Magento 2 Status

Execution Timeline

Tracks
Product

Status

Milestones
•

11/22 M3 Grooming complete

•

Notes/ Risks
•

12/13 MLS Code Complete

POC service layer and DB access need to proceed longer to gain insight

Design
Engineering

Quality

•
•

Defect count high
Automation

November 22, 2013

1
Program Items
Task/issue

Description

Issue / Notes

Owner(s)

Resolution
Dates

UX Design
Grooming
Milestone 2

Design epics prioritized, estimated for
Milestone 2

•

Groom
• Admin Panel 80%
• Patterns 100%
• Luma 70%

•

Jonathon/Priya
nka/PMO

•
•

10/18
11/8

1.X Code
merge Plan for
M3

Plan for code merging features/ fixes
forward

•
•

•

Andrew/Dhiraj

•

12/1

•

Delayed until Milestone 3
1.13 plan needs to be coordinated
with Mage 2
Scope determined 11/25

Roadmap
Schedule

High level Roadmap to deliver Developer
Beta

•

Need Final Scope and estimated

•

Tom

•
•
•

10/25
11/8
11/21

Quality for
Milestone 2
and beyond

We need to improve visibility into testing

•
•
•
•
•
•

Detailed Test Plan
Test Coverage
Automation plan
Metrics
Release Criteria
Scope of defects to be addressed

•

Tymur /Ahrey

•

11/1

Outsource
Jquery

RFP process for Jquery work

•
•

Evaluation of vendors responses
Selection by EOW

•

Dhiraj

•

11/15

Responsive
Web Design

Outsource Responsive Web Design

•
•

Vendor Selection in progress
Tracking as part of 1.13

•

Andrew

Magento 2 State of the Delivery

2
Overall Version Burn-up

Friday, November 22, 2013

3
Team SP Projected Completion
Team

Committed
SP

Projected
At 12/13

Overall
Arctic Owls
Dragons
Extensibility
Firedrakes
Folks
Goinc
MPI
Polar Seals
South
Tango
Troll
UXMen
UX @PM
Voodoo
Web Dev
Unassigned

1745.6
80.5
66.5
50 61
105 97
96.5
80
36
134 118
80
90
50
88
410.5
36
181
14.5 25.5

1654 1498
71 83
65 54
56 52
POC
130 114
106 86
70 78
47 41
163 142
95 78
95 107
55 58
130 105
196
24 19
POC
248 214
14.5 25.5 Git hub pull request

Mid-Sprint skews the projections

Notes

Friday, November 22, 2013

4
Epics
Epic ID

Description

Epic Report

Progress in SP

MAGETWO-14591

Modularity: "App" Component

Epic Report

Notes

47.5/68.5
47.5/68.5

MAGETWO-14593

Modularity: "View" component

Epic Report

42/58
5058

MAGETWO-971

Modularity: Backend

Epic Report

23/33.5
23.5/30

MAGETWO-11098

Modularity: Other Core Framework Components

Epic Report

63/83
63/87

MAGETWO-13164

Update Themes in M2

Epic Report

105/126
113/126

MAGETWO-14074

Basic Acceptance Functional Test Suite

Epic Report

29/29

MAGETWO-10852

Public Github Support

Epic Report

11/25
16/25

MAGETWO-11293

Regular GitHub Pull Requests Processing

Epic Report

5/32
14/32

MAGETWO-10867

Optimizations in base templates (phtml files in M2

Epic Report

0/71

Epic Report

Product Removed this epic from Milestone 2

98/197.5

modules)
MAGETWO-4017

Fixing Outstanding Bugs (Milestone2)

114/197.5
MAGETWO-14380

Tech Debt (Milestone 2)

Epic Report

43/53
48/53

MAGETWO-14239

Layout Improvements (Milestone 2)

Epic Report

29/29

MAGETWO-11757

Magento_Filesystem Library

Epic Report

16/56
21/48

Friday, November 22, 2013

5
Epics
Epic ID

Description

Report

Progress in SP

MAGETWO-11242

Web API Framework: Authorization [c2]

Epic Report

Notes

14/51
19/51

MAGETWO-9996

Patterns

Epic Report

91/99
91/99

MAGETWO-11046

Luma Reference Responsive Theme

Epic Report

29/149
22/154

MAGETWO-15464

Improvements and fixes on Admin Panel (UX)

Epic Report

13/55
21/55

MAGETWO-15216

Twig Template Engine Removal

Epic Report

3.5/3.5

MAGETWO-4163

Modularity: Application Areas Rework

Epic Report

20/29
20/29

MAGETWO-14077

Functional automated test coverage on end-

Epic Report

32/188

to-end scenarios
Benchmarking process and environment using Epic Report

20/41

LVS

MAGETWO-10555

34/159

33/46

MAGETWO-12230

No Direct Code Execution from Layout XML

Epic report

13/13

MAGETWO-10854

[DOC] Documentation Support

Epic Report

0/0

MAGETWO-12738

Regression Testing Activities (QA)

Epic Report

MAGETWO-11919

Admin Panel Look & Feel Consistency (UX)

Epic Report

Support stories
Support stories

0/123
0/123

MAGETWO-11858

Digital Pattern Library (UX)

Epic Report

0/26

Moved to Milestone 3 by PM

MAGETWO-15925

Service Strategy Validation (Prototype

Epic Report

26/49

POC – the SP will change

Customer Module)
MAGETWO-16044

Data Access Layer Prototype

30/59
Epic Report

8/31

PCO– the SP will change

8/31

Friday, November 22, 2013

6
Appendix

Presentation Title Goes Here
7
Quality
Defect Trend

1200

1000

436
420
429
423
417
422

600

338

400

200

195
202
213
219
224
243
255
279

Number of Defects

800

898
863
828
793
758
723
688
653
618
583
568
548
513
495
478
443
408
373
338
303
268
233
198
163
128
93

Find&Fix 35/70 Week
Actual Open
Linear (Actual Open)

58
23

0
8/4/13

9/4/13

10/4/13

11/4/13

12/4/13

1/4/14

2/4/14

3/4/14

4/4/14

5/4/14

6/4/14

Friday, November 22, 2013

8
Proposed Release Timeline

• Scope needs to be finalized
• The table on the right projects the “size of the content”
• Several Epics are still not estimated
• Defects have not be accounted for in the estimated

Epics in Milestone 3 split between 3 and 4.
Row Labels
Sum of Epic Points Sum of DevDays
Milestone1
109
1286
Milestone2
178
2212
Milestone3
135
1835
Milestone4
160
1850
Removed from M3
61
659
Grand Total
643
7842

November 22, 2013

9

More Related Content

Similar to M2 update 11 21

Issue tracking system
Issue tracking systemIssue tracking system
Issue tracking system
dharm18
 

Similar to M2 update 11 21 (20)

Feature driven development
Feature driven developmentFeature driven development
Feature driven development
 
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
 
ELK - Optimizations & Updates
ELK - Optimizations & UpdatesELK - Optimizations & Updates
ELK - Optimizations & Updates
 
CIMtrek migrator to share point user guide
CIMtrek migrator to share point user guideCIMtrek migrator to share point user guide
CIMtrek migrator to share point user guide
 
CIM UNIT 1.ppt
CIM UNIT 1.pptCIM UNIT 1.ppt
CIM UNIT 1.ppt
 
Mule soft meetup__adelaide_october_2020_final (2)
Mule soft meetup__adelaide_october_2020_final (2)Mule soft meetup__adelaide_october_2020_final (2)
Mule soft meetup__adelaide_october_2020_final (2)
 
Golive Presentation.pptx
Golive Presentation.pptxGolive Presentation.pptx
Golive Presentation.pptx
 
Issue tracking system
Issue tracking systemIssue tracking system
Issue tracking system
 
BTS Key Mgt
BTS Key MgtBTS Key Mgt
BTS Key Mgt
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Agile2015 short paper presentation: Development of Complex Software with Agil...
Agile2015 short paper presentation: Development of Complex Software with Agil...Agile2015 short paper presentation: Development of Complex Software with Agil...
Agile2015 short paper presentation: Development of Complex Software with Agil...
 
Test Metrics
Test MetricsTest Metrics
Test Metrics
 
Migration from Magento 1 to Magento 2, Why, When and How?
Migration from Magento 1 to Magento 2, Why, When and How?Migration from Magento 1 to Magento 2, Why, When and How?
Migration from Magento 1 to Magento 2, Why, When and How?
 
Convert Magento 1 Extensions to Magento 2
Convert Magento 1 Extensions to Magento 2Convert Magento 1 Extensions to Magento 2
Convert Magento 1 Extensions to Magento 2
 
Agile product design
Agile product designAgile product design
Agile product design
 
Ac2017 6. output based contracting
Ac2017   6. output based contractingAc2017   6. output based contracting
Ac2017 6. output based contracting
 
Issue Tracking System - My B.E. Project
Issue Tracking System - My B.E. ProjectIssue Tracking System - My B.E. Project
Issue Tracking System - My B.E. Project
 
2015 product
2015 product2015 product
2015 product
 
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
Solution Manager - SAP NW BW on HANA Setup Part 3 of 3 (Technical Monitoring ...
 

Recently uploaded

Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
panagenda
 

Recently uploaded (20)

Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Your enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4jYour enemies use GenAI too - staying ahead of fraud with Neo4j
Your enemies use GenAI too - staying ahead of fraud with Neo4j
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Google I/O Extended 2024 Warsaw
Google I/O Extended 2024 WarsawGoogle I/O Extended 2024 Warsaw
Google I/O Extended 2024 Warsaw
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfThe Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 

M2 update 11 21

  • 1. Magento 2 Status Execution Timeline Tracks Product Status Milestones • 11/22 M3 Grooming complete • Notes/ Risks • 12/13 MLS Code Complete POC service layer and DB access need to proceed longer to gain insight Design Engineering Quality • • Defect count high Automation November 22, 2013 1
  • 2. Program Items Task/issue Description Issue / Notes Owner(s) Resolution Dates UX Design Grooming Milestone 2 Design epics prioritized, estimated for Milestone 2 • Groom • Admin Panel 80% • Patterns 100% • Luma 70% • Jonathon/Priya nka/PMO • • 10/18 11/8 1.X Code merge Plan for M3 Plan for code merging features/ fixes forward • • • Andrew/Dhiraj • 12/1 • Delayed until Milestone 3 1.13 plan needs to be coordinated with Mage 2 Scope determined 11/25 Roadmap Schedule High level Roadmap to deliver Developer Beta • Need Final Scope and estimated • Tom • • • 10/25 11/8 11/21 Quality for Milestone 2 and beyond We need to improve visibility into testing • • • • • • Detailed Test Plan Test Coverage Automation plan Metrics Release Criteria Scope of defects to be addressed • Tymur /Ahrey • 11/1 Outsource Jquery RFP process for Jquery work • • Evaluation of vendors responses Selection by EOW • Dhiraj • 11/15 Responsive Web Design Outsource Responsive Web Design • • Vendor Selection in progress Tracking as part of 1.13 • Andrew Magento 2 State of the Delivery 2
  • 3. Overall Version Burn-up Friday, November 22, 2013 3
  • 4. Team SP Projected Completion Team Committed SP Projected At 12/13 Overall Arctic Owls Dragons Extensibility Firedrakes Folks Goinc MPI Polar Seals South Tango Troll UXMen UX @PM Voodoo Web Dev Unassigned 1745.6 80.5 66.5 50 61 105 97 96.5 80 36 134 118 80 90 50 88 410.5 36 181 14.5 25.5 1654 1498 71 83 65 54 56 52 POC 130 114 106 86 70 78 47 41 163 142 95 78 95 107 55 58 130 105 196 24 19 POC 248 214 14.5 25.5 Git hub pull request Mid-Sprint skews the projections Notes Friday, November 22, 2013 4
  • 5. Epics Epic ID Description Epic Report Progress in SP MAGETWO-14591 Modularity: "App" Component Epic Report Notes 47.5/68.5 47.5/68.5 MAGETWO-14593 Modularity: "View" component Epic Report 42/58 5058 MAGETWO-971 Modularity: Backend Epic Report 23/33.5 23.5/30 MAGETWO-11098 Modularity: Other Core Framework Components Epic Report 63/83 63/87 MAGETWO-13164 Update Themes in M2 Epic Report 105/126 113/126 MAGETWO-14074 Basic Acceptance Functional Test Suite Epic Report 29/29 MAGETWO-10852 Public Github Support Epic Report 11/25 16/25 MAGETWO-11293 Regular GitHub Pull Requests Processing Epic Report 5/32 14/32 MAGETWO-10867 Optimizations in base templates (phtml files in M2 Epic Report 0/71 Epic Report Product Removed this epic from Milestone 2 98/197.5 modules) MAGETWO-4017 Fixing Outstanding Bugs (Milestone2) 114/197.5 MAGETWO-14380 Tech Debt (Milestone 2) Epic Report 43/53 48/53 MAGETWO-14239 Layout Improvements (Milestone 2) Epic Report 29/29 MAGETWO-11757 Magento_Filesystem Library Epic Report 16/56 21/48 Friday, November 22, 2013 5
  • 6. Epics Epic ID Description Report Progress in SP MAGETWO-11242 Web API Framework: Authorization [c2] Epic Report Notes 14/51 19/51 MAGETWO-9996 Patterns Epic Report 91/99 91/99 MAGETWO-11046 Luma Reference Responsive Theme Epic Report 29/149 22/154 MAGETWO-15464 Improvements and fixes on Admin Panel (UX) Epic Report 13/55 21/55 MAGETWO-15216 Twig Template Engine Removal Epic Report 3.5/3.5 MAGETWO-4163 Modularity: Application Areas Rework Epic Report 20/29 20/29 MAGETWO-14077 Functional automated test coverage on end- Epic Report 32/188 to-end scenarios Benchmarking process and environment using Epic Report 20/41 LVS MAGETWO-10555 34/159 33/46 MAGETWO-12230 No Direct Code Execution from Layout XML Epic report 13/13 MAGETWO-10854 [DOC] Documentation Support Epic Report 0/0 MAGETWO-12738 Regression Testing Activities (QA) Epic Report MAGETWO-11919 Admin Panel Look & Feel Consistency (UX) Epic Report Support stories Support stories 0/123 0/123 MAGETWO-11858 Digital Pattern Library (UX) Epic Report 0/26 Moved to Milestone 3 by PM MAGETWO-15925 Service Strategy Validation (Prototype Epic Report 26/49 POC – the SP will change Customer Module) MAGETWO-16044 Data Access Layer Prototype 30/59 Epic Report 8/31 PCO– the SP will change 8/31 Friday, November 22, 2013 6
  • 8. Quality Defect Trend 1200 1000 436 420 429 423 417 422 600 338 400 200 195 202 213 219 224 243 255 279 Number of Defects 800 898 863 828 793 758 723 688 653 618 583 568 548 513 495 478 443 408 373 338 303 268 233 198 163 128 93 Find&Fix 35/70 Week Actual Open Linear (Actual Open) 58 23 0 8/4/13 9/4/13 10/4/13 11/4/13 12/4/13 1/4/14 2/4/14 3/4/14 4/4/14 5/4/14 6/4/14 Friday, November 22, 2013 8
  • 9. Proposed Release Timeline • Scope needs to be finalized • The table on the right projects the “size of the content” • Several Epics are still not estimated • Defects have not be accounted for in the estimated Epics in Milestone 3 split between 3 and 4. Row Labels Sum of Epic Points Sum of DevDays Milestone1 109 1286 Milestone2 178 2212 Milestone3 135 1835 Milestone4 160 1850 Removed from M3 61 659 Grand Total 643 7842 November 22, 2013 9