Total Productive Maintenance TPM - Why, What, Where, Who .. Anand Subramaniam
2 “Another flaw in the human character is that everybody wants to build and nobody wants to do maintenance.”  - Kurt Vonnegut
3 Highlights TPM – Overview TPM, TQM, 6S TPM Pillars Losses / Waste / 3 Zero
TPM - Overview
Lean System 5 Peak Performance Pull system / flow production Rapid Changeover / Customer-driven lot size Continuous Waste Reduction Lean Measures 5S  Visual Factory Standardised Work T P M Variation reduction / Six Sigma In-Station Process Control Leadership by Example & Commitment Employee Involvement & Mutual Respect
Current Challenges High numbers of component parts Lack  of innovation / new ideas & change management Huge Losses – high set up, breakdown, defects, adjustment, reduced  speed, yield & productivity Low-quality products & services Workforce lack -  skills,  training,  co-ordination,  accountability, responsibility Challenges Work place – unsafe,  dirty, & untidy Lack of growth potential Lack and / or complicated production procedures Badly designed, outmoded & many "bottleneck” processes High Operational Costs 6
Total  All encompassing by maintenance and production individuals working together ,[object Object]
Aim -  to eliminate all accidents, defects and breakdownsProductive Production goods and services that meet or exceed customers’ expectations ,[object Object]
Production challenges are minimisedMaintenance Keeping equipment and plant in as good as or better than the original conditions at all times ,[object Object]
Repair, clean, lubricateTPM
TPM - What Plant improvement methodology Build quality into equipment maintenance Company wide strategy for equipment, process improvement & a team based effort  A Lean Tool to optimise the effectiveness of manufacturing equipment Continuous improvement of manufacturing process using tools of TQM What Closed-loop measurement of results Aka  Autonomous Maintenance, where users take time to clean, inspect & carry out basic maintenance on their equipment. Employee involvement, & empowerment 8
TPM - Why 9 Organisation ,[object Object]
Less “firefighting” to repair machines
Lower operating costs
Better able to meet commitments to customers
Improved ability to compete in the world marketplaceEmployees ,[object Object]
Better cooperation between maintenance, production, and other departments
Reduced chance of accidents
Higher job satisfaction & improved job security,[object Object]
TPM - Principles Involve everyone & utilise cross-functional teamwork Provide training to upgrade operations & maintenance skills Starts with 5S / Visual Factory Use Overall Equipment Effectiveness (OEE) as a compass for success Improve existing planned maintenance systems Principles Complete elimination of the ‘six major losses’ while striving for a goal of zero unscheduled downtime Reduce life cycle cost 11
TPM – Goals Maintaining Equipment for life and Increase production quality Obtain support and cooperation from top managers to all levels Encourage input from all employees Use teams for continuous improvement Goals Empower and increase job satisfaction Build a comprehensive plant maintenance system based on autonomous small group activities Bring together people from all departments concerned with equipment 12
13 TPM - Strategies Initial Control System Planned Mainten-ance System Operator Autono-mous Mainten-ance Loss Elimination TPM Strategies Education &  Training 3 Zeros -  Defects , Accidents, & Failures
TPM - Benefits Improved capacity & higher productivity Reduced emergency downtime Increased employee skill levels and employee empowerment Increased equipment FPY (first pass yield) / FTT (first time through)  Preventive maintenance costs reduced as equipment operators conduct autonomous maintenance Benefits Engineers, technicians and managers trained in maintenance and quality Improved equipment design eliminates the root cause of defects Increased return on investment 14
TPM – Measures 15 Short Term ,[object Object]
Increase OEE by “y”% within for individual work centersLong Term ,[object Object],[object Object]
TPM & TQM Similarities Employees empowered to initiate action On-going, continuous process improvement Both requires Senior Management commitment Long term outlook, TPM take time to implement & sustain 17
TPM & TQM Differences 18

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Tpm ppt
Tpm pptTpm ppt
Tpm ppt
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Poka Yoke Final Ppt
Poka Yoke  Final PptPoka Yoke  Final Ppt
Poka Yoke Final Ppt
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)TPM: Focused Improvement (Kobetsu Kaizen)
TPM: Focused Improvement (Kobetsu Kaizen)
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Phenomenon & Mechanism Analysis
Phenomenon & Mechanism AnalysisPhenomenon & Mechanism Analysis
Phenomenon & Mechanism Analysis
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
 

Destaque

Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Achuthan Rajagopal
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Anand Subramaniam
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management SystemPeter van Dijk
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
FMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysisFMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysisSoumyajit Bhuin
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect AnalysisECC International
 
failure modes and effects analysis (fmea)
failure modes and effects analysis (fmea)failure modes and effects analysis (fmea)
failure modes and effects analysis (fmea)palanivendhan
 
FMEA 4th Edition for Beginer
FMEA 4th Edition for BeginerFMEA 4th Edition for Beginer
FMEA 4th Edition for BeginerNukool Thanuanram
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationAndy_Watson_Sim
 
Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]ExerciseLeanLLC
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Abou Ibri
 

Destaque (20)

Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)Failure Modes & Effects Analysis (FMEA)
Failure Modes & Effects Analysis (FMEA)
 
Tpm
TpmTpm
Tpm
 
Tpm structure
Tpm structureTpm structure
Tpm structure
 
Tqm tpm kaizen
Tqm tpm kaizenTqm tpm kaizen
Tqm tpm kaizen
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
FMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysisFMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysis
 
F.M.E.C.A pdf
F.M.E.C.A pdfF.M.E.C.A pdf
F.M.E.C.A pdf
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
failure modes and effects analysis (fmea)
failure modes and effects analysis (fmea)failure modes and effects analysis (fmea)
failure modes and effects analysis (fmea)
 
FMEA 4th Edition for Beginer
FMEA 4th Edition for BeginerFMEA 4th Edition for Beginer
FMEA 4th Edition for Beginer
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
 
Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]Fmea Handbook V4.1[1][1]
Fmea Handbook V4.1[1][1]
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Quality audit
Quality auditQuality audit
Quality audit
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
Tqm fmea
Tqm fmeaTqm fmea
Tqm fmea
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 

Semelhante a Total Productive Maintenance

Semelhante a Total Productive Maintenance (20)

TPM&Kaizen(Junu)
TPM&Kaizen(Junu)TPM&Kaizen(Junu)
TPM&Kaizen(Junu)
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
 
Tpm preview
Tpm previewTpm preview
Tpm preview
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Tpm final
Tpm finalTpm final
Tpm final
 
TPM_sample
TPM_sampleTPM_sample
TPM_sample
 
Tpm Sample
Tpm SampleTpm Sample
Tpm Sample
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
 
On concept of Total Productive Maintenance
On concept of Total Productive MaintenanceOn concept of Total Productive Maintenance
On concept of Total Productive Maintenance
 
TQM TPM
TQM TPMTQM TPM
TQM TPM
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 

Mais de Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 

Último

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 

Último (20)

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 

Total Productive Maintenance

  • 1. Total Productive Maintenance TPM - Why, What, Where, Who .. Anand Subramaniam
  • 2. 2 “Another flaw in the human character is that everybody wants to build and nobody wants to do maintenance.” - Kurt Vonnegut
  • 3. 3 Highlights TPM – Overview TPM, TQM, 6S TPM Pillars Losses / Waste / 3 Zero
  • 5. Lean System 5 Peak Performance Pull system / flow production Rapid Changeover / Customer-driven lot size Continuous Waste Reduction Lean Measures 5S Visual Factory Standardised Work T P M Variation reduction / Six Sigma In-Station Process Control Leadership by Example & Commitment Employee Involvement & Mutual Respect
  • 6. Current Challenges High numbers of component parts Lack of innovation / new ideas & change management Huge Losses – high set up, breakdown, defects, adjustment, reduced speed, yield & productivity Low-quality products & services Workforce lack - skills, training, co-ordination, accountability, responsibility Challenges Work place – unsafe, dirty, & untidy Lack of growth potential Lack and / or complicated production procedures Badly designed, outmoded & many "bottleneck” processes High Operational Costs 6
  • 7.
  • 8.
  • 9.
  • 11. TPM - What Plant improvement methodology Build quality into equipment maintenance Company wide strategy for equipment, process improvement & a team based effort A Lean Tool to optimise the effectiveness of manufacturing equipment Continuous improvement of manufacturing process using tools of TQM What Closed-loop measurement of results Aka Autonomous Maintenance, where users take time to clean, inspect & carry out basic maintenance on their equipment. Employee involvement, & empowerment 8
  • 12.
  • 13. Less “firefighting” to repair machines
  • 15. Better able to meet commitments to customers
  • 16.
  • 17. Better cooperation between maintenance, production, and other departments
  • 18. Reduced chance of accidents
  • 19.
  • 20. TPM - Principles Involve everyone & utilise cross-functional teamwork Provide training to upgrade operations & maintenance skills Starts with 5S / Visual Factory Use Overall Equipment Effectiveness (OEE) as a compass for success Improve existing planned maintenance systems Principles Complete elimination of the ‘six major losses’ while striving for a goal of zero unscheduled downtime Reduce life cycle cost 11
  • 21. TPM – Goals Maintaining Equipment for life and Increase production quality Obtain support and cooperation from top managers to all levels Encourage input from all employees Use teams for continuous improvement Goals Empower and increase job satisfaction Build a comprehensive plant maintenance system based on autonomous small group activities Bring together people from all departments concerned with equipment 12
  • 22. 13 TPM - Strategies Initial Control System Planned Mainten-ance System Operator Autono-mous Mainten-ance Loss Elimination TPM Strategies Education & Training 3 Zeros - Defects , Accidents, & Failures
  • 23. TPM - Benefits Improved capacity & higher productivity Reduced emergency downtime Increased employee skill levels and employee empowerment Increased equipment FPY (first pass yield) / FTT (first time through) Preventive maintenance costs reduced as equipment operators conduct autonomous maintenance Benefits Engineers, technicians and managers trained in maintenance and quality Improved equipment design eliminates the root cause of defects Increased return on investment 14
  • 24.
  • 25.
  • 26. TPM & TQM Similarities Employees empowered to initiate action On-going, continuous process improvement Both requires Senior Management commitment Long term outlook, TPM take time to implement & sustain 17
  • 27. TPM & TQM Differences 18
  • 28.
  • 29.
  • 31.
  • 34. TPM - 8 Activity Pillars 21 TPM Pillar Autonomous Maintenance Individual Improvement Planned Maintenance Quality Maintenance Education & Training Office TPM Safety, Health & Environment 5S – Initial Phase Management System
  • 35. Aims – Each TPM Activity Pillar 22 Individual improvementactivities Improvement of equipment efficiency via the pursuit of zero loss, and improvement of technical capabilities Eight pillars of TPM activities Establishment of the autonomous maintenance system Training of personnel proficient in equipment and work, and capable of maintenance management Establishment of the planned maintenance system Establishment of the plans and a management system to realise zero failure equipment, and prevent failures Establishment of the initial-phase management system Establishment of systems to shorten the development period, and to enable one-short start up Establishment of conditions for zero failures to prevent defects, and establishment of systems for maintenance and management Establishment of the quality maintenance system Establish office TPM systems to improve efficiency of admin & support Establishment of an efficient office where office work loss is eliminated Establishment of systems to systematically foster personnel proficient in equipment and work Establishment of the systems for education and training Establishment of the systems for safety, health and the environment Establishment of active plants which are safe and secure for workers
  • 37. Losses / Waste – 6 Major Losses Defect Losses Defects in process Reduced yield between start of production and stable production Down Time Losses Equipment failures Set-up and adjustments Speed Losses Idling and minor stoppages Reduced speed (actual operating vs. designed)
  • 38.
  • 39. Past examples of malfunctions
  • 40.
  • 42. # of equipment failures
  • 44. 26 “All parts should go together without forcing. You must remember that the parts you are reassembling were disassembled by you. Therefore, if you can't get them together again, there must be a reason. By all means, do not use a hammer.” - IBM maintenance manual
  • 45. 27 Good Luck http://www.linkedin.com/in/anandsubramaniam