Construction Technologies
              related to Site Preparation
                              Preparation,
               Civil and Structural Works
          IAEA Construction Technologies Workshop
               Constr ction              Workshop,
              Charlotte NC, August 19-20, 2010


                          Azhar Khan
                          Manager, EC6 Plant Layout,
                               g ,             y ,
                          Containment Design and
                          Constructability,
                          Atomic Energy of Canada Ltd


UNRESTRICTED / ILLIMITÉ
Overall Project Schedule




UNRESTRICTED / ILLIMITÉ                              2
Construction Schedule




UNRESTRICTED / ILLIMITÉ                           3
Site Preparation




UNRESTRICTED / ILLIMITÉ                      4
Background to Site Planning and Development


       • Phases of site planning and development works:
                 –   Advanced site development
                                           p
                 –   Supply-chain infrastructure
                 –   Off-site management for module fabrication
                 –   Module delivery, assembly and outfitting
                 –   Power island construction
             – Open top construction:
                 – Need at least 1 VHL crane
             – M d l i ti and prefabrication:
               Modularization d  f b i ti
                 – Fully developed site infrastructure to support offloading , assembly and
                   outfitting to exact standards before first nuclear concrete.
                 – Module lay-down areas to be “hardstand”, fully trafficable and heavy
                               y                               ,    y                   y
                   load capable.
                 – Support facilities required for off site module fabrication and module
                   assembly
                 – Large area needed for storage, prefabrication and pre assembly of
                                            storage                      pre-assembly
                   modules

UNRESTRICTED / ILLIMITÉ                                                                       5
Site Development Schedule



       • Site development affects construction schedule:
                 – If lay-down areas are not available for storage, prefabrication
                   and pre-assembly of modules - site construction schedule will
                   be affected
                 – Excavation of power block to be completed before site
                   development




UNRESTRICTED / ILLIMITÉ                                                              6
Pre-requisites for Site development and Plant
                             Construction

       • It is recommended that the following be completed prior to
         commencement of site development and plant construction:
                 – Subsurface (soils and bedrock) testing and analysis to assess site
                   optimum location
                 – Environmental assessment
                 – Site survey, and site survey control programme established
                 – Transportation study for modules, equipment and personnel
                 – Upgrades and load testing of routes required to handle heavy loads of
                   existing roads, bridges or overpasses and barge offload facilities
                 – Significant cuts and fills necessary to provide a flat and level site free of
                   encumbrances and obstructions
                 – Design for both permanent and temporary construction facilities
                 – Electronic three dimensional (3-D) model for all permanent and
                   temporary sites, structures and components
                 – Site drainage, trenching for utilities
                 – Site development schedule
                 – Excavation plan

UNRESTRICTED / ILLIMITÉ                                                                            7
Pre-requisites for Site development and Plant
                       Construction, cont’d.

                 – Temporary services facilities and assembly areas
                 – Site development permits, licensing documentation for site
                   preparation and construction licenses
                 – Procurement of equipment and facilities required for site
                   preparation
                 – Develop quality assurance program
                     – Quality Assurrance procedures
                     – Quality surveillance procedures/check lists
                     – Quality control procedures/check lists




UNRESTRICTED / ILLIMITÉ                                                         8
Methods Utilized for Site Infrastructure Implementation
                     and Layout for Site Construction


       • All weather construction method:
             – Construction environment isolated from ambient weather
             – Buildings have temporary enclosures – Qinshan CANDU
             – Open top Construction
       • Methods for construction personnel mobility:
             – Scaffolding
             – Mobile scissor lifts, bucket trucks
             – Access to personal services (tool sheds, toilets, wash water)
             – Mobile communication systems




UNRESTRICTED / ILLIMITÉ                                                        9
Methods Utilized for Site Infrastructure Implementation
                 and Layout for Site Construction, cont’d.


       • Transportation:
             – Stick build approach
             – Modularization approach
             – Combined approach
             – Heavy haul path
             – Need barge unloading facility and heavy haul road(s)
             – Railroads
       • Site mapping and measuring:
            – Existing conditions including topography
            – Existing buildings and infrastructure
            – Existing underground infrastructure
            – Layout of reference points and markers
            – Laser and global p
                         g      positioning system mapping (
                                          g y         pp g (GPS)
                                                               )


UNRESTRICTED / ILLIMITÉ                                               10
Methods Utilized for Site Infrastructure Implementation
                 and Layout for Site Construction, cont’d.


       • Three dimensional modeling:
             – It can be developed during early design stages so that the entire
               plant can be designed using available software
             – There would be cases where the vendor already has a design with
               approved two dimensional (2-D) drawings that need to be partially
               modified to account for country specific requirements.
             – In such cases, it is recommended that the design drawings are input
               to the 3-D modelling software to derive the required modifications.
             – The only disadvantage in using 3-D modelling is that considerable
               time is needed to develop interference-free plant layout, to work out
               the BOM to be procured, and to develop ‘working drawings’ to be
               used in the field.




UNRESTRICTED / ILLIMITÉ                                                                11
Main Construction Facilities


       • Construction management centre:
           – Use the latest technology to provide direction and control of real time
             field activities, tracking of equipment, visual and daily debriefing with
             field personnel
           – Video conferencing
           – Real time management of critical path




UNRESTRICTED / ILLIMITÉ                                                                  12
Main Construction Facilities, cont’d.


       • Civil:
             – Computerized concrete batch plants:
                  – Good quality concrete on a continuous basis with no human error
             – Concrete/materials testing laboratories
             – Embedded parts fabrication shop
             – Reinforcing steel fabrication shop
             – Shop fabrication mock-up:
                  – F ll scale or partial scale mock-ups can save on actual work ti
                    Full    l        ti l    l     k                   t l     k time
             – Structural steel fabrication/assembly shop
             – Paint shop
             – Contractor building
             – Warehouse
             – Housing for staff
                      g


UNRESTRICTED / ILLIMITÉ                                                                 13
Main Construction Facilities cont’d.



       • Mechanical/Piping:
           – Pipe fabrication shop
           – Pickle bath facility
           – Paint shop
           – Contractor building
           – Warehouse
           – Housing for staff




UNRESTRICTED / ILLIMITÉ                                          14
Main Construction Facilities, cont’d.



       • Electrical, Control and Instrumentation:
            – Electrical cabling shop
            – Instrument calibration shop
            – Contractor building
            – Warehouse
            – Housing for staff




UNRESTRICTED / ILLIMITÉ                                       15
Main Construction Facilities, cont’d.



       • Owner:
           – Material management centre
           – Technical and administration building
           – Lay-down and assembly areas(modules, liner vessels,
             equipment)
           – Warehouse
           – Housing for staff
           – Transportation depot
           – VHL crane
           – Tower c a es and te escop c c a es
              o e cranes a d telescopic cranes
           – Construction control room
           – Construction parking
           – Security fencing gates and building
                      fencing,

UNRESTRICTED / ILLIMITÉ                                            16
Main Construction Facilities, cont’d.



       • Owner cont’d.:
           – Temporary power
           – Fire protection water and service water
           – Housing for staff
           – Transportation depot
           – Cafeteria for workers
           – First aid station




UNRESTRICTED / ILLIMITÉ                                       17
Construction Technologies for Civil
                  and Structural Works




UNRESTRICTED / ILLIMITÉ                           18
Civil and Structural Works


       • Civil and structural works comprise the construction (fabrication,
         manufacture) of buildings, structures and their components and
         the supply of yard services (drainage, fencing, etc.)
       • Longest duration on project schedule
       • Hence important to optimize by using advanced methods that
         reduce the schedule
       • Very difficult and very time consuming to correct mistakes
            – Quality assurance program is critical




UNRESTRICTED / ILLIMITÉ                                                       19
Civil and Structural Works cont’d.


       • The civil and structural works comprise the following:
             – Site clearing, grading and surveying;
             – Site protection works against flooding, tidal waves, typhoon, tsunami, etc.;
             – Excavation;
             – Earth soil/rock removal and disposal;
             – Site dewatering;
             – Remedial measures on foundation soil/rock;
             – Rock and soil slope stabilization;
             – Building under drainage;
             – Foundation works;
             – Building peripheral drainage;
             – Concrete works abo e foundation;
               Co c e e o s above ou da o ;
             – Structural steel fabrication and erection
             – Yard services
             – Backfill works
             – Roads and landscaping
             – Permanent security construction
UNRESTRICTED / ILLIMITÉ                                                                       20
Excavation


       • Requires permits from local jurisdiction prior to start
       • Requires construction license from regulator prior to start in some
         countries
       • Activity of long duration that can last between 6 to 12 months
       • Sometimes adjacent to operating nuclear power plants
       • Environment regulations and constraints
       • It is essential to minimize damage to final foundation material:
         Protection from blasting near final level
       • Protection from flood and freezing
       • It is essential to provide protection to workers
       • It is essential to provide protection to nearby facilities




UNRESTRICTED / ILLIMITÉ                                                        21
Excavation Cont’d.


       • Conventional method:
           – Uses light machinery, blasting and hand excavation
                        machinery                    excavation.
       • Advance method:
           – Precision line blasting;
           – Chemical foam expansion for breaking rock.




UNRESTRICTED / ILLIMITÉ                                            22
Confirmation Of Soundness Of
                          Foundation Materials And Remedial
                                      Measures

       • Visual examination
            – Identification of weak areas
       • Open pit load tests to confirm foundation materials
       • Conventional remedial measures:
            – Extra excavation to overcome weak areas;
            – Thicken and/or enlarged sub-base engineered to reduce differential
              settlement and tilt of buildings.
       • Advanced method:
           – Consolidation grouting;
           – Rock anchors;
           – Bridging of weak areas;
           – Instrumentation to measure differential settlement and tilt of
             buildings.


UNRESTRICTED / ILLIMITÉ                                                            23
Remedial Measures For Slope
                             stabilization

       Objective:
           – Safety of workers equipment and project assets during the
                       workers,
             construction phase
       Conventional methods:
           – Reducing slope of cuts
           – Use of anchored steel mesh
       • Advanced methods
           – Consolidation Grouting
           – Grouted rock anchors
           – Earth reinforcing
               at e oc g




UNRESTRICTED / ILLIMITÉ                                                  24
Concrete Types


       • Responsibility of site engineering to develop the specified mix designs
       • Nuclear plants are using more concrete; Hundred of thousands of cubic meters
       • Functional & performance requirements of buildings are different hence it is
         economical to specify different mixes
       • Concrete mixes should be developed and approved at least 6 months before
         concreting program
       • Supply of constituent materials (aggregates, sand, water, fly ash, etc) must be
         confirmed a minimum of 12 months before start of concreting program
       • Portland cement is normally used
       • Heavy shielding concrete
       • Higher performance concretes (45-60 MPa) are being specified recently for
         containment buildings




UNRESTRICTED / ILLIMITÉ                                                                    25
CONCRETE TYPES cont’d.


       • Conventional Concrete Mixes
             – Portland cement
             – 25 to 35 MPa
             – Heavy shielding concrete
       Advanced Concrete Mixes:
             – High workability concrete;
             – High performance concrete: 45 to 60 Mpa;
             – Fly ash concrete; large volume pours;
             – Pervious or “no fine” concrete;
             – Pre-cast concrete;
             – Self Consolidating Concrete;
               Self-Consolidating
             – Self levelling concrete.




UNRESTRICTED / ILLIMITÉ                                   26
Concrete Placement Methods


       • Conventional placement method:
             – Use of buckets and tower cranes to place concrete
       • Advanced Concrete Placement Method:
             – Concrete placed with pumps




UNRESTRICTED / ILLIMITÉ                                            27
Bonding Between Concrete Pours


       • Conventional method:
             – Expose aggregates to receive the next pour
       • Advanced method:
             – Green cutting




UNRESTRICTED / ILLIMITÉ                                     28
Reinforcing Steel


       • Conventional reinforcing steel method:
             – Placing steel bars with lap splices
             – Bar size 44 mm and above are connected by exothermic welding
       • Advanced reinforcing steel methods:
             – Using mechanical & cad weld splicing
             – T-headed shear bars
             – Use of automatic rebar tie machines
             – Large prefabricated rebar modules




UNRESTRICTED / ILLIMITÉ                                                       29
Embedded Parts


       • Conventional embedded parts:
             – Plate type with manually welded strips or studs for anchoring in
               concrete
             – Embedded anchor bolts for equipment and structural steel
             – Penetrations for piping and conduits
                                pp g


       • Advance embedded parts method:
           – Plate type with studs welded with stud gun
           – Steel plate reinforced walls: Supports are connected directly
             to the plate




UNRESTRICTED / ILLIMITÉ                                                           30
Expansion Anchors


       • These are anchors drilled into concrete to support structures,
         systems and components

       • Objective:
             – Should reduce the use of expansion anchors to only support conduits and
                                            p                     y pp
               non-seismically qualified systems and non vibrating equipment
             – Anchors should not cut reinforcing steel




UNRESTRICTED / ILLIMITÉ                                                                  31
Foundation Construction


       • Conventional foundation construction methods:
           – Spread footings, combined footings, mat foundations, pile
             foundations
           – In the case of mat foundations, multiple pours are used
       • Advanced foundation construction methods:
           – Advances in concrete technology and placement methods have
           – led to single pours for large mats
           – Advances in the development of seismic isolations p
                                       p                         permit the
           – isolation of foundations for structures and equipment and thus
           – protect them from high seismic events




UNRESTRICTED / ILLIMITÉ                                                       32
Concrete Construction Above Foundation


       • Formwork
       • Conventional formwork:
            – Slab formwork consists of wood/metal forms supported by shoring
            – Wall formwork consists of wood/metal face forms held together with
              form ties
            – Forms are stripped after concrete has set and achieved sufficient
              strength so that it can support its dead load plus a small live load
       • Advanced types of formworks:
            – Q-deck or left in shutters
            – Steel plate reinforced walls (no reinforcing steel in walls)
            – Steel plate modular floors
            – Pre-fabricated permanent formwork




UNRESTRICTED / ILLIMITÉ                                                              33
Walls & Columns


       • Conventional Method:
             – Place conventional form and pour concrete through trunks up to
               height of 6 to 7 meters.
       • Advanced Construction:
             – Steel plate reinforced walls;
             – Self consolidating concrete;
             – Self levelling concrete.




UNRESTRICTED / ILLIMITÉ                                                         34
Slab, floors and roofs


       • Conventional Method:
             – Use conventional concrete mixes conventional reinforcing steel with
                                            mixes,
               lap splicing, conventional formwork
       Advanced Method:
             – Use Q Deck or left in shutters in slabs not supporting seismically
                    Q-Deck
               qualified systems
             – Modular floors
             – Steel reinforcement concrete composite structures and Deck Plate
               construction
             – Self compacting concrete
             – Pre-fabricated permanent formwork
                              p




UNRESTRICTED / ILLIMITÉ                                                              35
Structural Steel Fabrication


       • Braced frames consisting of columns, beams and bracing, and
         equipment supporting steel systems
       • Conventional method
             – Cutting and welding of structural steel based on two-dimensional
               fabrication drawings and using manual measurements
             – Use of clip angles
             – Maximize welding in shop
       • Advanced method
             – Automated fabricating shop
             – Use of 3D and precision control maintained by lasers
             – Use of end plate connections




UNRESTRICTED / ILLIMITÉ                                                           36
Structural Steel Erection


       • Conventional method:
             – Use of temporary bracing to align and temporarily support the
               braced frame structures
             – Use of conventional high strength steel bolts using torque method
               such as turn of nut and calibrated wrenches
             – Maximize bolting and minimize welding at site
       • Advanced method:
           – Facilitates modularization and parallel works
           – Use of buckling restrained braces (BRBs)
           – Use of twist off bolts




UNRESTRICTED / ILLIMITÉ                                                            37
Water Proofing


       • Required for underground structures, basements, large water
         transporting system, liquid retaining concrete tanks, etc.
       • Conventional method:
             – Use of rubber water-stops
             – Use of external painted waterproofing on structures below ground
             – Use of sump pump installation
       • Advanced method:
             – Use of superior waterproofing material with advance spraying
               system
             – Use of fast setting epoxy injection material




UNRESTRICTED / ILLIMITÉ                                                           38
Backfilling


       •   Used for areas between open cut and buildings;
       •   Used in pipe trenches
       •   Used in landscaping
       •   Conventional method:
             – Common backfill in open area
             – Granular backfill adjacent to building and covering piping in trenches
       • Advanced method:
           –CCement / sand backfill mixture i used
                   t     d b kfill i t      is   d




UNRESTRICTED / ILLIMITÉ                                                                 39
Yard Services


       •   Storm water drainage system
       •   Sewage system
       •   Plant system, piping and cables
       •   Plant roads
       •   Conventional method:
             – Backfilled trenches
       • Advanced method
           – Tunnels




UNRESTRICTED / ILLIMITÉ                              40
Construction Technologies for
                Nuclear Power Plant Buildings




UNRESTRICTED / ILLIMITÉ                         41
CONTAINMENT BUILDING


       •   Foundation base slab + steel liner
       •   Containment vessel or steel lined concrete
       •   Containment wall + dome
       •   Shield wall (in double containments)
       •   Internal structures




UNRESTRICTED / ILLIMITÉ                                 42
FOUNDATION BASE SLAB + LINER


       • Large reinforced concrete mat foundations (greater than 5000 m3)
       • Waterproofing membrane under foundation
       • Conventional Method:
             – Multiple pours, placed to minimize shrinkage
             –CConventional concrete d i mix
                       ti   l       t design i
       • Advanced Methods:
             – Single pour due to improved concrete technology / concrete mixes
               with low shrinkage cement reduced cement content increased use
                                    cement,               content,
               of plasticizer admixtures, etc.
             – Significant increase in concrete pump use
             – Increased reliability of batch plants




UNRESTRICTED / ILLIMITÉ                                                           43
BASE SLAB




UNRESTRICTED / ILLIMITÉ               44
Example of RB Base Slab Rebar Mat




UNRESTRICTED / ILLIMITÉ                               45
CONTAINMENT WALL


       • Conventional Method:
             – Use pre-assembled gang wall forms & construct in multiple repetitive
                   pre assembled
               concrete lifts between 6 to 7 meters
             – Concrete placement using trunks to pour concrete; not greater than
               1 meter fall
             – Use vibrators for achieving homogeneity
             – Carpenter crews are employed for erecting forms
             – Large scaffolding to set up
       • Advanced Method:
            – Slip-forming:
                 – Continuous placing of concrete at p p
                                 p      g             pre-planned rates
                 – Hydraulic lift with jacks moving short section of formwork




UNRESTRICTED / ILLIMITÉ                                                               46
Climbing Formwork

       • Climbing formwork is a self supporting
         formwork system.
       • Standard steel forms supported from
         frame
       • After wall is poured, form is released and
         rolled back from face
       • Jacks lift or climb the whole frame up
         one level
       • Prefab rebar installed
       • Formwork panels are closed and next
                     p
         concrete wall is poured
       • Standard cycle times




UNRESTRICTED / ILLIMITÉ                               47
CONTAINMENT WALL SLIP-FORMING cont’d.




UNRESTRICTED / ILLIMITÉ                            48
CONTAINMENT WALL SLIP-FORMING cont’d.




UNRESTRICTED / ILLIMITÉ                            49
CONTAINMENT WALL SLIP-FORMING cont’d.




UNRESTRICTED / ILLIMITÉ                            50
CONTAINMENT WALL SLIP-FORMING cont’d.




UNRESTRICTED / ILLIMITÉ                            51
CONTAINMENT WALL cont’d.


       • Advanced Method cont’d.:
             – Jump forming:
             – This method is being used to construct practically all steel lined
               containment walls
             – Wall is formed in stages with the form lifted hydraulically or “jumped
                                    g                         y          y     j p
               up” to the next stage after concrete has reached sufficient strength
             – Use of prefabricated rebar modules




UNRESTRICTED / ILLIMITÉ                                                                 52
Jump Forming




UNRESTRICTED / ILLIMITÉ                  53
Jump Forming in Parallel with
                   Liner Construction and Installation




UNRESTRICTED / ILLIMITÉ                                  54
Jump Forming and Prefab Rebar Mat




UNRESTRICTED / ILLIMITÉ                              55
Completion of Jump Forming




UNRESTRICTED / ILLIMITÉ                                56
CONTAINMENT DOME


       • Conventional Method:
             – Support formwork:
           – Uses a space truss system and shoring supports from the
             base slab
       • Advanced Method:
             – Use a permanent steel plate dome formwork, lifted into place with a
               VHL crane
             – Jump form the dome
             – Use of prefabricated rebar modules




UNRESTRICTED / ILLIMITÉ                                                              57
CONTAINMENT DOME cont’d.




UNRESTRICTED / ILLIMITÉ                              58
INTERNAL STRUCTURES


       • Conventional Method:
             – Use preassembled gang wall forms or hand set forms and construct the wall
               in multiple repetitive lifts
             – Construction is up to underside of slabs, construct slab and then proceed
               with columns and walls up to next slab
             – Conventional concrete mixes are used
             – Scaffolding is supported from the base slab and subsequently from the next
               slab
       Advanced Methods:
             – Use Q-deck or left in shutters supported by steel beams, for slabs not
               supporting seismically qualified systems
             – Self consolidating concrete
             – Self levelling concrete
             – Proposed methods are to use modular floors and modules with mechanical
               and electrical systems. These activities are performed off site and
               subsequently, the modules are transported to site and installed with a VHL
                      q      y                       p
               crane

UNRESTRICTED / ILLIMITÉ                                                                     59
TURBINE BUILDING


       Significant activities are:
             – Excavation (significant at coastal sites with large tidal variations)
             – Dewatering system
             – Base Slab
             – Turbine generator Pedestal
             – Structural Steel
             – Building Crane (200 tons or greater);




UNRESTRICTED / ILLIMITÉ                                                                60
TURBINE BUILDING


       Conventional Method:
             – Base slab is constructed in multiple pours;
             – For concrete structures use preassembled gang wall forms and
               construct the wall in multiple repetitive lifts;
             – Turbine generator p
                        g           pedestal is concreted similar to other concrete
               structures;
             – Structural steel is erected with conventional method of erecting
               braced frames, stabilizing with temporary or permanent braces
             – Roof trusses are installed on columns after being preassembled on
               ground;
             – Building Crane is lifted in to place with a heavy lift transportation
               crane.
               crane




UNRESTRICTED / ILLIMITÉ                                                                61
TURBINE BUILDING cont’d.


       Advanced Method:
             – Base slabs – single pour or larger pours
             – Concrete structures – left in shutters, pumped concrete
             – Turbine pedestal – seismic isolators and self consolidating concrete,
               p p
               pumped concrete
             – Structural Steel – modularized and installed with heavy lift crane,
               use of buckling restraint braces, twist off bolts
             – Turbine building crane – installed with VHL crane




UNRESTRICTED / ILLIMITÉ                                                                62
Turbine Building Excavation




UNRESTRICTED / ILLIMITÉ                                 63
TURBINE BUILDING CONSTRUCTION




UNRESTRICTED / ILLIMITÉ                          64
Turbine Building Construction




UNRESTRICTED / ILLIMITÉ                               65
Turbine Building Base Mat




UNRESTRICTED / ILLIMITÉ                               66
TURBINE BUILDING CONSTRUCTION




UNRESTRICTED / ILLIMITÉ                          67
Prefabricated Rebar Mat




UNRESTRICTED / ILLIMITÉ                             68
Wall Rebar Mat




UNRESTRICTED / ILLIMITÉ                    69
UNRESTRICTED / ILLIMITÉ   70

Mais conteúdo relacionado

Mais procurados

Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020RamaChilamkurthy
 
Max Sommers CV 2017
Max Sommers CV 2017Max Sommers CV 2017
Max Sommers CV 2017Max Sommers
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221Brad Young
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aRai University
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin
 
Integrated Design Project Presentation
Integrated Design Project PresentationIntegrated Design Project Presentation
Integrated Design Project PresentationMuhamad Faiz Zulkifly
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project PhasingAlexiaLevite
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Daniel X. O'Neil
 
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014Cynthia Pols
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Fairfax County
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Crosstown TO
 

Mais procurados (19)

Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020Eastern market metro park meeting 06 24-2020
Eastern market metro park meeting 06 24-2020
 
Max Sommers CV 2017
Max Sommers CV 2017Max Sommers CV 2017
Max Sommers CV 2017
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
 
CV C Pieroni Sept 2016 (3)
CV C Pieroni  Sept 2016 (3)CV C Pieroni  Sept 2016 (3)
CV C Pieroni Sept 2016 (3)
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Shopping for a Solution
Shopping for a SolutionShopping for a Solution
Shopping for a Solution
 
Diploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction aDiploma(civil) sem i boce_unit 3_building construction a
Diploma(civil) sem i boce_unit 3_building construction a
 
David Goodwin Resume 2015 LP
David Goodwin Resume 2015 LPDavid Goodwin Resume 2015 LP
David Goodwin Resume 2015 LP
 
Integrated Design Project Presentation
Integrated Design Project PresentationIntegrated Design Project Presentation
Integrated Design Project Presentation
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
 
Pepsi Project Phasing
Pepsi Project PhasingPepsi Project Phasing
Pepsi Project Phasing
 
Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008Current Construction Projects, City of Chicago, August 21, 2008
Current Construction Projects, City of Chicago, August 21, 2008
 
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
ANC 1C presentation-Kalorama Park Plaza-Dec 3 2014
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 

Destaque

Element site preparation new
Element site preparation newElement site preparation new
Element site preparation newaizat76
 
1 1 Introduction Construction Industry
1 1 Introduction Construction Industry1 1 Introduction Construction Industry
1 1 Introduction Construction Industrymissnadz
 
excavation equipment used for construction
excavation equipment used for constructionexcavation equipment used for construction
excavation equipment used for constructionAlbin P Sunny
 
Demolition Equipment/Technique Available
Demolition Equipment/Technique Available Demolition Equipment/Technique Available
Demolition Equipment/Technique Available Girish Singh
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
The Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your BuildingThe Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your BuildingKipcon Inc.
 
Water Heating Options and Solar Water
Water Heating Options and Solar WaterWater Heating Options and Solar Water
Water Heating Options and Solar WaterJames Pader
 
Site Preparation for Home Building
Site Preparation for Home BuildingSite Preparation for Home Building
Site Preparation for Home BuildingFrank Benaderet
 
Building Construction - Foundation
Building Construction - FoundationBuilding Construction - Foundation
Building Construction - FoundationAdibah Awang
 
Room Acoustics
Room AcousticsRoom Acoustics
Room AcousticsDrew
 
Chapter 10 structure construction
Chapter 10  structure constructionChapter 10  structure construction
Chapter 10 structure constructionmohdasrimohdhasim
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plantSagnik Datta
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundationPrabhat chhirolya
 
Generation Of Electricity
Generation Of ElectricityGeneration Of Electricity
Generation Of ElectricityEd Stermer
 
Thermal Comfort
Thermal ComfortThermal Comfort
Thermal ComfortJamie Wolf
 
Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)Mohammed Zakaria
 

Destaque (20)

Element site preparation new
Element site preparation newElement site preparation new
Element site preparation new
 
Site preparation
Site preparationSite preparation
Site preparation
 
1 1 Introduction Construction Industry
1 1 Introduction Construction Industry1 1 Introduction Construction Industry
1 1 Introduction Construction Industry
 
excavation equipment used for construction
excavation equipment used for constructionexcavation equipment used for construction
excavation equipment used for construction
 
Demolition Equipment/Technique Available
Demolition Equipment/Technique Available Demolition Equipment/Technique Available
Demolition Equipment/Technique Available
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
The Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your BuildingThe Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your Building
 
Scaffolding 101
Scaffolding 101Scaffolding 101
Scaffolding 101
 
Water Heating Options and Solar Water
Water Heating Options and Solar WaterWater Heating Options and Solar Water
Water Heating Options and Solar Water
 
Site Preparation for Home Building
Site Preparation for Home BuildingSite Preparation for Home Building
Site Preparation for Home Building
 
Building Construction - Foundation
Building Construction - FoundationBuilding Construction - Foundation
Building Construction - Foundation
 
Room Acoustics
Room AcousticsRoom Acoustics
Room Acoustics
 
Chapter 10 structure construction
Chapter 10  structure constructionChapter 10  structure construction
Chapter 10 structure construction
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plant
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
 
Generation Of Electricity
Generation Of ElectricityGeneration Of Electricity
Generation Of Electricity
 
Illumination
IlluminationIllumination
Illumination
 
Electric power grid
Electric power gridElectric power grid
Electric power grid
 
Thermal Comfort
Thermal ComfortThermal Comfort
Thermal Comfort
 
Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)Shallow Foundations ( Combined, Strap, Raft foundation)
Shallow Foundations ( Combined, Strap, Raft foundation)
 

Semelhante a 07.site preparation.civil

Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutionsabbasz
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr Bhavana Deshpande
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr. Pramod Deshpande
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansourahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansourahmed mansour
 
omarPro updated latest 2015
omarPro updated latest 2015omarPro updated latest 2015
omarPro updated latest 2015Ummar Alam
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process EngineerJuber Loharia
 
Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Freddy Gonzales
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan
 
doaa mohamed cv -1
doaa mohamed  cv -1doaa mohamed  cv -1
doaa mohamed cv -1doaa saber
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu
 

Semelhante a 07.site preparation.civil (20)

Pishro Telecom Solutions
Pishro Telecom SolutionsPishro Telecom Solutions
Pishro Telecom Solutions
 
Ahmed_c.v
Ahmed_c.vAhmed_c.v
Ahmed_c.v
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
omarPro updated latest 2015
omarPro updated latest 2015omarPro updated latest 2015
omarPro updated latest 2015
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014
 
Asraful Latest_CV
Asraful Latest_CVAsraful Latest_CV
Asraful Latest_CV
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Vanalstine Soq 2012
Vanalstine Soq 2012Vanalstine Soq 2012
Vanalstine Soq 2012
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
doaa mohamed cv -1
doaa mohamed  cv -1doaa mohamed  cv -1
doaa mohamed cv -1
 
walid abou lhaf CV
walid abou lhaf  CVwalid abou lhaf  CV
walid abou lhaf CV
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) Updated
 
Infrastructure projects
Infrastructure projectsInfrastructure projects
Infrastructure projects
 

Mais de Nguyen Bao

Etabs presentation with new graphics sept 2002
Etabs presentation with new graphics sept 2002Etabs presentation with new graphics sept 2002
Etabs presentation with new graphics sept 2002Nguyen Bao
 
Bored piles production method
Bored piles   production methodBored piles   production method
Bored piles production methodNguyen Bao
 
Diaphragm walls
Diaphragm wallsDiaphragm walls
Diaphragm wallsNguyen Bao
 
Habitat (friedlander)
Habitat (friedlander)Habitat (friedlander)
Habitat (friedlander)Nguyen Bao
 

Mais de Nguyen Bao (8)

Etabs presentation with new graphics sept 2002
Etabs presentation with new graphics sept 2002Etabs presentation with new graphics sept 2002
Etabs presentation with new graphics sept 2002
 
Bored piles production method
Bored piles   production methodBored piles   production method
Bored piles production method
 
Nuclear power
Nuclear powerNuclear power
Nuclear power
 
Foundations
FoundationsFoundations
Foundations
 
Diaphragm walls
Diaphragm wallsDiaphragm walls
Diaphragm walls
 
Habitat (friedlander)
Habitat (friedlander)Habitat (friedlander)
Habitat (friedlander)
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
In A Persian
In A PersianIn A Persian
In A Persian
 

Último

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Último (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

07.site preparation.civil

  • 1. Construction Technologies related to Site Preparation Preparation, Civil and Structural Works IAEA Construction Technologies Workshop Constr ction Workshop, Charlotte NC, August 19-20, 2010 Azhar Khan Manager, EC6 Plant Layout, g , y , Containment Design and Constructability, Atomic Energy of Canada Ltd UNRESTRICTED / ILLIMITÉ
  • 5. Background to Site Planning and Development • Phases of site planning and development works: – Advanced site development p – Supply-chain infrastructure – Off-site management for module fabrication – Module delivery, assembly and outfitting – Power island construction – Open top construction: – Need at least 1 VHL crane – M d l i ti and prefabrication: Modularization d f b i ti – Fully developed site infrastructure to support offloading , assembly and outfitting to exact standards before first nuclear concrete. – Module lay-down areas to be “hardstand”, fully trafficable and heavy y , y y load capable. – Support facilities required for off site module fabrication and module assembly – Large area needed for storage, prefabrication and pre assembly of storage pre-assembly modules UNRESTRICTED / ILLIMITÉ 5
  • 6. Site Development Schedule • Site development affects construction schedule: – If lay-down areas are not available for storage, prefabrication and pre-assembly of modules - site construction schedule will be affected – Excavation of power block to be completed before site development UNRESTRICTED / ILLIMITÉ 6
  • 7. Pre-requisites for Site development and Plant Construction • It is recommended that the following be completed prior to commencement of site development and plant construction: – Subsurface (soils and bedrock) testing and analysis to assess site optimum location – Environmental assessment – Site survey, and site survey control programme established – Transportation study for modules, equipment and personnel – Upgrades and load testing of routes required to handle heavy loads of existing roads, bridges or overpasses and barge offload facilities – Significant cuts and fills necessary to provide a flat and level site free of encumbrances and obstructions – Design for both permanent and temporary construction facilities – Electronic three dimensional (3-D) model for all permanent and temporary sites, structures and components – Site drainage, trenching for utilities – Site development schedule – Excavation plan UNRESTRICTED / ILLIMITÉ 7
  • 8. Pre-requisites for Site development and Plant Construction, cont’d. – Temporary services facilities and assembly areas – Site development permits, licensing documentation for site preparation and construction licenses – Procurement of equipment and facilities required for site preparation – Develop quality assurance program – Quality Assurrance procedures – Quality surveillance procedures/check lists – Quality control procedures/check lists UNRESTRICTED / ILLIMITÉ 8
  • 9. Methods Utilized for Site Infrastructure Implementation and Layout for Site Construction • All weather construction method: – Construction environment isolated from ambient weather – Buildings have temporary enclosures – Qinshan CANDU – Open top Construction • Methods for construction personnel mobility: – Scaffolding – Mobile scissor lifts, bucket trucks – Access to personal services (tool sheds, toilets, wash water) – Mobile communication systems UNRESTRICTED / ILLIMITÉ 9
  • 10. Methods Utilized for Site Infrastructure Implementation and Layout for Site Construction, cont’d. • Transportation: – Stick build approach – Modularization approach – Combined approach – Heavy haul path – Need barge unloading facility and heavy haul road(s) – Railroads • Site mapping and measuring: – Existing conditions including topography – Existing buildings and infrastructure – Existing underground infrastructure – Layout of reference points and markers – Laser and global p g positioning system mapping ( g y pp g (GPS) ) UNRESTRICTED / ILLIMITÉ 10
  • 11. Methods Utilized for Site Infrastructure Implementation and Layout for Site Construction, cont’d. • Three dimensional modeling: – It can be developed during early design stages so that the entire plant can be designed using available software – There would be cases where the vendor already has a design with approved two dimensional (2-D) drawings that need to be partially modified to account for country specific requirements. – In such cases, it is recommended that the design drawings are input to the 3-D modelling software to derive the required modifications. – The only disadvantage in using 3-D modelling is that considerable time is needed to develop interference-free plant layout, to work out the BOM to be procured, and to develop ‘working drawings’ to be used in the field. UNRESTRICTED / ILLIMITÉ 11
  • 12. Main Construction Facilities • Construction management centre: – Use the latest technology to provide direction and control of real time field activities, tracking of equipment, visual and daily debriefing with field personnel – Video conferencing – Real time management of critical path UNRESTRICTED / ILLIMITÉ 12
  • 13. Main Construction Facilities, cont’d. • Civil: – Computerized concrete batch plants: – Good quality concrete on a continuous basis with no human error – Concrete/materials testing laboratories – Embedded parts fabrication shop – Reinforcing steel fabrication shop – Shop fabrication mock-up: – F ll scale or partial scale mock-ups can save on actual work ti Full l ti l l k t l k time – Structural steel fabrication/assembly shop – Paint shop – Contractor building – Warehouse – Housing for staff g UNRESTRICTED / ILLIMITÉ 13
  • 14. Main Construction Facilities cont’d. • Mechanical/Piping: – Pipe fabrication shop – Pickle bath facility – Paint shop – Contractor building – Warehouse – Housing for staff UNRESTRICTED / ILLIMITÉ 14
  • 15. Main Construction Facilities, cont’d. • Electrical, Control and Instrumentation: – Electrical cabling shop – Instrument calibration shop – Contractor building – Warehouse – Housing for staff UNRESTRICTED / ILLIMITÉ 15
  • 16. Main Construction Facilities, cont’d. • Owner: – Material management centre – Technical and administration building – Lay-down and assembly areas(modules, liner vessels, equipment) – Warehouse – Housing for staff – Transportation depot – VHL crane – Tower c a es and te escop c c a es o e cranes a d telescopic cranes – Construction control room – Construction parking – Security fencing gates and building fencing, UNRESTRICTED / ILLIMITÉ 16
  • 17. Main Construction Facilities, cont’d. • Owner cont’d.: – Temporary power – Fire protection water and service water – Housing for staff – Transportation depot – Cafeteria for workers – First aid station UNRESTRICTED / ILLIMITÉ 17
  • 18. Construction Technologies for Civil and Structural Works UNRESTRICTED / ILLIMITÉ 18
  • 19. Civil and Structural Works • Civil and structural works comprise the construction (fabrication, manufacture) of buildings, structures and their components and the supply of yard services (drainage, fencing, etc.) • Longest duration on project schedule • Hence important to optimize by using advanced methods that reduce the schedule • Very difficult and very time consuming to correct mistakes – Quality assurance program is critical UNRESTRICTED / ILLIMITÉ 19
  • 20. Civil and Structural Works cont’d. • The civil and structural works comprise the following: – Site clearing, grading and surveying; – Site protection works against flooding, tidal waves, typhoon, tsunami, etc.; – Excavation; – Earth soil/rock removal and disposal; – Site dewatering; – Remedial measures on foundation soil/rock; – Rock and soil slope stabilization; – Building under drainage; – Foundation works; – Building peripheral drainage; – Concrete works abo e foundation; Co c e e o s above ou da o ; – Structural steel fabrication and erection – Yard services – Backfill works – Roads and landscaping – Permanent security construction UNRESTRICTED / ILLIMITÉ 20
  • 21. Excavation • Requires permits from local jurisdiction prior to start • Requires construction license from regulator prior to start in some countries • Activity of long duration that can last between 6 to 12 months • Sometimes adjacent to operating nuclear power plants • Environment regulations and constraints • It is essential to minimize damage to final foundation material: Protection from blasting near final level • Protection from flood and freezing • It is essential to provide protection to workers • It is essential to provide protection to nearby facilities UNRESTRICTED / ILLIMITÉ 21
  • 22. Excavation Cont’d. • Conventional method: – Uses light machinery, blasting and hand excavation machinery excavation. • Advance method: – Precision line blasting; – Chemical foam expansion for breaking rock. UNRESTRICTED / ILLIMITÉ 22
  • 23. Confirmation Of Soundness Of Foundation Materials And Remedial Measures • Visual examination – Identification of weak areas • Open pit load tests to confirm foundation materials • Conventional remedial measures: – Extra excavation to overcome weak areas; – Thicken and/or enlarged sub-base engineered to reduce differential settlement and tilt of buildings. • Advanced method: – Consolidation grouting; – Rock anchors; – Bridging of weak areas; – Instrumentation to measure differential settlement and tilt of buildings. UNRESTRICTED / ILLIMITÉ 23
  • 24. Remedial Measures For Slope stabilization Objective: – Safety of workers equipment and project assets during the workers, construction phase Conventional methods: – Reducing slope of cuts – Use of anchored steel mesh • Advanced methods – Consolidation Grouting – Grouted rock anchors – Earth reinforcing at e oc g UNRESTRICTED / ILLIMITÉ 24
  • 25. Concrete Types • Responsibility of site engineering to develop the specified mix designs • Nuclear plants are using more concrete; Hundred of thousands of cubic meters • Functional & performance requirements of buildings are different hence it is economical to specify different mixes • Concrete mixes should be developed and approved at least 6 months before concreting program • Supply of constituent materials (aggregates, sand, water, fly ash, etc) must be confirmed a minimum of 12 months before start of concreting program • Portland cement is normally used • Heavy shielding concrete • Higher performance concretes (45-60 MPa) are being specified recently for containment buildings UNRESTRICTED / ILLIMITÉ 25
  • 26. CONCRETE TYPES cont’d. • Conventional Concrete Mixes – Portland cement – 25 to 35 MPa – Heavy shielding concrete Advanced Concrete Mixes: – High workability concrete; – High performance concrete: 45 to 60 Mpa; – Fly ash concrete; large volume pours; – Pervious or “no fine” concrete; – Pre-cast concrete; – Self Consolidating Concrete; Self-Consolidating – Self levelling concrete. UNRESTRICTED / ILLIMITÉ 26
  • 27. Concrete Placement Methods • Conventional placement method: – Use of buckets and tower cranes to place concrete • Advanced Concrete Placement Method: – Concrete placed with pumps UNRESTRICTED / ILLIMITÉ 27
  • 28. Bonding Between Concrete Pours • Conventional method: – Expose aggregates to receive the next pour • Advanced method: – Green cutting UNRESTRICTED / ILLIMITÉ 28
  • 29. Reinforcing Steel • Conventional reinforcing steel method: – Placing steel bars with lap splices – Bar size 44 mm and above are connected by exothermic welding • Advanced reinforcing steel methods: – Using mechanical & cad weld splicing – T-headed shear bars – Use of automatic rebar tie machines – Large prefabricated rebar modules UNRESTRICTED / ILLIMITÉ 29
  • 30. Embedded Parts • Conventional embedded parts: – Plate type with manually welded strips or studs for anchoring in concrete – Embedded anchor bolts for equipment and structural steel – Penetrations for piping and conduits pp g • Advance embedded parts method: – Plate type with studs welded with stud gun – Steel plate reinforced walls: Supports are connected directly to the plate UNRESTRICTED / ILLIMITÉ 30
  • 31. Expansion Anchors • These are anchors drilled into concrete to support structures, systems and components • Objective: – Should reduce the use of expansion anchors to only support conduits and p y pp non-seismically qualified systems and non vibrating equipment – Anchors should not cut reinforcing steel UNRESTRICTED / ILLIMITÉ 31
  • 32. Foundation Construction • Conventional foundation construction methods: – Spread footings, combined footings, mat foundations, pile foundations – In the case of mat foundations, multiple pours are used • Advanced foundation construction methods: – Advances in concrete technology and placement methods have – led to single pours for large mats – Advances in the development of seismic isolations p p permit the – isolation of foundations for structures and equipment and thus – protect them from high seismic events UNRESTRICTED / ILLIMITÉ 32
  • 33. Concrete Construction Above Foundation • Formwork • Conventional formwork: – Slab formwork consists of wood/metal forms supported by shoring – Wall formwork consists of wood/metal face forms held together with form ties – Forms are stripped after concrete has set and achieved sufficient strength so that it can support its dead load plus a small live load • Advanced types of formworks: – Q-deck or left in shutters – Steel plate reinforced walls (no reinforcing steel in walls) – Steel plate modular floors – Pre-fabricated permanent formwork UNRESTRICTED / ILLIMITÉ 33
  • 34. Walls & Columns • Conventional Method: – Place conventional form and pour concrete through trunks up to height of 6 to 7 meters. • Advanced Construction: – Steel plate reinforced walls; – Self consolidating concrete; – Self levelling concrete. UNRESTRICTED / ILLIMITÉ 34
  • 35. Slab, floors and roofs • Conventional Method: – Use conventional concrete mixes conventional reinforcing steel with mixes, lap splicing, conventional formwork Advanced Method: – Use Q Deck or left in shutters in slabs not supporting seismically Q-Deck qualified systems – Modular floors – Steel reinforcement concrete composite structures and Deck Plate construction – Self compacting concrete – Pre-fabricated permanent formwork p UNRESTRICTED / ILLIMITÉ 35
  • 36. Structural Steel Fabrication • Braced frames consisting of columns, beams and bracing, and equipment supporting steel systems • Conventional method – Cutting and welding of structural steel based on two-dimensional fabrication drawings and using manual measurements – Use of clip angles – Maximize welding in shop • Advanced method – Automated fabricating shop – Use of 3D and precision control maintained by lasers – Use of end plate connections UNRESTRICTED / ILLIMITÉ 36
  • 37. Structural Steel Erection • Conventional method: – Use of temporary bracing to align and temporarily support the braced frame structures – Use of conventional high strength steel bolts using torque method such as turn of nut and calibrated wrenches – Maximize bolting and minimize welding at site • Advanced method: – Facilitates modularization and parallel works – Use of buckling restrained braces (BRBs) – Use of twist off bolts UNRESTRICTED / ILLIMITÉ 37
  • 38. Water Proofing • Required for underground structures, basements, large water transporting system, liquid retaining concrete tanks, etc. • Conventional method: – Use of rubber water-stops – Use of external painted waterproofing on structures below ground – Use of sump pump installation • Advanced method: – Use of superior waterproofing material with advance spraying system – Use of fast setting epoxy injection material UNRESTRICTED / ILLIMITÉ 38
  • 39. Backfilling • Used for areas between open cut and buildings; • Used in pipe trenches • Used in landscaping • Conventional method: – Common backfill in open area – Granular backfill adjacent to building and covering piping in trenches • Advanced method: –CCement / sand backfill mixture i used t d b kfill i t is d UNRESTRICTED / ILLIMITÉ 39
  • 40. Yard Services • Storm water drainage system • Sewage system • Plant system, piping and cables • Plant roads • Conventional method: – Backfilled trenches • Advanced method – Tunnels UNRESTRICTED / ILLIMITÉ 40
  • 41. Construction Technologies for Nuclear Power Plant Buildings UNRESTRICTED / ILLIMITÉ 41
  • 42. CONTAINMENT BUILDING • Foundation base slab + steel liner • Containment vessel or steel lined concrete • Containment wall + dome • Shield wall (in double containments) • Internal structures UNRESTRICTED / ILLIMITÉ 42
  • 43. FOUNDATION BASE SLAB + LINER • Large reinforced concrete mat foundations (greater than 5000 m3) • Waterproofing membrane under foundation • Conventional Method: – Multiple pours, placed to minimize shrinkage –CConventional concrete d i mix ti l t design i • Advanced Methods: – Single pour due to improved concrete technology / concrete mixes with low shrinkage cement reduced cement content increased use cement, content, of plasticizer admixtures, etc. – Significant increase in concrete pump use – Increased reliability of batch plants UNRESTRICTED / ILLIMITÉ 43
  • 44. BASE SLAB UNRESTRICTED / ILLIMITÉ 44
  • 45. Example of RB Base Slab Rebar Mat UNRESTRICTED / ILLIMITÉ 45
  • 46. CONTAINMENT WALL • Conventional Method: – Use pre-assembled gang wall forms & construct in multiple repetitive pre assembled concrete lifts between 6 to 7 meters – Concrete placement using trunks to pour concrete; not greater than 1 meter fall – Use vibrators for achieving homogeneity – Carpenter crews are employed for erecting forms – Large scaffolding to set up • Advanced Method: – Slip-forming: – Continuous placing of concrete at p p p g pre-planned rates – Hydraulic lift with jacks moving short section of formwork UNRESTRICTED / ILLIMITÉ 46
  • 47. Climbing Formwork • Climbing formwork is a self supporting formwork system. • Standard steel forms supported from frame • After wall is poured, form is released and rolled back from face • Jacks lift or climb the whole frame up one level • Prefab rebar installed • Formwork panels are closed and next p concrete wall is poured • Standard cycle times UNRESTRICTED / ILLIMITÉ 47
  • 48. CONTAINMENT WALL SLIP-FORMING cont’d. UNRESTRICTED / ILLIMITÉ 48
  • 49. CONTAINMENT WALL SLIP-FORMING cont’d. UNRESTRICTED / ILLIMITÉ 49
  • 50. CONTAINMENT WALL SLIP-FORMING cont’d. UNRESTRICTED / ILLIMITÉ 50
  • 51. CONTAINMENT WALL SLIP-FORMING cont’d. UNRESTRICTED / ILLIMITÉ 51
  • 52. CONTAINMENT WALL cont’d. • Advanced Method cont’d.: – Jump forming: – This method is being used to construct practically all steel lined containment walls – Wall is formed in stages with the form lifted hydraulically or “jumped g y y j p up” to the next stage after concrete has reached sufficient strength – Use of prefabricated rebar modules UNRESTRICTED / ILLIMITÉ 52
  • 54. Jump Forming in Parallel with Liner Construction and Installation UNRESTRICTED / ILLIMITÉ 54
  • 55. Jump Forming and Prefab Rebar Mat UNRESTRICTED / ILLIMITÉ 55
  • 56. Completion of Jump Forming UNRESTRICTED / ILLIMITÉ 56
  • 57. CONTAINMENT DOME • Conventional Method: – Support formwork: – Uses a space truss system and shoring supports from the base slab • Advanced Method: – Use a permanent steel plate dome formwork, lifted into place with a VHL crane – Jump form the dome – Use of prefabricated rebar modules UNRESTRICTED / ILLIMITÉ 57
  • 59. INTERNAL STRUCTURES • Conventional Method: – Use preassembled gang wall forms or hand set forms and construct the wall in multiple repetitive lifts – Construction is up to underside of slabs, construct slab and then proceed with columns and walls up to next slab – Conventional concrete mixes are used – Scaffolding is supported from the base slab and subsequently from the next slab Advanced Methods: – Use Q-deck or left in shutters supported by steel beams, for slabs not supporting seismically qualified systems – Self consolidating concrete – Self levelling concrete – Proposed methods are to use modular floors and modules with mechanical and electrical systems. These activities are performed off site and subsequently, the modules are transported to site and installed with a VHL q y p crane UNRESTRICTED / ILLIMITÉ 59
  • 60. TURBINE BUILDING Significant activities are: – Excavation (significant at coastal sites with large tidal variations) – Dewatering system – Base Slab – Turbine generator Pedestal – Structural Steel – Building Crane (200 tons or greater); UNRESTRICTED / ILLIMITÉ 60
  • 61. TURBINE BUILDING Conventional Method: – Base slab is constructed in multiple pours; – For concrete structures use preassembled gang wall forms and construct the wall in multiple repetitive lifts; – Turbine generator p g pedestal is concreted similar to other concrete structures; – Structural steel is erected with conventional method of erecting braced frames, stabilizing with temporary or permanent braces – Roof trusses are installed on columns after being preassembled on ground; – Building Crane is lifted in to place with a heavy lift transportation crane. crane UNRESTRICTED / ILLIMITÉ 61
  • 62. TURBINE BUILDING cont’d. Advanced Method: – Base slabs – single pour or larger pours – Concrete structures – left in shutters, pumped concrete – Turbine pedestal – seismic isolators and self consolidating concrete, p p pumped concrete – Structural Steel – modularized and installed with heavy lift crane, use of buckling restraint braces, twist off bolts – Turbine building crane – installed with VHL crane UNRESTRICTED / ILLIMITÉ 62
  • 66. Turbine Building Base Mat UNRESTRICTED / ILLIMITÉ 66
  • 69. Wall Rebar Mat UNRESTRICTED / ILLIMITÉ 69