, tf LEADER APPROACHES UNDER ANGLE 2 f cos2 rGW rGW = rPHC = rNO = rS rPHC GW rNO NEARBY PHC OBJECT hl dl x0 WS/2 WS/2
  • 23. FUTURE WORK > sigma slp like interface EMTP_RV modeling and transients computation Monte Carlo Statistical Study and 3D EGM