Chapter 15 Materials Requirements Planning
Material Requirements Planning Defined ,[object Object],[object Object],[object Object],[object Object]
Example of MRP Logic and Product Structure Tree Product Structure Tree for Assembly A Lead Times A 1 day B  2 days C 1 day D  3 days E 4 days F 1 day Total Unit Demand Day 10    50 A Day 8   20 B (Spares) Day 6  15 D (Spares) Given the  product structure tree  for “A” and the lead time and demand information below, provide a materials requirements plan that defines the number of units of each component and when they will be needed B(4) E(1) D(2) C(2) F(2) D(3) A
First, the number of units of “A” are scheduled backwards to allow for their lead time.  So, in the materials requirement plan below, we have to place an order for 50 units of “A” on the 9 th  day to receive them on day 10. LT = 1 day
Next, we need to start scheduling the components that make up “A”.  In the case of component “B” we need 4 B’s for each A.  Since we need 50 A’s, that means 200 B’s.  And again, we back the schedule up for the necessary 2 days of lead time. B(4) E(1) D(2) C(2) F(2) D(3) A Spares LT = 2 4x50=200
Finally, repeating the process for all components, we have the final materials requirements plan: ,[object Object],B(4) E(1) D(2) C(2) F(2) D(3) A 40 + 15 spares Part D: Day 6
Master Production Schedule (MPS) ,[object Object],Aggregate Plan (Product Groups) MPS (Specific End Items)
Types of Time Fences ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Example of Time Fences Exhibit 15.5 8 15 26 Weeks Frozen Moderately Firm Flexible Firm Customer Orders Forecast and available capacity Capacity
Material Requirements Planning System ,[object Object],[object Object],[object Object],[object Object]
From Exhibit 15.6 ,[object Object],Firm orders  from known customers Forecasts of demand  from random customers Aggregate product plan Bill of material file Engineering design changes Inventory record file Inventory transactions Master production Schedule (MPS) Primary reports Secondary reports Planned order schedule for inventory and production control Exception reports Planning reports Reports for performance control Material planning (MRP  computer  program)
Bill of Materials (BOM) File A Complete Product Description ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Inventory Records File ,[object Object],[object Object],[object Object],[object Object]
Primary MRP Reports ,[object Object],[object Object],[object Object],[object Object],[object Object]
Secondary MRP Reports ,[object Object],[object Object],[object Object]
Additional MRP Scheduling Terminology ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MRP Example Requirements include 95 units (80 firm orders and 15 forecast) of X in week 10 A(2) B(1) D(5) C(2) X C(3)
A(2) X It takes 2 A’s for each X
B(1) A(2) X It takes 1 B for each X
A(2) B(1) X C(3) It takes 3 C’s for each A
A(2) B(1) C(2) X C(3) It takes 2 C’s for each B
A(2) B(1) D(5) C(2) X C(3) It takes 5 D’s for each B
Closed Loop MRP Production Planning Master Production Scheduling Material Requirements Planning Capacity Requirements Planning Realistic? No Feedback Execute: Capacity Plans Material Plans Yes Feedback
Manufacturing Resource Planning  (MRP II) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lot Sizing in MRP Programs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Akash Maurya
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemYash Dave
 
Production planning and scheduling
Production planning and schedulingProduction planning and scheduling
Production planning and schedulingNew Nabin Shrestha
 
Ops management lecture 4 process design & strategy
Ops management lecture 4 process design & strategyOps management lecture 4 process design & strategy
Ops management lecture 4 process design & strategyjillmitchell8778
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource PlanningBiswajit Ghosh
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Akash Maurya
 
Cellular LayOut
Cellular LayOutCellular LayOut
Cellular LayOutFahad Ali
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production schedulingmrinalmanik64
 
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectImprove On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectMahit Ohri
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Mahibur Rahman
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2Dr. Mahmoud Al-Naimi
 

Mais procurados (20)

MRP CASE STUDY
MRP CASE STUDYMRP CASE STUDY
MRP CASE STUDY
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) system
 
Production planning and scheduling
Production planning and schedulingProduction planning and scheduling
Production planning and scheduling
 
Ops management lecture 4 process design & strategy
Ops management lecture 4 process design & strategyOps management lecture 4 process design & strategy
Ops management lecture 4 process design & strategy
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Man and machine chart
Man and machine chartMan and machine chart
Man and machine chart
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
MRP and ERP
MRP and ERPMRP and ERP
MRP and ERP
 
Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009Mrp 1 deepak 12mt07ind009
Mrp 1 deepak 12mt07ind009
 
Cellular LayOut
Cellular LayOutCellular LayOut
Cellular LayOut
 
Ch17 Mrp
Ch17  MrpCh17  Mrp
Ch17 Mrp
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production scheduling
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectImprove On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2
 

Destaque

PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITYPRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITYTrinity Dwarka
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement PlanningPritesh Mogane
 
MIS - IT Infrastructure (Part I)
MIS  - IT Infrastructure (Part I)MIS  - IT Infrastructure (Part I)
MIS - IT Infrastructure (Part I)Soetam Rizky
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operationskahogan62
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Thomas Tanel
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1Craig Brown
 
Types of production processes
Types of production processesTypes of production processes
Types of production processesAnupam Kumar
 
Advanced Planning from Standard MPS/MRP
Advanced Planning from Standard MPS/MRPAdvanced Planning from Standard MPS/MRP
Advanced Planning from Standard MPS/MRPInSync Conference
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationDelwin Arikatt
 
Topic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial StatementsTopic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial Statementsguest441011
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesvideoaakash15
 
SAP SD Practice Exam
SAP SD Practice ExamSAP SD Practice Exam
SAP SD Practice ExamIT LearnMore
 
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45Intergen
 
What Is Rough Cut Capacity Planning?
What Is Rough Cut Capacity Planning? What Is Rough Cut Capacity Planning?
What Is Rough Cut Capacity Planning? AvercastMarketing
 
Ppt Slides On Tps,Dps & Eps
Ppt Slides On Tps,Dps & EpsPpt Slides On Tps,Dps & Eps
Ppt Slides On Tps,Dps & Epsnayanav
 

Destaque (20)

Ch16 mrp
Ch16 mrpCh16 mrp
Ch16 mrp
 
PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITYPRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
MIS - IT Infrastructure (Part I)
MIS  - IT Infrastructure (Part I)MIS  - IT Infrastructure (Part I)
MIS - IT Infrastructure (Part I)
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operations
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management
 
Information System Plan
Information System PlanInformation System Plan
Information System Plan
 
Risk management
Risk managementRisk management
Risk management
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Types of production processes
Types of production processesTypes of production processes
Types of production processes
 
Chapter three com 6 (1)
Chapter three com 6 (1)Chapter three com 6 (1)
Chapter three com 6 (1)
 
MRP 10 point plan
MRP 10 point planMRP 10 point plan
MRP 10 point plan
 
Advanced Planning from Standard MPS/MRP
Advanced Planning from Standard MPS/MRPAdvanced Planning from Standard MPS/MRP
Advanced Planning from Standard MPS/MRP
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Topic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial StatementsTopic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial Statements
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
 
SAP SD Practice Exam
SAP SD Practice ExamSAP SD Practice Exam
SAP SD Practice Exam
 
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
 
What Is Rough Cut Capacity Planning?
What Is Rough Cut Capacity Planning? What Is Rough Cut Capacity Planning?
What Is Rough Cut Capacity Planning?
 
Ppt Slides On Tps,Dps & Eps
Ppt Slides On Tps,Dps & EpsPpt Slides On Tps,Dps & Eps
Ppt Slides On Tps,Dps & Eps
 

Semelhante a Material Requisite Planning (20)

Mrpmep
MrpmepMrpmep
Mrpmep
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
 
Scps -materials_requirements_planning
Scps  -materials_requirements_planningScps  -materials_requirements_planning
Scps -materials_requirements_planning
 
Session 5
Session 5Session 5
Session 5
 
Chapter 5_OM
Chapter 5_OMChapter 5_OM
Chapter 5_OM
 
MRP in English
MRP in EnglishMRP in English
MRP in English
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planning
 
Planned order release
Planned order releasePlanned order release
Planned order release
 
samer amale mrp presentation
samer amale   mrp presentationsamer amale   mrp presentation
samer amale mrp presentation
 
5089529.ppt
5089529.ppt5089529.ppt
5089529.ppt
 
Mrp
MrpMrp
Mrp
 
Mrp
MrpMrp
Mrp
 
MRP
MRP MRP
MRP
 
Resource Requirement Planning
Resource Requirement PlanningResource Requirement Planning
Resource Requirement Planning
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou PlanninMrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
 
Capacity Planning Product and operation management
Capacity Planning Product and operation managementCapacity Planning Product and operation management
Capacity Planning Product and operation management
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 

Mais de ajithsrc

Business Plan On Retail Mall
Business Plan On Retail MallBusiness Plan On Retail Mall
Business Plan On Retail Mallajithsrc
 
New Ethics 5
New Ethics 5New Ethics 5
New Ethics 5ajithsrc
 
New Ethics 4
New Ethics 4New Ethics 4
New Ethics 4ajithsrc
 
Valuation Of S Ecurities
Valuation Of S EcuritiesValuation Of S Ecurities
Valuation Of S Ecuritiesajithsrc
 
Ajith Resume
Ajith ResumeAjith Resume
Ajith Resumeajithsrc
 
Operations Research
Operations ResearchOperations Research
Operations Researchajithsrc
 
Evolution Of Operations Management
Evolution Of Operations ManagementEvolution Of Operations Management
Evolution Of Operations Managementajithsrc
 
Textile Industry
Textile IndustryTextile Industry
Textile Industryajithsrc
 
Syndicate 1 Tqm
Syndicate 1 TqmSyndicate 1 Tqm
Syndicate 1 Tqmajithsrc
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jitajithsrc
 
Stevenson9e Ch04
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04ajithsrc
 

Mais de ajithsrc (20)

Business Plan On Retail Mall
Business Plan On Retail MallBusiness Plan On Retail Mall
Business Plan On Retail Mall
 
Ethics
EthicsEthics
Ethics
 
Ethics
EthicsEthics
Ethics
 
Ethics
EthicsEthics
Ethics
 
New Ethics 5
New Ethics 5New Ethics 5
New Ethics 5
 
New Ethics 4
New Ethics 4New Ethics 4
New Ethics 4
 
Valuation Of S Ecurities
Valuation Of S EcuritiesValuation Of S Ecurities
Valuation Of S Ecurities
 
Transport
TransportTransport
Transport
 
Inflation
InflationInflation
Inflation
 
Auto
AutoAuto
Auto
 
Ajith Resume
Ajith ResumeAjith Resume
Ajith Resume
 
Ksrtc
KsrtcKsrtc
Ksrtc
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
Evolution Of Operations Management
Evolution Of Operations ManagementEvolution Of Operations Management
Evolution Of Operations Management
 
Tqm Tool2
Tqm Tool2Tqm Tool2
Tqm Tool2
 
Tqm Tool1
Tqm Tool1Tqm Tool1
Tqm Tool1
 
Textile Industry
Textile IndustryTextile Industry
Textile Industry
 
Syndicate 1 Tqm
Syndicate 1 TqmSyndicate 1 Tqm
Syndicate 1 Tqm
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
Stevenson9e Ch04
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04
 

Material Requisite Planning

  • 1. Chapter 15 Materials Requirements Planning
  • 2.
  • 3. Example of MRP Logic and Product Structure Tree Product Structure Tree for Assembly A Lead Times A 1 day B 2 days C 1 day D 3 days E 4 days F 1 day Total Unit Demand Day 10 50 A Day 8 20 B (Spares) Day 6 15 D (Spares) Given the product structure tree for “A” and the lead time and demand information below, provide a materials requirements plan that defines the number of units of each component and when they will be needed B(4) E(1) D(2) C(2) F(2) D(3) A
  • 4. First, the number of units of “A” are scheduled backwards to allow for their lead time. So, in the materials requirement plan below, we have to place an order for 50 units of “A” on the 9 th day to receive them on day 10. LT = 1 day
  • 5. Next, we need to start scheduling the components that make up “A”. In the case of component “B” we need 4 B’s for each A. Since we need 50 A’s, that means 200 B’s. And again, we back the schedule up for the necessary 2 days of lead time. B(4) E(1) D(2) C(2) F(2) D(3) A Spares LT = 2 4x50=200
  • 6.
  • 7.
  • 8.
  • 9. Example of Time Fences Exhibit 15.5 8 15 26 Weeks Frozen Moderately Firm Flexible Firm Customer Orders Forecast and available capacity Capacity
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. MRP Example Requirements include 95 units (80 firm orders and 15 forecast) of X in week 10 A(2) B(1) D(5) C(2) X C(3)
  • 18. A(2) X It takes 2 A’s for each X
  • 19. B(1) A(2) X It takes 1 B for each X
  • 20. A(2) B(1) X C(3) It takes 3 C’s for each A
  • 21. A(2) B(1) C(2) X C(3) It takes 2 C’s for each B
  • 22. A(2) B(1) D(5) C(2) X C(3) It takes 5 D’s for each B
  • 23. Closed Loop MRP Production Planning Master Production Scheduling Material Requirements Planning Capacity Requirements Planning Realistic? No Feedback Execute: Capacity Plans Material Plans Yes Feedback
  • 24.
  • 25.

Notas do Editor

  1. 3 3
  2. 4 4
  3. 5 5
  4. 6 6
  5. 7 7
  6. 8 8
  7. 9 9
  8. 10 10
  9. 11 11
  10. 12 12
  11. 13 13
  12. 14 14
  13. 15 15
  14. 15 15
  15. 19 19
  16. 18 18
  17. 21 21
  18. 21 21
  19. 21 21
  20. 21 21
  21. 21 21
  22. 22 22
  23. 23 23
  24. 23 23