M2 update 11 21
1. Magento 2 Status
Execution Timeline
Tracks
Product
Status
Milestones
•
11/22 M3 Grooming complete
•
Notes/ Risks
•
12/13 MLS Code Complete
POC service layer and DB access need to proceed longer to gain insight
Design
Engineering
Quality
•
•
Defect count high
Automation
November 22, 2013
1
2. Program Items
Task/issue
Description
Issue / Notes
Owner(s)
Resolution
Dates
UX Design
Grooming
Milestone 2
Design epics prioritized, estimated for
Milestone 2
•
Groom
• Admin Panel 80%
• Patterns 100%
• Luma 70%
•
Jonathon/Priya
nka/PMO
•
•
10/18
11/8
1.X Code
merge Plan for
M3
Plan for code merging features/ fixes
forward
•
•
•
Andrew/Dhiraj
•
12/1
•
Delayed until Milestone 3
1.13 plan needs to be coordinated
with Mage 2
Scope determined 11/25
Roadmap
Schedule
High level Roadmap to deliver Developer
Beta
•
Need Final Scope and estimated
•
Tom
•
•
•
10/25
11/8
11/21
Quality for
Milestone 2
and beyond
We need to improve visibility into testing
•
•
•
•
•
•
Detailed Test Plan
Test Coverage
Automation plan
Metrics
Release Criteria
Scope of defects to be addressed
•
Tymur /Ahrey
•
11/1
Outsource
Jquery
RFP process for Jquery work
•
•
Evaluation of vendors responses
Selection by EOW
•
Dhiraj
•
11/15
Responsive
Web Design
Outsource Responsive Web Design
•
•
Vendor Selection in progress
Tracking as part of 1.13
•
Andrew
Magento 2 State of the Delivery
2
9. Proposed Release Timeline
• Scope needs to be finalized
• The table on the right projects the “size of the content”
• Several Epics are still not estimated
• Defects have not be accounted for in the estimated
Epics in Milestone 3 split between 3 and 4.
Row Labels
Sum of Epic Points Sum of DevDays
Milestone1
109
1286
Milestone2
178
2212
Milestone3
135
1835
Milestone4
160
1850
Removed from M3
61
659
Grand Total
643
7842
November 22, 2013
9