Kaizen Events - Blitz (Kaikaku ) & Lean Projects Drive quick improvements which lead to a leaner business operating system Anand Subramaniam
2 “Manpower is something that is beyond measurement.  Capabilities can be extended indefinitely when everyone begins to think.” - TaiichiOhno
Highlights Kaizen Overview Kaizen Event – Kaikaku / Kaizen Blitz / Kaizen Super Kaizen Event – Implementation Kaizen Blitz Lean Project with Kaizen Kaizen – Problem Solving Manage – Stakeholders & Change Kaizen Workshops Kaizen – Tools & Techniques 3
Kaizen - Overview
Kaizen  5 Kaizen 改善改 Kai = To Break善 Zen = For the Better
Kaizen – Origination A tool developed by Toyota, as part Toyota Production System (TPS) to enable continued improvement It began as "Quality Circles," where manufacturing staff solved quality issues within a structured - team framework, using specific tools Adapted by many firms around the world as a way of accelerating improvements 6
7 Why Kaizen ? Reduces scrap & defects while minimising the need for capital expenditures Reduces lead times and WIP dramatically Improves Safety, Quality, and Delivery, by the elimination of waste (muda) in its many forms Clear objectives and measurement focus Assists management to find new ways to gain substantial savings in time, space and labor output Why? Uses creativity before capital Improves worker productivity  by breaking down “silos” within & between depts. & divisions Empowers workers who know the situation best,  to make decisions  in the quickest time Data driven, fact based and improves standard operation procedures
Kaizen – Principles Team process Clear objectives Quick and simple, action first Tight focus on time (one week) Necessary resources available right away Immediate results (new process functioning by end of week) 8
Kaizen Strategies / Goals Prioritising problems Elimination of wastes (8W) Define clear leadership initiatives Create a culture where Perfection is perpetually chased Teamwork: train employees (Kaizen & problem solving) Communicate ideas up and down company hierarchy; every one is encouraged to seek out and exploit new opportunities 9
10 Kaizen – Blitz & Projects Reduce setup times - SMED Establish new metrics Visual factory Reduce WIP MRO Eliminates long conveyor assembly lines with cells Combine operations Kaizen Projects New product development Change process 5 S Determine proper tooling needed and organise Reduce lot sizes Load level schedule Improve safety
Kaizen – Key Success Factors It should change / remove the “Value Stream” (VS) constraint(s)  Be certain to define whole “VS” metrics when, determining and assessing the impact of a Kaizen implementation Redeploy resources so that they contribute to adding value; not just eliminating them Ensure Value Stream Mapping (VSM) process is implemented correctly, this will end up with a list of potential Kaizen events as actions lists on the Implementation Plan A Kaizen is an ACTION that, increases “Value” in the VS.  It must have a permanent positive impact on the VS as a whole, in order to be called Kaizen 11
Kaizen Event – Kaikaku / Kaizen Blitz / Kaizen Super
Kaizen Event A Kaizen event is any planned action that causes a Current State Map (“As~Is”) to become obsolete and that causes the Value Stream's productivity to permanently* change for good.  * by permanently means ..until the next Kaizen improves it further... 13
14 Why Kaizen Events? Kaizen drives the improvements which lead to a leaner  business operating system Future State (Lean) (To~Be) Current State (As~Is) Kaizen
What is a Kaizen Event? Kaizen Event Specific Goals  Short time frame  Specific Deliverables  Dedicated Resources Highly focused activities  Continuous Improvement Teams work together to create radical change Also known as Kaizen Super Kaizen Blitz Kaikaku Lean Event Rapid Fire Lean  Rapid Continuous Improvement Event  15
Kaizen Event – Goal / Objective Improve an area of the business Throughput  Labor Efficiency Waste  / Space Reduction Output Improvement Quality or Mistake Proofing  Employee Involvement  Culture change Trying out ideas Manageable Initiatives that can be done right away (Not OPEX / CAPEX projects)  16
Kaizen Event - Resource Involvement Dedicated Resources No other responsibilities for event duration  8 hours for 5 days Core Team Members Event Leader Subject matter expert (non) operations Process Owner / Supervisor (from the target area) 17
Core team expectation during an event Hear out every member’s ideas Group decides on direction  Ideas should be tried & tested Accountable to the goals established Work as a group throughout the period (no rank, no title) Everyone must be a full participant (no observers) for 3 ~ 5 days 18
Kaizen Event - Implementation
Kaizen Umbrella Quality Improvement Customer Orientation Total Quality Control Discipline in Work Place Productivity Improvement Total Productive Maintenance New Product Development Co-operative Labour Management Relations Kanban Robotics Zero Defect Q.C. Circle Automation Just-in–Time Suggestion System Small Group Activity 20
Kaizen Event – Key Principles Say “ NO “ to status quo  Good ideas come when the going gets tough Do not look for excuses, find ways to make it happen  Do not worry about being perfect - even if you get half way - Start now  If something is wrong fix it on the spot Get rid of old assumptions  It does not have to cost a lot of money to improve the process Look for wisdom from the team rather than one individual Do not stop asking questions till root causes of problems are established  Never stop doing Kaizen event 21
Kaizen Events – Concepts / Application Widely applicable – Can be used in both manufacturing and non-manufacturing environments Team based & cross functional – Team members can be from various functions of the business. Top management participation is encouraged. Planned & tied to business goals – Events are planned in advance and tied to business goals and or value streams. Planning is critical to the success of the event. Focused in scope – Events are very focused, Don’t take too much on at one time! …. 22
Kaizen Events (Contd.) Short term, fast & iterative – Events last approximately 2 to 5 days. Even though the process has gotten better you may have to repeat events on the same process… Continuous Improvement  Based on IMPLEMENTATION – Events are biased to ACTION.   Plan your events on DOING……… Highly effective & results oriented - Kaizen events will generate quick results. Measurable results. Establish the baseline, and measure the change!  A Learning Experience – Every member of a Kaizen Team will walk away from the event learning something new! 23
Kaizen Cycle  24 Start Here Do It Again Celebrate Document Reality Make this the Standard Identify Waste Kaizen Measure Results Plan Counter- measures Verify Change Reality Check Make Changes
Kaizen Event - Implementation Successful implementation of Kaizen Event, include – 5-S 8-W  The 5 Whys Value Stream Mapping PDCA (Plan, Do, Check, Act) 25
Typical Kaizen Event ( 3 ~ 5 days) Team training (1/2 day)  Lean overview  Structure of Kaizen event  Team conducts Kaizen on the factory floor area (2.5 ~ 3.5 days)  Identifying problems  Defining current process  Observing, sketching process and collecting data  Brainstorming suggestions for improvement Implementing solutions (rearrange equipment, modify machines, change methods, etc)  Team measures improvements and verifies solutions (0.5 day) Team presents results to management, co-workers and shop floor personnel (0.5 day) 26
27 Kaizen Event – Roadmap Conceptual Training Kaizen on factory floor area  Measure Improvement Evaluate Improvements Present & Celebrate Day 1 Day 2 Day 3 Day 4 Day 5 ,[object Object]
Standard Operations
5S
Kaizen Methodology
Tools & Techniques
Discover Problem
Measure & Analyse Current Work Process
Brainstorm solutions & formulate Process Improvements
Create and map new process
Apply rapid implementa-tion
Establish New Standard Process
Operate Using New Standard Process
Finalise New Standard Process
Monitor & Control
Present Results and Celebrate,[object Object]
Kaizen Blitz
Kaizen Blitz A Kaizen Blitz is an intense and rapid improvement process in which a team or a department throws all its resources into an improvement project over a short time period, as opposed to traditional Kaizen applications, which are performed on a part-time basis
Kaizen Blitz - Benefits Required resources are low Change is almost immediate Relatively simple to plan and implement Many small improvements can be as, if not more, beneficial than larger scale changes
Lean Project with Kaizen
33 Kaizen – Implementation Roadmap Project / Change Management Diagnostic Kaizen Sustain Planning Pre Diagnois-tic Plan Manage Stakeholder Expectations Continuous Improvement Plan (Define) As~Is Collect Date Business Improvement To~Be Monitor Execute VSM, 7W, Takt, 5S,  Prioritise (Future Projects) DMA IC   1   ~   4          5                6                7	     8     9    10  	      11 ~  15 Weeks
Planning / Diagnose Phase Planning and preparing for kaizen events includes:  Collecting background data Selecting a target area and problem Scheduling the event Selecting team members Making all preparations for a successful event 34
Kaizen Phase Process changes are made.  Typical steps include:  Team orientation Gathering baseline data (time studies, etc.)  Mapping the process Brainstorming improvement ideas Testing ideas – visioning process Analysing the results / quality assurance  Documenting the new process, and  Presenting the results 35
Monitor, Control & Sustain Phase Closure and follow-up activities, to ensure that the results of a Kaizen event are communicated and sustained. Typical steps include:  Lesson learnt and highlight improvements made during the event on bulletin boards / newsletters Celebrate success, recognise and award team member contributions Hold monthly “mini-meetings” to discuss the need for adjustments and to ensure unresolved actions are completed 36
Kaizen – Problem Solving
Kaizen – Eliminate the Gap 38 Eliminate the Gap! Kaizen will help us do that    Customer	                         Supplier
Kaizen - Steps Select a bottleneck situation Understand the “Current State” of the bottleneck Brainstorm the “Future State” to set improvement goals.  Implement within the five days Then use the 30 day opportunity log to finish up any items requiring more time 39
Kaizen – Teams Understand Goals and objectives Team rules and guidelines Know the process Members - dedicated or volunteers  Team performance evaluation Team reward and recognition 40
Kaizen – Goal Setting Team must define the purpose / objective State the desired goal of the process and set aggressive stretch goals  Goals should be “SMART” (e.g. Reduce machine set up time in the fabrication process, from 65% to 75% by 30.06.2010) 41
Kaizen – Team Charter Challenge Everything and NOT a license to spend No action – no success Focus on improving things, not pointing fingers Quick and simple is better than slow and fancy If it doesn’t work out, can always go back to the way it used to be 42
Lesson Learned Get everyone involved Complete all actions on time Take photos before and after Your customer or your CFO should see results Management support critical for long term success Plan events that support company goals (avoid “shotgun Kaizen”) It’s easier to cut costs by 10% than it is to increase sales by 10% 43
Manage – Stakeholders & Change
Stakeholder (Sponsor) Engagement  45 SPONSORS CHANGE AGENTS TARGETS
46 Sponsor’s Role Model a confident and constructive view of change  Solicit feedback Understand the need for the change and help others design the “Future State”  Monitor and readjust priorities & allocate resources  Acknowledge what people are experiencing and give them opportunity to express it  Sponsor Show personal support – both public and private - throughout the change  Hold Change Agents & the Targets accountable Change the reward / recognition system
47 Change Agent’s Role Modify time frames / resources as needed Integrate the change into the culture Exhibit leader behavior and create dissatisfaction with the “status quo” Plan and/or implement the “communication”, “education & training” and “reward” strategies Understand the need for the change & the impact on all involved Change Agent Communicate the change clearly and CONSTANTLY Involve the Targets in planning whenever possible Manage the change resources
48 Targets Successful Change   begins with understanding the Targets of the change Think first about what they have to give up, not what they’ll get Be concerned that they don’t have enough skill or resources Feel alone even if everyone else is going through the change Targets Feel self conscious and ill at ease when confronted by change Be at different levels of readiness for change Only be able to handle so much change Try to go back to doing things the “right way” when the pressure is off
49 Resistance It would have worked in other places but not here We need to spend more time thinking about it We’ve tried something like this before   We don’t have time for this It’s a good idea; it just won’t fit here Resistance It’s impossible; it just won’t work The union / shop floor / etc. won’t go for it Too many changes have been made already It will cause conflict / difficulty / chaos I just want to be left alone to do my job / my thing  It’s unrealistic; reality will kill it The company is doing fine already; who needs it?
50 Resistance - Reasons  Freeze ,[object Object]
Too much effort for so little gain
Change is a criticism of my past performance
Don’t trust the Change Agents
Don’t trust the SponsorsUnfreeze ,[object Object]
Don’t believe organisation can get through transition and too much disruption
Nobody asked my opinion

Mais conteúdo relacionado

Mais procurados

Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues ImprovementShravan Bhumkar
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?Tina Arora
 
Kanban
KanbanKanban
Kanbanatif22
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingOperational Excellence Consulting
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training jah10632
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 

Mais procurados (20)

Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Lean basics
Lean basicsLean basics
Lean basics
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues Improvement
 
How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?How to Introduce Operational Excellence in your Organisation?
How to Introduce Operational Excellence in your Organisation?
 
Lean principles
Lean principlesLean principles
Lean principles
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Dmaic
DmaicDmaic
Dmaic
 
Kanban
KanbanKanban
Kanban
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence Consulting
 
Spaghetti Diagrams
Spaghetti DiagramsSpaghetti Diagrams
Spaghetti Diagrams
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training
 
Kaizen | Continuous Improvement for Organization
Kaizen | Continuous Improvement for OrganizationKaizen | Continuous Improvement for Organization
Kaizen | Continuous Improvement for Organization
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
Kaizen Poster
Kaizen PosterKaizen Poster
Kaizen Poster
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 

Destaque (20)

Toyota Kata Summary
Toyota Kata SummaryToyota Kata Summary
Toyota Kata Summary
 
Developing A Lean Culture by Gregg Miner
Developing A Lean Culture by Gregg MinerDeveloping A Lean Culture by Gregg Miner
Developing A Lean Culture by Gregg Miner
 
Toyota Kata
Toyota KataToyota Kata
Toyota Kata
 
Learning to learn with the improvement kata
Learning to learn with the improvement kataLearning to learn with the improvement kata
Learning to learn with the improvement kata
 
Kata Slides & Graphics v4.1
Kata Slides & Graphics v4.1Kata Slides & Graphics v4.1
Kata Slides & Graphics v4.1
 
Introduction to the Improvement Kata
Introduction to the Improvement KataIntroduction to the Improvement Kata
Introduction to the Improvement Kata
 
Material Handling
Material Handling Material Handling
Material Handling
 
Quality Tools
Quality ToolsQuality Tools
Quality Tools
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
Process Audit
Process AuditProcess Audit
Process Audit
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
Solving Client Issues
Solving Client IssuesSolving Client Issues
Solving Client Issues
 
Link (Non)Financial To Supply Chain Performance Metrics
Link (Non)Financial To Supply Chain Performance MetricsLink (Non)Financial To Supply Chain Performance Metrics
Link (Non)Financial To Supply Chain Performance Metrics
 
5 S – Manufacturing Audit
5 S – Manufacturing Audit5 S – Manufacturing Audit
5 S – Manufacturing Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
QMS & ISO 9001:2000
QMS & ISO 9001:2000QMS & ISO 9001:2000
QMS & ISO 9001:2000
 
Innovation
InnovationInnovation
Innovation
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 

Semelhante a Kaizen Events Blitz & Lean Projects

Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen EventsStephen Depoe
 
Lean Mfg Takeawayssharing
Lean Mfg TakeawayssharingLean Mfg Takeawayssharing
Lean Mfg TakeawayssharingFNian
 
Kaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewKaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewJaroslaw Gadek, MBA
 
Lean tool- Kaizen
Lean tool- KaizenLean tool- Kaizen
Lean tool- KaizenAntara Paul
 
Product development kaizen (PDK)
Product  development kaizen (PDK)Product  development kaizen (PDK)
Product development kaizen (PDK)Glen Alleman
 
Kaizen folder
Kaizen folderKaizen folder
Kaizen folderrey0708
 
Dennis Stevens - Using Agile and Lean to Lead Business Transformation
Dennis Stevens - Using Agile and Lean to Lead Business TransformationDennis Stevens - Using Agile and Lean to Lead Business Transformation
Dennis Stevens - Using Agile and Lean to Lead Business TransformationSFA
 
Product development kaizen (pdk)
Product  development kaizen (pdk)Product  development kaizen (pdk)
Product development kaizen (pdk)Glen Alleman
 
Kaizen - the key of continuos improvement
Kaizen - the key of continuos improvementKaizen - the key of continuos improvement
Kaizen - the key of continuos improvementluca mezzalira
 
Organizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile PracticesOrganizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile PracticesLean India Summit
 
Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A JourneyAnand Subramaniam
 
Conducting a Kaizen.pdf
Conducting a Kaizen.pdfConducting a Kaizen.pdf
Conducting a Kaizen.pdfVijay Khonde
 
Product development kaizen (PDK)
Product  development kaizen (PDK)Product  development kaizen (PDK)
Product development kaizen (PDK)Glen Alleman
 
How to Navigate the Transformation Continuum
How to Navigate the Transformation ContinuumHow to Navigate the Transformation Continuum
How to Navigate the Transformation ContinuumKaiNexus
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma OverviewRon Drew
 

Semelhante a Kaizen Events Blitz & Lean Projects (20)

Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
 
Lean Mfg Takeawayssharing
Lean Mfg TakeawayssharingLean Mfg Takeawayssharing
Lean Mfg Takeawayssharing
 
Kaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_previewKaizen the continuous_improvement_way_preview
Kaizen the continuous_improvement_way_preview
 
Lean tool- Kaizen
Lean tool- KaizenLean tool- Kaizen
Lean tool- Kaizen
 
Product development kaizen (PDK)
Product  development kaizen (PDK)Product  development kaizen (PDK)
Product development kaizen (PDK)
 
Kaizen folder
Kaizen folderKaizen folder
Kaizen folder
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
Dennis Stevens - Using Agile and Lean to Lead Business Transformation
Dennis Stevens - Using Agile and Lean to Lead Business TransformationDennis Stevens - Using Agile and Lean to Lead Business Transformation
Dennis Stevens - Using Agile and Lean to Lead Business Transformation
 
Product development kaizen (pdk)
Product  development kaizen (pdk)Product  development kaizen (pdk)
Product development kaizen (pdk)
 
Kaizen - the key of continuos improvement
Kaizen - the key of continuos improvementKaizen - the key of continuos improvement
Kaizen - the key of continuos improvement
 
Organizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile PracticesOrganizational growth towards Lean by adopting Agile Practices
Organizational growth towards Lean by adopting Agile Practices
 
Lean Transformation ~ A Journey
Lean Transformation ~ A JourneyLean Transformation ~ A Journey
Lean Transformation ~ A Journey
 
Assignment kaizen
Assignment kaizenAssignment kaizen
Assignment kaizen
 
Strategy Execution
Strategy ExecutionStrategy Execution
Strategy Execution
 
Kaizen Event
Kaizen EventKaizen Event
Kaizen Event
 
Kaizen
KaizenKaizen
Kaizen
 
Conducting a Kaizen.pdf
Conducting a Kaizen.pdfConducting a Kaizen.pdf
Conducting a Kaizen.pdf
 
Product development kaizen (PDK)
Product  development kaizen (PDK)Product  development kaizen (PDK)
Product development kaizen (PDK)
 
How to Navigate the Transformation Continuum
How to Navigate the Transformation ContinuumHow to Navigate the Transformation Continuum
How to Navigate the Transformation Continuum
 
RDrew Six Sigma Overview
RDrew Six Sigma OverviewRDrew Six Sigma Overview
RDrew Six Sigma Overview
 

Mais de Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Service / Product Innovation
Service / Product InnovationService / Product Innovation
Service / Product Innovation
 
Innovation Assessment & Tools
Innovation Assessment & ToolsInnovation Assessment & Tools
Innovation Assessment & Tools
 

Último

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Último (20)

Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Kaizen Events Blitz & Lean Projects

  • 1. Kaizen Events - Blitz (Kaikaku ) & Lean Projects Drive quick improvements which lead to a leaner business operating system Anand Subramaniam
  • 2. 2 “Manpower is something that is beyond measurement. Capabilities can be extended indefinitely when everyone begins to think.” - TaiichiOhno
  • 3. Highlights Kaizen Overview Kaizen Event – Kaikaku / Kaizen Blitz / Kaizen Super Kaizen Event – Implementation Kaizen Blitz Lean Project with Kaizen Kaizen – Problem Solving Manage – Stakeholders & Change Kaizen Workshops Kaizen – Tools & Techniques 3
  • 5. Kaizen 5 Kaizen 改善改 Kai = To Break善 Zen = For the Better
  • 6. Kaizen – Origination A tool developed by Toyota, as part Toyota Production System (TPS) to enable continued improvement It began as "Quality Circles," where manufacturing staff solved quality issues within a structured - team framework, using specific tools Adapted by many firms around the world as a way of accelerating improvements 6
  • 7. 7 Why Kaizen ? Reduces scrap & defects while minimising the need for capital expenditures Reduces lead times and WIP dramatically Improves Safety, Quality, and Delivery, by the elimination of waste (muda) in its many forms Clear objectives and measurement focus Assists management to find new ways to gain substantial savings in time, space and labor output Why? Uses creativity before capital Improves worker productivity by breaking down “silos” within & between depts. & divisions Empowers workers who know the situation best, to make decisions in the quickest time Data driven, fact based and improves standard operation procedures
  • 8. Kaizen – Principles Team process Clear objectives Quick and simple, action first Tight focus on time (one week) Necessary resources available right away Immediate results (new process functioning by end of week) 8
  • 9. Kaizen Strategies / Goals Prioritising problems Elimination of wastes (8W) Define clear leadership initiatives Create a culture where Perfection is perpetually chased Teamwork: train employees (Kaizen & problem solving) Communicate ideas up and down company hierarchy; every one is encouraged to seek out and exploit new opportunities 9
  • 10. 10 Kaizen – Blitz & Projects Reduce setup times - SMED Establish new metrics Visual factory Reduce WIP MRO Eliminates long conveyor assembly lines with cells Combine operations Kaizen Projects New product development Change process 5 S Determine proper tooling needed and organise Reduce lot sizes Load level schedule Improve safety
  • 11. Kaizen – Key Success Factors It should change / remove the “Value Stream” (VS) constraint(s) Be certain to define whole “VS” metrics when, determining and assessing the impact of a Kaizen implementation Redeploy resources so that they contribute to adding value; not just eliminating them Ensure Value Stream Mapping (VSM) process is implemented correctly, this will end up with a list of potential Kaizen events as actions lists on the Implementation Plan A Kaizen is an ACTION that, increases “Value” in the VS. It must have a permanent positive impact on the VS as a whole, in order to be called Kaizen 11
  • 12. Kaizen Event – Kaikaku / Kaizen Blitz / Kaizen Super
  • 13. Kaizen Event A Kaizen event is any planned action that causes a Current State Map (“As~Is”) to become obsolete and that causes the Value Stream's productivity to permanently* change for good. * by permanently means ..until the next Kaizen improves it further... 13
  • 14. 14 Why Kaizen Events? Kaizen drives the improvements which lead to a leaner business operating system Future State (Lean) (To~Be) Current State (As~Is) Kaizen
  • 15. What is a Kaizen Event? Kaizen Event Specific Goals Short time frame Specific Deliverables Dedicated Resources Highly focused activities Continuous Improvement Teams work together to create radical change Also known as Kaizen Super Kaizen Blitz Kaikaku Lean Event Rapid Fire Lean Rapid Continuous Improvement Event 15
  • 16. Kaizen Event – Goal / Objective Improve an area of the business Throughput Labor Efficiency Waste / Space Reduction Output Improvement Quality or Mistake Proofing Employee Involvement Culture change Trying out ideas Manageable Initiatives that can be done right away (Not OPEX / CAPEX projects) 16
  • 17. Kaizen Event - Resource Involvement Dedicated Resources No other responsibilities for event duration 8 hours for 5 days Core Team Members Event Leader Subject matter expert (non) operations Process Owner / Supervisor (from the target area) 17
  • 18. Core team expectation during an event Hear out every member’s ideas Group decides on direction Ideas should be tried & tested Accountable to the goals established Work as a group throughout the period (no rank, no title) Everyone must be a full participant (no observers) for 3 ~ 5 days 18
  • 19. Kaizen Event - Implementation
  • 20. Kaizen Umbrella Quality Improvement Customer Orientation Total Quality Control Discipline in Work Place Productivity Improvement Total Productive Maintenance New Product Development Co-operative Labour Management Relations Kanban Robotics Zero Defect Q.C. Circle Automation Just-in–Time Suggestion System Small Group Activity 20
  • 21. Kaizen Event – Key Principles Say “ NO “ to status quo Good ideas come when the going gets tough Do not look for excuses, find ways to make it happen Do not worry about being perfect - even if you get half way - Start now If something is wrong fix it on the spot Get rid of old assumptions It does not have to cost a lot of money to improve the process Look for wisdom from the team rather than one individual Do not stop asking questions till root causes of problems are established Never stop doing Kaizen event 21
  • 22. Kaizen Events – Concepts / Application Widely applicable – Can be used in both manufacturing and non-manufacturing environments Team based & cross functional – Team members can be from various functions of the business. Top management participation is encouraged. Planned & tied to business goals – Events are planned in advance and tied to business goals and or value streams. Planning is critical to the success of the event. Focused in scope – Events are very focused, Don’t take too much on at one time! …. 22
  • 23. Kaizen Events (Contd.) Short term, fast & iterative – Events last approximately 2 to 5 days. Even though the process has gotten better you may have to repeat events on the same process… Continuous Improvement Based on IMPLEMENTATION – Events are biased to ACTION. Plan your events on DOING……… Highly effective & results oriented - Kaizen events will generate quick results. Measurable results. Establish the baseline, and measure the change! A Learning Experience – Every member of a Kaizen Team will walk away from the event learning something new! 23
  • 24. Kaizen Cycle 24 Start Here Do It Again Celebrate Document Reality Make this the Standard Identify Waste Kaizen Measure Results Plan Counter- measures Verify Change Reality Check Make Changes
  • 25. Kaizen Event - Implementation Successful implementation of Kaizen Event, include – 5-S 8-W The 5 Whys Value Stream Mapping PDCA (Plan, Do, Check, Act) 25
  • 26. Typical Kaizen Event ( 3 ~ 5 days) Team training (1/2 day) Lean overview Structure of Kaizen event Team conducts Kaizen on the factory floor area (2.5 ~ 3.5 days) Identifying problems Defining current process Observing, sketching process and collecting data Brainstorming suggestions for improvement Implementing solutions (rearrange equipment, modify machines, change methods, etc) Team measures improvements and verifies solutions (0.5 day) Team presents results to management, co-workers and shop floor personnel (0.5 day) 26
  • 27.
  • 29. 5S
  • 33. Measure & Analyse Current Work Process
  • 34. Brainstorm solutions & formulate Process Improvements
  • 35. Create and map new process
  • 38. Operate Using New Standard Process
  • 41.
  • 43. Kaizen Blitz A Kaizen Blitz is an intense and rapid improvement process in which a team or a department throws all its resources into an improvement project over a short time period, as opposed to traditional Kaizen applications, which are performed on a part-time basis
  • 44. Kaizen Blitz - Benefits Required resources are low Change is almost immediate Relatively simple to plan and implement Many small improvements can be as, if not more, beneficial than larger scale changes
  • 46. 33 Kaizen – Implementation Roadmap Project / Change Management Diagnostic Kaizen Sustain Planning Pre Diagnois-tic Plan Manage Stakeholder Expectations Continuous Improvement Plan (Define) As~Is Collect Date Business Improvement To~Be Monitor Execute VSM, 7W, Takt, 5S, Prioritise (Future Projects) DMA IC 1 ~ 4 5 6 7 8 9 10 11 ~ 15 Weeks
  • 47. Planning / Diagnose Phase Planning and preparing for kaizen events includes: Collecting background data Selecting a target area and problem Scheduling the event Selecting team members Making all preparations for a successful event 34
  • 48. Kaizen Phase Process changes are made. Typical steps include: Team orientation Gathering baseline data (time studies, etc.) Mapping the process Brainstorming improvement ideas Testing ideas – visioning process Analysing the results / quality assurance Documenting the new process, and Presenting the results 35
  • 49. Monitor, Control & Sustain Phase Closure and follow-up activities, to ensure that the results of a Kaizen event are communicated and sustained. Typical steps include: Lesson learnt and highlight improvements made during the event on bulletin boards / newsletters Celebrate success, recognise and award team member contributions Hold monthly “mini-meetings” to discuss the need for adjustments and to ensure unresolved actions are completed 36
  • 51. Kaizen – Eliminate the Gap 38 Eliminate the Gap! Kaizen will help us do that Customer Supplier
  • 52. Kaizen - Steps Select a bottleneck situation Understand the “Current State” of the bottleneck Brainstorm the “Future State” to set improvement goals. Implement within the five days Then use the 30 day opportunity log to finish up any items requiring more time 39
  • 53. Kaizen – Teams Understand Goals and objectives Team rules and guidelines Know the process Members - dedicated or volunteers Team performance evaluation Team reward and recognition 40
  • 54. Kaizen – Goal Setting Team must define the purpose / objective State the desired goal of the process and set aggressive stretch goals Goals should be “SMART” (e.g. Reduce machine set up time in the fabrication process, from 65% to 75% by 30.06.2010) 41
  • 55. Kaizen – Team Charter Challenge Everything and NOT a license to spend No action – no success Focus on improving things, not pointing fingers Quick and simple is better than slow and fancy If it doesn’t work out, can always go back to the way it used to be 42
  • 56. Lesson Learned Get everyone involved Complete all actions on time Take photos before and after Your customer or your CFO should see results Management support critical for long term success Plan events that support company goals (avoid “shotgun Kaizen”) It’s easier to cut costs by 10% than it is to increase sales by 10% 43
  • 58. Stakeholder (Sponsor) Engagement 45 SPONSORS CHANGE AGENTS TARGETS
  • 59. 46 Sponsor’s Role Model a confident and constructive view of change Solicit feedback Understand the need for the change and help others design the “Future State” Monitor and readjust priorities & allocate resources Acknowledge what people are experiencing and give them opportunity to express it Sponsor Show personal support – both public and private - throughout the change Hold Change Agents & the Targets accountable Change the reward / recognition system
  • 60. 47 Change Agent’s Role Modify time frames / resources as needed Integrate the change into the culture Exhibit leader behavior and create dissatisfaction with the “status quo” Plan and/or implement the “communication”, “education & training” and “reward” strategies Understand the need for the change & the impact on all involved Change Agent Communicate the change clearly and CONSTANTLY Involve the Targets in planning whenever possible Manage the change resources
  • 61. 48 Targets Successful Change begins with understanding the Targets of the change Think first about what they have to give up, not what they’ll get Be concerned that they don’t have enough skill or resources Feel alone even if everyone else is going through the change Targets Feel self conscious and ill at ease when confronted by change Be at different levels of readiness for change Only be able to handle so much change Try to go back to doing things the “right way” when the pressure is off
  • 62. 49 Resistance It would have worked in other places but not here We need to spend more time thinking about it We’ve tried something like this before We don’t have time for this It’s a good idea; it just won’t fit here Resistance It’s impossible; it just won’t work The union / shop floor / etc. won’t go for it Too many changes have been made already It will cause conflict / difficulty / chaos I just want to be left alone to do my job / my thing It’s unrealistic; reality will kill it The company is doing fine already; who needs it?
  • 63.
  • 64. Too much effort for so little gain
  • 65. Change is a criticism of my past performance
  • 66. Don’t trust the Change Agents
  • 67.
  • 68. Don’t believe organisation can get through transition and too much disruption
  • 69. Nobody asked my opinion
  • 70. The change is Irreversible
  • 72.
  • 76. Caused a loss of jobs
  • 77.
  • 78.
  • 80. Clearly define the Desired State
  • 81. Identify what is not going to change
  • 82.
  • 83. Provide information and answers in a variety of ways
  • 84. Create safe ways to express resistance
  • 86.
  • 87. Communicate positive results of Desired State
  • 88. Acknowledge the price they have paid
  • 89.
  • 90. Assess gap between current knowledge/skill level and desired level
  • 91.
  • 92. Provide training about change and the change process
  • 93.
  • 95.
  • 96. Identify behaviors that are desired and need to be encouraged
  • 97.
  • 98. Reward incremental steps toward new performance levels
  • 99.
  • 100. Reward achievement of new performance measurements
  • 101. Do not reward or ignore undesirable performance
  • 102.
  • 103.
  • 109. ‘Fairs’ to involve stakeholders
  • 110.
  • 111. Every idea gets a response
  • 112.
  • 118.
  • 119. Charter the workshop and contract with Sponsor
  • 120. Sensing Sessions to collect data, identify issues and refine the problem/ opportunity statement
  • 122. Collect background data and determine topic questions
  • 123. Design Workshop meeting agenda and plan logistics
  • 124. Identify participants and communicate expectations
  • 125.
  • 126. Kaizen Workshop – Characteristics A focus on an area or process to achieve a specific goal Includes a team that is empowered to make changes Team make-up should include: operators, maintenance, quality, outside eyes and a process owner (If possible a customer) Supported by Management with $$, time, and frequent “Gemba” activity Managed to resolution and a commitment to sustain 58
  • 127. Pre-Kaizen Workshop – Planning Define the opportunity cost, quality, delivery, waste, safety, morale etc – Be Specific Form & train the team Must be dedicated resources and commited Must be trained in specifics regarding the task at hand. (ie: process knowledge, lean tools) Set goals / collect baseline data Is the problem well understood – what does success look like? Leader & team responsibilities 59
  • 128. Kaizen Teams Team composition & training is critical to the success of the team Composition should reflect the diversity of the work center / shop floor / warehouse A team generally consists of 3 ~ 8 people Each member will be chosen to perform a specific role 60
  • 129. Kaizen – Engagement Rules Respect others Particularly the local operators, you are in their living room Document reality If you make changes based on data, the data should be based on reality Do your share Everyone has to contribute 61
  • 130. Kaizen – Engagement Rules (Contd) Try something new Be open minded - try it instead of racking your brain for reasons why it won’t work (try-storming) Ask why (the 5 why’s) Gain complete understanding, assume nothing Be safe / Think safe Both in your actions and in what you implement 62
  • 131. Kaizen – Do & Do Not Do Do Not Open minded to all approaches Try as many ideas as possible. Minimum of three (3) Do as many observations of reality as possible (10) Do include one person who is convinced it can’t be done Do make sure management is committed to resolving the issue and supporting the team Assume everything is good on what you hear (see it with your eyes) Just sit around but brainstorm (justify the current way things are done) Assume you know the problem Hold a Kaizen to resolve an issue that is not driving a business goal 63
  • 132. Kaizen – Tools / Techniques
  • 133.
  • 135. Set targets and enter on Target Progress Report
  • 136. Plan & initiate Kaizen Workshop
  • 137. Pair up 2 for each process
  • 138. One times w/ stopwatch, other jots down times
  • 139. Verify if Cycle Time meets TaktTime
  • 143. If equipment seems to lack in capacity, use Capacity Sheet to define problems
  • 144. Fill out StandardisedWork Combination Sheet with best times
  • 145. Note long times on Combination Sheet, there are opportunities for Kaizen
  • 146. Continue to observe site, note problems on Kaizen Newspaper
  • 147. Try out ideas for kaizen immediately, verify results
  • 148. Prepare Kaizen Proposal Sheets for effective kaizen ideas
  • 151.
  • 152. 67 Lean - Tools 5S 7 W (Waste) Jidoka / Andon / PokaYoke / Mistake Proofing Single minute exchange of die (SMED) Standard Operating Proced-ures Kaizen Tools Kanban Total Preventa-tiveMainten-ance Takt time Through-put time Spaghetti diagram Value Stream Mapping Kaizen blitz or event
  • 153. 68 “If we don’t change our direction, we might end up where we’re headed.” - Chinese Proverb
  • 154. 69 Good Luck http://www.linkedin.com/in/anandsubramaniam

Notas do Editor

  1. Transition: A Kaizen event is a defined period of time set aside for continuous improvement. The goal is met by the team coming up with numerous small improvements that add up to one large change for the better for the area.There are many other names for a Kaizen event but they all mean the same thing.