POST TENSIONING
Review Session
Review Session
Objective: Performance through product quality, as
well as effective installation, supervision and inspection
to achieve a successful completion of a project.
Note: This review session will not replace the training
that an installation/ inspection agency receives.
AMSYSCO, Inc. is not responsible for the training of the
installation crew or individual associated with the field
installation of the post tensioning material.
I. Change in ACI Code
• To use an encapsulated system at all locations
on a commercial structure.
II. Upgrade of AMSYSCO’s Encapsulated System
• No grease at “dead ends” and stressing ends
• Grease to be filled in sleeves of intermediate
anchors
• Plastic sheathing remains intact within the
extended sleeve of the anchor
– Field labor savings
III. Post Tensioning Field Operations
A. Storage & Handling
• Store PT bundles off ground
• Cover with tarp
• If bundle is shrink wrapped, punch holes in
wrapping to allow air circulation
• Use nylon slings for handling
• Do not drag by “dead end”
• All material (PT tendons, anchors, wedges) to be
stored in dry environment
• Mill certification
• Calibration chart of stressing equipment
III. Post Tensioning Field Operations
B. Installation
• Attach stressing anchors and intermediate
anchors to bulkhead
• Position of anchor with regards to bulkhead
• Tendons installed in a curve
• Anchor/ pocket former
• Pocket former and grease – What type of
grease
• Use WD-40
Installation (cont.)
• Overlapping anchors
• Reverse curvature
• Position of support and backup bars
• Wobble
• Standard friction loss
• Can tendon be moved vertically or horizontally?
• Can anchor (position) be moved vertically or
horizontally?
III. Post Tensioning Field Operations
C. Stressing
• Wedge orientation
• Gage pressure – What does it mean?
• Position of stressing jack
• Location and positioning of pump
• Eye contact by pump operator
• One-way stressing
• Two-way stressing
• Multiple pulls (stressing) on the same tendon
Stressing (cont.)
• Paint marking (benchmark)
• Scale and guide for paint marker
• Measurement of elongation
• Recording of elongation
• Recording of gage pressure
• Recording notes in the Elongation Report
Stressing (cont.)
• Elongation tolerances
• Under elongation
• Over elongation
• Instant comparison of field elongations vs.
mathematical elongations
• Decision making if there is deviation and
resultant action
• Submitting elongation report to the Structural
Engineer of Record
III. Post Tensioning Field Operations
D. Stressing Equipment
• Keep equipment dry at all times
• Service and maintenance of the stressing
equipment
• Calibration chart
• Safety
• Log of service by the operator or contractor’s
appointed person
III. Post Tensioning Field Operations
E. Miscellaneous
• Hairline cracks in wedges
• Strand break
– Why strand can break at a lower pressure/ force below the
ultimate breaking level
• Unraveled strand
• Kink in strand
• Length of electric cord from stressing pump
• Stressing equipment and rain
• Lift off
• Detensioning
• When to detension
• Overstressing (5%)

Mais conteúdo relacionado

Mais procurados

Post tensioning شد لاحق - مسبق الاجهاد
Post tensioning   شد لاحق - مسبق الاجهادPost tensioning   شد لاحق - مسبق الاجهاد
Post tensioning شد لاحق - مسبق الاجهاد
Dr.Youssef Hammida
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Rahul
 

Mais procurados (20)

What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Final thesis presentation.
Final thesis presentation.Final thesis presentation.
Final thesis presentation.
 
Post tensioning شد لاحق - مسبق الاجهاد
Post tensioning   شد لاحق - مسبق الاجهادPost tensioning   شد لاحق - مسبق الاجهاد
Post tensioning شد لاحق - مسبق الاجهاد
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Post Tensioning
Post TensioningPost Tensioning
Post Tensioning
 
Pre stressed concrete
Pre stressed concretePre stressed concrete
Pre stressed concrete
 
comparison between Post tensioned slab and conventional slab
comparison between Post tensioned slab and conventional slabcomparison between Post tensioned slab and conventional slab
comparison between Post tensioned slab and conventional slab
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt Ltd
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Introduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete TechnologyIntroduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete Technology
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential building
 
Post tension tendon
Post tension tendonPost tension tendon
Post tension tendon
 
5. pre stressed & pre-cast members
5. pre stressed & pre-cast members5. pre stressed & pre-cast members
5. pre stressed & pre-cast members
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Post tensioned (PT) slabs
Post tensioned (PT) slabsPost tensioned (PT) slabs
Post tensioned (PT) slabs
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
 

Destaque

OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deck
AMSYSCO Inc.
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post Tensioning
AMSYSCO Inc.
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabs
CCL Concrete
 

Destaque (15)

CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-TensioningCTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
 
OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deck
 
What Could You Buy For $263 Trillion
What Could You Buy For $263 TrillionWhat Could You Buy For $263 Trillion
What Could You Buy For $263 Trillion
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post Tensioning
 
Case Study - One Eleven Tower
Case Study - One Eleven TowerCase Study - One Eleven Tower
Case Study - One Eleven Tower
 
Case Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldCase Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and Field
 
Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)
 
Build for You
Build for YouBuild for You
Build for You
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabs
 
Minnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post TensioningMinnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post Tensioning
 
Post operative electron beam therapy for keloids by loreh peter
Post operative electron beam therapy for keloids by loreh peterPost operative electron beam therapy for keloids by loreh peter
Post operative electron beam therapy for keloids by loreh peter
 
The Importance of Unbonded Field Certification
The Importance of Unbonded Field CertificationThe Importance of Unbonded Field Certification
The Importance of Unbonded Field Certification
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab design
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 

Semelhante a Post Tensioning Review Session for Installers

Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
Sandeep Jain
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
zul husni
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
William York
 

Semelhante a Post Tensioning Review Session for Installers (20)

Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
 
Scaffold safe work method statement
Scaffold safe work method statementScaffold safe work method statement
Scaffold safe work method statement
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
safety while prestressed concrete
safety while prestressed concretesafety while prestressed concrete
safety while prestressed concrete
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard Chitty
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 
Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...
 
CS S3
CS S3CS S3
CS S3
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
 
Tire Testing Applications & Solutions
Tire Testing Applications & SolutionsTire Testing Applications & Solutions
Tire Testing Applications & Solutions
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Locating and clamping devices.pptx
Locating and clamping devices.pptxLocating and clamping devices.pptx
Locating and clamping devices.pptx
 
apm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.pptapm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.ppt
 

Mais de AMSYSCO Inc.

ENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan Condos
AMSYSCO Inc.
 
ENR Article; New Guthrie Theater & Garage
ENR Article;  New Guthrie Theater & GarageENR Article;  New Guthrie Theater & Garage
ENR Article; New Guthrie Theater & Garage
AMSYSCO Inc.
 
PTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkPTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The Park
AMSYSCO Inc.
 
ENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport Garage
AMSYSCO Inc.
 

Mais de AMSYSCO Inc. (14)

Concrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay InfrastructureConcrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay Infrastructure
 
AMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall BuildingsAMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall Buildings
 
PTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavementPTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavement
 
Case Study – Social Media Small Business
Case Study – Social Media Small BusinessCase Study – Social Media Small Business
Case Study – Social Media Small Business
 
2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards
 
2008 PTI Awards Booklet
2008 PTI Awards Booklet2008 PTI Awards Booklet
2008 PTI Awards Booklet
 
White paper - Encapsulated Post Tensioned Concrete
White paper -  Encapsulated Post Tensioned ConcreteWhite paper -  Encapsulated Post Tensioned Concrete
White paper - Encapsulated Post Tensioned Concrete
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
 
Parking Today article: Louisville Arena
Parking Today article: Louisville ArenaParking Today article: Louisville Arena
Parking Today article: Louisville Arena
 
ENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan Condos
 
ENR Article; New Guthrie Theater & Garage
ENR Article;  New Guthrie Theater & GarageENR Article;  New Guthrie Theater & Garage
ENR Article; New Guthrie Theater & Garage
 
PTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkPTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The Park
 
ENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport Garage
 
Amsysco Brochure
Amsysco BrochureAmsysco Brochure
Amsysco Brochure
 

Último

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 

Post Tensioning Review Session for Installers

  • 2. Review Session Objective: Performance through product quality, as well as effective installation, supervision and inspection to achieve a successful completion of a project. Note: This review session will not replace the training that an installation/ inspection agency receives. AMSYSCO, Inc. is not responsible for the training of the installation crew or individual associated with the field installation of the post tensioning material.
  • 3. I. Change in ACI Code • To use an encapsulated system at all locations on a commercial structure.
  • 4. II. Upgrade of AMSYSCO’s Encapsulated System • No grease at “dead ends” and stressing ends • Grease to be filled in sleeves of intermediate anchors • Plastic sheathing remains intact within the extended sleeve of the anchor – Field labor savings
  • 5. III. Post Tensioning Field Operations A. Storage & Handling • Store PT bundles off ground • Cover with tarp • If bundle is shrink wrapped, punch holes in wrapping to allow air circulation • Use nylon slings for handling • Do not drag by “dead end” • All material (PT tendons, anchors, wedges) to be stored in dry environment • Mill certification • Calibration chart of stressing equipment
  • 6. III. Post Tensioning Field Operations B. Installation • Attach stressing anchors and intermediate anchors to bulkhead • Position of anchor with regards to bulkhead • Tendons installed in a curve • Anchor/ pocket former • Pocket former and grease – What type of grease • Use WD-40
  • 7. Installation (cont.) • Overlapping anchors • Reverse curvature • Position of support and backup bars • Wobble • Standard friction loss • Can tendon be moved vertically or horizontally? • Can anchor (position) be moved vertically or horizontally?
  • 8. III. Post Tensioning Field Operations C. Stressing • Wedge orientation • Gage pressure – What does it mean? • Position of stressing jack • Location and positioning of pump • Eye contact by pump operator • One-way stressing • Two-way stressing • Multiple pulls (stressing) on the same tendon
  • 9. Stressing (cont.) • Paint marking (benchmark) • Scale and guide for paint marker • Measurement of elongation • Recording of elongation • Recording of gage pressure • Recording notes in the Elongation Report
  • 10. Stressing (cont.) • Elongation tolerances • Under elongation • Over elongation • Instant comparison of field elongations vs. mathematical elongations • Decision making if there is deviation and resultant action • Submitting elongation report to the Structural Engineer of Record
  • 11. III. Post Tensioning Field Operations D. Stressing Equipment • Keep equipment dry at all times • Service and maintenance of the stressing equipment • Calibration chart • Safety • Log of service by the operator or contractor’s appointed person
  • 12. III. Post Tensioning Field Operations E. Miscellaneous • Hairline cracks in wedges • Strand break – Why strand can break at a lower pressure/ force below the ultimate breaking level • Unraveled strand • Kink in strand • Length of electric cord from stressing pump • Stressing equipment and rain • Lift off • Detensioning • When to detension • Overstressing (5%)